Timeline
Aug 12, 2015:
- 1:02 PM Ticket #453 (12 Aug 10:00 Final Report) created by
- The report has been uploaded. There is interference in channel B, as in …
Aug 11, 2015:
- 5:18 PM Ticket #394 (15 Jul 20:00 Operation Resume) reopened by
- 5:06 PM Ticket #365 (13 Jul 19:55 Operation Resume) reopened by
- 4:49 PM Ticket #365 (13 Jul 19:55 Operation Resume) closed by
- invalid
Jul 31, 2015:
- 12:06 PM Ticket #452 (31 Jul 11:40 Operativity ISR+Imaging July) created by
- ISR+Imaging Support ISR School 20 to 23 July 2015
Jul 30, 2015:
- 5:50 PM Ticket #451 (30 Jul 17:30 Operativity DP Faraday July) created by
- DP Faraday July 2015 Support CNOFS 13 to 17 July
- 5:46 PM Ticket #394 (15 Jul 20:00 Operation Resume) closed by
- invalid
- 5:15 PM Ticket #450 (30 Jul 17:00 Operativity) created by
- MST ISR EEJ 14 to 17 July
- 2:26 PM Ticket #449 (30 Jul 14:00 Operativity Resume) created by
- Valley Experiment 08 to 12 Jun 2015
- 1:56 PM Ticket #448 (30 Jul 13:00 Resume MST-ISR-EEJ Apr 2015) created by
- The report of MST-ISR-EEJ April 14 to 17 2015
- 12:54 PM Ticket #446 (15 Apr 20:00 Operation Resume) closed by
- invalid
- 12:22 PM Ticket #447 (27 Jul 17:50 Data was uploaded to PUMA) created by
- The data was uploaded to PUMA 2015_07/SupportCNOFS
Jul 27, 2015:
- 5:42 PM Ticket #446 (15 Apr 20:00 Operation Resume) created by
- Person in Charge: J. Verastegui Experiment: Mst-Isr-EEj 1) 08:00 - 20:00 …
- 12:17 PM Ticket #445 (21 Jul 23:59 Plots) created by
- 11:31 AM Ticket #444 (27 Jul 11:30 Data was uploaded to PUMA) created by
- EW_Drift: Nro. files: 1156, Size: 82.2 GB Faraday: Nro files: 391, Size: …
Jul 23, 2015:
- 4:55 PM Ticket #443 (23 Jul 08:20 Experiment ended) created by
- The experiment has ended at 08:20
- 4:54 PM Ticket #442 (23 Jul 08:00 Operation Resume) created by
- Person in Charge: A. Belleza Experiment: EW_Drift-Faraday-Imaging 1) 20:00 …
- 7:03 AM Ticket #441 (23 Jul 07:00 Transmitter Power Measurement) created by
- 00:00 TX Power sample (-70 dB coupling) Tx1 +6.6 dBm Tx2 +1.5 dBm Tx4 +1.1 …
- 6:18 AM Ticket #440 (23 Jul 06:30 Stop Imaging) created by
- Stop Imaging at JARS
- 12:32 AM Ticket #439 (22 Jul 23:59 Load Plots) created by
- Load Plots
Jul 22, 2015:
- 11:07 PM Ticket #438 (22 Jul 23:00 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.6 dBm Tx2 +1.6 dBm Tx4 +1.2 …
- 7:59 PM Ticket #437 (22 Jul 19:59 Operation resume) created by
- Person in Charge: P. Condor. Experiment: EW_Drift-Faraday-Imaging 1) 08:00 …
- 7:56 PM Ticket #436 (22 Jul 19:45 Transmitter power measurements) created by
- 09:00 TX Power sample (-70 dB coupling) Tx1 +6.8 dBm Tx2 +1.6,3.7 dBm Tx4 …
- 7:55 PM Ticket #435 (22 Jul 19:50 Tx off) created by
- Tx off at: 09 to change disk 10, 12 and 15 hours for visit
- 7:52 PM Ticket #434 (22 Jul 17:29 Spark gaps Adjustment) created by
- 11:28 Spark gaps Adjustment 14:31 Spark gaps Adjustment 17:29 Spark …
- 7:50 PM Ticket #433 (22 Jul 17:31 Start Imaging) created by
- Start Imaging
- 7:48 PM Ticket #432 (22 Jul 16:15 Restart Faraday) created by
- Restart Faraday for desynchronization.
