Timeline
Aug 25, 2015:
- 7:17 PM Ticket #461 (25 Aug 19:00 Transmitter Power Measurement) created by
- 07:00 LV ON 07:10 HV ON 07:20 TX Power sample (-70 dB coupling) Tx1 +6.3 …
- 4:11 PM Ticket #460 (25 Agu 14:00 Plots of the Experiment) created by
Aug 24, 2015:
- 2:46 PM Ticket #459 (24 Aug 14:28 VSWR Antenna) created by
- WUp 1.02 WDn 1.07 NDn 1.05 NUp 1.04 EUp 1.09 EDn 1.04 SDn 1.06 SUp 1.02
- 2:45 PM Ticket #458 (24 Aug 14:20 Log created) created by
- The campaign CNOFS Support 25-28 August 2015 Mode: ISR + Imaging
Aug 20, 2015:
- 1:08 PM Ticket #457 (20 Aug 10:00 Final Report) created by
- The report of the campaign is included. There is some interference every …
Aug 17, 2015:
- 3:05 PM Ticket #456 (09 Jul 16:58 Transmitter off) created by
- Transmitter off
- 3:03 PM Ticket #455 (09 Jul 11:04 Transmitter off) created by
- Transmitter off.
- 2:00 PM Ticket #454 (08 Jul 15:30 Transmitter Off) created by
- Transmitter off for revision of lines.
Aug 12, 2015:
- 1:02 PM Ticket #453 (12 Aug 10:00 Final Report) created by
- The report has been uploaded. There is interference in channel B, as in …
Aug 11, 2015:
- 5:18 PM Ticket #394 (15 Jul 20:00 Operation Resume) reopened by
- 5:06 PM Ticket #365 (13 Jul 19:55 Operation Resume) reopened by
- 4:49 PM Ticket #365 (13 Jul 19:55 Operation Resume) closed by
- invalid
Jul 31, 2015:
- 12:06 PM Ticket #452 (31 Jul 11:40 Operativity ISR+Imaging July) created by
- ISR+Imaging Support ISR School 20 to 23 July 2015
Jul 30, 2015:
- 5:50 PM Ticket #451 (30 Jul 17:30 Operativity DP Faraday July) created by
- DP Faraday July 2015 Support CNOFS 13 to 17 July
- 5:46 PM Ticket #394 (15 Jul 20:00 Operation Resume) closed by
- invalid
- 5:15 PM Ticket #450 (30 Jul 17:00 Operativity) created by
- MST ISR EEJ 14 to 17 July
- 2:26 PM Ticket #449 (30 Jul 14:00 Operativity Resume) created by
- Valley Experiment 08 to 12 Jun 2015
- 1:56 PM Ticket #448 (30 Jul 13:00 Resume MST-ISR-EEJ Apr 2015) created by
- The report of MST-ISR-EEJ April 14 to 17 2015
- 12:54 PM Ticket #446 (15 Apr 20:00 Operation Resume) closed by
- invalid
- 12:22 PM Ticket #447 (27 Jul 17:50 Data was uploaded to PUMA) created by
- The data was uploaded to PUMA 2015_07/SupportCNOFS
Jul 27, 2015:
- 5:42 PM Ticket #446 (15 Apr 20:00 Operation Resume) created by
- Person in Charge: J. Verastegui Experiment: Mst-Isr-EEj 1) 08:00 - 20:00 …
- 12:17 PM Ticket #445 (21 Jul 23:59 Plots) created by
- 11:31 AM Ticket #444 (27 Jul 11:30 Data was uploaded to PUMA) created by
- EW_Drift: Nro. files: 1156, Size: 82.2 GB Faraday: Nro files: 391, Size: …
Note: See TracTimeline
for information about the timeline view.