Timeline
Sep 24, 2015:
- 11:36 PM Ticket #547 (24 Set 23:00 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.3 dBm Tx2 +1.9 dBm Tx4 +2.2 …
- 8:19 PM Ticket #546 (24 Sep 19:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: ISR + Imaging 1) 08:00 - 20:00 2) …
- 8:11 PM Ticket #545 (24 Sep 19:40 Transmitter power measurements) created by
- 17:35 Driver 3 ON "Imaging"
- 7:40 PM Ticket #544 (24 Sep 19:30 Weird behaviour at ew_drift A channel) created by
- It was observed that the signal level of the A and B channels were lower …
- 7:35 PM Ticket #543 (24 Sep 19:00 Plots) created by
- 7:13 PM Ticket #542 (24 Sep 18:40 spark gaps adjustment) created by
- ATR's adjustment: 1) 24 Sep 09:38 spark gaps adjustment. 2) 24 Sep 12:38 …
- 6:42 PM Ticket #541 (24 Sep 18:00 Noise levels) created by
- ||= =||= ew_drift =||= faraday =||= imaging =|| || 09:36 || || || || A …
- 8:22 AM Ticket #540 (24 Sep 07:59 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: EW_Drift-Faraday-Imaging 1) 20:00 …
- 8:11 AM Ticket #539 (24 Sep 07:40 plots) created by
- plots of rti, spectras, etc
- 7:36 AM Ticket #538 (24 Set 07:10 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.3 dBm Tx2 +2.2 dBm Tx4 +1.2 …
- 7:02 AM Ticket #537 (24 Sep 06:20 Spark gaps adjustment) created by
- 23 september 21:20 Spark gaps adjustment 24 september 00:25 Spark gaps …
- 6:59 AM Ticket #536 (24 Sep 06:15 Noise levels) created by
- EW DRIFTS A: 22.03 B: 21.70 C: 22.36 D: 22.94 FARADAY A: 16.98 B: 17.60
- 6:57 AM Ticket #535 (24 Sep 05:50 Restart EW Drifts and faraday batches) created by
- Restart EW Drifts and faraday batches
- 6:55 AM Ticket #534 (24 Sep 03:05 Noise levels) created by
- Ew Drifts A: 21.67 B: 20.90 C: 21.33 D: 21.88 FARADAY A:16.20 B: 16.64
- 6:53 AM Ticket #533 (24 Sep 01:43 Off Imaging) created by
- Off Imaging
- 6:49 AM Ticket #532 (24 Sep 00:16 Noise levels) created by
- EW Drifts A: 22.22 B: 21.79 C:22.48 D: 23.03 FARADAY A: 17.99 B:18.61 …
- 6:04 AM Ticket #531 (24 Sep 00:00 Plots) created by
- Plots of rtis, spectras, noise and others.
- 6:03 AM Ticket #530 (23 Sep 23:15 Restart EW Drift and Faraday batches) created by
- Restart EW Drift and Faraday batches by problems in the acquisition.
- 6:00 AM Ticket #529 (23 Sep 22:14 Reset of Faraday Pc) created by
- Reset of Faraday Pc and we run after the batch.
- 5:56 AM Ticket #528 (23 Sep 22:10 Restart Faraday) created by
- Restart Faraday batch because it was desynchronized.
- 5:52 AM Ticket #527 (23 Sep 21:50 Restart Faraday Pc) created by
- Restart Faraday Pc because it was not working from 21:46
Sep 23, 2015:
- 8:06 PM Ticket #526 (23 Sep 14:00 Experiments plots) created by
- 8:06 PM Ticket #525 (23 Sep 18:32 ATR adjustment) created by
- 8:05 PM Ticket #524 (23 Sep 18:23 Transmitter turned on, the protection circuit failed) created by
- 8:04 PM Ticket #523 (23 Sep 18:12 Transmitter went down) created by
- 8:04 PM Ticket #522 (23 Sep 18:00 Imaging system turned on) created by
- 8:03 PM Ticket #521 (23 Sep 15:41 Faraday plots were restarted, signal chain were not sending ...) created by
- 8:03 PM Ticket #520 (23 Sep 13:05 ATR adjustment) created by
- 8:02 PM Ticket #519 (23 Sep 11:00 Transmitter turned off for a connection checking. The channel ...) created by
- 8:01 PM Ticket #518 (23 Sep 09:57 ATR adjustment) created by
- 8:01 PM Ticket #517 (23 Sep 19:30 Transmitter power measurements) created by
- 08:15 CROWBAR 08:50 CROWBAR 08:55 Failure at PA 1 screen power supply …
- 8:00 PM Ticket #516 (23 Sep 09:10 Faraday plot was restarted, the digisonde file used for the ...) created by
- 7:58 PM Ticket #515 (23 Sep 09:04 Faraday plots were restarted, the software were not sending ...) created by
- 7:56 PM Ticket #514 (23 Sep 08:55 Transmitter turned on) created by
- 7:55 PM Ticket #513 (23 Sep 08:50 Transmitter went down) created by
- 11:09 AM Ticket #512 (23 Sep 07:59 Operation Resume) created by
- Person in Charge: A. Belleza. Experiment: ISR + Imaging 1) 20:00 - 08:00 …
- 11:06 AM Ticket #511 (23 Sep 07:22 Fall of transmitters) created by
- Transmitters were off during 10 minutes.