- 7:45 PM Ticket #431 (22 Jul 14:59 Reset pc Faraday) created by
- Reset pc Faraday because it was desinchronizated
- 7:43 PM Ticket #430 (22 Jul 11:00 Attenuation in Faraday) created by
- Attenuation in Faraday CH A 3 db Ch B 8 db
- 7:40 PM Ticket #429 (22 Jul 10:00 Reset batch Faraday for desinchronization) created by
- Reset batch Faraday for desinchronization
- 7:38 PM Ticket #428 (22 Jul 08:20 Restart Faraday) created by
- Restart Faraday because Farday was off from yesterday at 21 hours.
- 8:02 AM Ticket #427 (22 Jul 08:00 Operation Resume) created by
- Person in Charge: D. Lume. Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
- 7:27 AM Ticket #426 (22 Jul 07:25 Transmitter Power Measurement) created by
- 18:00 TX Power sample (-70 dB coupling) Tx1 +6.7 dBm Tx2 +1.6 dBm Tx4 +1.3 …
- 7:16 AM Ticket #425 (22 Jul 04:40 Spark Gap Adjustment) created by
- 7:10 AM Ticket #424 (22 Jul 01:17 Spark Gap Adjustment) created by
- 7:06 AM Ticket #423 (21 Jul 23:59 Stop Imaging) created by
- 7:03 AM Ticket #422 (21 Jul 22:20 Galaxy pass) created by
- 7:01 AM Ticket #421 (21 Jul 22:10 Spark Gap Adjustment) created by
Jul 21, 2015:
- 7:29 PM Ticket #420 (21 Jul 20:00 Operation Resume) created by
- Person in Charge: R. Yanque. Experiment: ISR+Imaging 1) 08:00 - 20:00 2) …
- 7:24 PM Ticket #419 (21 Jul 18:37 Spark Gaps resume) created by
- 09:39 Spark Gap adjustment 12:34 Spark Gap adjustment 15:57 Spark Gap …
- 7:19 PM Ticket #418 (21 Jul 17:40 Start Imaging) created by
- Imaging is started
- 7:17 PM Ticket #417 (21 Jul 11:37 Attenuations) created by
- EW Drift (03 Pre-amps) ChA 0 dB ChB 1 dB ChC 0 dB ChD 1 dB Faraday (04 …
- 7:12 PM Ticket #416 (21 Jul 08:00 Spark Gap Summary) created by
- July 20 21:35 ATR Spark Gap adjustment July 21 00:40 ATR Spark Gap …
- 7:04 PM Ticket #415 (21 Jul 08:00 Operation Resume) created by
- Person in Charge: A. Belleza. Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
- 7:02 PM Ticket #414 (21 Jul 19:00 Transmitter Power Measurement) created by
- 08:00 TX Power sample (-70 dB coupling) Tx1 +6.7 dBm Tx2 +1.5,3.6 dBm Tx4 …
- 10:19 AM Ticket #413 (21 Jul 10:00 Low power at PA2 and PA4) created by
- PA2 and PA4 have been selected for transmitting the Faraday pulses. They …
- 10:18 AM Ticket #412 (21 Jul 08:26 TR Faraday is changed and a flip is connected in faraday that ...) created by
- TR Faraday is changed and a flip is connected in faraday that was not put. …
- 10:13 AM Ticket #411 (21 Jul 08:09 We changed ChA for Ch B faraday) created by
- We changed ChA for Ch B faraday. After is returned.
- 10:12 AM Ticket #410 (21 Jul 08:08 Ch B - Faraday is attenuated 2 db) created by
- Ch B - Faraday is attenuated 2 db
- 10:05 AM Ticket #409 (21 Jul 08:00 Imaging Off and restart Faraday) created by
- Imaging Off and restart Faraday because it is desynchronized.
- 10:03 AM Ticket #408 (20 Jul 16:30 Start Imaging) created by
- Imaging On. We do calibration of noise and after Imaging is all OK.
- 10:02 AM Ticket #407 (20 Jul 18:00 Change of Hybrid) created by
- We change Hybrid of Faraday. But Faraday no produce good Te.
