Timeline
Sep 29, 2017:
- 8:18 AM Ticket #1739 (29 Sep 08:00 Operation Resume) created by
- Person in Charge: A. Valdez. Experiment: drifts Medium power 1) 20:00 - …
- 7:54 AM Ticket #1738 (29 Sep 00:05 Plots) created by
- Plots of rti, spectrometers and drifts.
Sep 28, 2017:
- 7:59 PM Ticket #1737 (28 Sep 19:30 Transmitter report) created by
- 09:00 Power sample (-70 dB coupling) D2 -5.0 dBm D4 -5.1 dBm Line Voltage …
- 8:30 AM Ticket #1736 (28 Sep 08:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: drifts Medium power 1) 20:00 - …
- 8:08 AM Ticket #1735 (28 Sep 07:40 Plots) created by
- Plots of rti, spectrogram and drifts.
- 7:58 AM Ticket #1734 (28 Sep 04:13 Spark gaps adjustment) created by
- 27-09-2017 23:23 Spark gaps adjustment 28-09-2017 04:13 Spark gaps …
- 7:57 AM Ticket #1733 (28 Sep 07:04 Noise levels) created by
- 27-09-2017 22:05 EW-DRIFTS A:25.93 C:27.17 IMAGING 1:15.95 2:15.12 3:16.07 …
- 7:53 AM Ticket #1732 (28 Sept 07:30 Transmitter report) created by
- 20:00 Power sample (-70 dB coupling) D1 -8.3 dBm D2 -5.0 dBm D4 -5.0 dBm …
- 2:14 AM Ticket #1731 (28 Sep 00:05 Plots) created by
- Plots of rti, spectrometers and drifts.
Sep 27, 2017:
- 8:16 PM Ticket #1730 (27 Sep 20:00 Operation Resume) created by
- Person in Charge: R. Yanque Experiment: Medium Power 1) 08:00 - 20:00 2) …
- 8:09 PM Ticket #1729 (27 Sep 19:38 Noise Levels) created by
- Meduim Power ChB 2 dB Attenuation ChA 0 dB Attenuation
- 8:08 PM Ticket #1728 (27 Sep 18:04 Spark Gaps) created by
- 09:06 Spark Gaps Adjustment 13:21 Spark Gaps Adjustment 18:04 Spark Gaps …
- 7:58 PM Ticket #1727 (27 Sept 19:30 Transmitter report) created by
- 09:00 Power sample (-70 dB coupling) D2 -5.0 dBm D4 -5.0 dBm Line Voltage …
- 6:03 PM Ticket #1726 (27 Sep 17:17 Imaging On) created by
- Imaging experiment on
- 6:03 PM Ticket #1725 (27 Sep 16:20 VIPIR On) created by
- Vipir is turned on with an IPP of 1500 Km
- 5:59 PM Ticket #1724 (26 Sep 20:07 Spark Gaps) created by
- 10:49 Spark Gap Adjustment 15:36 Spark Gap Adjustment 20:07 Spark Gap …
- 5:51 PM Ticket #1723 (26 Sep 09:50 Reciever) created by
- 1 dB is attenuated to have same noise in each channel
- 5:43 PM Ticket #1722 (26 Sep 09:30 Radar down) created by
- The radar was down due to the following: Change of the hard disk for the …
- 4:16 PM Ticket #1721 (26 Sep 20:00 Operation Resume) created by
- 7:28 AM Ticket #1720 (27 Set 07:00 Transmitter Power Measurements) created by
- 00:00 Power sample (-70 dB coupling) D1 -8.1 dBm D2 -5.0 dBm D4 -4.9 dBm …
Sep 26, 2017:
- 11:32 PM Ticket #1719 (26 Set 23:05 Transmitter Power Measurements) created by
- 20:00 Power sample (-70 dB coupling) D1 -8.1 dBm D2 -5.1 dBm D4 -5.0 dBm …
- 7:27 AM Ticket #1718 (26 Set 07:00 Transmitter Power Measurements) created by
- 00:00 Power sample (-70 dB coupling) D2 -5.1 dBm D4 -5.0 dBm Line Voltage …
- 7:22 AM Ticket #1717 (26 Sep 08:00 Operation Resume) created by
- Person in Charge: A.Valdez. Experiment: Medium Power 1) 20:00 - 08:00 2) …
- 1:56 AM Ticket #1716 (25 sep 23:59 Plots) created by
- Plots of experiment before and after problems and midnight
Sep 25, 2017:
- 11:45 PM Ticket #1715 (25 Set 23:20 Transmitter Power Measurements) created by
- 17:30 LV ON 17:50 HV ON 18:00 Power sample (-70 dB coupling) D1 -8.8 dBm …
- 4:45 PM Ticket #1714 (25 Sep 15:00 Antenna VSWR) created by
- 49.72 49.92 50.12 WUp 1.15 1.08 1.30 WDn 1.20 1.02 …
- 9:23 AM Ticket #1713 (25 Sep 09:00 Log Created) created by
- L. User: P. Condor Starts: Mon Sep 25 2017 Ends: Sat Sep 30 2017 Drifts …
Sep 21, 2017:
- 7:24 AM Ticket #1712 (21 Set 07:00 Transmitter Power Measurements) created by
