Feb 14, 2015:
- 8:03 PM Ticket #88 (14 Feb 19:25 Transmitter power measurement) created by
- 09:00 TX Power sample (-70 dB coupling) Tx1 +5.6 dBm Tx2 +1.9,5.6 dBm Tx4 …
- 7:51 PM Ticket #87 (14 Feb 11:50 Attenuation Channel E) created by
- The attenuation of channel E was 9dB. We changed the value to 8dB to get …
- 7:47 PM Ticket #86 (14 Feb 19:10 Spark gaps summary) created by
- 1) 14 Feb 10:27 spark gaps adjustment. 2) 14 Feb 14:22 spark gaps …
- 8:34 AM Ticket #85 (14 Feb 07:59 Operation resume) created by
- Experiment: ISR + Imaging 1) 20:00 - 08:00 2) Operation Hours: 11 h 55 …
- 7:03 AM Ticket #84 (14 Feb 06:30 Spark gaps summary) created by
- 1) 13 Feb 22:15 spark gaps adjustment. 2) 14 Feb 02:00 spark gaps …
- 4:36 AM Ticket #83 (14 Feb 03:30 Transmitters fall) created by
- Because of changes at the voltage line.
- 4:19 AM Ticket #82 (14 Feb 01:30 Imaging experiment is finished) created by
- 12:24 AM Ticket #81 (13 Feb 23:59 Experiment plots) created by
Feb 13, 2015:
- 8:30 PM Ticket #80 (13 Feb 19:59 Operation Resume) created by
- Person in Charge: Julio Oscanoa Experiment: EW_Drift-Faraday-Imaging 1) …
- 7:54 PM Ticket #79 (13 Feb 19:20 Transmitter Power Measurements) created by
- 08:00 TX Power sample (-70 dB coupling) Tx1 +5.3 dBm Tx2 +2.1,5.2 dBm Tx4 …
- 7:47 PM Ticket #78 (13 Feb 18:01 Spark Gaps Adjustment) created by
- 13 Feb 10:53 Adjustment of TRs and ATRs 13 Feb 14:34 Adjustment of TRs and …
- 6:43 PM Ticket #77 (13 Feb 17:45 Imaging experiment was started) created by
- 6:42 PM Ticket #76 (13 Feb 12:15 Interference was observed) created by
- Unknown interference appeared at 12:15 in both Drifts and Faraday …
- 8:10 AM Ticket #75 (13 Feb 06:20 Spark gaps adjustment) created by
- 8:08 AM Ticket #74 (13 Feb 02:10 Spark gaps adjustment) created by
- 8:05 AM Ticket #73 (13 Feb 00:35 Internet conection intermitent, uploaded plots aren´t great ...) created by
- 8:02 AM Ticket #72 (13 Feb 00:30 Imaging system shut down, EW drift RF signal reconnected) created by
- 7:50 AM Ticket #71 (13 Feb 07:30 Transmitter power measurements) created by
- 20:00 TX Power sample (-70 dB coupling) TX1 +5.8 dBm TX2 +2.2 dBm TX4 …
- 3:40 AM Ticket #70 (13 Feb 00:02 Plots of rti and spectra) created by
- 3:38 AM Ticket #69 (12 Feb 22:20 Spark gaps adjustment) created by
Feb 12, 2015:
- 8:31 PM Ticket #68 (12 Feb 19:55 Transmitter power measurements) created by
- 10:00 TX Power sample (-70 dB coupling) 1 +5.8 dBm 2 +2.0 dBm/ +5.6 dBm 4 …
- 8:22 AM Ticket #67 (12 Feb 07:59 Operation Resume) created by
- Person in Charge: P. Condor Experiment: EW_Drift-Faraday-Imaging 1) 20:00 …
- 7:33 AM Ticket #66 (12 Feb 23:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Tx1 +5.9 dBm Tx2 +2.0 dBm Tx4 +2.4 …
- 7:27 AM Ticket #65 (12 Feb 06:15 Spark gaps adjustment) created by
- 11 Feb 22:00 12 Feb 02:15 12 Feb 06;15 Adjustment of TRs and ATRs.
- 7:23 AM Ticket #64 (12 Feb 06:20 Moon Pass) created by
- Moon pass producing interferences
- 4:21 AM Ticket #63 (12 Feb 03:30 Tx Off) created by
- Tx Off. Problem with transmitter it ON at 03:33
- 4:19 AM Ticket #62 (12 Feb 01:40 OFF Imaging) created by
- OFF Imaging
- 3:42 AM Ticket #61 (11 Feb 23:00 Plots of rti and spectra) created by
- Plots of rti and spectra
- 3:40 AM Ticket #60 (11 Feb 20:40 Restart Faraday) created by
- Restart Faraday
- 3:40 AM Ticket #59 (11 Feb 20:32 Restart EW_Drift) created by
- Restart EW_Drift
- 3:39 AM Ticket #58 (11 Feb 20:32 Faraday Desincronization) created by
- Faraday Desincronization
- 3:38 AM Ticket #57 (11 Feb 20:31 Problem with PC ARES) created by
- Problem with PC ARES. Restart pc.
Feb 11, 2015:
- 11:34 PM Ticket #56 (11 Feb 23:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +5.9 dBm Tx2 +2.0 dBm Tx4 +2.4 …
- 8:25 PM Ticket #55 (11 Feb 19:52 Operation Resume) created by
- Experiment: ISR + Imaging 1) 08:00 - 20:00 2) Operation Hours: 11 h 51 …
- 8:23 PM Ticket #54 (11 Feb 18:49 Transmitters go down) created by
- Transmitters (channels A, B, C and D) go down for approximately 1 minute.
