Timeline
Feb 11, 2015:
- 11:34 PM Ticket #56 (11 Feb 23:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +5.9 dBm Tx2 +2.0 dBm Tx4 +2.4 …
- 8:25 PM Ticket #55 (11 Feb 19:52 Operation Resume) created by
- Experiment: ISR + Imaging 1) 08:00 - 20:00 2) Operation Hours: 11 h 51 …
- 8:23 PM Ticket #54 (11 Feb 18:49 Transmitters go down) created by
- Transmitters (channels A, B, C and D) go down for approximately 1 minute.
- 8:20 PM Ticket #53 (11 Feb 18:05 Spark Gaps Adjustment) created by
- Adjustment of TRs and ATRs
- 8:19 PM Ticket #52 (11 Feb 17:40 Imaging Experiment was started) created by
- Imaging Experiment was started. Signal Chain will start to plot at 18:00 …
- 8:15 PM Ticket #51 (11 Feb 14:14 Spark Gaps adjustment) created by
- Adjustment of TRs and ATRs
- 8:11 PM Ticket #50 (11 Feb 12:20 Sun appears in data) created by
- Sun appears in data
- 8:04 PM Ticket #49 (11 Feb 11:11 Lost of data) created by
- ARES PC turns hang for 8 minutes. Operation was restored at 11:19
- 8:03 PM Ticket #48 (11 Feb 19:25 Transmitter power measurement) created by
- 09:00 TX Power sample (-70 dB coupling) 1 +5.8 dBm 2 +2.2 dBm/ +5.6 dBm 4 …
- 7:54 PM Ticket #47 (11 Feb 09:55 Spark gaps adjustment) created by
- Adjustment of TRs and ATRs
- 9:23 AM Ticket #46 (11 Feb 08:37 Channel E issues) created by
- Attenuation of channel E set to 9dB
- 8:06 AM Ticket #45 (11 Feb 08:00 Operation Resume) created by
- Experiment: ISR + Imaging 1) 20:00 - 08:00 2) Operation Hours: 12 h 00 …
- 8:03 AM Ticket #44 (11 Feb 06:15 Problems with channel E) created by
- Channel 1 Faraday = Channel Rxb fARADAY DP The channel1 of Faraday …
- 7:38 AM Ticket #43 (11 Feb 07:00 Figures of Experiment) created by
- 7:34 AM Ticket #42 (11 Feb 07:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Tx1 +6.0 dBm Tx2 +1.9 dBm Tx4 +2.5 …
- 7:30 AM Ticket #41 (11 Feb 06:15 Spark gap summary) created by
- 1) 10 Feb 22:00 spark gaps adjusment. 2) 11 Feb 02:00 spark gaps …
Feb 10, 2015:
- 11:41 PM Ticket #40 (10 Feb 23:10 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +5.9 dBm Tx2 +1.8 dBm Tx4 +2.4 …
- 8:25 PM Ticket #39 (10 Feb 19:59 Operation resume) created by
- Experiment: ISR + Imaging 1) 08:00 - 20:00 2) Operation Hours: 11 h 45 …
- 8:02 PM Ticket #38 (10 Feb 19:30 Transmitter Power Measurements) created by
- 06:40 LV ON 06:50 HV ON 07:00 TX Power sample (-70 dB coupling) Tx1 …
- 7:24 PM Ticket #37 (10 Feb 18:08 PC Ares is restarted) created by
- PC Ares hang, so it was restarted. There was not data for about two …
- 7:16 PM Ticket #36 (10 Feb 18:00 Imaging experiment is started) created by
- 7:16 PM Ticket #35 (10 Feb 17:45 Transmitters fall) created by
- For about 2 minutes.
- 7:02 PM Ticket #34 (10 Feb 17:40 Interference was observed) created by
- 40 minutes interference was observed at the EW_Drift experiment.
- 3:55 PM Ticket #33 (10 Feb 12:30 Increase of the noise level) created by
- All channels increased the noise level due to solar event.
- 3:42 PM Ticket #32 (10 Feb 08:00 Transmitters fall twice) created by
- 1) 07:24 during 3 minutes. 2) 07:55 during 8 minutes.
