Changes between Initial Version and Version 2 of Ticket #25


Ignore:
Timestamp:
Jan 20, 2015 8:51:02 AM (10 years ago)
Author:
imanay
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Ticket #25

    • Property Cc ramiro.yanque@…, marco.milla@…, percy.condor@…, alexander.valdez@… added
    • Property Summary changed from 16 Jan 11:00 Tests after the experiment to 16 Jan 11:00 Tests after the end of experiment
  • Ticket #25 – Description

    initial v2  
    1 Because channels C and D suddenly behaved weird (See coherence plot in Figure 1), a test was implemented after the end of the experiment: Two pairs of hybrid inputs were exchanged, the one that generates the A and B channels were exchanged with the one that generates the C and D channels. According to Figure 2, the problem found in the CD coherence plot, it is showed at the AB coherence plot now. A VSWR measure of the antenna showed that it has not problem, also ues lines were checked and they were ok. Only a part of the ATR was pending to check, 
     1Because channels C and D suddenly behaved weird (See coherence plot in Figure 1), a test was implemented after the end of the experiment: Two pairs of hybrid inputs were exchanged, the one that generates the A and B channels were exchanged with the one that generates the C and D channels. According to Figure 2, the problem found in the CD coherence plot, it is showed at the AB coherence plot now. A VSWR measure of the antenna showed that it had not problem, also ues lines were checked and they were ok. Only a part of the ATR was pending to check.