111	16 Feb 17:00 Operation Resumen	ISR			General		new	2015-02-16T17:33:56-05:00	2015-02-16T17:33:56-05:00		avaldez
802	Turno 23/01/2016 - 08:00 - 20:00	ISR			General		new	2016-01-23T21:20:59-05:00	2016-01-23T21:20:59-05:00	"09:03 Ajuste de ATrs

10:00 (JASMET) Se cambian los pulsos de jasmet de 84km a 42km y se calibra el canal D, ahora los ruidos son:
     A 41.8
     B 41.9
     C 41.9
     D 41.4
     E 42.8

12:20 Canal B se le coloca ateunador y se atenua 2 dB, ahora los ruidos son:

     MST    ISR    EEJ        JASMET
A    26.8   26.5   26.5       40.7
B    26.4   26.8   26.0       41.3
C    26.4   25.3   26.1       41.5
D    26.4   25.8   26.0       42.1
E                             42.3

12:28 Canal B ahora solo tiene 1 dB de atenuacion

15:16 ajuste de ATrs

16:13 Niveles de ruido

     MST    ISR    EEJ        JASMET
A    25.7   25.5   25.6       37.9
B    25.2   24.9   25.1       38.2
C    25.2   24.3   25.0       38.8
D    25.6   24.8   25.1       40.1
E                             39.2

18:10 ajuste de Atrs
18:50 ajuste de Atrs
"	kkuyeng
1815	23 Jan 11:59 plot	ISR			Plot	abelleza	new	2018-01-22T08:04:23-05:00	2018-01-22T08:04:23-05:00	23 Jan 11:59 plot	abelleza
90	14 Feb 23:55 Transmitter Power Measurements	ISR			Start experiment		new	2015-02-15T00:34:33-05:00	2015-02-15T00:34:33-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9 dBm
Tx4 +2.1 dBm
D3 -5.6 dBm
Line voltage and power: 4080 VAC, 300 KW

'''20:16 driver Tx1 OFF, problem in pulse of EW_Drifts.
20:20 HV OFF
22:38 HV ON'''

22:40 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9 dBm
Tx4 +2.1 dBm
D3 -5.6 dBm
Line voltage and power: 4020 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +2.0 dBm
Tx4 +2.3 dBm
D3 -5.6 dBm
Line voltage and power: 4050 VAC, 300 KW"	vquesada
248	25 May 20:40 Start Experiment	ISR			Start experiment		new	2015-05-26T18:20:45-05:00	2015-05-26T18:20:45-05:00	The acquisition starts.	ryanque
255	26 May 12:34 Faraday spectra Channel B a little low	ISR			Start experiment		new	2015-05-26T19:16:29-05:00	2015-05-26T19:16:29-05:00	"Spectra on Channel B of Faraday a little low.
Could be due to ABS system, Digisonde shows low Ionosphere activity."	ryanque
619	11 Dec 07:10 Transmitter power measurements	ISR+Imaging			Transmitters		new	2015-12-11T08:25:50-05:00	2015-12-11T08:25:50-05:00	"10/12/2015
19:50 Problem detected at PA2 screen power suply
20:05 Problem detected at PA2 screen power suply
21:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +6.2 dBm
Dr3 -5.8 dBm
Line voltage and power: 4050 VAC, 360 KW
22:08 RF OFF (Adquisition system request)
22:15 RF ON
22:45 CROWBAR (Problem is used to check the Rx B on Imaging before restarting TX's)
23:59 HV ON
11/12/2015
00:10 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.8 dBm
Dr3 OFF
01:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Dr3 OFF
Line voltage and power: 4050 VAC, 350 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Dr3 OFF
Line voltage and power: 4050 VAC, 350 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +6.3 dBm
Tx4 +6.0 dBm
Dr3 OFF
Line voltage and power: 4100 VAC, 360 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.8 dBm
Dr3 OFF
Line voltage and power: 4040 VAC, 350 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.8 dBm
Dr3 OFF
Line voltage and power: 4050 VAC, 350 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.8 dBm
Dr3 OFF
Line voltage and power: 4040 VAC, 350 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.8 dBm
Dr3 OFF
Line voltage and power: 4100 VAC, 360 KW"	ryaya
651	13 Dec 19:50 Transmitter power measurements	ISR+Imaging			Transmitters		new	2015-12-13T21:01:57-05:00	2015-12-13T21:01:57-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.3 dBm
Line voltage and power: 4050 VAC, 350 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.9 dBm
Line voltage and power: 4030 VAC, 350 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.9 dBm
Line voltage and power: 4040 VAC, 350 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.8 dBm
Line voltage and power: 4040 VAC, 350 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.8 dBm
Line voltage and power: 4050 VAC, 350 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.9 dBm
Line voltage and power: 4080 VAC, 350 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.9 dBm
Line voltage and power: 4080 VAC, 350 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4050 VAC, 350 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.8 dBm
Line voltage and power: 4040 VAC, 350 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.9 dBm
Line voltage and power: 4050 VAC, 350 KW"	ryaya
680	05 Jan 19:30 Transmitter Power Measurements	ISR+Imaging			Transmitters		new	2016-01-05T20:47:22-05:00	2016-01-05T20:47:22-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Line voltage: 4050 VAC
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage: 4050 VAC
10:30 SYSTEM OFF - New config. combine PA1 with PA4 for EW DRIFT experiment and Dr2 to Imaging 
11:55 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4080 VAC, 360 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4020 VAC, 360 KW
14:30 Problem with phase at PA1 + PA4, new adjustment is done
14:40 RF off - Rx requirement
14:47 RF ON
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage and power: 4060 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage and power: 4060 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage and power: 4080 VAC, 360 KW
17:40 RF OFF - Rx requirement
17:50 RF ON - Dr2 ON IMAGING
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage and power: 4040 VAC, 350 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage and power: 4100 VAC, 360 KW"	ryaya
1774	16 Dec 19:34 Transmitter  Failures	ISR			Transmitters		new	2017-12-16T17:07:40-05:00	2017-12-16T17:07:40-05:00	"12:15 RF control fails
17:28 Overcurrent in the Tx3 screen source"	vquesada
10	14 Jan 09:02 Experiment  Configuration change	ISR		2015_01 VIPIR + Topside	Acquisition system		new	2015-01-14T14:58:38-05:00	2015-01-14T14:58:38-05:00	The pulse configuration file was changed and now it's ok identical to the configuration yesterday. 	avaldez
3	12 Jan 17:59 Antenna results	ISR		2015_01 VIPIR + Topside	Antennas	W. Rojas	new	2015-01-13T19:44:28-05:00	2015-01-14T19:08:53-05:00	"VSWR of the antenna quarters:

WUP : 1.05
WDW : 1.08
NDW : 1.06
NUP : 1.03
EUP : 1.03
EDW : 1.06
SDW : 1.04
SUP : 1.06"	imanay
7	13 Jan 20:00 Stop of the experiment	ISR		2015_01 VIPIR + Topside	Break Experiment	I. Manay	new	2015-01-13T20:17:49-05:00	2015-01-13T20:17:49-05:00	Experiment is stopped according to the schedule. It is going to continue the next day at 07:00 AM.	imanay
14	14 Jan 17:30 Problems with Channel C or D Stop the experiment	ISR		2015_01 VIPIR + Topside	General		new	2015-01-14T21:25:23-05:00	2015-01-14T21:25:23-05:00	"1) We make a change between hybrid 1 (ChA&CHB) and 2(ChC&ChD) to identify it's the problem is the hybryd or something else. If we don't see a swap in Cross-Spectra graphics  the hybrid is not the problem. So, after the change hybrid we don't see any swap in the cross-spectra graphics. Then the hybrid are ok. We did the same test changing channel A&B with C&D in th input of T/R after the change we notice that the ghraphics swap , so that means that the problem is outside, also we did the probe in the amplifier channel changing the same position getting the same resulta, so the conclusion I think There is a problem in the compensation device or in the antennas, please comment if something is not clear.

18:30 THe experiment continue.
"	avaldez
19	14 Jan 23:33  End of Experiment 150 km Jicamarca	ISR		2015_01 VIPIR + Topside	General	AValdez	new	2015-01-15T08:17:23-05:00	2015-01-15T08:17:23-05:00		avaldez
22	15 Jan 08:00 Events at A, B, G and H channels	ISR		2015_01 VIPIR + Topside	General	I. Manay	new	2015-01-15T18:44:05-05:00	2015-01-15T18:44:05-05:00	It was observed an increase of the noise level at A and B channels, then they recovered and an increase of the noise level was observed at G and H channels. Finally G and H channels recovered but some interferences were observed for a while.	imanay
26	19 Jan 14:30 Experiment manual	ISR		2015_01 VIPIR + Topside	General	I. Manay	new	2015-01-19T14:45:45-05:00	2015-01-19T14:52:17-05:00		imanay
27	04 Feb 08:10 Operation Resumen	ISR		2015_01 VIPIR + Topside	General	avaldez	new	2015-02-04T08:40:07-05:00	2015-02-16T17:47:47-05:00		avaldez
16	14 Jan 20:00   Spread F start	ISR		2015_01 VIPIR + Topside	Physical Phenomena		new	2015-01-14T21:27:01-05:00	2015-01-14T21:27:01-05:00		avaldez
17	14 Jan 21:00 Coherence 32 Short Pulse   Problem durind the day	ISR		2015_01 VIPIR + Topside	Plot		new	2015-01-14T21:33:21-05:00	2015-01-14T21:33:21-05:00	In the Coherence graphics the picture show that there was some problems started from 10am to 2pm to degrade the coherence signal, so we need to be carefull with this problem tomorrow	avaldez
6	13 Jan 13:30 Spark-gaps adjustment	ISR		2015_01 VIPIR + Topside	Spark Gaps	W. Rojas	new	2015-01-13T19:59:27-05:00	2015-01-13T19:59:27-05:00	"13 Jan 14:45 Spark-gaps adjustment.
13 Jan 17:50 Spark-gaps adjustment."	imanay
11	14 Jan 09:48 Spark Gaps Adjustment	ISR		2015_01 VIPIR + Topside	Spark Gaps		new	2015-01-14T15:00:09-05:00	2015-01-14T15:00:09-05:00		avaldez
12	14 Jan 13:20 Spark Gaps adjustment	ISR		2015_01 VIPIR + Topside	Spark Gaps		new	2015-01-14T15:01:57-05:00	2015-01-14T15:01:57-05:00		avaldez
13	14 Jan 16:02 Spark Gaps adjustment	ISR		2015_01 VIPIR + Topside	Spark Gaps		new	2015-01-14T19:32:29-05:00	2015-01-14T19:32:29-05:00		avaldez
15	14 Jan 19:15 Spark Gaps adjustment	ISR		2015_01 VIPIR + Topside	Spark Gaps		new	2015-01-14T21:26:13-05:00	2015-01-14T21:26:13-05:00		avaldez
24	15 Jan 19:29 spark-gap adjustments	ISR		2015_01 VIPIR + Topside	Spark Gaps	I. Manay	new	2015-01-15T20:00:21-05:00	2015-01-15T20:00:21-05:00	"15 Jan 07:20 spark-gap adjustment.
15 Jan 10:27 spark-gap adjustment.
15 Jan 13:37 spark-gap adjustment.
15 Jan 16:23 spark-gap adjustment.
15 Jan 19:29 spark-gap adjustment."	imanay
1	12 Jan 10:35 Log created	ISR		2015_01 VIPIR + Topside	Start experiment	ryanque	new	2015-01-12T10:56:49-05:00	2015-01-12T10:56:49-05:00	"The log has been created for the 
VIPIR + Topside Experiment
13-15 Jan 2015

