Timeline


and

Aug 20, 2015:

1:08 PM Ticket #457 (20 Aug 10:00 Final Report) created by ryanque
The report of the campaign is included. There is some interference every …

Aug 17, 2015:

3:05 PM Ticket #456 (09 Jul 16:58 Transmitter off) created by pcondor
Transmitter off
3:03 PM Ticket #455 (09 Jul 11:04 Transmitter off) created by pcondor
Transmitter off.
2:00 PM Ticket #454 (08 Jul 15:30 Transmitter Off) created by pcondor
Transmitter off for revision of lines.

Aug 12, 2015:

1:02 PM Ticket #453 (12 Aug 10:00 Final Report) created by ryanque
The report has been uploaded. There is interference in channel B, as in …

Aug 11, 2015:

5:18 PM Ticket #394 (15 Jul 20:00 Operation Resume) reopened by ryanque
5:06 PM Ticket #365 (13 Jul 19:55 Operation Resume) reopened by ryanque
4:49 PM Ticket #365 (13 Jul 19:55 Operation Resume) closed by ryanque
invalid

Jul 31, 2015:

12:06 PM Ticket #452 (31 Jul 11:40 Operativity ISR+Imaging July) created by ryanque
ISR+Imaging Support ISR School 20 to 23 July 2015

Jul 30, 2015:

5:50 PM Ticket #451 (30 Jul 17:30 Operativity DP Faraday July) created by ryanque
DP Faraday July 2015 Support CNOFS 13 to 17 July
5:46 PM Ticket #394 (15 Jul 20:00 Operation Resume) closed by ryanque
invalid
5:15 PM Ticket #450 (30 Jul 17:00 Operativity) created by ryanque
MST ISR EEJ 14 to 17 July
2:26 PM Ticket #449 (30 Jul 14:00 Operativity Resume) created by ryanque
Valley Experiment 08 to 12 Jun 2015
1:56 PM Ticket #448 (30 Jul 13:00 Resume MST-ISR-EEJ Apr 2015) created by ryanque
The report of MST-ISR-EEJ April 14 to 17 2015
12:54 PM Ticket #446 (15 Apr 20:00 Operation Resume) closed by ryanque
invalid
12:22 PM Ticket #447 (27 Jul 17:50 Data was uploaded to PUMA) created by ryanque
The data was uploaded to PUMA 2015_07/SupportCNOFS

Jul 27, 2015:

5:42 PM Ticket #446 (15 Apr 20:00 Operation Resume) created by ryanque
Person in Charge: J. Verastegui Experiment: Mst-Isr-EEj 1) 08:00 - 20:00 …
12:17 PM Ticket #445 (21 Jul 23:59 Plots) created by imanay
11:31 AM Ticket #444 (27 Jul 11:30 Data was uploaded to PUMA) created by imanay
EW_Drift: Nro. files: 1156, Size: 82.2 GB Faraday: Nro files: 391, Size: …

Jul 23, 2015:

4:55 PM Ticket #443 (23 Jul 08:20 Experiment ended) created by ryanque
The experiment has ended at 08:20
4:54 PM Ticket #442 (23 Jul 08:00 Operation Resume) created by ryanque
Person in Charge: A. Belleza Experiment: EW_Drift-Faraday-Imaging 1) 20:00 …
7:03 AM Ticket #441 (23 Jul 07:00 Transmitter Power Measurement) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 +6.6 dBm Tx2 +1.5 dBm Tx4 +1.1 …
6:18 AM Ticket #440 (23 Jul 06:30 Stop Imaging) created by abelleza
Stop Imaging at JARS
12:32 AM Ticket #439 (22 Jul 23:59 Load Plots) created by abelleza
Load Plots

Jul 22, 2015:

