Timeline


and

Feb 12, 2015:

8:31 PM Ticket #68 (12 Feb 19:55 Transmitter power measurements) created by ryaya
10:00 TX Power sample (-70 dB coupling) 1 +5.8 dBm 2 +2.0 dBm/ +5.6 dBm 4 …
8:22 AM Ticket #67 (12 Feb 07:59 Operation Resume) created by pcondor
Person in Charge: P. Condor Experiment: EW_Drift-Faraday-Imaging 1) 20:00 …
7:33 AM Ticket #66 (12 Feb 23:00 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 +5.9 dBm Tx2 +2.0 dBm Tx4 +2.4 …
7:27 AM Ticket #65 (12 Feb 06:15 Spark gaps adjustment) created by pcondor
11 Feb 22:00 12 Feb 02:15 12 Feb 06;15 Adjustment of TRs and ATRs.
7:23 AM Ticket #64 (12 Feb 06:20 Moon Pass) created by pcondor
Moon pass producing interferences
4:21 AM Ticket #63 (12 Feb 03:30 Tx Off) created by pcondor
Tx Off. Problem with transmitter it ON at 03:33
4:19 AM Ticket #62 (12 Feb 01:40 OFF Imaging) created by pcondor
OFF Imaging
3:42 AM Ticket #61 (11 Feb 23:00 Plots of rti and spectra) created by pcondor
Plots of rti and spectra
3:40 AM Ticket #60 (11 Feb 20:40 Restart Faraday) created by pcondor
Restart Faraday
3:40 AM Ticket #59 (11 Feb 20:32 Restart EW_Drift) created by pcondor
Restart EW_Drift
3:39 AM Ticket #58 (11 Feb 20:32 Faraday Desincronization) created by pcondor
Faraday Desincronization
3:38 AM Ticket #57 (11 Feb 20:31 Problem with PC ARES) created by pcondor
Problem with PC ARES. Restart pc.

Feb 11, 2015:

11:34 PM Ticket #56 (11 Feb 23:00 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +5.9 dBm Tx2 +2.0 dBm Tx4 +2.4 …
8:25 PM Ticket #55 (11 Feb 19:52 Operation Resume) created by aaguilar
Experiment: ISR + Imaging 1) 08:00 - 20:00 2) Operation Hours: 11 h 51 …
8:23 PM Ticket #54 (11 Feb 18:49 Transmitters go down) created by aaguilar
Transmitters (channels A, B, C and D) go down for approximately 1 minute.
8:20 PM Ticket #53 (11 Feb 18:05 Spark Gaps Adjustment) created by aaguilar
Adjustment of TRs and ATRs
8:19 PM Ticket #52 (11 Feb 17:40 Imaging Experiment was started) created by aaguilar
Imaging Experiment was started. Signal Chain will start to plot at 18:00 …
8:15 PM Ticket #51 (11 Feb 14:14 Spark Gaps adjustment) created by aaguilar
Adjustment of TRs and ATRs
8:11 PM Ticket #50 (11 Feb 12:20 Sun appears in data) created by aaguilar
Sun appears in data
8:04 PM Ticket #49 (11 Feb 11:11 Lost of data) created by aaguilar
ARES PC turns hang for 8 minutes. Operation was restored at 11:19
8:03 PM Ticket #48 (11 Feb 19:25 Transmitter power measurement) created by ryaya
09:00 TX Power sample (-70 dB coupling) 1 +5.8 dBm 2 +2.2 dBm/ +5.6 dBm 4 …
7:54 PM Ticket #47 (11 Feb 09:55 Spark gaps adjustment) created by aaguilar
Adjustment of TRs and ATRs
9:23 AM Ticket #46 (11 Feb 08:37 Channel E issues) created by aaguilar
Attenuation of channel E set to 9dB
8:06 AM Ticket #45 (11 Feb 08:00 Operation Resume) created by avaldez
Experiment: ISR + Imaging 1) 20:00 - 08:00 2) Operation Hours: 12 h 00 …
8:03 AM Ticket #44 (11 Feb 06:15 Problems with channel E) created by avaldez
Channel 1 Faraday = Channel Rxb fARADAY DP The channel1 of Faraday …
7:38 AM Ticket #43 (11 Feb 07:00 Figures of Experiment) created by avaldez
7:34 AM Ticket #42 (11 Feb 07:00 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 +6.0 dBm Tx2 +1.9 dBm Tx4 +2.5 …
7:30 AM Ticket #41 (11 Feb 06:15 Spark gap summary) created by avaldez
1) 10 Feb 22:00 spark gaps adjusment. 2) 11 Feb 02:00 spark gaps …

Feb 10, 2015:

11:41 PM Ticket #40 (10 Feb 23:10 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +5.9 dBm Tx2 +1.8 dBm Tx4 +2.4 …
8:25 PM Ticket #39 (10 Feb 19:59 Operation resume) created by imanay
Experiment: ISR + Imaging 1) 08:00 - 20:00 2) Operation Hours: 11 h 45 …
8:02 PM Ticket #38 (10 Feb 19:30 Transmitter Power Measurements) created by rtadeo
06:40 LV ON 06:50 HV ON 07:00 TX Power sample (-70 dB coupling) Tx1 …
7:24 PM Ticket #37 (10 Feb 18:08 PC Ares is restarted) created by imanay
PC Ares hang, so it was restarted. There was not data for about two …
7:16 PM Ticket #36 (10 Feb 18:00 Imaging experiment is started) created by imanay
7:16 PM Ticket #35 (10 Feb 17:45 Transmitters fall) created by imanay
For about 2 minutes.
7:02 PM Ticket #34 (10 Feb 17:40 Interference was observed) created by imanay
40 minutes interference was observed at the EW_Drift experiment.
3:55 PM Ticket #33 (10 Feb 12:30 Increase of the noise level) created by imanay
All channels increased the noise level due to solar event.
3:42 PM Ticket #32 (10 Feb 08:00 Transmitters fall twice) created by imanay
1) 07:24 during 3 minutes. 2) 07:55 during 8 minutes.
3:37 PM Ticket #31 (10 Feb 07:15 Start of the experiment) created by imanay
3:34 PM Ticket #30 (10 Feb 07:12 Spark gap summary) created by imanay
1) 10 Feb 07:12 spark gaps adjustment. 2) 10 Feb 11:15 spark gaps …