User: E. Kudeki, M. Milla"	ryanque
4	13 Jan 07:55 Start of the experiment	ISR		2015_01 VIPIR + Topside	Start experiment	I. Manay	new	2015-01-13T19:56:47-05:00	2015-01-13T19:56:47-05:00	Reception lines were checked before the start: Level noise of the A channel is higher than the others, G and H noise levels are the lower.	imanay
8	14 Jan 06:54  Start of the experiment	ISR		2015_01 VIPIR + Topside	Start experiment		new	2015-01-14T14:52:24-05:00	2015-01-14T14:52:24-05:00	NOTE: There was a mystake with the configuration experiment early this morning, we were running from 7am to 9am with a different pulse configuration,the difference  in this case was  it had just 340 profiles there were no profiles for the noise, then, we did the change to the correct configuration pulse which works fine yesterday, this happened   at 9:00 am  aproximately, please take care and don't forget this when you or someone else  is processing the data.	avaldez
20	15 Jan 07:22 Re-start of the experiment	ISR		2015_01 VIPIR + Topside	Start experiment	I. Manay	new	2015-01-15T18:31:39-05:00	2015-01-15T18:31:52-05:00		imanay
2	13 Jan 19:00 Transmitter power measurements	ISR		2015_01 VIPIR + Topside	Transmitters		new	2015-01-13T19:36:34-05:00	2015-01-13T19:36:34-05:00	"
13:30 rf pulse coded
13:35 power adjustment PA1 and PA4
13:40 TX Power sample (-70 dB coupling)
 Tx1 +4.7 dBm
 Tx4 +5.0 dBm
 Line voltage and power: 4050 VAC, 320 KW
14:00 TX Power sample (-70 dB coupling)
 Tx1 +4.7 dBm
 Tx4 +5.0 dBm
 Line voltage and power: 4050 VAC, 320 KW
15:00 TX Power sample (-70 dB coupling)
 Tx1 +4.1 dBm
 Tx4 +4.2 dBm
 Line voltage and power: 4030 VAC, 320 KW
16:00 TX Power sample (-70 dB coupling)
 Tx1 +4.0 dBm
 Tx4 +3.9 dBm
 Line voltage and power: 4030 VAC, 320 KW
17:00 TX Power sample (-70 dB coupling)
 Tx1 +4.0 dBm
 Tx4 +3.8 dBm
 Line voltage and power: 4020 VAC, 320 KW
18:00 TX Power sample (-70 dB coupling)
 Tx1 +4.0 dBm
 Tx4 +3.8 dBm
 Line voltage and power: 4020 VAC, 320 KW
18:50 power adjustment PA4
19:00 TX Power sample (-70 dB coupling)
 Tx1 +4.2 dBm
 Tx4 +4.0 dBm
 Line voltage and power: 4020 VAC, 320 KW
20:00 TX (OFF)

"	rtadeo
9	14 Jan 07:19   Transmitter falls	ISR		2015_01 VIPIR + Topside	Transmitters		new	2015-01-14T14:55:31-05:00	2015-01-14T14:55:31-05:00	07:20 Transmitters were ok THe experiment continue	avaldez
18	14 Jan 23:00 Transmitter Power Measurements	ISR		2015_01 VIPIR + Topside	Transmitters		new	2015-01-14T23:20:52-05:00	2015-01-14T23:20:52-05:00	"06:50 LV ON
06:55 HV ON
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.3 dBm
Line voltage and power: 4080 VAC, 340 KW
08:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.3 dBm
Line voltage and power: 4080 VAC, 340 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.3 dBm
Line voltage and power: 4050 VAC, 340 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line voltage and power: 4020 VAC, 340 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 +4.4 dBm
Line voltage and power: 4020 VAC, 340 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 +4.4 dBm
Line voltage and power: 4050 VAC, 340 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 +4.1 dBm
Line voltage and power: 4020 VAC, 330 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 +4.1 dBm
Line voltage and power: 4000 VAC, 330 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 +4.1 dBm
Line voltage and power: 4000 VAC, 330 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 +4.1 dBm
Line voltage and power: 4000 VAC, 330 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 +4.2 dBm
Line voltage and power: 4050 VAC, 340 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 +4.1 dBm
Line voltage and power: 4050 VAC, 340 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 +4.1 dBm
Line voltage and power: 4080 VAC, 340 KW
20:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 +4.2 dBm
Line voltage and power: 4080 VAC, 340 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 +4.1 dBm
Line voltage and power: 4080 VAC, 340 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.2 dBm
Line voltage and power: 4080 VAC, 340 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.2 dBm
Line voltage and power: 4080 VAC, 340 KW.
"	vquesada
21	15 Jan 07:33 Adjustment at transmitter	ISR		2015_01 VIPIR + Topside	Transmitters	I. Manay	new	2015-01-15T18:35:02-05:00	2015-01-15T18:35:02-05:00	It was observed a slighty power differences between the two transmitters, so an adjustment was made.	imanay
23	15 Jan 19:00 Transmitter Power Measurements	ISR		2015_01 VIPIR + Topside	Transmitters		new	2015-01-15T19:35:12-05:00	2015-01-15T19:35:12-05:00	"