- 11:03 AM Ticket #510 (23 Sep 06:50 Spark gaps adjustment) created by
- ATR's adjustment: 1) 22 Sep 21:40 spark gaps adjustment. 2) 23 Sep 00:45 …
- 10:35 AM Ticket #509 (23 Sep 00:01 Plots) created by
- 8:10 AM Ticket #508 (23 Set 07:50 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.4 dBm Tx2 +1.9 dBm Tx4 +2.2 …
- 8:02 AM Ticket #507 (23 Set 07:33 Spark gaps adjustment) created by
- 22 Set 21:40 Spark gaps adjustment 23 Set 00:45 Spark gaps adjustment 23 …
- 12:38 AM Ticket #506 (23 Sep 00:06 Imaging Off) created by
- 23 Sep 00:06 Imaging Off
- 12:10 AM Ticket #505 (22 Sep 23:50 Experiment Plot) created by
- 22 Sep 23:50 Experiment Plot
Sep 22, 2015:
- 8:17 PM Ticket #504 (22 Sep 19:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: ISR + Imaging 1) 08:00 - 20:00 2) …
- 7:29 PM Ticket #503 (22 Set 19:00 Transmitter Power Measurement) created by
- 06:50 LV ON 06:55 HV ON 07:10 TX Power sample (-70 dB coupling) Tx1 +6.4 …
- 7:01 PM Ticket #502 (22 Sep 18:30 Spark gaps adjustment) created by
- ATR's adjustment: 1) 22 Sep 10:08 spark gaps adjustment. 2) 22 Sep 12:32 …
- 6:47 PM Ticket #501 (22 Sep 18:00 Plots of the experiment) created by
- 6:42 PM Ticket #500 (22 Sep 16:55 Fall of the transmitters) created by
- Transmitters falls twice: 11:45 and 16:55. Almost six minutes.
- 6:40 PM Ticket #499 (22 Sep 11:17 Faraday acquisition was restarted) created by
- The acquisition of the Faraday system was restarted twice: 08:16 and 11:17
- 9:09 AM Ticket #498 (22 Sep 07:10 Experiment starts) created by
- EW Drift A 0 dB B 0 dB C 0 dB D 1 dB Faraday E 6 dB F 7 dB Imaging A 0 dB …
Sep 17, 2015:
- 5:45 PM Ticket #497 (17 Sep 17:10 VSWR Antenna) created by
- WUp 1.06 WDn 1.07 NDn 1.07 NUp 1.04 EUp 1.03 EDn 1.00 SDn 1.06 SUp 1.04 …
- 5:39 PM Ticket #496 (17 Sep 17:00 Log created for ISR+Imaging) created by
- The log has been created for the campaign ISR+Imaging Support CNOFS Sep …
Aug 31, 2015:
- 3:44 PM Ticket #495 (31 Aug 15:21 Data uploaded to PUMA) created by
- Faraday : 523 files, 27.1 GB Ew_drift : 1316 files, 94 GB. Imaging : 382 …
Aug 28, 2015:
- 8:25 AM Ticket #494 (28 Aug 08:00 Transmitter Power Measurement) created by
- 00:00 TX Power sample (-70 dB coupling) Tx1 +6.4 dBm Tx2 +1.3 dBm Tx4 +1.9 …
- 7:36 AM Ticket #493 (28 Agu 07:30 OPERATION RESUME) created by
- Person in Charge: AVALDEZ. Experiment: EW_DRIFT FARADAY IMAGING 1) 20:00 - …
- 7:36 AM Ticket #492 (28 Agu 07:20 Spark gaps adjustment) created by
- ATR's adjustment: 1) 27 Aug 22:09 spark gaps adjustment. 2) 28 Aug 01:07 …
- 7:25 AM Ticket #491 (27 Agu 23:59 Last Plots of the Experiment) created by
Aug 27, 2015:
- 11:19 PM Ticket #490 (27 Aug 23:00 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.4 dBm Tx2 +1.3 dBm Tx4 +1.9 …
- 8:25 PM Ticket #489 (27 Aug 19:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: ISR + Imaging 1) 08:00 - 20:00 2) …
- 7:53 PM Ticket #488 (27 Aug 19:30 Transmitter power measurements) created by
- 09:00 TX Power sample (-70 dB coupling) Tx1 +6.2 dBm Tx2 +5.1,1.6 dBm Tx4 …
- 7:44 PM Ticket #487 (27 Aug 19:15 Change of reception hybrid) created by
- As test, reception hybrid of faraday experiment was changed. Channel A of …
- 7:19 PM Ticket #486 (27 Aug 19:00 Spark-gaps summary) created by
- ATR's adjustment: 1) 27 Aug 08:54 spark gaps adjustment. 2) 27 Aug 12:00 …
- 7:03 PM Ticket #485 (27 Aug 19:00 Noise levels) created by
- ||= =||= ew_drift =||= faraday =||= imaging =|| || 09:07 || || || || A …
- 4:25 PM Ticket #484 (27 Aug 16:00 Plots of the experiments) created by
- 4:07 PM Ticket #483 (27 Aug 15:16 Fall of transmitters) created by
- Transmitters were restablished at 15:27.