- 3:37 PM Ticket #31 (10 Feb 07:15 Start of the experiment) created by
- 3:34 PM Ticket #30 (10 Feb 07:12 Spark gap summary) created by
- 1) 10 Feb 07:12 spark gaps adjustment. 2) 10 Feb 11:15 spark gaps …
Feb 9, 2015:
- 12:51 PM Ticket #29 (09 Feb 12:19 Antenna VSWR) created by
- SUP 1.05 SDN 1.06 EDN 1.02 EUP 1.05 NUP 1.08 NDN 1.06 WDN 1.06 WUP 1.03
- 12:30 PM Ticket #28 (09 Feb 11:58 Log created) created by
- Log created for ISR + Imaging Campaign Stratospheric Warming (ISCOD) Tue …
Feb 4, 2015:
Jan 19, 2015:
- 2:45 PM Ticket #26 (19 Jan 14:30 Experiment manual) created by
- 9:35 AM Ticket #25 (16 Jan 11:00 Tests after the end of experiment) created by
- Because channels C and D suddenly behaved weird (See coherence plot in …
Jan 15, 2015:
- 8:00 PM Ticket #24 (15 Jan 19:29 spark-gap adjustments) created by
- 15 Jan 07:20 spark-gap adjustment. 15 Jan 10:27 spark-gap adjustment. 15 …
- 7:35 PM Ticket #23 (15 Jan 19:00 Transmitter Power Measurements) created by
- 06:50 LV ON 07:00 HV ON 07:15 TX Power sample (-70 dB coupling) Tx1 +4.0 …
- 6:44 PM Ticket #22 (15 Jan 08:00 Events at A, B, G and H channels) created by
- It was observed an increase of the noise level at A and B channels, then …
- 6:35 PM Ticket #21 (15 Jan 07:33 Adjustment at transmitter) created by
- It was observed a slighty power differences between the two transmitters, …
- 6:31 PM Ticket #20 (15 Jan 07:22 Re-start of the experiment) created by
- 8:17 AM Ticket #19 (14 Jan 23:33 End of Experiment 150 km Jicamarca) created by
Jan 14, 2015:
- 11:20 PM Ticket #18 (14 Jan 23:00 Transmitter Power Measurements) created by
- 06:50 LV ON 06:55 HV ON 07:00 TX Power sample (-70 dB coupling) Tx1 +4.4 …
- 9:33 PM Ticket #17 (14 Jan 21:00 Coherence 32 Short Pulse Problem durind the day) created by
- In the Coherence graphics the picture show that there was some problems …
- 9:27 PM Ticket #16 (14 Jan 20:00 Spread F start) created by
- 9:26 PM Ticket #15 (14 Jan 19:15 Spark Gaps adjustment) created by
- 9:25 PM Ticket #14 (14 Jan 17:30 Problems with Channel C or D Stop the experiment) created by
- 1) We make a change between hybrid 1 (ChA&CHB) and 2(ChC&ChD) to identify …
- 7:32 PM Ticket #13 (14 Jan 16:02 Spark Gaps adjustment) created by
- 3:01 PM Ticket #12 (14 Jan 13:20 Spark Gaps adjustment) created by
- 3:00 PM Ticket #11 (14 Jan 09:48 Spark Gaps Adjustment) created by
- 2:58 PM Ticket #10 (14 Jan 09:02 Experiment Configuration change) created by
- The pulse configuration file was changed and now it's ok identical to the …
- 2:55 PM Ticket #9 (14 Jan 07:19 Transmitter falls) created by
- 07:20 Transmitters were ok THe experiment continue
- 2:52 PM Ticket #8 (14 Jan 06:54 Start of the experiment) created by
- NOTE: There was a mystake with the configuration experiment early this …
Jan 13, 2015:
- 8:17 PM Ticket #7 (13 Jan 20:00 Stop of the experiment) created by
- Experiment is stopped according to the schedule. It is going to continue …
- 7:59 PM Ticket #6 (13 Jan 13:30 Spark-gaps adjustment) created by
- 13 Jan 14:45 Spark-gaps adjustment. 13 Jan 17:50 Spark-gaps adjustment.
- 7:57 PM Ticket #5 (13 Jan 13:30 Change of DDS) created by
- It was found that two channels of the DDS were not coding properly, so it …
- 7:56 PM Ticket #4 (13 Jan 07:55 Start of the experiment) created by
- Reception lines were checked before the start: Level noise of the A …
- 7:44 PM Ticket #3 (12 Jan 17:59 Antenna results) created by
- VSWR of the antenna quarters: WUP : 1.05 WDW : 1.08 NDW : 1.06 NUP : 1.03 …
- 7:36 PM Ticket #2 (13 Jan 19:00 Transmitter power measurements) created by
- 13:30 rf pulse coded 13:35 power adjustment PA1 and PA4 13:40 TX Power …
Jan 12, 2015:
- 10:56 AM Ticket #1 (12 Jan 10:35 Log created) created by
- The log has been created for the VIPIR + Topside Experiment 13-15 Jan …
Note: See TracTimeline
for information about the timeline view.