Timeline


and

Dec 21, 2017:

6:44 AM Ticket #1811 (19 Dec 20:00 Operation Resume) created by ryanque
Person in Charge: R. Yanque Experiment: ISR + Imaging 1) 08:00 - 20:00 2) …
6:42 AM Ticket #1810 (19 Dec 19:20 Noise levels) created by ryanque
08:03 EW Drift ChA 23.05 ChB 22.44 ChC 22.58 ChD …
6:17 AM Ticket #1809 (19 Dec 10:17 Faraday Processing stopped) created by ryanque
10:17 Faraday processing stopped 10:30 Faraday processing restarted
6:05 AM Ticket #1808 (19 Dec 18:41 Spark gap adjustments) created by ryanque
09:11 Spark gap adjustment 12:31 Spark gap adjustment 15:36 Spark gap …
6:03 AM Ticket #1807 (19 Dec 17:39 Faraday restart) created by ryanque
Faraday restart due to loss of sincronization
6:02 AM Ticket #1806 (19 Dec 17:33 Imaging on) created by ryanque
Imaging experiment starts
6:01 AM Ticket #1805 (19 Dec 17:32 Transmitter on) created by ryanque
13:18 Transmitter off 13:20 Trnasmitter on 17:29 Transmitter off 17:32 …
6:00 AM Ticket #1804 (19 Dec 12:06 Transmitter off) created by ryanque
Due to an arc in one of the 20 KV power line This was corrected 12:25 …

Dec 20, 2017:

5:29 AM Ticket #1803 (20 Dec 07:50 Operation Resume) created by imanay
Person in Charge: I. Manay. Experiment: ISR + Imaging 1) 20:00 - 08:00 2) …
4:46 AM Ticket #1802 (20 Dec 07:00 plots) created by imanay
4:42 AM Ticket #1801 (20 Dec 07:08 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 9 Kw Tx3 10 Kw Tx4 8 Kw D2 …
4:06 AM Ticket #1800 (20 Dec 06:26 Spark-gap adjustment) created by imanay
19 Dec, 21:29 Spark gaps adjustment 20 Dec, 00:34 Spark gaps adjustment 20 …
3:49 AM Ticket #1799 (20 Dec 06:00 stop of experiment) created by imanay
Imaging experiment was stopped

Dec 19, 2017:

9:32 PM Ticket #1798 (19 Dec 23:58 plots) created by imanay
8:40 PM Ticket #1797 (19 Dec 23:05 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 9 Kw Tx3 10 Kw Tx4 8 Kw D2 …
4:49 AM Ticket #1796 (19 Dec 06:05 Spark Gaps) created by abelleza
18 Dec 21:08 Spark Gaps Adjustment 19 Dec 00:08 Spark Gaps Adjustment 19 …
4:47 AM Ticket #1795 (17 Dec 05:32 Spark Gaps) created by abelleza
16 Dec 20:39 Spark Gaps Adjustment 16 Dec 23:31 Spark Gaps Adjustment 17 …
4:44 AM Ticket #1794 (19 Dec 07:10 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 +2.6 dBm Tx3 +6.4 dBm Tx4 +2.6 …
4:38 AM Ticket #1793 (18 Dec 11:59 plot) created by abelleza
18 Dec 11:59 plot

Dec 18, 2017:

8:35 PM Ticket #1792 (18 Dec 20:00 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +2.5 dBm Tx3 +6.2 dBm Tx4 +2.6 …
5:05 PM Ticket #1791 (18 Dec 19:30 Transmitter report) created by ryaya
09:00 TX Power sample (-70 dB coupling) Tx1 +2.6 dBm Tx3 +6.3 dBm Tx4 …
5:36 AM Ticket #1790 (18 Dec 08:00 Operation Resume) created by pcondor
Person in Charge: P. Condor. Experiment: EW Drifts-Faraday-Imaging 1) …
5:08 AM Ticket #1789 (18 Dec 07:30 Plots) created by pcondor
Plots of rtis, spectras and parameters.
4:56 AM Ticket #1788 (18 Dec 07:00 Transmitter Power Measurements) created by rtadeo
17/12/17 20:00 TX Power sample (-70 dB coupling) Tx1 +2.6 dBm Tx3 +6.2 dBm …
4:49 AM Ticket #1787 (18 Dec 06:06 Imaging off) created by pcondor
Imaging off
4:48 AM Ticket #1786 (18 Dec 06:05 Spark gaps adjustment) created by pcondor
17-12-2017 21:15 Spark gaps adjustment 18-12-2017 00:05 Spark gaps …
4:45 AM Ticket #1785 (18 Dec 07:00 Noise levels) created by pcondor
17-12-2017 22:50 EW DRIFTS A:22.21 B:21.49 C:22.28 D:21.71 FARADAY …