- 1:20 PM Ticket #482 (27 Aug 11:44 Faraday acquisition was restarted) created by
- Automatic restart failed, it was manually restarted.
- 9:36 AM Ticket #481 (27 Aug 08:16 Faraday acquisition was restarted) created by
- Automatic restart failed, it was manually restarted.
- 8:17 AM Ticket #480 (27 Ago 08:00 Operation resume) created by
- Person in Charge: P. Condor. Experiment: EW_Drift-Faraday-Imaging 1) 20:00 …
- 7:53 AM Ticket #479 (27 Ago 07:40 Plots rtis, noise and spectra) created by
- Plots rtis, noise and spectra
- 7:49 AM Ticket #478 (27 Ago 07:30 Spark gaps summary) created by
- 26 aug 21:36 Spark Gap adjustment 27 Aug 01:20 Spark Gap adjustment 04:30 …
- 7:43 AM Ticket #477 (27 Ago 07:20 Noise levels) created by
- EW_Drifts A:20.77 B:20.79 C:21.42 D:21.35 Faraday A:16.17 B:16.80
- 7:41 AM Ticket #476 (27 Ago 07:10 Turn off Imaging) created by
- Turn off Imaging
- 7:40 AM Ticket #475 (27 Ago 06:27 Pass CNOFS) created by
- Pass CNOFS
- 7:37 AM Ticket #474 (27 Aug 07:00 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.9 dBm Tx2 +1.8 dBm Tx4 +2.3 …
- 5:43 AM Ticket #473 (27 Ago 04:03 Noise Levels) created by
- EW_Drifts A:20.90 B:20.92 C:21.31 D:21.21 Faraday A:15.82 B:16.71 …
- 5:40 AM Ticket #472 (27 Ago 02:23 Noise levels) created by
- EW_Drifts A:21.30 B:21.40 C:21.91 D:21.81 Faraday A:16.35 B:17.21 …
- 5:24 AM Ticket #471 (27 Ago 00:00 Plots) created by
- Plots of rti, noise and spectras
- 5:04 AM Ticket #470 (26 Ago 23:01 Noise levels) created by
- EW_Drifts A:21.96 B:22.11 C:22.45 D:22.48 Faraday …
- 4:57 AM Ticket #469 (26 Ago 22:00 Interference for Moon) created by
- Interference for Moon
- 4:56 AM Ticket #468 (26 Ago 21:01 Noise levels) created by
- EW_Drifts Faraday Imaging A:24.90 A:18.22 …
- 4:27 AM Ticket #467 (26 Ago 20:26 Faraday loss synchronization) created by
- Faraday loss synchronization for little minutes.
Aug 26, 2015:
- 7:25 PM Ticket #466 (26 Aug 19:10 Transmitter power measurements) created by
- 09:00 TX Power sample (-70 dB coupling) Tx1 +6.5 dBm Tx2 +5.3,1.6 dBm Tx4 …
- 7:58 AM Ticket #465 (26 Aug 01:10 Restart Faraday) created by
- 26 Aug 01:10 Restart Faraday
- 7:57 AM Ticket #464 (26 Aug 00:16 Imaging Off) created by
- 26 Aug 00:16 Stop Imaging at JARS
- 7:54 AM Ticket #463 (26 Aug 07:30 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.9 dBm Tx2 +1.7 dBm Tx4 +1.9 …
- 12:18 AM Ticket #462 (25 Agu 23:59 Last Plots of the Experiment) created by
- 25 Agu 23:59 Last Plots of the Experiment
Aug 25, 2015:
- 7:17 PM Ticket #461 (25 Aug 19:00 Transmitter Power Measurement) created by
- 07:00 LV ON 07:10 HV ON 07:20 TX Power sample (-70 dB coupling) Tx1 +6.3 …
- 4:11 PM Ticket #460 (25 Agu 14:00 Plots of the Experiment) created by
Note: See TracTimeline
for information about the timeline view.