- 8:20 PM Ticket #53 (11 Feb 18:05 Spark Gaps Adjustment) created by
- Adjustment of TRs and ATRs
- 8:19 PM Ticket #52 (11 Feb 17:40 Imaging Experiment was started) created by
- Imaging Experiment was started. Signal Chain will start to plot at 18:00 …
- 8:15 PM Ticket #51 (11 Feb 14:14 Spark Gaps adjustment) created by
- Adjustment of TRs and ATRs
- 8:11 PM Ticket #50 (11 Feb 12:20 Sun appears in data) created by
- Sun appears in data
- 8:04 PM Ticket #49 (11 Feb 11:11 Lost of data) created by
- ARES PC turns hang for 8 minutes. Operation was restored at 11:19
- 8:03 PM Ticket #48 (11 Feb 19:25 Transmitter power measurement) created by
- 09:00 TX Power sample (-70 dB coupling) 1 +5.8 dBm 2 +2.2 dBm/ +5.6 dBm 4 …
- 7:54 PM Ticket #47 (11 Feb 09:55 Spark gaps adjustment) created by
- Adjustment of TRs and ATRs
- 9:23 AM Ticket #46 (11 Feb 08:37 Channel E issues) created by
- Attenuation of channel E set to 9dB
- 8:06 AM Ticket #45 (11 Feb 08:00 Operation Resume) created by
- Experiment: ISR + Imaging 1) 20:00 - 08:00 2) Operation Hours: 12 h 00 …
- 8:03 AM Ticket #44 (11 Feb 06:15 Problems with channel E) created by
- Channel 1 Faraday = Channel Rxb fARADAY DP The channel1 of Faraday …
- 7:38 AM Ticket #43 (11 Feb 07:00 Figures of Experiment) created by
- 7:34 AM Ticket #42 (11 Feb 07:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Tx1 +6.0 dBm Tx2 +1.9 dBm Tx4 +2.5 …
- 7:30 AM Ticket #41 (11 Feb 06:15 Spark gap summary) created by
- 1) 10 Feb 22:00 spark gaps adjusment. 2) 11 Feb 02:00 spark gaps …
Feb 10, 2015:
- 11:41 PM Ticket #40 (10 Feb 23:10 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +5.9 dBm Tx2 +1.8 dBm Tx4 +2.4 …
- 8:25 PM Ticket #39 (10 Feb 19:59 Operation resume) created by
- Experiment: ISR + Imaging 1) 08:00 - 20:00 2) Operation Hours: 11 h 45 …
- 8:02 PM Ticket #38 (10 Feb 19:30 Transmitter Power Measurements) created by
- 06:40 LV ON 06:50 HV ON 07:00 TX Power sample (-70 dB coupling) Tx1 …
- 7:24 PM Ticket #37 (10 Feb 18:08 PC Ares is restarted) created by
- PC Ares hang, so it was restarted. There was not data for about two …
- 7:16 PM Ticket #36 (10 Feb 18:00 Imaging experiment is started) created by
- 7:16 PM Ticket #35 (10 Feb 17:45 Transmitters fall) created by
- For about 2 minutes.
- 7:02 PM Ticket #34 (10 Feb 17:40 Interference was observed) created by
- 40 minutes interference was observed at the EW_Drift experiment.
- 3:55 PM Ticket #33 (10 Feb 12:30 Increase of the noise level) created by
- All channels increased the noise level due to solar event.
- 3:42 PM Ticket #32 (10 Feb 08:00 Transmitters fall twice) created by
- 1) 07:24 during 3 minutes. 2) 07:55 during 8 minutes.
- 3:37 PM Ticket #31 (10 Feb 07:15 Start of the experiment) created by
- 3:34 PM Ticket #30 (10 Feb 07:12 Spark gap summary) created by
- 1) 10 Feb 07:12 spark gaps adjustment. 2) 10 Feb 11:15 spark gaps …
Feb 9, 2015:
- 12:51 PM Ticket #29 (09 Feb 12:19 Antenna VSWR) created by
- SUP 1.05 SDN 1.06 EDN 1.02 EUP 1.05 NUP 1.08 NDN 1.06 WDN 1.06 WUP 1.03
- 12:30 PM Ticket #28 (09 Feb 11:58 Log created) created by
- Log created for ISR + Imaging Campaign Stratospheric Warming (ISCOD) Tue …
Feb 4, 2015:
Jan 19, 2015:
- 2:45 PM Ticket #26 (19 Jan 14:30 Experiment manual) created by
- 9:35 AM Ticket #25 (16 Jan 11:00 Tests after the end of experiment) created by
- Because channels C and D suddenly behaved weird (See coherence plot in …
Jan 15, 2015:
- 8:00 PM Ticket #24 (15 Jan 19:29 spark-gap adjustments) created by
- 15 Jan 07:20 spark-gap adjustment. 15 Jan 10:27 spark-gap adjustment. 15 …
- 7:35 PM Ticket #23 (15 Jan 19:00 Transmitter Power Measurements) created by
- 06:50 LV ON 07:00 HV ON 07:15 TX Power sample (-70 dB coupling) Tx1 +4.0 …
- 6:44 PM Ticket #22 (15 Jan 08:00 Events at A, B, G and H channels) created by
- It was observed an increase of the noise level at A and B channels, then …
- 6:35 PM Ticket #21 (15 Jan 07:33 Adjustment at transmitter) created by
- It was observed a slighty power differences between the two transmitters, …
- 6:31 PM Ticket #20 (15 Jan 07:22 Re-start of the experiment) created by
- 8:17 AM Ticket #19 (14 Jan 23:33 End of Experiment 150 km Jicamarca) created by