- 10:00 AM Ticket #406 (20 Jul 16:05 Start with TX) created by
- Start acquisition with Tx. EW_Drift is ok but Faraday no give good Te.
- 9:55 AM Ticket #405 (21 Jul 21:33 Stop Acquisition Faraday) created by
- Faraday acquisition stopped due to reset of PC
- 9:26 AM Ticket #404 (21 Jul 09:23 Plot Faraday OK) created by
- Parameters
- 8:04 AM Ticket #403 (21 Jul 07:30 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.8 dBm Tx2 +1.4 dBm Tx4 +0.5 …
Jul 20, 2015:
- 7:02 PM Ticket #402 (20 Jul 19:00 Transmitter Power Measurement) created by
- 14:35 LV ON 16:00 HV ON 16:05 TX Power sample (-70 dB coupling) Tx1 +6.6 …
- 5:21 PM Ticket #401 (20 Jul 17:19 Farday) created by
- 12:46 PM Ticket #400 (20 Jul 12:34 VSWR Antenna) created by
- WUp 1.04 WDn 1.05 NDn 1.04 NUp 1.06 EUp 1.06 EDn 1.08 SDn 1.05 SUp 1.01 …
- 12:36 PM Ticket #399 (20 Jul 12:30 Log created) created by
- ISR + Imaging Support ISR School L. User: P. Condor Mon 20 to Wed 22
Jul 17, 2015:
- 8:31 PM Ticket #398 (17 Jul 19:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: LP_Faraday 1) 08:00 - 20:00 2) …
- 7:49 PM Ticket #397 (17 Jul 19:30 plots) created by
- 7:43 PM Ticket #396 (17 Jul 19:05 Spark-gaps summary) created by
- ATR's adjustment: 1) 17 Jul 09:20 spark gaps adjustment. 2) 17 Jul 12:18 …
- 7:29 PM Ticket #395 (17 Jul 19:00 Transmitter Power Measurement) created by
- 08:00 TX Power sample (-70 dB coupling) Tx2 40 Kw Tx4 -2.4 dBm Line …
- 11:44 AM Ticket #394 (15 Jul 20:00 Operation Resume) created by
- Person in Charge: J. Ortiz Experiment: Faraday H2 1) 08:00 - 20:00 2) …
- 7:33 AM Ticket #393 (17 Jul 08:00 Operation Resume) created by
- Person in Charge: Alexander Valdez Experiment: Faraday H2 1) 20:00 - 08:00 …
- 7:25 AM Ticket #392 (17 Jul 07:00 Spark-gaps summary) created by
- 16 July 19:30 Spark gaps adjustment 21:00 Spark gaps adjustment 17 July …
- 7:23 AM Ticket #391 (17 Jul 07:00 Transmitter Power Measurement) created by
- 16 July 20:00 TX Power sample (-70 dB coupling) Tx2 39 Kw Tx4 -2.5 dBm …
- 7:10 AM Ticket #390 (17 Jul 00:01 Plots of experiment) created by
Jul 16, 2015:
- 11:24 PM Ticket #389 (16 Jul 20:00 Operation Resume) created by
- Person in Charge: R. Yanque Experiment: Faraday H2 1) 08:00 - 20:00 2) …
- 7:29 PM Ticket #388 (16 Jul 19:00 Transmitter Power Measurement) created by
- 08:00 TX Power sample (-70 dB coupling) Tx2 39 Kw Tx4 -2.4 dBm Line …
- 6:30 PM Ticket #387 (16 Jul 17:28 Spark Gap Adjustment) created by
- 11:30 Spark Gap Adjustment 14:35 Spark Gap Adjustment 17:28 Spark Gap …
- 6:28 PM Ticket #386 (16 Jul 08:30 Channel B Noise problem) created by
- From 00:50 to 08:30 there is a noise fluctuation in channel B. This was …
- 8:15 AM Ticket #385 (16 Jul 08:00 Operation Resume) created by
- Person in Charge: Julio Oscanoa. Experiment: Faraday H2 1) 20:00 - 08:00 …
- 7:46 AM Ticket #384 (16 Jul 07:00 Spark-gaps summary) created by
- ATR's adjustment: 1) 15 Jul 22:00 spark gaps adjustment. 2) 16 Jul 01:00 …