Feb 9, 2015:

12:51 PM Ticket #29 (09 Feb 12:19 Antenna VSWR) created by ryanque
SUP 1.05 SDN 1.06 EDN 1.02 EUP 1.05 NUP 1.08 NDN 1.06 WDN 1.06 WUP 1.03
12:30 PM Ticket #28 (09 Feb 11:58 Log created) created by ryanque
Log created for ISR + Imaging Campaign Stratospheric Warming (ISCOD) Tue …

Feb 4, 2015:

8:40 AM Ticket #27 (04 Feb 08:10 Operation Resumen) created by avaldez

Jan 19, 2015:

2:45 PM Ticket #26 (19 Jan 14:30 Experiment manual) created by imanay
9:35 AM Ticket #25 (16 Jan 11:00 Tests after the end of experiment) created by imanay
Because channels C and D suddenly behaved weird (See coherence plot in …

Jan 15, 2015:

8:00 PM Ticket #24 (15 Jan 19:29 spark-gap adjustments) created by imanay
15 Jan 07:20 spark-gap adjustment. 15 Jan 10:27 spark-gap adjustment. 15 …
7:35 PM Ticket #23 (15 Jan 19:00 Transmitter Power Measurements) created by rtadeo
06:50 LV ON 07:00 HV ON 07:15 TX Power sample (-70 dB coupling) Tx1 +4.0 …
6:44 PM Ticket #22 (15 Jan 08:00 Events at A, B, G and H channels) created by imanay
It was observed an increase of the noise level at A and B channels, then …
6:35 PM Ticket #21 (15 Jan 07:33 Adjustment at transmitter) created by imanay
It was observed a slighty power differences between the two transmitters, …
6:31 PM Ticket #20 (15 Jan 07:22 Re-start of the experiment) created by imanay
8:17 AM Ticket #19 (14 Jan 23:33 End of Experiment 150 km Jicamarca) created by avaldez

Jan 14, 2015:

11:20 PM Ticket #18 (14 Jan 23:00 Transmitter Power Measurements) created by vquesada
06:50 LV ON 06:55 HV ON 07:00 TX Power sample (-70 dB coupling) Tx1 +4.4 …
9:33 PM Ticket #17 (14 Jan 21:00 Coherence 32 Short Pulse Problem durind the day) created by avaldez
In the Coherence graphics the picture show that there was some problems …
9:27 PM Ticket #16 (14 Jan 20:00 Spread F start) created by avaldez
9:26 PM Ticket #15 (14 Jan 19:15 Spark Gaps adjustment) created by avaldez
9:25 PM Ticket #14 (14 Jan 17:30 Problems with Channel C or D Stop the experiment) created by avaldez
1) We make a change between hybrid 1 (ChA&CHB) and 2(ChC&ChD) to identify …
7:32 PM Ticket #13 (14 Jan 16:02 Spark Gaps adjustment) created by avaldez
3:01 PM Ticket #12 (14 Jan 13:20 Spark Gaps adjustment) created by avaldez
3:00 PM Ticket #11 (14 Jan 09:48 Spark Gaps Adjustment) created by avaldez
2:58 PM Ticket #10 (14 Jan 09:02 Experiment Configuration change) created by avaldez
The pulse configuration file was changed and now it's ok identical to the …
2:55 PM Ticket #9 (14 Jan 07:19 Transmitter falls) created by avaldez
07:20 Transmitters were ok THe experiment continue
2:52 PM Ticket #8 (14 Jan 06:54 Start of the experiment) created by avaldez
NOTE: There was a mystake with the configuration experiment early this …

Jan 13, 2015:

8:17 PM Ticket #7 (13 Jan 20:00 Stop of the experiment) created by imanay
Experiment is stopped according to the schedule. It is going to continue …
7:59 PM Ticket #6 (13 Jan 13:30 Spark-gaps adjustment) created by imanay
13 Jan 14:45 Spark-gaps adjustment. 13 Jan 17:50 Spark-gaps adjustment.
7:57 PM Ticket #5 (13 Jan 13:30 Change of DDS) created by imanay
It was found that two channels of the DDS were not coding properly, so it …
7:56 PM Ticket #4 (13 Jan 07:55 Start of the experiment) created by imanay
Reception lines were checked before the start: Level noise of the A …
7:44 PM Ticket #3 (12 Jan 17:59 Antenna results) created by imanay
VSWR of the antenna quarters: WUP : 1.05 WDW : 1.08 NDW : 1.06 NUP : 1.03 …
7:36 PM Ticket #2 (13 Jan 19:00 Transmitter power measurements) created by rtadeo
13:30 rf pulse coded 13:35 power adjustment PA1 and PA4 13:40 TX Power …
Note: See TracTimeline for information about the timeline view.