06:50 LV ON
07:00 HV ON
07:15 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 +3.8 dBm
Line voltage and power: 4050 VAC, 320 KW
07:40failure source screen
08:00 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 +3.5 dBm
Line voltage and power: 4000 VAC, 320 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 +3.3 dBm
Line voltage and power: 4000 VAC, 310 KW
10:17 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 +3.2 dBm
Line voltage and power: 3950 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +3.9 dBm
Tx4 +3.1 dBm
Line voltage and power: 3950 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +3.9 dBm
Tx4 +3.0 dBm
Line voltage and power: 3950 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +3.8 dBm
Tx4 +3.0 dBm
Line voltage and power: 3950 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +3.8 dBm
Tx4 +3.0 dBm
Line voltage and power: 3950 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +3.9 dBm
Tx4 +2.9 dBm
Line voltage and power: 3950 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 +3.0 dBm
Line voltage and power: 4000 VAC, 310 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 +3.0 dBm
Line voltage and power: 4050 VAC, 310 KW
20:00 TX (OFF)"	rtadeo
36	10 Feb 18:00 Imaging experiment is started	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system	I. Manay	new	2015-02-10T19:16:08-05:00	2015-02-10T19:16:08-05:00		imanay
49	11 Feb 11:11 Lost of data	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system	A. Aguilar	new	2015-02-11T20:04:35-05:00	2015-02-11T20:04:35-05:00	"ARES PC turns hang for 8 minutes. 
Operation was restored at 11:19"	aaguilar
57	11 Feb 20:31 Problem with PC ARES	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system		new	2015-02-12T03:38:00-05:00	2015-02-12T03:38:00-05:00	Problem with PC ARES. Restart pc.	pcondor
58	11 Feb 20:32  Faraday Desincronization	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system		new	2015-02-12T03:39:07-05:00	2015-02-12T03:39:07-05:00	Faraday Desincronization	pcondor
59	11 Feb 20:32 Restart EW_Drift	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system		new	2015-02-12T03:40:04-05:00	2015-02-12T03:40:04-05:00	 Restart EW_Drift	pcondor
60	11 Feb 20:40 Restart Faraday	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system		new	2015-02-12T03:40:54-05:00	2015-02-12T03:40:54-05:00	Restart Faraday	pcondor
62	12 Feb 01:40 OFF Imaging	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system		new	2015-02-12T04:19:52-05:00	2015-02-12T04:19:52-05:00	OFF Imaging	pcondor
72	13 Feb 00:30 Imaging system shut down, EW drift RF signal reconnected	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Acquisition system		new	2015-02-13T08:02:27-05:00	2015-02-13T08:02:27-05:00		jverastegui
82	14 Feb 01:30 Imaging experiment is finished	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system	I. Manay	new	2015-02-14T04:19:32-05:00	2015-02-14T04:19:32-05:00		imanay
87	14 Feb 11:50 Attenuation Channel E	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system	AVALDEZ	new	2015-02-14T19:51:46-05:00	2015-02-14T19:51:46-05:00	The attenuation of channel E was 9dB. We changed the value to 8dB to get same noise level in channel A and B of Faraday.	avaldez
89	14 Feb 22:40 Restart Adquisition	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system	P.Condor	new	2015-02-15T00:08:44-05:00	2015-02-15T00:08:44-05:00	"Restart Adquisition. Because at 20:43 OFF transmitter thinking that the problem is TX1 but really It was pulse of EW_Drifts.
Restart Pulse and EW_drifts. Also restart Faraday and Imaging.
All is ok "	pcondor
93	14 Feb 19:50 Faraday Desynchronization	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system	P. Condor	new	2015-02-15T07:51:04-05:00	2015-02-15T07:51:04-05:00	 Faraday Desynchronization 	pcondor
96	14 Feb 22:00 The problem was the pulse of EW_Drifts	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system	P. Condor	new	2015-02-15T07:57:17-05:00	2015-02-15T07:57:17-05:00	" The problem was the pulse of EW_Drifts and no Tx1.
Pulse EW_Drifts was corrected and we are On all as before"	pcondor
97	14 Feb 22:40 Restart Acquisition	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system	P. Condor	new	2015-02-15T07:59:16-05:00	2015-02-15T07:59:16-05:00	 Restart Acquisition. EW_drift, Faraday and Imaging was working normally	pcondor
99	15 Feb 02:07 Imaging OFF	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system	P. Condor	new	2015-02-15T08:18:13-05:00	2015-02-15T08:18:13-05:00	 Imaging OFF	pcondor
102	15 Feb 06:40 Faraday Desynchronization	ISR		2015_02 ISR + Imaging (ISCOD)	Acquisition system	P. Condor	new	2015-02-15T08:22:37-05:00	2015-02-15T08:22:37-05:00	Faraday Desynchronization	pcondor
29	09 Feb 12:19 Antenna VSWR	ISR		2015_02 ISR + Imaging (ISCOD)	Antennas	ryanque	new	2015-02-09T12:51:34-05:00	2015-02-09T12:51:34-05:00	"SUP 1.05
SDN 1.06
EDN 1.02
EUP 1.05
NUP 1.08
NDN 1.06
WDN 1.06
WUP 1.03"	ryanque
39	10 Feb 19:59 Operation resume	ISR		2015_02 ISR + Imaging (ISCOD)	General	I. Manay	new	2015-02-10T20:25:37-05:00	2015-02-10T20:25:37-05:00	"Experiment: ISR + Imaging
1) 08:00 - 20:00
2) Operation Hours: 11 h 45 minutes
3) Operation incomplete: 15 minutes
4) Reasons:
-Transmitters were off.
-Acquisition pcs hung."	imanay
45	11 Feb 08:00 Operation Resume	ISR		2015_02 ISR + Imaging (ISCOD)	General	AVALDEZ	new	2015-02-11T08:06:27-05:00	2015-02-11T08:06:27-05:00	"Experiment: ISR + Imaging
1) 20:00 - 08:00
2) Operation Hours: 12 h 00 minutes
3) Operation incomplete: 00 minutes
4) Reasons:
- There was no stop."	avaldez
55	11 Feb 19:52 Operation Resume	ISR		2015_02 ISR + Imaging (ISCOD)	General	A. Aguilar	new	2015-02-11T20:25:49-05:00	2015-02-11T20:25:49-05:00	"Experiment: ISR + Imaging
1) 08:00 - 20:00
2) Operation Hours: 11 h 51 minutes
3) Operation incomplete: 9 minutes
4) Reasons:
-Transmitters were off.
-Acquisition pcs hung."	aaguilar
64	12 Feb 06:20 Moon Pass	ISR		2015_02 ISR + Imaging (ISCOD)	General		new	2015-02-12T07:23:57-05:00	2015-02-12T07:23:57-05:00	Moon pass producing interferences	pcondor
67	12 Feb 07:59 Operation Resume	ISR		2015_02 ISR + Imaging (ISCOD)	General		new	2015-02-12T08:22:52-05:00	2015-02-12T08:22:52-05:00	"Person in Charge: P. Condor
Experiment: EW_Drift-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 11h 49 min
3) Operation incomplete: 11 min
4) Reasons:
a) Desyncronization Faraday:8min
b) Tx Off: 3 min"	pcondor
80	13 Feb 19:59 Operation Resume	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	General		new	2015-02-13T20:30:55-05:00	2015-02-13T20:30:55-05:00	"Person in Charge: Julio Oscanoa
Experiment: EW_Drift-Faraday-Imaging
1) 08:00 - 20:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:
"	joscanoa
85	14 Feb 07:59 Operation resume	ISR		2015_02 ISR + Imaging (ISCOD)	General	I. Manay	new	2015-02-14T08:34:14-05:00	2015-02-14T08:34:14-05:00	"Experiment: ISR + Imaging
1) 20:00 - 08:00
2) Operation Hours: 11 h 55 minutes
3) Operation incomplete: 5 minutes
4) Reasons:
-Transmitters were off."	imanay
94	14 Feb 20:10 Problem with Faraday and EW_Drifts	ISR		2015_02 ISR + Imaging (ISCOD)	General	P. Condor	new	2015-02-15T07:53:05-05:00	2015-02-15T07:53:05-05:00	Problem with Faraday and EW_Drifts. Also in Tx 1. We are checking.	pcondor
104	15 Feb Operation Resume	ISR		2015_02 ISR + Imaging (ISCOD)	General	P. Condor	new	2015-02-15T08:37:19-05:00	2015-02-15T08:37:19-05:00	"Person in Charge: P. Condor
Experiment: EW_Drift-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 09h 52 min
3) Operation incomplete: 2h 08 min
4) Reasons:
a) Desyncronization Faraday:5 min
b) Tx Off: 2h
c) Tx off: 3 min"	pcondor
113	18 Feb 15:00 Data uploaded to PUMA	ISR		2015_02 ISR + Imaging (ISCOD)	General	I. Manay	new	2015-02-18T15:20:08-05:00	2015-02-18T15:20:08-05:00	"1) EW_Drift:
170GB, 2386 files.
2) Faraday:
48.3GB, 931 files.
3)Imaging
263GB, 338 files."	imanay
92	14 Feb 19:45 Restart Digisonde	ISR		2015_02 ISR + Imaging (ISCOD)	Other Instruments	P. Condor	new	2015-02-15T07:48:59-05:00	2015-02-15T07:48:59-05:00	 Restart Digisonde	pcondor
50	11 Feb 12:20 Sun appears in data	ISR		2015_02 ISR + Imaging (ISCOD)	Physical Phenomena	A. Aguilar	new	2015-02-11T20:11:57-05:00	2015-02-11T20:11:57-05:00	 Sun appears in data	aaguilar
33	10 Feb 12:30 Increase of the noise level	ISR		2015_02 ISR + Imaging (ISCOD)	Plot	I. Manay	new	2015-02-10T15:55:11-05:00	2015-02-10T16:00:41-05:00	All channels increased the noise level due to solar event.	imanay
34	10 Feb 17:40 Interference was observed	ISR		2015_02 ISR + Imaging (ISCOD)	Plot	I. Manay	new	2015-02-10T19:02:00-05:00	2015-02-10T19:02:00-05:00	40 minutes interference was observed at the EW_Drift experiment.	imanay
43	11 Feb 07:00 Figures of Experiment	ISR		2015_02 ISR + Imaging (ISCOD)	Plot		new	2015-02-11T07:38:23-05:00	2015-02-11T07:38:23-05:00		avaldez
70	13 Feb 00:02 Plots of rti and spectra	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Plot		new	2015-02-13T03:40:57-05:00	2015-02-13T03:40:57-05:00		jverastegui
73	13 Feb 00:35 Internet conection intermitent, uploaded plots aren´t great or take too much time to upload	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Plot		new	2015-02-13T08:05:41-05:00	2015-02-13T08:05:41-05:00		jverastegui
76	13 Feb 12:15 Interference was observed	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Plot		new	2015-02-13T18:42:06-05:00	2015-02-13T18:42:06-05:00	Unknown interference appeared at 12:15 in both Drifts and Faraday experiments for about 15-20 minutes, then disappeared.	joscanoa
81	13 Feb 23:59 Experiment plots	ISR		2015_02 ISR + Imaging (ISCOD)	Plot	I. Manay	new	2015-02-14T00:24:01-05:00	2015-02-14T00:24:01-05:00		imanay
61	11 Feb 23:00 Plots of rti and spectra	ISR		2015_02 ISR + Imaging (ISCOD)	Process/Analysis Program		new	2015-02-12T03:42:35-05:00	2015-02-12T03:42:35-05:00	 Plots of rti and spectra	pcondor
98	14 Feb 23:59 Plots of rti, noise  and others	ISR		2015_02 ISR + Imaging (ISCOD)	Process/Analysis Program	P. Condor	new	2015-02-15T08:00:12-05:00	2015-02-15T08:00:12-05:00	Plots of rti, noise  and others	pcondor
100	14 Feb 23:58 Plot Imaging	ISR		2015_02 ISR + Imaging (ISCOD)	Process/Analysis Program		new	2015-02-15T08:19:38-05:00	2015-02-15T08:19:38-05:00	Plot Imaging	pcondor
37	10 Feb 18:08 PC Ares is restarted	ISR		2015_02 ISR + Imaging (ISCOD)	Reception	I. Manay	new	2015-02-10T19:24:02-05:00	2015-02-10T19:24:02-05:00	PC Ares hang, so it was restarted. There was not data for about two minutes.	imanay
44	11 Feb 06:15 Problems with channel E	ISR		2015_02 ISR + Imaging (ISCOD)	Reception	AVALDEZ	new	2015-02-11T08:03:34-05:00	2015-02-11T08:03:34-05:00	"Channel 1 Faraday = Channel Rxb fARADAY DP

