Timeline
Dec 19, 2017:
- 9:32 PM Ticket #1798 (19 Dec 23:58 plots) created by
- 8:40 PM Ticket #1797 (19 Dec 23:05 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 9 Kw Tx3 10 Kw Tx4 8 Kw D2 …
- 4:49 AM Ticket #1796 (19 Dec 06:05 Spark Gaps) created by
- 18 Dec 21:08 Spark Gaps Adjustment 19 Dec 00:08 Spark Gaps Adjustment 19 …
- 4:47 AM Ticket #1795 (17 Dec 05:32 Spark Gaps) created by
- 16 Dec 20:39 Spark Gaps Adjustment 16 Dec 23:31 Spark Gaps Adjustment 17 …
- 4:44 AM Ticket #1794 (19 Dec 07:10 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Tx1 +2.6 dBm Tx3 +6.4 dBm Tx4 +2.6 …
- 4:38 AM Ticket #1793 (18 Dec 11:59 plot) created by
- 18 Dec 11:59 plot
Dec 18, 2017:
- 8:35 PM Ticket #1792 (18 Dec 20:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +2.5 dBm Tx3 +6.2 dBm Tx4 +2.6 …
- 5:05 PM Ticket #1791 (18 Dec 19:30 Transmitter report) created by
- 09:00 TX Power sample (-70 dB coupling) Tx1 +2.6 dBm Tx3 +6.3 dBm Tx4 …
- 5:36 AM Ticket #1790 (18 Dec 08:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: EW Drifts-Faraday-Imaging 1) …
- 5:08 AM Ticket #1789 (18 Dec 07:30 Plots) created by
- Plots of rtis, spectras and parameters.
- 4:56 AM Ticket #1788 (18 Dec 07:00 Transmitter Power Measurements) created by
- 17/12/17 20:00 TX Power sample (-70 dB coupling) Tx1 +2.6 dBm Tx3 +6.2 dBm …
- 4:49 AM Ticket #1787 (18 Dec 06:06 Imaging off) created by
- Imaging off
- 4:48 AM Ticket #1786 (18 Dec 06:05 Spark gaps adjustment) created by
- 17-12-2017 21:15 Spark gaps adjustment 18-12-2017 00:05 Spark gaps …
- 4:45 AM Ticket #1785 (18 Dec 07:00 Noise levels) created by
- 17-12-2017 22:50 EW DRIFTS A:22.21 B:21.49 C:22.28 D:21.71 FARADAY …
Dec 17, 2017:
- 9:58 PM Ticket #1784 (18 Dec 00:05 Plots) created by
- Plots of rtis, spectras and parameters
- 5:18 PM Ticket #1783 (17 Dec 19:50 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: ISR + Imaging 1) 08:00 - 20:00 2) …
- 5:14 PM Ticket #1782 (17 Dec 19:40 Transmitter report) created by
- 09:00 TX Power sample (-70 dB coupling) Tx1 +2.8 dBm Tx3 +6.3 dBm Tx4 …
- 4:21 PM Ticket #1781 (17 Dec 18:40 plots) created by
- 4:11 PM Ticket #1780 (17 Dec 18:00 Imaging experiment is started) created by
- 4:10 PM Ticket #1779 (17 Dec 18:00 Experiment without transmitters) created by
- Two main falls until 18h00: 1. From 08:22 to 08:27, Fail at transmitters. …
- 4:03 PM Ticket #1778 (17 Dec 18:00 Spark-gap adjustment) created by
- 08:40 Spark gaps adjustment 11:32 Spark gaps adjustment 14:37 Spark gaps …
- 4:58 AM Ticket #1777 (17 Dec 07:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +2.8 dBm Tx3 +6.4 dBm Tx4 +2.9 …
Dec 16, 2017:
- 9:39 PM Ticket #1776 (16 Dec 11:59 plot) created by
- 16 Dec 11:59 plot
- 5:18 PM Ticket #1775 (16 Dic 20:00 Operation Resume) created by
- Person in Charge: K.Kuyeng. Experiment: ISR + Imaging 1) 07:30 - 20:00 2) …
- 5:07 PM Ticket #1774 (16 Dec 19:34 Transmitter Failures) created by
- 12:15 RF control fails 17:28 Overcurrent in the Tx3 screen source
- 5:06 PM Ticket #1773 (16 Dic 07:00-20:00 Spark Gap calibración) created by
- Spark Gap calibración 10:33 14:10 17:10
- 4:53 PM Ticket #1772 (16 Dic 18:09 Start Imaging) created by
- Se inicia Imaging
- 4:52 PM Ticket #1771 (16 Dic 17:30 - 18:07 Fallal en TX) created by
- No quería entrar el voltaje de alta
- 4:46 PM Ticket #1770 (16 Dic 12:15 - 12:55 Falla de control en TX) created by
- Se ve que el control de la RF por PLC no est{a funcionando ya que hace que …
- 4:44 PM Ticket #1769 (16 Dic Arcos de malla en la antena) created by
- 09:38 y 10:05 se apaga un rato el transmisor para sacar la malla enredada …
- 4:36 PM Ticket #1768 (16 Dic 08:25 Faraday Restart) created by
- Faraday había arrancado mal, se reinicia programa de adquisición.
- 4:35 PM Ticket #1767 (16 Dic 07:49 Start Experiment) created by
- Luego de problemas con el divisor, se llega a arrancar el experimento.
- 4:33 PM Ticket #1766 (16 Dec 19:00 Transmitter Power Measurements) created by
- 06:54 LV ON 07:07 HV ON 07:45 TX Power sample (-70 dB coupling) Tx1 …
Dec 14, 2017:
- 3:10 PM Ticket #1765 (14 Dec 17:30 Log created) created by
- Campaign: Convection Polar Cap (ISCOD) Mode: ISR + Imaging Starts: Sat 16 …