11:07 PM Ticket #438 (22 Jul 23:00 Transmitter Power Measurement) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +6.6 dBm Tx2 +1.6 dBm Tx4 +1.2 …
7:59 PM Ticket #437 (22 Jul 19:59 Operation resume) created by pcondor
Person in Charge: P. Condor. Experiment: EW_Drift-Faraday-Imaging 1) 08:00 …
7:56 PM Ticket #436 (22 Jul 19:45 Transmitter power measurements) created by ryaya
09:00 TX Power sample (-70 dB coupling) Tx1 +6.8 dBm Tx2 +1.6,3.7 dBm Tx4 …
7:55 PM Ticket #435 (22 Jul 19:50 Tx off) created by pcondor
Tx off at: 09 to change disk 10, 12 and 15 hours for visit
7:52 PM Ticket #434 (22 Jul 17:29 Spark gaps Adjustment) created by pcondor
11:28 Spark gaps Adjustment 14:31 Spark gaps Adjustment 17:29 Spark …
7:50 PM Ticket #433 (22 Jul 17:31 Start Imaging) created by pcondor
Start Imaging
7:48 PM Ticket #432 (22 Jul 16:15 Restart Faraday) created by pcondor
Restart Faraday for desynchronization.
7:45 PM Ticket #431 (22 Jul 14:59 Reset pc Faraday) created by pcondor
Reset pc Faraday because it was desinchronizated
7:43 PM Ticket #430 (22 Jul 11:00 Attenuation in Faraday) created by pcondor
Attenuation in Faraday CH A 3 db Ch B 8 db
7:40 PM Ticket #429 (22 Jul 10:00 Reset batch Faraday for desinchronization) created by pcondor
Reset batch Faraday for desinchronization
7:38 PM Ticket #428 (22 Jul 08:20 Restart Faraday) created by pcondor
Restart Faraday because Farday was off from yesterday at 21 hours.
8:02 AM Ticket #427 (22 Jul 08:00 Operation Resume) created by dlume
Person in Charge: D. Lume. Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
7:27 AM Ticket #426 (22 Jul 07:25 Transmitter Power Measurement) created by rtadeo
18:00 TX Power sample (-70 dB coupling) Tx1 +6.7 dBm Tx2 +1.6 dBm Tx4 +1.3 …
7:16 AM Ticket #425 (22 Jul 04:40 Spark Gap Adjustment) created by dlume
7:10 AM Ticket #424 (22 Jul 01:17 Spark Gap Adjustment) created by dlume
7:06 AM Ticket #423 (21 Jul 23:59 Stop Imaging) created by dlume
7:03 AM Ticket #422 (21 Jul 22:20 Galaxy pass) created by dlume
7:01 AM Ticket #421 (21 Jul 22:10 Spark Gap Adjustment) created by dlume

Jul 21, 2015:

7:29 PM Ticket #420 (21 Jul 20:00 Operation Resume) created by ryanque
Person in Charge: R. Yanque. Experiment: ISR+Imaging 1) 08:00 - 20:00 2) …
7:24 PM Ticket #419 (21 Jul 18:37 Spark Gaps resume) created by ryanque
09:39 Spark Gap adjustment 12:34 Spark Gap adjustment 15:57 Spark Gap …
7:19 PM Ticket #418 (21 Jul 17:40 Start Imaging) created by ryanque
Imaging is started
7:17 PM Ticket #417 (21 Jul 11:37 Attenuations) created by ryanque
EW Drift (03 Pre-amps) ChA 0 dB ChB 1 dB ChC 0 dB ChD 1 dB Faraday (04 …
7:12 PM Ticket #416 (21 Jul 08:00 Spark Gap Summary) created by ryanque
July 20 21:35 ATR Spark Gap adjustment July 21 00:40 ATR Spark Gap …
7:04 PM Ticket #415 (21 Jul 08:00 Operation Resume) created by ryanque
Person in Charge: A. Belleza. Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
7:02 PM Ticket #414 (21 Jul 19:00 Transmitter Power Measurement) created by vquesada
08:00 TX Power sample (-70 dB coupling) Tx1 +6.7 dBm Tx2 +1.5,3.6 dBm Tx4 …
10:19 AM Ticket #413 (21 Jul 10:00 Low power at PA2 and PA4) created by ryaya
PA2 and PA4 have been selected for transmitting the Faraday pulses. They …
10:18 AM Ticket #412 (21 Jul 08:26 TR Faraday is changed and a flip is connected in faraday that ...) created by pcondor
TR Faraday is changed and a flip is connected in faraday that was not put. …
10:13 AM Ticket #411 (21 Jul 08:09 We changed ChA for Ch B faraday) created by pcondor
We changed ChA for Ch B faraday. After is returned.
10:12 AM Ticket #410 (21 Jul 08:08 Ch B - Faraday is attenuated 2 db) created by pcondor
Ch B - Faraday is attenuated 2 db
10:05 AM Ticket #409 (21 Jul 08:00 Imaging Off and restart Faraday) created by pcondor
Imaging Off and restart Faraday because it is desynchronized.
10:03 AM Ticket #408 (20 Jul 16:30 Start Imaging) created by pcondor
Imaging On. We do calibration of noise and after Imaging is all OK.
10:02 AM Ticket #407 (20 Jul 18:00 Change of Hybrid) created by pcondor
We change Hybrid of Faraday. But Faraday no produce good Te.
10:00 AM Ticket #406 (20 Jul 16:05 Start with TX) created by pcondor
Start acquisition with Tx. EW_Drift is ok but Faraday no give good Te.
9:55 AM Ticket #405 (21 Jul 21:33 Stop Acquisition Faraday) created by pcondor
Faraday acquisition stopped due to reset of PC
9:26 AM Ticket #404 (21 Jul 09:23 Plot Faraday OK) created by pcondor
Parameters
8:04 AM Ticket #403 (21 Jul 07:30 Transmitter Power Measurement) created by rtadeo
20:00 TX Power sample (-70 dB coupling) Tx1 +6.8 dBm Tx2 +1.4 dBm Tx4 +0.5 …
Note: See TracTimeline for information about the timeline view.