The channel1 of Faraday increase the noise level in 3 dB, we change T/R outside but nothing happened, then we change the amplifier, nothing happened, finally we decided to increment the attenuation level from 9 to 11dB.
The test started at 6 am and finished at 6:52 am.
"	avaldez
30	10 Feb 07:12 Spark gap summary	ISR		2015_02 ISR + Imaging (ISCOD)	Spark Gaps	A. Coronado	new	2015-02-10T15:34:09-05:00	2015-02-14T06:25:10-05:00	"1) 10 Feb 07:12 spark gaps adjustment.
2) 10 Feb 11:15 spark gaps adjustment.
3) 10 Feb 15:20 spark gaps adjustment.
4) 10 Feb 19:15 spark gaps adjustment."	imanay
41	11 Feb 06:15 Spark gap summary	ISR		2015_02 ISR + Imaging (ISCOD)	Spark Gaps	AVALDEZ	new	2015-02-11T07:30:58-05:00	2015-02-11T07:30:58-05:00	"1) 10 Feb 22:00 spark gaps adjusment.
2) 11 Feb 02:00 spark gaps adjusment.
3) 11 Feb 06:15 spark gaps adjusment.
"	avaldez
47	11 Feb 09:55 Spark gaps adjustment	ISR		2015_02 ISR + Imaging (ISCOD)	Spark Gaps	A. Aguilar	new	2015-02-11T19:54:52-05:00	2015-02-11T19:54:52-05:00	Adjustment of TRs and ATRs	aaguilar
51	11 Feb 14:14 Spark Gaps adjustment	ISR		2015_02 ISR + Imaging (ISCOD)	Spark Gaps	A. Aguilar	new	2015-02-11T20:15:08-05:00	2015-02-11T20:24:02-05:00	Adjustment of TRs and ATRs	aaguilar
53	11 Feb 18:05 Spark Gaps Adjustment	ISR		2015_02 ISR + Imaging (ISCOD)	Spark Gaps	A. Aguilar	new	2015-02-11T20:20:55-05:00	2015-02-11T20:20:55-05:00	Adjustment of TRs and ATRs	aaguilar
65	12 Feb 06:15 Spark gaps adjustment	ISR		2015_02 ISR + Imaging (ISCOD)	Spark Gaps		new	2015-02-12T07:27:36-05:00	2015-02-12T07:27:36-05:00	"11 Feb 22:00
12 Feb 02:15
12 Feb 06;15
Adjustment of TRs and ATRs."	pcondor
69	12 Feb 22:20 Spark gaps adjustment	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Spark Gaps		new	2015-02-13T03:38:34-05:00	2015-02-13T03:38:34-05:00		jverastegui
74	13 Feb 02:10 Spark gaps adjustment	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Spark Gaps		new	2015-02-13T08:08:43-05:00	2015-02-13T08:08:43-05:00		jverastegui
75	13 Feb 06:20 Spark gaps adjustment	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Spark Gaps		new	2015-02-13T08:10:57-05:00	2015-02-13T08:10:57-05:00		jverastegui
78	13 Feb 18:01 Spark Gaps Adjustment	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Spark Gaps		new	2015-02-13T19:47:10-05:00	2015-02-13T19:47:10-05:00	"13 Feb 10:53 Adjustment of TRs and ATRs
13 Feb 14:34 Adjustment of TRs and ATRs
13 Feb 18:01 Adjustment of TRs and ATRs
"	joscanoa
84	14 Feb 06:30 Spark gaps summary	ISR		2015_02 ISR + Imaging (ISCOD)	Spark Gaps	J. Lavado	new	2015-02-14T07:03:20-05:00	2015-02-14T07:03:20-05:00	"1) 13 Feb 22:15 spark gaps adjustment.
2) 14 Feb 02:00 spark gaps adjustment.
3) 14 Feb 06:30 spark gaps adjustment."	imanay
86	14 Feb 19:10 Spark gaps summary	ISR		2015_02 ISR + Imaging (ISCOD)	Spark Gaps	AVALDEZ	new	2015-02-14T19:47:23-05:00	2015-02-14T19:47:23-05:00	"1) 14 Feb 10:27 spark gaps adjustment.
2) 14 Feb 14:22 spark gaps adjustment.
3) 14 Feb 18:38 spark gaps adjustment.
4) 14 Feb 18:50 Change of tungsteno element . Turn off transmitter for 14 minutes."	avaldez
103	15 Feb 06:25 Spark gaps adjustment	ISR		2015_02 ISR + Imaging (ISCOD)	Spark Gaps	A. Belleza	new	2015-02-15T08:34:19-05:00	2015-02-15T08:34:19-05:00	"14 Feb 22:40 Spark gaps adjustment
15 Feb 02:27 Spark gaps adjustment
15 Feb 06:25 Spark gaps adjustment
"	pcondor
105	15 Feb 10:40 Spark Gaps Adjusment	ISR		2015_02 ISR + Imaging (ISCOD)	Spark Gaps		new	2015-02-15T18:29:15-05:00	2015-02-15T18:30:04-05:00		dlume
107	15 Feb 14:50 Spark Gaps Adjusment	ISR		2015_02 ISR + Imaging (ISCOD)	Spark Gaps		new	2015-02-15T18:33:21-05:00	2015-02-15T18:33:21-05:00		dlume
28	09 Feb 11:58 Log created	ISR		2015_02 ISR + Imaging (ISCOD)	Start experiment		new	2015-02-09T12:30:26-05:00	2015-02-09T12:30:26-05:00	"Log created for 
ISR + Imaging Campaign
Stratospheric Warming (ISCOD)
Tue 10 - Sun 15 "	ryanque
31	10 Feb 07:15 Start of the experiment	ISR		2015_02 ISR + Imaging (ISCOD)	Start experiment	I. Manay	new	2015-02-10T15:37:12-05:00	2015-02-10T15:37:12-05:00		imanay
52	11 Feb 17:40  Imaging Experiment was started	ISR		2015_02 ISR + Imaging (ISCOD)	Start experiment	A. Aguilar	new	2015-02-11T20:19:32-05:00	2015-02-11T20:19:32-05:00	 Imaging Experiment was started. Signal Chain will start to plot at 18:00 o'clock	aaguilar
77	13 Feb 17:45 Imaging experiment was started	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Start experiment		new	2015-02-13T18:43:36-05:00	2015-02-13T18:43:36-05:00		joscanoa
106	15 Feb 12:10 Hydra	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Start experiment		new	2015-02-15T18:31:56-05:00	2015-02-15T18:31:56-05:00		dlume
108	15 Feb 15:20 Change TR of channel A	ISR		2015_02 ISR + Imaging (ISCOD)	Start experiment		new	2015-02-15T18:34:37-05:00	2015-02-15T18:34:37-05:00		dlume
109	15 Feb Operation Resume	ISR		2015_02 ISR + Imaging (ISCOD)	Start experiment		new	2015-02-15T19:28:25-05:00	2015-02-15T19:28:25-05:00	"Experiment: ISR
1) 08:00 - 19:00
2) Operation Hours: 11 h minutes
3) Operation incomplete:0 minutes
4) Reasons:
"	dlume
112	16 Feb 17:00 Operation Resumen	ISR		2015_02 ISR + Imaging (ISCOD)	Start experiment		new	2015-02-16T17:43:23-05:00	2015-02-16T17:43:23-05:00		avaldez
32	10 Feb 08:00 Transmitters fall twice	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters	I. Manay	new	2015-02-10T15:42:02-05:00	2015-02-10T15:42:02-05:00	"1) 07:24 during 3 minutes.
2) 07:55 during 8 minutes."	imanay
35	10 Feb 17:45 Transmitters fall	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters	I. Manay	new	2015-02-10T19:16:02-05:00	2015-02-10T19:16:02-05:00	For about 2 minutes.	imanay
38	10 Feb 19:30 Transmitter Power Measurements	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-10T20:02:54-05:00	2015-02-10T20:02:54-05:00	" 06:40 LV ON
 06:50 HV ON
 07:00 TX Power sample (-70 dB coupling)
 Tx1 +5.8 dBm
 Tx2 +1.9/+5.4 dBm
 Tx4 +2.0 dBm
 Dr3 Off
 Line voltage and power: 4000 VAC, 300 KW
 07:25 failure caused by crowbar
 08:00 PLC Fault variation in the AC lines(cooling system)
 09:00 TX Power sample (-70 dB coupling)
 Tx1 +6.0 dBm
 Tx2 +2.0/+5.8 dBm
 Tx4 +2.3 dBm
 Dr3 Off
 Line voltage and power: 4000 VAC, 300 KW
 10:00 TX Power sample (-70 dB coupling)
 Tx1 +5.8 dBm
 Tx2 +1.8/+5.5 dBm
 Tx4 +2.2 dBm
 Dr3 Off
 Line voltage and power: 4000 VAC, 300 KW
 11:00 TX Power sample (-70 dB coupling)
 Tx1 +5.8 dBm
 Tx2 +1.8/+5.5 dBm
 Tx4 +2.2 dBm
 Dr3 Off
 Line voltage and power: 4000 VAC, 300 KW
 12:00 TX Power sample (-70 dB coupling)
 Tx1 +6.0 dBm
 Tx2 +1.9/+5.8 dBm
 Tx4 +2.5 dBm
 Dr3 Off
 Line voltage and power: 4000 VAC, 300 KW
 13:00 TX Power sample (-70 dB coupling)
 Tx1 +5.8 dBm
 Tx2 +1.8/+5.8 dBm
 Tx4 +2.4 dBm
 Dr3 Off
 Line voltage and power: 4050 VAC, 300 KW
 14:00 TX Power sample (-70 dB coupling)
 Tx1 +5.8 dBm
 Tx2 +1.8/+5.8 dBm
 Tx4 +2.4 dBm
 Dr3 Off
 Line voltage and power: 4000 VAC, 300 KW
 15:00 TX Power sample (-70 dB coupling)
 Tx1 +5.9 dBm
 Tx2 +1.8/+5.8 dBm
 Tx4 +2.4 dBm
 Dr3 Off
 Line voltage and power: 4050 VAC, 300 KW
 16:00 TX Power sample (-70 dB coupling)
 Tx1 +5.9 dBm
 Tx2 +1.8/+5.8 dBm
 Tx4 +2.4 dBm
 Dr3 Off
 Line voltage and power: 4050 VAC, 300 KW
 17:00 TX Power sample (-70 dB coupling)
 Tx1 +5.9 dBm
 Tx2 +1.8/+5.8 dBm
 Tx4 +2.4 dBm
 Dr3 Off
 Line voltage and power: 4050 VAC, 300 KW
 17:20 Dr3 -5.8 dBm (Imaging ON)
 17:45 Failure source PA1 Screen
 18:00 TX Power sample (-70 dB coupling)
 Tx1 +6.0 dBm
 Tx2 +2.9 dBm
 Tx4 +2.4 dBm
 Dr3 -5.8 dBm
 Line voltage and power: 4100 VAC, 300 KW
 19:00 TX Power sample (-70 dB coupling)
 Tx1 +6.0 dBm
 Tx2 +2.9 dBm
 Tx4 +2.4 dBm
 Dr3 -5.9 dBm
 Line voltage and power: 4100 VAC, 300 KW



 
"	rtadeo
40	10 Feb 23:10 Transmitter Power Measurements	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-10T23:41:01-05:00	2015-02-10T23:41:01-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.8 dBm
Tx4 +2.4 dBm
D3  -5.8 dBm
Line voltage and power: 4080 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.8 dBm
Tx4 +2.4 dBm
D3  -5.8 dBm
Line voltage and power: 4080 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9 dBm
Tx4 +2.4 dBm
D3  -5.8 dBm
Line voltage and power: 4080 VAC, 310 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9 dBm
Tx4 +2.4 dBm
D3  -5.8 dBm
Line voltage and power: 4080 VAC, 310 KW
"	vquesada
42	11 Feb 07:00 Transmitter Power Measurements	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-11T07:34:28-05:00	2015-02-11T07:34:28-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx2 +1.9 dBm
Tx4 +2.5 dBm
D3 -5.8 dBm
Line voltage and power: 4080 VAC, 310 KW
01:00 D3  OFF
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx2 +1.9,5.6 dBm
Tx4 +2.5 dBm
Line voltage and power: 4080 VAC, 310 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9,5.6 dBm
Tx4 +2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9,5.6 dBm
Tx4 +2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9,5.6 dBm
Tx4 +2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9,5.6 dBm
Tx4 +2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx2 +2.1,6.0 dBm
Tx4 +2.5 dBm
Line voltage and power: 4000 VAC, 310 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx2 +2.1,6.0 dBm
Tx4 +2.5 dBm
Line voltage and power: 4000 VAC, 310 KW"	vquesada
46	11 Feb 08:37 Channel E issues	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters	A. Aguilar	assigned	2015-02-11T09:23:30-05:00	2015-02-11T09:32:29-05:00	Attenuation of channel E set to 9dB	aaguilar
48	11 Feb 19:25 Transmitter power measurement	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-11T20:03:22-05:00	2015-02-11T20:03:22-05:00	"09:00 TX Power sample (-70 dB coupling)
1 +5.8 dBm
2 +2.2 dBm/ +5.6 dBm
4 +2.4 dBm
Voltage line and power: 4080 VAC, 300 KW
09:20 Problem at PA 1 Screen power supply
12:00 TX Power sample (-70 dB coupling)
1 +5.8 dBm
2 +2.1 dBm/ +5.6 dBm
4 +2.4 dBm
Voltage line and power: 4060 VAC, 310 KW
14:00 TX Power sample (-70 dB coupling)
1 +5.7 dBm
2 +2.1 dBm/ +5.6 dBm
4 +2.4 dBm
Voltage line and power: 4010 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
1 +5.7 dBm
2 +2.1 dBm/ +5.6 dBm
4 +2.4 dBm
16:00 TX Power sample (-70 dB coupling)
1 +5.7 dBm
2 +2.0 dBm/ +5.6 dBm
4 +2.4 dBm
Voltage line and power: 4080 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
1 +5.6 dBm
2 +2.0 dBm/ +5.6 dBm
4 +2.4 dBm
Voltage line and power: 4020 VAC, 300 KW
17:40 Driver 3 ON (IMAGING)
18:00 TX Power sample (-70 dB coupling)
1 +5.8 dBm
2 +2.1 dBm
4 +2.4 dBm
D3 -5.6 dBm
Voltage line and power: 4050 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
1 +6.0 dBm
2 +2.1 dBm
4 +2.4 dBm
D3 -5.6 dBm
Voltage line and power: 4080 VAC, 300 KW"	ryaya
54	11 Feb 18:49 Transmitters go down	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters	A. Aguilar	new	2015-02-11T20:23:36-05:00	2015-02-11T20:23:36-05:00	Transmitters (channels A, B, C and D) go down for approximately 1 minute.	aaguilar
56	11 Feb 23:00 Transmitter Power Measurements	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-11T23:34:47-05:00	2015-02-11T23:34:47-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +2.0 dBm
Tx4 +2.4 dBm
D3 -5.6 dBm
Line voltage and power: 4080 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +2.0 dBm
Tx4 +2.4 dBm
D3 -5.6 dBm
Line voltage and power: 4080 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +2.0 dBm
Tx4 +2.4 dBm
D3 -5.6 dBm
Line voltage and power: 4080 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +2.0 dBm
Tx4 +2.4 dBm
D3 -5.6 dBm
Line voltage and power: 4080 VAC, 300 KW