Dec 17, 2017:

9:58 PM Ticket #1784 (18 Dec 00:05 Plots) created by pcondor
Plots of rtis, spectras and parameters
5:18 PM Ticket #1783 (17 Dec 19:50 Operation Resume) created by imanay
Person in Charge: I. Manay. Experiment: ISR + Imaging 1) 08:00 - 20:00 2) …
5:14 PM Ticket #1782 (17 Dec 19:40 Transmitter report) created by ryaya
09:00 TX Power sample (-70 dB coupling) Tx1 +2.8 dBm Tx3 +6.3 dBm Tx4 …
4:21 PM Ticket #1781 (17 Dec 18:40 plots) created by imanay
4:11 PM Ticket #1780 (17 Dec 18:00 Imaging experiment is started) created by imanay
4:10 PM Ticket #1779 (17 Dec 18:00 Experiment without transmitters) created by imanay
Two main falls until 18h00: 1. From 08:22 to 08:27, Fail at transmitters. …
4:03 PM Ticket #1778 (17 Dec 18:00 Spark-gap adjustment) created by imanay
08:40 Spark gaps adjustment 11:32 Spark gaps adjustment 14:37 Spark gaps …
4:58 AM Ticket #1777 (17 Dec 07:00 Transmitter Power Measurements) created by rtadeo
20:00 TX Power sample (-70 dB coupling) Tx1 +2.8 dBm Tx3 +6.4 dBm Tx4 +2.9 …

Dec 16, 2017:

9:39 PM Ticket #1776 (16 Dec 11:59 plot) created by abelleza
16 Dec 11:59 plot
5:18 PM Ticket #1775 (16 Dic 20:00 Operation Resume) created by kkuyeng
Person in Charge: K.Kuyeng. Experiment: ISR + Imaging 1) 07:30 - 20:00 2) …
5:07 PM Ticket #1774 (16 Dec 19:34 Transmitter Failures) created by vquesada
12:15 RF control fails 17:28 Overcurrent in the Tx3 screen source
5:06 PM Ticket #1773 (16 Dic 07:00-20:00 Spark Gap calibración) created by kkuyeng
Spark Gap calibración 10:33 14:10 17:10
4:53 PM Ticket #1772 (16 Dic 18:09 Start Imaging) created by kkuyeng
Se inicia Imaging
4:52 PM Ticket #1771 (16 Dic 17:30 - 18:07 Fallal en TX) created by kkuyeng
No quería entrar el voltaje de alta
4:46 PM Ticket #1770 (16 Dic 12:15 - 12:55 Falla de control en TX) created by kkuyeng
Se ve que el control de la RF por PLC no est{a funcionando ya que hace que …
4:44 PM Ticket #1769 (16 Dic Arcos de malla en la antena) created by kkuyeng
09:38 y 10:05 se apaga un rato el transmisor para sacar la malla enredada …
4:36 PM Ticket #1768 (16 Dic 08:25 Faraday Restart) created by kkuyeng
Faraday había arrancado mal, se reinicia programa de adquisición.
4:35 PM Ticket #1767 (16 Dic 07:49 Start Experiment) created by kkuyeng
Luego de problemas con el divisor, se llega a arrancar el experimento.
4:33 PM Ticket #1766 (16 Dec 19:00 Transmitter Power Measurements) created by vquesada
06:54 LV ON 07:07 HV ON 07:45 TX Power sample (-70 dB coupling) Tx1 …

Dec 14, 2017:

3:10 PM Ticket #1765 (14 Dec 17:30 Log created) created by ryanque
Campaign: Convection Polar Cap (ISCOD) Mode: ISR + Imaging Starts: Sat 16 …
Note: See TracTimeline for information about the timeline view.