Timeline
Mar 31, 2015:
- 2:48 PM Ticket #174 (31 Mar 14:40 Data uploaded to PUMA) created by
- 1) EW_Drift: Nro. files : 1528. Size : 108GB. 2) Faraday: Nro. files : …
- 10:05 AM Ticket #173 (31 Mar 09:56 Operability) created by
- File of operability campaign
Mar 27, 2015:
- 8:07 AM Ticket #172 (27 Mar 08:00 Operation Resume) created by
- Person in Charge: Julio Oscanoa Experiment: EW_Drift-Faraday-Imaging 1) …
- 8:00 AM Ticket #171 (27 Mar 08:00 Transmitter Power measurements) created by
- 2015_03 ISR + Imaging CNOFS Support 26/03/2015 20:00 TX Power sample …
- 7:31 AM Ticket #170 (27 Mar 07:30 Spark gaps summary) created by
- The spark gaps were adjusted at: 26 Mar 20:40 27 Mar 00:20 27 Mar 04:00
- 6:34 AM Ticket #169 (27 Mar 06:00 Channel 1 Tx was changed) created by
- 6:32 AM Ticket #168 (27 Mar 06:00 Processing software was restarted) created by
- Drifts program was restarted
- 6:30 AM Ticket #167 (27 Mar 05:15 Processing software stopped working) created by
- The IDL drifts and Signal Chain software freezed and stopped processing.
- 1:00 AM Ticket #166 (27 Mar 00:45 Imaging experiment ended) created by
- Imaging experiment was ended
- 12:29 AM Ticket #165 (26 Mar 23:59 Plots of the experiment) created by
Mar 26, 2015:
- 7:19 PM Ticket #164 (26 Mar 19:30 Spark gaps summary) created by
- The time intervals for adjusting the spark gaps are: 10:20 16:25
- 7:13 PM Ticket #163 (26 Mar 17:50 Start experiment IMAGING JARS) created by
- The experiment IMAGING JARS was started
- 7:12 PM Ticket #162 (26 Mar 16:25 Problem in channel A was corrected) created by
- The problem in channel A was located in the spark-gaps, A.Coronado …
- 7:07 PM Ticket #161 (26 Mar 16:00 Transmitters are powered) created by
- The transmitters are powered but we observed that the noise in channel A …
- 7:03 PM Ticket #160 (26 Mar 19:00 Transmitter Power Measurements) created by
- 08:00 TX Power sample (-70 dB coupling) Tx1 +5.6 dBm Tx2 +5.7,2.1 dBm Tx4 …
- 7:00 PM Ticket #159 (26 Mar 13:23 Stop power transmission) created by
- Because of a failure in the water pump, we have to stpo thw power …
- 6:46 PM Ticket #158 (26 Mar 8:17 Attenuation has been changed in channel B of the Drift ...) created by
- Because exists a difference (1 dB) in the power noise of channel A and B, …
- 4:44 PM Ticket #157 (26 Mar 16:42RW Pump failure) created by
- 13:26 RW Pump failure 15:30 RW Pump is replaced by an repaired. 16:00 LV …
- 7:58 AM Ticket #156 (26 Mar 07:59 Operation resume) created by
- Experiment: ISR + Imaging 1) 20:00 - 08:00 2) Operation Hours: 12 h 3) …
- 7:39 AM Ticket #155 (26 Mar 07:30 Transmitter Power measurements) created by
- 25/03/2015 20:00 TX Power sample (-70 dB coupling) Tx1 +5.5 dBm Tx2 …
- 6:43 AM Ticket #154 (26 Mar 06:20 Problem with channel A of ew_drift experiment) created by
- Channel A is about 2db less than the other channels. A and B cables at the …
- 6:27 AM Ticket #153 (26 Mar 01:00 Imaging experiment ended) created by
Mar 25, 2015:
- 11:51 PM Ticket #152 (25 Mar 23:59 Plots of the experiments) created by
- 11:03 PM Ticket #151 (25 Mar 22:35 Spark gaps summary) created by
- 1) 25 Mar 22:35 spark gaps adjustment. 2) 26 Mar 02:21 spark gaps …
- 8:14 PM Ticket #150 (25 Mar 18:35 Spark gaps adjustment) created by
- 8:14 PM Ticket #149 (25 Mar 18:00 Channels 2 and 8 attenuated by 1 dB) created by
- 8:13 PM Ticket #148 (25 Mar 17:40 Imaging system started.) created by
- 8:12 PM Ticket #147 (25 Mar 14:28 Spark gaps adjustment) created by
- 8:11 PM Ticket #146 (25 Mar 11:20 System completely restored with the processing software.) created by
