Timeline
Aug 27, 2015:
- 11:19 PM Ticket #490 (27 Aug 23:00 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.4 dBm Tx2 +1.3 dBm Tx4 +1.9 …
- 8:25 PM Ticket #489 (27 Aug 19:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: ISR + Imaging 1) 08:00 - 20:00 2) …
- 7:53 PM Ticket #488 (27 Aug 19:30 Transmitter power measurements) created by
- 09:00 TX Power sample (-70 dB coupling) Tx1 +6.2 dBm Tx2 +5.1,1.6 dBm Tx4 …
- 7:44 PM Ticket #487 (27 Aug 19:15 Change of reception hybrid) created by
- As test, reception hybrid of faraday experiment was changed. Channel A of …
- 7:19 PM Ticket #486 (27 Aug 19:00 Spark-gaps summary) created by
- ATR's adjustment: 1) 27 Aug 08:54 spark gaps adjustment. 2) 27 Aug 12:00 …
- 7:03 PM Ticket #485 (27 Aug 19:00 Noise levels) created by
- ||= =||= ew_drift =||= faraday =||= imaging =|| || 09:07 || || || || A …
- 4:25 PM Ticket #484 (27 Aug 16:00 Plots of the experiments) created by
- 4:07 PM Ticket #483 (27 Aug 15:16 Fall of transmitters) created by
- Transmitters were restablished at 15:27.
- 1:20 PM Ticket #482 (27 Aug 11:44 Faraday acquisition was restarted) created by
- Automatic restart failed, it was manually restarted.
- 9:36 AM Ticket #481 (27 Aug 08:16 Faraday acquisition was restarted) created by
- Automatic restart failed, it was manually restarted.
- 8:17 AM Ticket #480 (27 Ago 08:00 Operation resume) created by
- Person in Charge: P. Condor. Experiment: EW_Drift-Faraday-Imaging 1) 20:00 …
- 7:53 AM Ticket #479 (27 Ago 07:40 Plots rtis, noise and spectra) created by
- Plots rtis, noise and spectra
- 7:49 AM Ticket #478 (27 Ago 07:30 Spark gaps summary) created by
- 26 aug 21:36 Spark Gap adjustment 27 Aug 01:20 Spark Gap adjustment 04:30 …
- 7:43 AM Ticket #477 (27 Ago 07:20 Noise levels) created by
- EW_Drifts A:20.77 B:20.79 C:21.42 D:21.35 Faraday A:16.17 B:16.80
- 7:41 AM Ticket #476 (27 Ago 07:10 Turn off Imaging) created by
- Turn off Imaging
- 7:40 AM Ticket #475 (27 Ago 06:27 Pass CNOFS) created by
- Pass CNOFS
- 7:37 AM Ticket #474 (27 Aug 07:00 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.9 dBm Tx2 +1.8 dBm Tx4 +2.3 …
- 5:43 AM Ticket #473 (27 Ago 04:03 Noise Levels) created by
- EW_Drifts A:20.90 B:20.92 C:21.31 D:21.21 Faraday A:15.82 B:16.71 …
- 5:40 AM Ticket #472 (27 Ago 02:23 Noise levels) created by
- EW_Drifts A:21.30 B:21.40 C:21.91 D:21.81 Faraday A:16.35 B:17.21 …
- 5:24 AM Ticket #471 (27 Ago 00:00 Plots) created by
- Plots of rti, noise and spectras
- 5:04 AM Ticket #470 (26 Ago 23:01 Noise levels) created by
- EW_Drifts A:21.96 B:22.11 C:22.45 D:22.48 Faraday …
- 4:57 AM Ticket #469 (26 Ago 22:00 Interference for Moon) created by
- Interference for Moon
- 4:56 AM Ticket #468 (26 Ago 21:01 Noise levels) created by
- EW_Drifts Faraday Imaging A:24.90 A:18.22 …
- 4:27 AM Ticket #467 (26 Ago 20:26 Faraday loss synchronization) created by
- Faraday loss synchronization for little minutes.
