You do not have enough permissions for this action.
You do not have enough permissions for this action.
You do not have enough permissions for this action.
You do not have enough permissions for this action.
You do not have enough permissions for this action.
#PO-153-7Mar19 IDI Mantenimiento ABS RF [ARL INDUSTRIAL SAC]
Items
| Name |
Qty |
Qty received |
Currency |
Agreed price |
Budget |
Active |
|
| #5722 - Espuma Expansible Cortafuego RF 120 (750ml) ---
|
6.00 |
6.00 |
PEN |
57.0000 |
UDT Proyecto ABS [445] |
Open |
|
|
|
| #3799 - Silicona sikaflex 11FC
|
8.00 |
8.00 |
PEN |
29.5000 |
UDT Proyecto ABS [445] |
Open |
|
|
|
| #2454 - Thiner estandar
|
1.00 |
1.00 |
PEN |
19.0000 |
UDT Proyecto ABS [445] |
Open |
|
|
|
| #7111 - Juego de macho M3 x 0.5 de 3 unidades
|
2.00 |
2.00 |
PEN |
87.5000 |
UDT Proyecto ABS [445] |
Open |
|
|
|
| #3706 - Sierra copa 22mm, 7/8pulg. m/BAHCO
|
2.00 |
2.00 |
PEN |
39.0000 |
UDT Proyecto ABS [445] |
Open |
|
|
|
| #7881 - Porta macho tipo T (M3 - 1/8")
|
2.00 |
2.00 |
PEN |
90.0000 |
UDT Proyecto ABS [445] |
Open |
|
|
|
| #7883 - Tornillos M3 x 10mm zincado con tuerca
|
600.00 |
600.00 |
PEN |
0.1200 |
UDT Proyecto ABS [445] |
Open |
|
|
|
| #4878 - Sierra copa 1 1/2plg.
|
1.00 |
1.00 |
PEN |
60.5000 |
UDT Proyecto ABS [445] |
Open |
|
|
|
Budgets List
| Name |
Currency |
Cost |
Currency |
Current Balance |
|
| UDT Proyecto ABS [445]
|
PEN |
1162.500000 |
USD |
2573.16 |
|
Total Cost
| Name |
Currency |
Total Cost |
|
| #PO-153-7Mar19 IDI Mantenimiento ABS RF [ARL INDUSTRIAL SAC]
|
PEN |
1162.500000 |
|