﻿id	summary	reporter	owner	description	type	status	priority	milestone	component	version	resolution	keywords	cc	parents
321	01 04 17:00 Imaging pre-amplifier maintenance finished	imanay	imanay	"Maintenance details:
1. Number of pre-amplifiers checked: 8 (Imaging field pre-amplifiers)
2. Internal connections and soldering checked.
3. Amplifier gain and bandwidth measured. These parameters were adjusted for some of them:

||= item=||=GAIN(dB)=||=BW(MHz)=||
||= A =||=31.05=||=9.34=||
||= B =||=31.15=||=7.66=||
||= C =||=30.81=||=9.93=||
||= D =||=30.97=||=5.38=||
||= E =||=30.25=||=8.65=||
||= F =||=30.80=||=9.31=||
||= G =||=31.72=||=7.24=||
||= H =||=45.85=||=8.47=||

Noise RTI's are atached as a result of the maintenance."	Reception	new	normal	2023 JULIA & Imaging	IMAGING			Maintenance		