"	vquesada
63	12 Feb 03:30 Tx Off	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-12T04:21:25-05:00	2015-02-12T04:21:25-05:00	Tx Off. Problem with transmitter it ON at 03:33	pcondor
66	12 Feb 23:00 Transmitter Power Measurements	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-12T07:33:17-05:00	2015-02-12T07:33:17-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +2.0 dBm
Tx4 +2.4 dBm
D3 -5.6 dBm
Line voltage and power: 4080 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +2.0 dBm
Tx4 +2.4 dBm
D3 -5.6 dBm
Line voltage and power: 4080 VAC, 300 KW
01:40 Driver 3 OFF
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +2.0, 6.0 dBm
Tx4 +2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +2.0, 6.0 dBm
Tx4 +2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx2 +2.1, 6.4 dBm
Tx4 +2.5 dBm
Line voltage and power: 4080 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx2 +2.1, 6.4 dBm
Tx4 +2.5 dBm
Line voltage and power: 4080 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.0, 6.2 dBm
Tx4 +2.4 dBm
Line voltage and power: 4040 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.0, 6.2 dBm
Tx4 +2.4 dBm
Line voltage and power: 4040 VAC, 300 KW"	vquesada
68	12 Feb 19:55 Transmitter power measurements	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-12T20:31:35-05:00	2015-02-12T20:31:35-05:00	"10:00 TX Power sample (-70 dB coupling)
1 +5.8 dBm
2 +2.0 dBm/ +5.6 dBm
4 +2.4 dBm
Voltage line and power: 4020 VAC, 300 KW
10:45 Problem at PA 1 screen power supply
11:00 TX Power sample (-70 dB coupling)
1 +5.7 dBm
2 +2.0 dBm/ +5.6 dBm
4 +2.4 dBm
Voltage line and power: 4050 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
1 +5.8 dBm
2 +2.1 dBm/ +5.6 dBm
4 +2.5 dBm
Voltage line and power: 4050 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
1 +5.8 dBm
2 +2.1 dBm/ +5.6 dBm
4 +2.3 dBm
Voltage line and power: 4020 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
1 +5.8 dBm
2 +2.1 dBm/ +5.7 dBm
4 +2.4 dBm
Voltage line and power: 4010 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
1 +5.8 dBm
2 +2.2 dBm/ +5.7 dBm
4 +2.4 dBm
Voltage line and power: 4020 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
1 +5.8 dBm
2 +2.0 dBm/ +5.6 dBm
4 +2.4 dBm
Voltage line and power: 4030 VAC, 300 KW
16:50 Problem at PA1 screen power supply
17:00 TX Power sample (-70 dB coupling)
1 +5.8 dBm
2 +2.1 dBm/ +5.7 dBm
4 +2.4 dBm
Voltage line and power: 4030 VAC, 300 KW
17:40 Driver 3 ON (IMAGING)
18:00 TX Power sample (-70 dB coupling)
1 +5.9 dBm
2 +2.2 dBm
4 +2.4 dBm
D3 -5.6 dBm
Voltage line and power: 4050 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
1 +5.8 dBm
2 +2.2 dBm
4 +2.4 dBm
D3 -5.6 dBm
Voltage line and power: 4050 VAC, 300 KW"	ryaya
71	13 Feb 07:30 Transmitter power measurements	ISR+Imaging		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-13T07:50:33-05:00	2015-02-13T07:50:33-05:00	" 
20:00 TX Power sample (-70 dB coupling)
 TX1 +5.8 dBm
 TX2 +2.2 dBm
 TX4 +2.4 dBm
 Dr3 -5.6 dBm
 Voltage line and power: 4060 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
 TX1 +5.8 dBm
 TX2 +2.2 dBm
 TX4 +2.4 dBm
 Dr3 -5.6 dBm
 Voltage line and power: 4060 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
 TX1 +5.9 dBm
 TX2 +2.2 dBm
 TX4 +2.4 dBm
 Dr3 -5.6 dBm
 Voltage line and power: 4070 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
 TX1 +5.9 dBm
 TX2 +2.0 dBm
 TX4 +2.4 dBm
 Dr3 -5.8 dBm
 Voltage line and power: 4060 VAC, 300 KW

13/02/2015
00:00 TX Power sample (-70 dB coupling)
 TX1 +5.9 dBm
 TX2 +2.0 dBm
 TX4 +2.4 dBm
 Dr3 -5.8 dBm
 Voltage line and power: 4080 VAC, 300 KW
00:30 Dr3 => OFF
01:00 TX Power sample (-70 dB coupling)
 TX1 +5.8 dBm
 TX2 +2.0 dBm/+5.4 dBm
 TX4 +2.5 dBm
 Voltage line and power: 4080 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
 TX1 +5.8 dBm
 TX2 +2.0 dBm/+5.4 dBm
 TX4 +2.5 dBm
 Voltage line and power: 4080 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
 TX1 +5.8 dBm
 TX2 +2.0 dBm/+5.4 dBm
 TX4 +2.5 dBm
 Voltage line and power: 4080 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
 TX1 +5.7 dBm
 TX2 +2.0 dBm/+5.4 dBm
 TX4 +2.5 dBm
 Voltage line and power: 4080 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
 TX1 +5.5 dBm
 TX2 +2.0 dBm/+5.3 dBm
 TX4 +2.5 dBm
 Voltage line and power: 4080 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
 TX1 +5.5 dBm
 TX2 +2.0 dBm/+5.3 dBm
 TX4 +2.5 dBm
 Voltage line and power: 4080 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
 TX1 +5.4 dBm
 TX2 +2.0 dBm/+5.3 dBm
 TX4 +2.5 dBm
 Voltage line and power: 4100 VAC, 300 KW
"	rtadeo
79	13 Feb 19:20 Transmitter Power Measurements	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-13T19:54:01-05:00	2015-02-13T19:54:01-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx2 +2.1,5.2 dBm
Tx4 +2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx2 +2.1,5.2 dBm
Tx4 +2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.0,5.2 dBm
Tx4 +2.4 dBm
Line voltage and power: 4000 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.0,5.2 dBm
Tx4 +2.4 dBm
Line voltage and power: 4000 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.0,5.3 dBm
Tx4 +2.5 dBm
Line voltage and power: 4080 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.0,5.3 dBm
Tx4 +2.5 dBm
Line voltage and power: 4080 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +1.9,5.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +1.9,5.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +1.9,6.0 dBm
Tx4 +2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +1.9,5.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 4000 VAC, 300 KW
17:45 Driver ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.2 dBm
Tx4 +2.5 dBm
D3  -5.7 dbm
Line voltage and power: 4080 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.2 dBm
Tx4 +2.5 dBm
D3  -5.7 dbm
Line voltage and power: 4080 VAC, 300 KW"	vquesada
83	14 Feb 03:30 Transmitters fall	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters	I. Manay	new	2015-02-14T04:36:11-05:00	2015-02-14T04:36:11-05:00	Because of changes at the voltage line.	imanay
88	14 Feb 19:25 Transmitter power measurement	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-14T20:03:31-05:00	2015-02-14T20:03:31-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +1.9,5.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4000 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx2 +2.0,5.6 dBm
Tx4 +2.3 dBm
Line voltage and power: 4080 VAC, 310 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +2.0,5.5 dBm
Tx4 +2.2 dBm
Line voltage and power: 4050 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.1,5.6 dBm
Tx4 +2.3 dBm
Line voltage and power: 4050 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.0,5.6 dBm
Tx4 +2.3 dBm
Line voltage and power: 4020 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx2 +2.0,5.6 dBm
Tx4 +2.3 dBm
Line voltage and power: 4050 VAC, 300 KW
14:40 Problem at Dr1 screen power supply
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.1,5.6 dBm
Tx4 +2.4 dBm
Line voltage and power: 4070 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.1,5.7 dBm
Tx4 +2.4 dBm
Line voltage and power: 4060 VAC, 300 KW
17:50 Driver 3 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.1 dBm
Tx4 +2.3 dBm
D3 -5.6 dbm
Line voltage and power: 4050 VAC, 300 KW
18:45 RF OFF - Spark gap replacement
19:00 RF ON
TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.0 dBm
Tx4 +2.3 dBm
D3 -5.6 dbm
Line voltage and power: 4060 VAC, 300 KW"	ryaya
91	15 Feb 07:05 Transmitter Power Measurements	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-15T07:39:01-05:00	2015-02-15T07:39:01-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +2.0 dBm
Tx4 +2.3 dBm
D3 -5.6 dBm
Line voltage and power: 4080 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx2 +2.2 dBm
Tx4 +2.4 dBm
D3 -5.6 dBm
Line voltage and power: 4100 VAC, 310 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx2 +2.2 dBm
Tx4 +2.4 dBm
D3 -5.6 dBm
Line voltage and power: 4100 VAC, 310 KW
02:07 Driver 3 OFF
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +5.7,2.0 dBm
Tx4 +2.2 dBm
Line voltage and power: 4050 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +5.7,2.0 dBm
Tx4 +2.2 dBm
Line voltage and power: 4050 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +5.8,2.0 dBm
Tx4 +2.3 dBm
Line voltage and power: 4080 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +5.8,2.0 dBm
Tx4 +2.3 dBm
Line voltage and power: 4080 VAC, 300 KW
06:27 Crowbar.
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +5.8,2.0 dBm
Tx4 +2.3 dBm
Line voltage and power: 4080 VAC, 300 KW


