Timeline


and

Oct 26, 2016:

8:12 PM Ticket #1211 (26 Oct 19:59 Operation Resume) created by imanay
Person in Charge: I. Manay. Experiment: EW_Drift 1) 07:30 - 20:00 2) …
8:12 PM Ticket #1210 (26 Oct 19:00 Spark gaps adjustment history) created by imanay
07:25 Spark gaps adjustment. 10:17 Spark gaps adjustment. 13:40 Spark gaps …
7:50 PM Ticket #1209 (26 Oct 19:30 Transmitter Power Measurements) created by rtadeo
26/10/2016 06:40 LV ON 06:50 HV ON 07:00 Rf ON 07:25 TX Power sample (-70 …
7:36 PM Ticket #1208 (26 Oct 16:15 Experiment was re-established) created by imanay
After they finished the switchyard job, the experiment was re-established.
7:33 PM Ticket #1207 (26 Oct 15:00 Break at the experiment) created by imanay
Power of the two transmitters were measure, then the experiment was …
7:30 PM Ticket #1206 (26 Oct 07:30 Adjustment of reception line) created by imanay
1dB attenuation was applied to the A channel.
7:27 PM Ticket #1205 (26 Oct 07:30 Start of the experiment) created by imanay

Oct 25, 2016:

5:24 PM Ticket #1204 (25 Oct 11:10 Antenna VSWR) created by ryanque
WUp 1.05 WDn 1.04 NDn 1.07 NUp 1.08 EUp 1.03 EDn 1.08 SDn 1.09 SUp 1.08
5:22 PM Ticket #1203 (25 Oct 11:00 Log Created) created by ryanque
LP Campaign Oct 26-27 2016 LP Faraday Mode

Oct 19, 2016:

9:52 AM Ticket #1202 (19 Oct 09:00 Report Campaign) created by ryanque
The productivity of the Campaign is attached The Report of the Campaign is …

Oct 1, 2016:

8:15 AM Ticket #1201 (01 Oct 08:04 Plots) created by abelleza
8:11 AM Ticket #1200 (01 Oct 08:00 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 +7.0 dBm Line voltage and …
7:08 AM Ticket #1199 (01 Oct 06:30 Spark gaps adjustment) created by abelleza
01 Set - Spark gaps adjustment: 20:30 Spark gaps adjustment 22:55 Spark …
6:58 AM Ticket #1198 (30 Set 23:59 Plots) created by abelleza
30 Set 23:59 Plots

Sep 30, 2016:

11:16 PM Ticket #1197 (30 Sep 23:08 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +7.0 dBm Line voltage and …
8:02 PM Ticket #1196 (30 Set 20:00 Operation Resume) created by pcondor
Person in Charge: P. Condor. Experiment: EW_Drift 1) 08:00 - 20:00 2) …
7:55 PM Ticket #1195 (30 Set 19:50 Figures) created by pcondor
Figures of rti,spectras and results
7:50 PM Ticket #1194 (30 Sep 19:10 Transmitter power measurements) created by ryaya
09:00 TX Power sample (-70 dB coupling) Tx1 +7.0 dBm 10:00 TX Power sample …
7:38 PM Ticket #1193 (30 Set 17:45 Spark gaps adjustment) created by pcondor
09:58 Spark gaps adjustment 12:28 Spark gaps adjustment 15:00 Spark gaps …
7:37 PM Ticket #1192 (30 Set 19:02 Noise levels) created by pcondor
EW Drifts 10:00 A:22.05 B:22.52 C:21.72 D:21.79 13:50 A:22.75 B:22.90 …
7:28 PM Ticket #1191 (30 Set 11:40 Finish processing of drifts with the interchange of channels.) created by pcondor
Finish processing of drifts with the interchange of channels. Drifts now …
7:27 PM Ticket #1190 (30 Set 11:38 Restart Acquisition in ARES) created by pcondor
We canceled program in ARES that it is saturating the CPU.
7:24 PM Ticket #1189 (30 Set 11:30 Interchange of Channels) created by pcondor
Interchange channels in program IDL: 0,1->3,4.
7:09 AM Ticket #1188 (30 Sep 07:00 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 +7.0 dBm Line voltage and …
6:34 AM Ticket #1187 (30 Sep 00:01 Plots) created by avaldez
6:33 AM Ticket #1186 (30 Sep 07:50 Operation resume) created by avaldez
Person in Charge: A. Valdez Experiment: Ew_Drift 1) 20:00 - 08:00 2) …
6:27 AM Ticket #1185 (30 Sep 07:50 Spark gaps adjustment) created by avaldez
22:06 Spark gaps adjustment. 00:12 Spark gaps adjustment. 02:30 Spark gaps …

Sep 29, 2016:

11:29 PM Ticket #1184 (29 Set 23:20 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +6.8 dBm Line voltage and …
11:01 PM Ticket #1183 (29 Sep 19:30 Black out) created by imanay
The radar system was off from 19:20 to 19:45 due to a five minutes black …
11:00 PM Ticket #1182 (29 Sep 19:59 Operation resume) created by imanay
Person in Charge: I. Manay Experiment: Ew_Drift 1) 10:00 - 20:00 2) …
10:59 PM Ticket #1181 (29 Sep 19:20 Spark gaps adjustment) created by imanay
12:03 Spark gaps adjustment. 14:26 Spark gaps adjustment. 17:05 Spark gaps …
10:58 PM Ticket #1180 (29 Sep 19:00 Interference during the experiment) created by imanay
A fixed interference was observed. See the attachement.
10:57 PM Ticket #1179 (29 Sep 15:40 Test with JARS) created by imanay
Four splitters were used to connect reception lines to the JARS system.
3:38 PM Ticket #1178 (29 Sep 11:00 Bad spectra) created by pcondor
Bad spectra in coherence for problem in pc Ares The Proctime0 should be …
3:08 PM Ticket #1177 (28 Sep 18:00 Antenna VSWR) created by ryanque
WUp 1.02 WDn 1.04 EUp 1.09 EDn 1.03
3:05 PM Ticket #1176 (28 Sep 17:00 Log Created) created by ryanque
The log was created for this ISCOD Storm Campaign Start: Sep 29 08:00 End: …

Sep 26, 2016:

10:06 AM Ticket #1175 (13 Jul 23:59 Plots) created by imanay
Note: See TracTimeline for information about the timeline view.