- 00:00 Power sample (-70 dB coupling) Tx1 +2.9 dBm Line Voltage and Power: …
- 6:52 AM Ticket #1711 (20 sep 23:59 Plots) created by
Sep 20, 2017:
- 11:24 PM Ticket #1710 (20 Set 23:00 Transmitter Power Measurements) created by
- 17:00 LV 17:30 HV 17:30 Power sample (-70 dB coupling) Tx1 +3.0 dBm …
- 8:40 PM Ticket #1709 (20 Sep 20:00 Operation Resume) created by
- 7:33 PM Ticket #1708 (20 Sep 18:03 Transmitter off) created by
- 18:03 Transmitter off 18:06 Transmitter on
- 7:32 PM Ticket #1707 (20 Sep 17:15 Experiment Start) created by
- The adquisition was started 17:28 Digisonde turned off
- 9:24 AM Ticket #1706 (20 Sep 09:00 Final Reports) created by
- The final report of the campaign The operativity of the campaign
- 8:16 AM Ticket #1705 (20 Sep 08:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: Meteor 1) 20:00 - 08:00 2) …
- 8:15 AM Ticket #1704 (20 Sep 07:50 Plots) created by
- Plots of rti and spectrogram
- 7:46 AM Ticket #1703 (20 Sep 06:29 Noise Levels) created by
- 19-09-2017 21:17 1:22.97 2:22.94 3:23.03 20-09-2017 00:35 1:21.61 2:21.56 …
- 7:25 AM Ticket #1702 (20 Set 07:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Tx1 +3.4 dBm Line Voltage and …
- 1:34 AM Ticket #1701 (20 sep 01:00 Plots) created by
- Plots of rti and spectrogram of Meteor.
Sep 19, 2017:
- 11:25 PM Ticket #1700 (19 Set 23:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +3.0 dBm Line Voltage and …
- 8:17 PM Ticket #1699 (19 Set 20:00 Transmitter report) created by
- 17:30 TX Power sample (-70 dB coupling) Tx1 +3.0 dBm Line Voltage and …
- 8:11 PM Ticket #1698 (19 Sep 19:50 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: Meteors 1) 17:30 - 20:00 2) …
- 7:32 PM Ticket #1697 (19 Sep 17:50 Turn digisonde off) created by
- Digisonde and vipir were off for this experiment.
- 7:31 PM Ticket #1696 (19 Sep 17:30 Experiment started) created by
- For this day: ipp=1500Km tx=67.5Km DC=4.5%
- 5:32 PM Ticket #1695 (19 Sep 17:00 Log Created) created by
- Campaign Meteors L. User K. Kuyeng Starts Tue 19 ends Thu 21 in the …
Sep 14, 2017:
- 10:57 AM Ticket #1694 (12 Sep 12:30 Upload data to PUMA) created by
- Faraday: 1045 files, 54.5G Drifts: 2664 files, 188G Imaging: 747 files, …
Sep 11, 2017:
- 7:50 PM Ticket #1693 (11 Set 19:30 Plots) created by
- 7:50 PM Ticket #1692 (11 Sep 2017 19:15 End experiment) created by
- ISR + Imaging end experiment Por falla en tramnsmisores (alarma de …
- 7:49 PM Ticket #1691 (11 Sep 2017 17:30 Imaging experiment started) created by
- 7:47 PM Ticket #1690 (11 Sep 2017 19:30 Spark-gap adjustment) created by
- 08:59 Spark gaps adjustment 12:04 Spark gaps adjustment 16:34 Spark gaps …
- 7:46 PM Ticket #1689 (11 Set 2017 19:30 Operation Resume) created by
- Person in Charge: K.Kuyeng Experiment: _ISR-Imaging 1) 08:00 - 20:00 2) …
- 8:13 AM Ticket #1688 (11 set 08:00 Operation resume) created by
- Person in Charge: P. Condor. Experiment: EW_drifts+Faraday+Imaging 1) …
- 8:08 AM Ticket #1687 (11 Set 07:50 Plots) created by
- Plots of rtis, spectras and parameters.
- 7:56 AM Ticket #1686 (11 Set 07:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx2 +2.3 dBm Tx3 +6.4 dBm Tx4 +2.6 …
- 7:39 AM Ticket #1685 (11 set 04:49 Spark gaps adjustment) created by
- 10-09-2017 22:38 Spark gaps adjustment 11-09-2017 01:35 Spark gaps …
- 7:35 AM Ticket #1684 (11 set 06:40 Imaging off) created by
- Imaging off
- 7:34 AM Ticket #1683 (11 set 06:37 Noise levels) created by
- 10-09-2017 21:11 EW DRIFTS A:23.98 B:23.87 C:24.12 D:24.00 FARADAY …
- 1:05 AM Ticket #1682 (11 Set 00:10 Plots) created by
- Plots of rtis, spectras and parameters.
Note: See TracTimeline
for information about the timeline view.