"	vquesada
95	14 Feb 20:43 Problem with Transmitter	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters	P. Condor	new	2015-02-15T07:54:38-05:00	2015-02-15T07:54:38-05:00	 Problem with Transmitter. Off all  to check Tx1.	pcondor
101	15 Feb 06:28 Problem with Tx	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters	P. Condor	new	2015-02-15T08:20:22-05:00	2015-02-15T08:20:22-05:00	Problem with Tx	pcondor
110	15 Feb 19:00 Transmitter power measurements	ISR		2015_02 ISR + Imaging (ISCOD)	Transmitters		new	2015-02-15T19:32:45-05:00	2015-02-15T19:32:45-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +1.9,5.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4050 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +2.1,5.8 dBm
Tx4 +2.3 dBm
Line voltage and power: 4080 VAC, 310 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.0,5.6 dBm
Tx4 +2.3 dBm
Line voltage and power: 4040 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx2 +2.0,5.7 dBm
Tx4 +2.4 dBm
Line voltage and power: 4060 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx2 +1.9,5.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4050 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx2 +1.9,5.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4050 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +1.9,5.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4020 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +1.9,5.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4030 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx2 +1.9,+5.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4060 VAC, 300 KW
19:00 RF OFF, HV OFF"	ryaya
133	25 Mar 01:00 Imaging Off	ISR		2015_03 ISR + Imaging CNOFS Support	Acquisition system		new	2015-03-25T04:53:19-05:00	2015-03-25T04:53:19-05:00	Imaging Off	pcondor
140	25 Mar 10:20 Faraday experiment unsynchronized	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Acquisition system		new	2015-03-25T19:40:32-05:00	2015-03-25T19:40:32-05:00		jverastegui
141	25 Mar 10:23 Ares PC rebooted, it was halted.	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Acquisition system		new	2015-03-25T19:51:30-05:00	2015-03-25T19:51:30-05:00		jverastegui
144	25 Mar 10:50 Restarting clock divider device.	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Acquisition system		new	2015-03-25T19:55:34-05:00	2015-03-25T19:55:34-05:00		jverastegui
145	25 Mar 10:23 Changing the Trendnet device that change the aquisition computers monitors.	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Acquisition system		new	2015-03-25T19:56:38-05:00	2015-03-25T19:56:38-05:00		jverastegui
146	25 Mar 11:20 System completely restored with the processing software.	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Acquisition system		new	2015-03-25T20:11:17-05:00	2015-03-25T20:11:17-05:00		jverastegui
148	25 Mar 17:40 Imaging system started.	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Acquisition system		new	2015-03-25T20:13:09-05:00	2015-03-25T20:13:09-05:00		jverastegui
153	26 Mar 01:00 Imaging experiment ended	ISR		2015_03 ISR + Imaging CNOFS Support	Acquisition system	I. Manay	new	2015-03-26T06:27:31-05:00	2015-03-26T06:27:31-05:00		imanay
166	27 Mar 00:45 Imaging experiment ended	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Acquisition system		new	2015-03-27T01:00:47-05:00	2015-03-27T01:00:47-05:00	Imaging experiment was ended	joscanoa
175	26 Mar 22:00 Imaging Acquisition System Lost of synchronization	ISR		2015_03 ISR + Imaging CNOFS Support	Acquisition system	ryanque	new	2015-04-01T14:30:15-05:00	2015-04-01T14:30:15-05:00	"At 19:50 The Imaging acquisition system lost synchronization and automatically recovered it.
At 22:00 The Imaging acquisition system lost synchronization and automatically recovered it."	ryanque
506	23 Sep 00:06 Imaging Off	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Acquisition system		new	2015-09-23T00:38:48-05:00	2015-09-23T00:38:48-05:00	23 Sep 00:06 Imaging Off	abelleza
115	23 Mar 12:30 Antenna VSWR	ISR		2015_03 ISR + Imaging CNOFS Support	Antennas	ryanque	new	2015-03-23T12:35:21-05:00	2015-03-23T12:35:21-05:00	"Antenna VSWR
WUp 1.03
WDn 1.02
NDn 1.03
NUP 1.09
EUp 1.04
EDn 1.05
SDn 1.07
SUp 1.05"	ryanque
117	23 Mar 07:59 Operation resume	ISR		2015_03 ISR + Imaging CNOFS Support	General	I. Manay	new	2015-03-23T20:02:42-05:00	2015-03-23T20:02:42-05:00	"Experiment: ISR + Imaging
1) 18:40 - 20:00
2) Operation Hours: 1 h 20 minutes
3) Operation incomplete: 0 minutes
4) Reasons:
-None."	imanay
121	24  Mar 07:59 Operation resume	ISR		2015_03 ISR + Imaging CNOFS Support	General	AVALDEZ	new	2015-03-24T07:12:13-05:00	2015-03-24T07:12:13-05:00	"Experiment: ISR + Imaging
1) 20:00 - 08:00
2) Operation Hours: 11 h 50 minutes
3) Operation incomplete: 10 minutes
4) Reasons:
-Problem with Tx."	avaldez
122	24 Mar 08:45 Noise Level Increase	ISR		2015_03 ISR + Imaging CNOFS Support	General		new	2015-03-24T09:37:56-05:00	2015-03-24T09:37:56-05:00	Increase in noise / interference from unknown source. 08:45am- 09:05 am	jortiz
137	25 Mar 08:00 Operation Resume	ISR		2015_03 ISR + Imaging CNOFS Support	General		new	2015-03-25T07:41:45-05:00	2015-03-25T07:41:45-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 11h 57 min
3) Operation incomplete: 3 min
4) Reasons:
a) Tx off 3 min."	pcondor
154	26 Mar 06:20 Problem with channel A of ew_drift experiment	ISR		2015_03 ISR + Imaging CNOFS Support	General	I. Manay	new	2015-03-26T06:43:11-05:00	2015-03-26T06:46:13-05:00	Channel A is about 2db less than the other channels. A and B cables at the input of the TR-s were exchanged (See RTI at 06:00 AM). Spark gaps were checked and they were ok.	imanay
156	26 Mar 07:59 Operation resume	ISR		2015_03 ISR + Imaging CNOFS Support	General	I. Manay	new	2015-03-26T07:58:36-05:00	2015-03-26T07:58:36-05:00	"Experiment: ISR + Imaging
1) 20:00 - 08:00
2) Operation Hours: 12 h
3) Operation incomplete: 0 h
4) Reasons:
-None."	imanay
172	27 Mar 08:00 Operation Resume	ISR		2015_03 ISR + Imaging CNOFS Support	General		new	2015-03-27T08:07:09-05:00	2015-03-27T08:07:09-05:00	"Person in Charge: Julio Oscanoa
Experiment: EW_Drift-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons: - 
"	joscanoa
173	31 Mar 09:56 Operability	ISR		2015_03 ISR + Imaging CNOFS Support	General		new	2015-03-31T10:05:37-05:00	2015-03-31T10:05:37-05:00	File of operability campaign	pcondor
174	31 Mar 14:40 Data uploaded to PUMA	ISR		2015_03 ISR + Imaging CNOFS Support	General	I. Manay	new	2015-03-31T14:48:07-05:00	2015-03-31T14:48:07-05:00	"1) EW_Drift:
Nro. files : 1528.
Size : 108GB.