- 7:22 AM Ticket #383 (16 Jul 07:00 Transmitter Power Measurement) created by
- 00:00 TX Power sample (-70 dB coupling) Tx2 39 Kw Tx4 -2.4 dBm Line …
- 12:26 AM Ticket #382 (15 Jul 23:59 Plots) created by
- Plots
Jul 15, 2015:
- 11:27 PM Ticket #381 (15 Jul 23:05 Transmitter Power Measurement) created by
- 20:00 TX Power sample (-70 dB coupling) Tx2 39 Kw Tx4 -2.4 dBm Line …
- 7:38 PM Ticket #380 (15 Jul 19:20 Transmitter power measurement) created by
- 08:25 Crowbar, transient at line voltage 09:00 TX Power sample (-70 dB …
- 7:18 PM Ticket #379 (15 Jul 19:00 Spark-gaps summary) created by
- ATR's adjustment: 1) 15 Jul 09:39 spark gaps adjustment. 2) 15 Jul 12:30 …
- 9:09 AM Ticket #378 (15 Jul 08:29 Transmitters were off) created by
- The transmitters were off during 2 minutes, 08:29 to 08:31 due to variance …
- 8:54 AM Ticket #377 (15 Jul 07:59 Operation Resume) created by
- Person in Charge: A. Belleza. Experiment: LP Faraday H2 1) 20:00 - 08:00 …
- 8:43 AM Ticket #376 (15 Jul 00:01 Plots) created by
- 8:38 AM Ticket #375 (15 Jul 06:30 Spark-gaps summary) created by
- ATR's adjustment: 1) 14 Jul 22:40 spark gaps adjustment. 2) 15 Jul 02:39 …
- 8:18 AM Ticket #374 (15 Jul 07:30 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx2 39 Kw Tx4 -2.5 dBm Line …
Jul 14, 2015:
- 8:00 PM Ticket #373 (14 Jul 19:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: LP_Faraday 1) 08:00 - 20:00 2) …
- 7:58 PM Ticket #372 (14 Jul 19:25 Spark-gaps summary) created by
- ATR's adjustment: 1) 14 Jul 10:14 spark gaps adjustment. 2) 14 Jul 13:18 …
- 7:46 PM Ticket #371 (14 Jul 19:25 Transmitter Power Measurements) created by
- 08:00 TX Power sample (-70 dB coupling) Tx2 38 Kw Tx4 -2.5 dBm Line …
- 8:14 AM Ticket #370 (14 Jul 07:59 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: Faraday H2 1) 20:00 - 08:00 2) …
- 8:08 AM Ticket #369 (14 Jul 06:55 Spark gaps adjustment) created by
- 13 Jul 21:54 spark gaps adjustment 14 Jul 00:38 spark gaps adjustment …
- 8:00 AM Ticket #368 (14 Jul 07:30 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx2 38 Kw Tx4 -2.5 dBm Line …
- 12:35 AM Ticket #367 (13 Jul 23:59 Plots) created by
- Plots of noisem rti and powers.
- 12:32 AM Ticket #366 (13 Jul 20:50 Start of Experiment) created by
- Change of hybrido because data no is good. Tx is off. After Tx is on and …
- 12:16 AM Ticket #365 (13 Jul 19:55 Operation Resume) created by
- Person in Charge: A. Valdez. Experiment: Faraday H2 1) 08:00 - 20:00 2) …
Jul 13, 2015:
- 7:21 PM Ticket #364 (13 Jul 19:00 Transmitter Power Measurements) created by
- 16:20 LV ON 16:42 HV ON 17:00 TX Power sample (-70 dB coupling) Tx2 +6.8 …
- 1:19 PM Ticket #363 (13 Jul 12:30 Antenna VSWR) created by
- Antenna VSWR WUp 1.03 WDn 1.09 NDn 1.07 NUp 1.02 EUp 1.04 EDn 1.04 SDn …
- 1:17 PM Ticket #362 (13 Jul 12:20 Log Created Hybrid Mode) created by
- Log created Hybrid Mode LP & DP Faraday Mon 13 to Fri 17 July 2015
Note: See TracTimeline
for information about the timeline view.