Aug 26, 2015:
- 7:25 PM Ticket #466 (26 Aug 19:10 Transmitter power measurements) created by
- 09:00 TX Power sample (-70 dB coupling) Tx1 +6.5 dBm Tx2 +5.3,1.6 dBm Tx4 …
- 7:58 AM Ticket #465 (26 Aug 01:10 Restart Faraday) created by
- 26 Aug 01:10 Restart Faraday
- 7:57 AM Ticket #464 (26 Aug 00:16 Imaging Off) created by
- 26 Aug 00:16 Stop Imaging at JARS
- 7:54 AM Ticket #463 (26 Aug 07:30 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.9 dBm Tx2 +1.7 dBm Tx4 +1.9 …
- 12:18 AM Ticket #462 (25 Agu 23:59 Last Plots of the Experiment) created by
- 25 Agu 23:59 Last Plots of the Experiment
Aug 25, 2015:
- 7:17 PM Ticket #461 (25 Aug 19:00 Transmitter Power Measurement) created by
- 07:00 LV ON 07:10 HV ON 07:20 TX Power sample (-70 dB coupling) Tx1 +6.3 …
- 4:11 PM Ticket #460 (25 Agu 14:00 Plots of the Experiment) created by
Aug 24, 2015:
- 2:46 PM Ticket #459 (24 Aug 14:28 VSWR Antenna) created by
- WUp 1.02 WDn 1.07 NDn 1.05 NUp 1.04 EUp 1.09 EDn 1.04 SDn 1.06 SUp 1.02
- 2:45 PM Ticket #458 (24 Aug 14:20 Log created) created by
- The campaign CNOFS Support 25-28 August 2015 Mode: ISR + Imaging
Aug 20, 2015:
- 1:08 PM Ticket #457 (20 Aug 10:00 Final Report) created by
- The report of the campaign is included. There is some interference every …
Aug 17, 2015:
- 3:05 PM Ticket #456 (09 Jul 16:58 Transmitter off) created by
- Transmitter off
- 3:03 PM Ticket #455 (09 Jul 11:04 Transmitter off) created by
- Transmitter off.
- 2:00 PM Ticket #454 (08 Jul 15:30 Transmitter Off) created by
- Transmitter off for revision of lines.
Aug 12, 2015:
- 1:02 PM Ticket #453 (12 Aug 10:00 Final Report) created by
- The report has been uploaded. There is interference in channel B, as in …
Aug 11, 2015:
- 5:18 PM Ticket #394 (15 Jul 20:00 Operation Resume) reopened by
- 5:06 PM Ticket #365 (13 Jul 19:55 Operation Resume) reopened by
- 4:49 PM Ticket #365 (13 Jul 19:55 Operation Resume) closed by
- invalid
Jul 31, 2015:
- 12:06 PM Ticket #452 (31 Jul 11:40 Operativity ISR+Imaging July) created by
- ISR+Imaging Support ISR School 20 to 23 July 2015
Jul 30, 2015:
- 5:50 PM Ticket #451 (30 Jul 17:30 Operativity DP Faraday July) created by
- DP Faraday July 2015 Support CNOFS 13 to 17 July
- 5:46 PM Ticket #394 (15 Jul 20:00 Operation Resume) closed by
- invalid
- 5:15 PM Ticket #450 (30 Jul 17:00 Operativity) created by
- MST ISR EEJ 14 to 17 July
- 2:26 PM Ticket #449 (30 Jul 14:00 Operativity Resume) created by
- Valley Experiment 08 to 12 Jun 2015
- 1:56 PM Ticket #448 (30 Jul 13:00 Resume MST-ISR-EEJ Apr 2015) created by
- The report of MST-ISR-EEJ April 14 to 17 2015
- 12:54 PM Ticket #446 (15 Apr 20:00 Operation Resume) closed by
- invalid
- 12:22 PM Ticket #447 (27 Jul 17:50 Data was uploaded to PUMA) created by
- The data was uploaded to PUMA 2015_07/SupportCNOFS
Note: See TracTimeline
for information about the timeline view.