Opened 10 years ago

Last modified 10 years ago

#159 assigned Break Experiment

26 Mar 13:23 Stop power transmission

Reported by: dcordova Owned by: dcordova
Priority: high Milestone: 2015_03 ISR + Imaging CNOFS Support
Component: ISR Version:
Keywords: Cc:

Description

Because of a failure in the water pump, we have to stpo thw power transmission.
One of the phases of low pressure water-pump showed high current, compared with the other phases, so this activated the current protection of this pump, besides generated a signal alarm in the transmitter control program.
The currents that we measured when the pump is turn on are(A): 55,53, 71
Then, we changed the pump for another, the currents that we measured when the pump is turn on are(A): 54,54, 54
The voltages in the pump are 470VAC

Change History (2)

comment:1 Changed 10 years ago by dcordova

  • Priority changed from normal to high

comment:2 Changed 10 years ago by dcordova

  • Owner set to dcordova
  • Status changed from new to assigned
Note: See TracTickets for help on using tickets.