Timeline
Dec 14, 2017:
- 3:10 PM Ticket #1765 (14 Dec 17:30 Log created) created by
- Campaign: Convection Polar Cap (ISCOD) Mode: ISR + Imaging Starts: Sat 16 …
Nov 17, 2017:
- 5:26 PM Ticket #1764 (17 Nov 08:00 End Experiment) created by
- 08:00 se termina experimento 08:16 se prende Digisonda
- 5:25 PM Ticket #1763 (17 Nov 01:15 Noise decreased) created by
- 01:15 se bajó el nivel de ruido 1dB en todos los canales
- 5:24 PM Ticket #1762 (16 Nov 20:15 Noise increased) created by
- 20:15 En todos los canales subió el nivel de ruido 1dB aproximadamente
- 5:23 PM Ticket #1761 (16 Nov 16:30 Start Experiment) created by
- 5:21 PM Ticket #1760 (16 Nov 07:35 End Experiment) created by
- 5:20 PM Ticket #1759 (15 Nov 17:26 Start Experiment) created by
- Se observan interferencias tipo spikes en todo el rango de frecuencia. Se …
- 3:55 PM Ticket #1758 (15 Nov 07:50 End Expeirment) created by
- 07:50 Se observó que los sitemas estaban desfasados 10seg. Se aprovecho …
- 3:30 PM Ticket #1757 (14 Nov 16:33 Start Experiment) created by
- MIMO without TRs Driver 2 Tx RFA CodeA -> W14 module - only Tx Driver 4 …
- 3:26 PM Ticket #1756 (14 Nov 07:54 End Expeirment) created by
- 3:22 PM Ticket #1755 (14 Nov 05:15 - 07:15 Hydra pass) created by
- Drivers were off from 05:15 to 07:18. The devices were on after 07:18. …
- 3:19 PM Ticket #1754 (13 Nov 20:00 TR W15 failure) created by
- 20:00 Falla de TR de antena W15, se para transmision para reparar TR. …
- 3:14 PM Ticket #1753 (13 Nov 17:00 Start Experiment) created by
- Driver 2 Tx RFA CodeA -> Hysell module (Rx channel H) Driver 4 Tx RFB …
Nov 16, 2017:
- 8:24 AM Ticket #1752 (16 Nov 07:40 Plots) created by
- Plots
- 8:23 AM Ticket #1751 (16 Nov 08:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: MIMO 1) 20:00 - 08:00 2) …
- 8:18 AM Ticket #1750 (16 Nov 06:26 Transmitter on) created by
- Transmitter on
- 8:17 AM Ticket #1749 (16 Nov 05:07 Transmitter off) created by
- Transmitter off
- 2:17 AM Ticket #1748 (16 Nov 00:05 Plots) created by
- Plots of spectra and rti
Nov 15, 2017:
- 7:56 AM Ticket #1747 (15 Nov 07:10 Transmitter power) created by
- 05:20 transmitter power Dr2: -6.0 dBm (51Kw) Screen 600V Dr4: -6.2 dBm …
- 7:41 AM Ticket #1746 (15 Nov 07:00 plot) created by
- 7:38 AM Ticket #1745 (15 Nov 07:00 Temperature of connectors) created by
- Temperature of the RG218 connector at the six inch junction was measured: …
- 7:23 AM Ticket #1744 (15 Nov 06:18 Hydra pass) created by
- DSS and drivers were off during an hour, 05:18 to 06:18. The devices were …
Note: See TracTimeline
for information about the timeline view.