2) Faraday:
Nro. files : 604.
Size : 31.7GB

3) Imaging:
Nro. files : 266.
Size : 207GB"	imanay
119	23 Mar 23:59 Plot Imaging	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Plot	AVALDEZ	new	2015-03-24T05:07:08-05:00	2015-03-24T05:07:08-05:00		avaldez
152	25 Mar 23:59 Plots of the experiments	ISR		2015_03 ISR + Imaging CNOFS Support	Plot	I. Manay	new	2015-03-25T23:51:09-05:00	2015-03-25T23:51:09-05:00		imanay
165	26 Mar 23:59  Plots of the experiment	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Plot		new	2015-03-27T00:29:32-05:00	2015-03-27T00:37:02-05:00		joscanoa
462	25 Agu 23:59 Last Plots of the Experiment	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Plot		new	2015-08-26T00:18:01-05:00	2015-08-26T00:18:01-05:00	25 Agu 23:59 Last Plots of the Experiment	abelleza
505	22 Sep 23:50 Experiment Plot	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Plot		new	2015-09-23T00:10:44-05:00	2015-09-23T00:10:44-05:00	22 Sep 23:50 Experiment Plot	abelleza
132	24 Mar 23:59 Plots	ISR		2015_03 ISR + Imaging CNOFS Support	Process/Analysis Program		new	2015-03-25T00:20:42-05:00	2015-03-25T00:20:42-05:00	Plots of spectra, rtis and others.	pcondor
139	25  Mar 10:15 IDL software stopped processing EW drift data.	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Process/Analysis Program		new	2015-03-25T19:37:12-05:00	2015-03-25T19:37:12-05:00		jverastegui
143	25 Mar 10:30 Faraday processing software restarted and synchronized.	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Process/Analysis Program		new	2015-03-25T19:54:35-05:00	2015-03-25T19:54:35-05:00		jverastegui
167	27 Mar 05:15 Processing software stopped working	ISR		2015_03 ISR + Imaging CNOFS Support	Process/Analysis Program		new	2015-03-27T06:30:17-05:00	2015-03-27T06:30:54-05:00	The IDL drifts and Signal Chain software freezed and stopped processing.	joscanoa
168	27 Mar 06:00 Processing software was restarted	ISR		2015_03 ISR + Imaging CNOFS Support	Process/Analysis Program		new	2015-03-27T06:32:13-05:00	2015-03-27T06:32:13-05:00	Drifts program was restarted	joscanoa
464	26 Aug 00:16 Imaging Off	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Process/Analysis Program		new	2015-08-26T07:57:36-05:00	2015-08-26T07:57:36-05:00	26 Aug 00:16 Stop Imaging at JARS	abelleza
465	26 Aug 01:10 Restart Faraday	ISR		2015_03 ISR + Imaging CNOFS Support	Process/Analysis Program		new	2015-08-26T07:58:55-05:00	2015-08-26T07:58:55-05:00	26 Aug 01:10 Restart Faraday	abelleza
149	25 Mar 18:00 Channels 2 and 8 attenuated by 1 dB	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Reception		new	2015-03-25T20:14:13-05:00	2015-03-25T20:14:13-05:00		jverastegui
158	26 Mar 8:17 Attenuation has been changed in channel B of the Drift experiment	ISR		2015_03 ISR + Imaging CNOFS Support	Reception	dcordova	assigned	2015-03-26T18:46:49-05:00	2015-03-26T19:38:34-05:00	"Because exists a difference (1 dB) in the power noise of channel A and B, it was changed the attenuation in B, from 1 to 2dB
Now, the level of noise(dB) in the Drift mode are:
A:23.56
B:24.13
C:24.17
D:24.28"	dcordova
123	24 Mar 09:10 Spark gaps adjustment	ISR		2015_03 ISR + Imaging CNOFS Support	Spark Gaps		new	2015-03-24T09:49:15-05:00	2015-03-24T09:49:15-05:00		jortiz
125	24 Mar 12:08 Spark gaps adjustment	ISR		2015_03 ISR + Imaging CNOFS Support	Spark Gaps		new	2015-03-24T12:39:56-05:00	2015-03-24T12:39:56-05:00		jortiz
126	24 Mar 15:23 Spark gaps adjustment	ISR		2015_03 ISR + Imaging CNOFS Support	Spark Gaps		new	2015-03-24T16:08:04-05:00	2015-03-24T16:08:04-05:00		jortiz
129	24 Mar 18:35 Spark gaps adjustment	ISR		2015_03 ISR + Imaging CNOFS Support	Spark Gaps		new	2015-03-24T18:38:57-05:00	2015-03-24T18:38:57-05:00		jortiz
136	25 Mar 07:30 Spark gaps adjustment	ISR		2015_03 ISR + Imaging CNOFS Support	Spark Gaps		new	2015-03-25T07:30:27-05:00	2015-03-25T07:30:27-05:00	"22:30 Spark gaps adjustment
03:30 Spark gaps adjustment
06:30 Spark gaps adjustment"	pcondor
142	25 Mar 10:29 Spark gaps adjustment	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Spark Gaps		new	2015-03-25T19:52:33-05:00	2015-03-25T19:52:33-05:00		jverastegui
147	25 Mar 14:28 Spark gaps adjustment	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Spark Gaps		new	2015-03-25T20:12:01-05:00	2015-03-25T20:12:01-05:00		jverastegui
150	25 Mar 18:35 Spark gaps adjustment	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Spark Gaps		new	2015-03-25T20:14:52-05:00	2015-03-25T20:14:52-05:00		jverastegui
151	25 Mar 22:35 Spark gaps summary	ISR		2015_03 ISR + Imaging CNOFS Support	Spark Gaps	I. Manay	new	2015-03-25T23:03:24-05:00	2015-03-26T06:31:54-05:00	"1) 25 Mar 22:35 spark gaps adjustment.
2) 26 Mar 02:21 spark gaps adjustment.
3) 26 Mar 06:20 spark gaps adjustment."	imanay
164	26 Mar 19:30 Spark gaps summary	ISR		2015_03 ISR + Imaging CNOFS Support	Spark Gaps	A.Coronado	new	2015-03-26T19:19:23-05:00	2015-03-26T19:19:23-05:00	"The time intervals for adjusting the spark gaps are:
10:20
16:25
"	dcordova
170	27 Mar 07:30 Spark gaps summary	ISR		2015_03 ISR + Imaging CNOFS Support	Spark Gaps		new	2015-03-27T07:31:53-05:00	2015-03-27T07:31:53-05:00	"The spark gaps were adjusted at:
26 Mar 20:40
27 Mar 00:20
27 Mar 04:00"	joscanoa
507	23 Set 07:33 Spark gaps adjustment	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Spark Gaps		new	2015-09-23T08:02:00-05:00	2015-09-23T08:02:00-05:00	"22 Set 21:40 Spark gaps adjustment
23 Set 00:45 Spark gaps adjustment
23 Set 03:35 Spark gaps adjustment
23 Set 06:50 Spark gaps adjustment

By J.Lavado"	abelleza
114	Log created	ISR		2015_03 ISR + Imaging CNOFS Support	Start experiment	ryanque	new	2015-03-18T16:22:05-05:00	2015-03-18T16:22:05-05:00	"The log has been created for the following campaign

- ISR + Imaging
Mon 23 to Fri 27 March 2015
Local User: Percy Condor"	ryanque
116	23 Mar 18:40 Start of the experiments	ISR		2015_03 ISR + Imaging CNOFS Support	Start experiment	I. Manay	new	2015-03-23T19:21:51-05:00	2015-03-23T19:21:51-05:00		imanay
128	24 Mar 18:07 Imaging experiment was started	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Start experiment		new	2015-03-24T18:15:19-05:00	2015-03-24T18:16:01-05:00		jortiz
163	26 Mar 17:50 Start  experiment IMAGING JARS	ISR		2015_03 ISR + Imaging CNOFS Support	Start experiment	dcordova	assigned	2015-03-26T19:13:41-05:00	2015-03-26T19:36:57-05:00	The experiment IMAGING JARS was started	dcordova
118	23 Mar 23:00 Transmitter power measurements	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-23T23:02:21-05:00	2015-03-23T23:02:21-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +3.5 dBm
Tx2 +2.2 dBm
Tx4 +2.5 dBm
D3 - 5.9 dBm
Line voltage and power: 4060 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +3.5 dBm
Tx2 +2.2 dBm
Tx4 +2.5 dBm
D3 - 5.9 dBm
Line voltage and power: 4060 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +3.4 dBm
Tx2 +2.3 dBm
Tx4 +2.3 dBm
D3 - 5.8 dBm
Line voltage and power: 4060 VAC, 310 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +3.4 dBm
Tx2 +2.3 dBm
Tx4 +2.3 dBm
D3 - 5.8 dBm
Line voltage and power: 4060 VAC, 310 KW"	vquesada
120	24 Mar 07:00 Transmitter power measurements	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-24T07:03:44-05:00	2015-03-24T07:03:44-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.3 dBm
Tx4 +2.3 dBm
D3 - 5.8 dBm
Line voltage and power: 4060 VAC, 310 KW
00:39 Crowbar
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.3 dBm
Tx4 +2.3 dBm
D3 - 5.8 dBm
Line voltage and power: 4060 VAC, 310 KW
01:57 Driver 3 OFF
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +5.7,2.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 4090 VAC, 315 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +5.7,2.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 4090 VAC, 315 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +5.7,2.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 4090 VAC, 315 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +5.7,2.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 4090 VAC, 315 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +5.6,2.3 dBm
Tx4 +2.5 dBm
Line voltage and power: 4090 VAC, 315 KW
06:20 Source screen falls Tx1
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +5.6,2.3 dBm
Tx4 +2.5 dBm
Line voltage and power: 4090 VAC, 315 KW


"	vquesada
124	24 Mar 09:39 Problem with Tx	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-24T09:51:11-05:00	2015-03-24T09:51:11-05:00		jortiz
127	24 Mar 17:58 Problem with Transmitter	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-24T18:11:35-05:00	2015-03-24T18:11:35-05:00	Problem with Pre-amplifier on Channel 5 Imaging	jortiz
130	24 Mar 19:30 Transmitter power measurements	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-24T19:32:24-05:00	2015-03-24T19:32:24-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.1,5.4 dBm
Tx4 +2.2 dBm
Line voltage and power: 4030 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +2.4,5.6 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 300 KW
09:35 Problem at PA 1 screen power supply
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.3,5.5 dBm
Tx4 +2.3 dBm
Line voltage and power: 4050 VAC, 310 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.4,5.6 dBm
Tx4 +2.4 dBm
Line voltage and power: 4050 VAC, 310 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.3,5.5 dBm
Tx4 +2.4 dBm
Line voltage and power: 4080 VAC, 310 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.3,5.5 dBm
Tx4 +2.4 dBm
Line voltage and power: 4030 VAC, 310 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +2.3,5.5 dBm
Tx4 +2.4 dBm
Line voltage and power: 4080 VAC, 310 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.4,5.6 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 310 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +2.3,5.6 dBm
Tx4 +2.4 dBm
Line voltage and power: 4070 VAC, 310 KW
17:28 D3 On IMAGING
17:55 RF OFF (Problem at Channel E IMAGING)
18:05 RF ON
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.3 Bm
Tx4 +2.4 dBm
D3 -5.6 dBm



"	ryaya
131	24 Mar 23:00 Transmitter power measurements	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-24T23:02:44-05:00	2015-03-24T23:02:44-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.4 dBm
Tx4 +2.5 dBm
D3 - 5.3 dBm
Line voltage and power: 4000 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.4 dBm
Tx4 +2.5 dBm
D3 - 5.3 dBm
Line voltage and power: 4000 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.2 dBm
Tx4 +2.3 dBm
D3 - 5.3 dBm
Line voltage and power: 4060 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.2 dBm
Tx4 +2.3 dBm
D3 - 5.3 dBm
Line voltage and power: 4060 VAC, 300 KW

"	vquesada
134	25 Mar 02:53 Problem with TX	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-25T04:56:24-05:00	2015-03-25T04:56:24-05:00	Problem with transmitter that last 3 minutes.	pcondor
135	25 Mar 07:00 Transmitter Power Measurements	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-25T07:03:36-05:00	2015-03-25T07:03:36-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx2 +2.1 dBm
Tx4 +2.3 dBm
D3 - 5.4 dBm
Line voltage and power: 4050 VAC, 300 KW
01:00 Driver 3 OFF
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx2 +5.2,2.1 dBm
Tx4 +2.3 dBm
Line voltage and power: 4050 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx2 +5.2,2.1 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 310 KW
02:53 Crowbar
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx2 +5.2,2.1 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 310 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.4,2.2 dBm
Tx4 +2.4 dBm
Line voltage and power: 4080 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.4,2.2 dBm
Tx4 +2.4 dBm
Line voltage and power: 4080 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.7,2.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.7,2.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 300 KW