- 7:56 PM Ticket #145 (25 Mar 10:23 Changing the Trendnet device that change the aquisition ...) created by
- 7:55 PM Ticket #144 (25 Mar 10:50 Restarting clock divider device.) created by
- 7:54 PM Ticket #143 (25 Mar 10:30 Faraday processing software restarted and synchronized.) created by
- 7:52 PM Ticket #142 (25 Mar 10:29 Spark gaps adjustment) created by
- 7:51 PM Ticket #141 (25 Mar 10:23 Ares PC rebooted, it was halted.) created by
- 7:40 PM Ticket #140 (25 Mar 10:20 Faraday experiment unsynchronized) created by
- 7:37 PM Ticket #139 (25 Mar 10:15 IDL software stopped processing EW drift data.) created by
- 7:30 PM Ticket #138 (25 Mar 19:30 Transmitter Power measurements) created by
- 09:00 TX Power sample (-70 dB coupling) Tx1 +5.4 dBm Tx2 +2.3 dBm,5.4 dBm …
- 7:41 AM Ticket #137 (25 Mar 08:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: EW_Drift-Faraday-Imaging 1) 20:00 …
- 7:30 AM Ticket #136 (25 Mar 07:30 Spark gaps adjustment) created by
- 22:30 Spark gaps adjustment 03:30 Spark gaps adjustment 06:30 Spark gaps …
- 7:03 AM Ticket #135 (25 Mar 07:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Tx1 +5.3 dBm Tx2 +2.1 dBm Tx4 +2.3 …
- 4:56 AM Ticket #134 (25 Mar 02:53 Problem with TX) created by
- Problem with transmitter that last 3 minutes.
- 4:53 AM Ticket #133 (25 Mar 01:00 Imaging Off) created by
- Imaging Off
- 12:20 AM Ticket #132 (24 Mar 23:59 Plots) created by
- Plots of spectra, rtis and others.
Mar 24, 2015:
- 11:02 PM Ticket #131 (24 Mar 23:00 Transmitter power measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +5.6 dBm Tx2 +2.4 dBm Tx4 +2.5 …
- 7:32 PM Ticket #130 (24 Mar 19:30 Transmitter power measurements) created by
- 08:00 TX Power sample (-70 dB coupling) Tx1 +5.4 dBm Tx2 +2.1,5.4 dBm Tx4 …
- 6:38 PM Ticket #129 (24 Mar 18:35 Spark gaps adjustment) created by
- 6:15 PM Ticket #128 (24 Mar 18:07 Imaging experiment was started) created by
- 6:11 PM Ticket #127 (24 Mar 17:58 Problem with Transmitter) created by
- Problem with Pre-amplifier on Channel 5 Imaging
- 4:08 PM Ticket #126 (24 Mar 15:23 Spark gaps adjustment) created by
- 12:39 PM Ticket #125 (24 Mar 12:08 Spark gaps adjustment) created by
- 9:51 AM Ticket #124 (24 Mar 09:39 Problem with Tx) created by
- 9:49 AM Ticket #123 (24 Mar 09:10 Spark gaps adjustment) created by
- 9:37 AM Ticket #122 (24 Mar 08:45 Noise Level Increase) created by
- Increase in noise / interference from unknown source. 08:45am- 09:05 am
- 7:12 AM Ticket #121 (24 Mar 07:59 Operation resume) created by
- Experiment: ISR + Imaging 1) 20:00 - 08:00 2) Operation Hours: 11 h 50 …
- 7:03 AM Ticket #120 (24 Mar 07:00 Transmitter power measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Tx1 +5.4 dBm Tx2 +2.3 dBm Tx4 +2.3 …
- 5:07 AM Ticket #119 (23 Mar 23:59 Plot Imaging) created by
Mar 23, 2015:
- 11:02 PM Ticket #118 (23 Mar 23:00 Transmitter power measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +3.5 dBm Tx2 +2.2 dBm Tx4 +2.5 …
- 8:02 PM Ticket #117 (23 Mar 07:59 Operation resume) created by
- Experiment: ISR + Imaging 1) 18:40 - 20:00 2) Operation Hours: 1 h 20 …
- 7:21 PM Ticket #116 (23 Mar 18:40 Start of the experiments) created by
- 12:35 PM Ticket #115 (23 Mar 12:30 Antenna VSWR) created by
- Antenna VSWR WUp 1.03 WDn 1.02 NDn 1.03 NUP 1.09 EUp 1.04 EDn 1.05 SDn …
Mar 18, 2015:
- 4:22 PM Ticket #114 (Log created) created by
- The log has been created for the following campaign - ISR + Imaging Mon …
Note: See TracTimeline
for information about the timeline view.