"	vquesada
138	25 Mar 19:30 Transmitter Power measurements	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-25T19:30:40-05:00	2015-03-25T19:30:40-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.3 dBm,5.4 dBm
Tx4 +2.3 dBm
Line voltage and power: 4030 VAC, 310 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.3 dBm,5.4 dBm
Tx4 +2.3 dBm
Line voltage and power: 4060 VAC, 310 KW
10:10 Problems at Rx system, transmitters works normally
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.2 dBm,5.5 dBm
Tx4 +2.3 dBm
Line voltage and power: 4050 VAC, 310 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.2 dBm,5.5 dBm
Tx4 +2.3 dBm
Line voltage and power: 4030 VAC, 310 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.3 dBm,5.5 dBm
Tx4 +2.3 dBm
Line voltage and power: 4070 VAC, 310 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx2 +2.3 dBm,5.4 dBm
Tx4 +2.3 dBm
Line voltage and power: 4080 VAC, 310 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.4 dBm,5.6 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 310 KW
17:48 D3 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +2.2 dBm
Tx4 +2.3 dBm
D3  -5.6 dBm
Line voltage and power: 4030 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx2 +2.5 dBm
Tx4 +2.5 dBm
D3  -5.5 dBm
Line voltage and power: 4100 VAC, 310 KW
"	ryaya
155	26 Mar 07:30 Transmitter Power measurements	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-26T07:39:35-05:00	2015-03-26T07:39:35-05:00	"25/03/2015
 20:00 TX Power sample (-70 dB coupling)
 Tx1 +5.5 dBm
 Tx2 +2.2 dBm
 Tx4 +2.3 dBm
 Dr3 -5.6 dBm
 Line voltage and power: 4050 VAC, 300 KW
 21:00 TX Power sample (-70 dB coupling)
 Tx1 +5.5 dBm
 Tx2 +2.2 dBm
 Tx4 +2.3 dBm
 Dr3 -5.6 dBm
 Line voltage and power: 4050 VAC, 300 KW
 22:00 TX Power sample (-70 dB coupling)
 Tx1 +5.6 dBm
 Tx2 +2.3 dBm
 Tx4 +2.3 dBm
 Dr3 -5.7 dBm
 Line voltage and power: 4050 VAC, 300 KW
 23:00 TX Power sample (-70 dB coupling)
 Tx1 +5.6 dBm
 Tx2 +2.3 dBm
 Tx4 +2.3 dBm
 Dr3 -5.7 dBm
 Line voltage and power: 4050 VAC, 300 KW
26/03/2015
 00:00 TX Power sample (-70 dB coupling)
 Tx1 +5.6 dBm
 Tx2 +2.3 dBm
 Tx4 +2.3 dBm
 Dr3 -5.7 dBm
 Line voltage and power: 4100 VAC, 310 KW
 00:55 Drv3 OFF (IMAGING)
 01:00 TX Power sample (-70 dB coupling)
 Tx1 +5.6 dBm
 Tx2 +2.4 dBm/+5.6 dBm
 Tx4 +2.4 dBm
 Dr3 off
 Line voltage and power: 4100 VAC, 305 KW
 02:00 TX Power sample (-70 dB coupling)
 Tx1 +5.6 dBm
 Tx2 +2.4 dBm/+5.6 dBm
 Tx4 +2.4 dBm
 Dr3 off
 Line voltage and power: 4100 VAC, 305 KW
 03:00 TX Power sample (-70 dB coupling)
 Tx1 +5.5 dBm
 Tx2 +2.3 dBm/+5.7 dBm
 Tx4 +2.3 dBm
 Dr3 off
 Line voltage and power: 4050 VAC, 300 KW
 04:00 TX Power sample (-70 dB coupling)
 Tx1 +5.5 dBm
 Tx2 +2.3 dBm/+5.7 dBm
 Tx4 +2.3 dBm
 Dr3 off
 Line voltage and power: 4050 VAC, 300 KW
 05:00 TX Power sample (-70 dB coupling)
 Tx1 +5.7 dBm
 Tx2 +2.6 dBm/+5.7 dBm
 Tx4 +2.4 dBm
 Dr3 off
 Line voltage and power: 4100 VAC, 300 KW
 06:00 TX Power sample (-70 dB coupling)
 Tx1 +5.7 dBm
 Tx2 +2.6 dBm/+5.7 dBm
 Tx4 +2.4 dBm
 Dr3 off
 Line voltage and power: 4100 VAC, 300 KW
 07:00 TX Power sample (-70 dB coupling)
 Tx1 +5.7 dBm
 Tx2 +2.6 dBm/+5.7 dBm
 Tx4 +2.4 dBm
 Dr3 off
 Line voltage and power: 4100 VAC, 300 KW



"	rtadeo
160	26 Mar 19:00 Transmitter Power Measurements	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-26T19:03:10-05:00	2015-03-26T19:03:10-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.7,2.1 dBm
Tx4 +2.5 dBm
Line voltage and power: 4100 VAC, 310 Kw
09:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.7,2.1 dBm
Tx4 +2.5 dBm
Line voltage and power: 4100 VAC, 310 Kw
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.5,2.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 310 Kw
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.5,2.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 310 Kw
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.6,2.4 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 310 Kw
13:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.6,2.4 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 310 Kw
13:26 RW Pump failure
15:30 RW Pump is replaced by an repaired.
16:00 LV ON
16:20 HV ON
16:25 TXs OK.
16:25 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +5.6,2.5 dBm
Tx4 +2.4 dBm
Line voltage and power: 4080 VAC, 310 Kw
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx2 +5.6,2.5 dBm
Tx4 +2.4 dBm
Line voltage and power: 4080 VAC, 310 Kw
17:52 Driver 3 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.6 dBm
Tx4 +2.5 dBm
D3 - 5.2 dBm
Line voltage and power: 4100 VAC, 310 Kw
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +2.6 dBm
Tx4 +2.5 dBm
D3 - 5.2 dBm
Line voltage and power: 4100 VAC, 310 Kw
"	vquesada
161	26 Mar 16:00 Transmitters are powered	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters	dcordova	assigned	2015-03-26T19:07:19-05:00	2015-03-26T19:37:44-05:00	"The transmitters are powered but we observed that the noise in channel A is 5dB below the others channels
We checked the T/R and preamplifier stage but they are working 
"	dcordova
169	27 Mar 06:00 Channel 1 Tx was changed	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-27T06:34:41-05:00	2015-03-27T06:34:41-05:00		joscanoa
171	27 Mar 08:00 Transmitter Power measurements	ISR+Imaging		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-27T08:00:30-05:00	2015-03-27T08:00:30-05:00	"2015_03 ISR + Imaging CNOFS Support  
26/03/2015
 20:00 TX Power sample (-70 dB coupling)
 Tx1 +5.1 dBm
 Tx2 +2.2 dBm
 Tx4 +2.4 dBm
 Dr3 -5.2 dBm
 Line voltage and power: 4050 VAC, 305 KW
 21:00 TX Power sample (-70 dB coupling)
 Tx1 +5.1 dBm
 Tx2 +2.2 dBm
 Tx4 +2.4 dBm
 Dr3 -5.2 dBm
 Line voltage and power: 4050 VAC, 305 KW
 22:00 TX Power sample (-70 dB coupling)
 Tx1 +5.2 dBm
 Tx2 +2.4 dBm
 Tx4 +2.3 dBm
 Dr3 -5.2 dBm
 23:00 TX Power sample (-70 dB coupling)
 Tx1 +5.2 dBm
 Tx2 +2.4 dBm
 Tx4 +2.3 dBm
 Dr3 -5.2 dBm
 Line voltage and power: 4050 VAC, 310 KW
27/03/2015
 00:00 TX Power sample (-70 dB coupling)
 Tx1 +5.2 dBm
 Tx2 +2.4 dBm
 Tx4 +2.3 dBm
 Dr3 -5.2 dBm
 Line voltage and power: 4050 VAC, 300 KW
 00:40 Drv3 OFF (IMAGING)
 01:00 TX Power sample (-70 dB coupling)
 Tx1 +5.6 dBm
 Tx2 +2.5 dBm /+5.6 dBm
 Tx4 +2.4 dBm
 Line voltage and power: 4100 VAC, 300 KW
 02:00 TX Power sample (-70 dB coupling)
 Tx1 +5.5 dBm
 Tx2 +2.5 dBm /+5.5 dBm
 Tx4 +2.4 dBm
 Line voltage and power: 4050 VAC, 300 KW
 03:00 TX Power sample (-70 dB coupling)
 Tx1 +5.5 dBm
 Tx2 +2.5 dBm /+5.5 dBm
 Tx4 +2.4 dBm
 Line voltage and power: 4050 VAC, 300 KW
 04:00 TX Power sample (-70 dB coupling)
 Tx1 +5.5 dBm
 Tx2 +2.5 dBm /+5.5 dBm
 Tx4 +2.4 dBm
 Line voltage and power: 4050 VAC, 300 KW
 05:00 TX Power sample (-70 dB coupling)
 Tx1 +5.5 dBm
 Tx2 +2.5 dBm /+5.6 dBm
 Tx4 +2.4 dBm
 Line voltage and power: 4070 VAC, 300 KW
 06:00 TX Power sample (-70 dB coupling)
 Tx1 +5.5 dBm
 Tx2 +2.5 dBm /+5.6 dBm
 Tx4 +2.4 dBm
 Line voltage and power: 4070 VAC, 300 KW
 07:00 TX Power sample (-70 dB coupling)
 Tx1 +5.5 dBm
 Tx2 +2.5 dBm /+5.5 dBm
 Tx4 +2.4 dBm
 Line voltage and power: 4050 VAC, 300 KW

END OF THE TRANSMISSION

 


"	rtadeo
177	06 Apr 12:15 Antenna VSWR	ISR		2015_04 MST - ISR -EEJ	Antennas	ryanque	new	2015-04-06T12:25:06-05:00	2015-04-06T12:25:06-05:00	"VSWR Antenna

SUP 1.09
SDN 1.04
EDN 1.06
EUP 1.06
NUP 1.04
NDN 1.08
WUP 1.04
WDN 1.06"	ryanque
186	07 Apr 20:45 Problems with metal mesh in East Room	ISR		2015_04 MST - ISR -EEJ	Antennas	AVALDEZ	new	2015-04-08T06:04:55-05:00	2015-04-08T06:06:42-05:00	There was a contact between the dipolo and the black mesh in the east room. The problem was solve.	avaldez
192	08 Apr 11:30 Campaign canceled	ISR		2015_04 MST - ISR -EEJ	End experiment	ryanque	new	2015-04-13T14:31:46-05:00	2015-04-13T14:38:19-05:00	The MST-ISR-EEJ campaign has been canceled due to failure of Transmitter. The line voltage 4160 VAC proteccion for the 20 KVDC failed.  	ryanque
183	07 Apr 19:59 Operation resume	ISR		2015_04 MST - ISR -EEJ	General	I. Manay	new	2015-04-07T20:05:35-05:00	2015-04-07T20:05:35-05:00	"Experiment: MST-ISR-EEJ
1) 07:20 - 20:00
2) Operation Hours: 12 h 40 min.
3) Operation incomplete: 30 min.
4) Reasons:
-Transmitter fall."	imanay
190	08 Apr 08:00 Operation Resume	ISR		2015_04 MST - ISR -EEJ	General		new	2015-04-08T06:35:29-05:00	2015-04-08T06:35:29-05:00	"Experiment: MST-ISR-EEJ
1) 20:00-08:00
2) Operation Hours: 12 h 0 min.
3) Operation incomplete: 3 hours 23 min.
4) Reasons:
-High voltage switch failure."	avaldez
187	07 Apr 23:59 Plots of experiment	ISR	JRO Staff	2015_04 MST - ISR -EEJ	Plot		new	2015-04-08T06:08:42-05:00	2015-04-08T06:08:42-05:00		avaldez
179	07 Apr 08:00 Decrease of noise at experiment channels	ISR		2015_04 MST - ISR -EEJ	Reception	I. Manay	new	2015-04-07T19:09:39-05:00	2015-04-07T19:09:39-05:00	Filters were used to reduce interferences. Filters were located at the pre-amplifier stage. A noise reduction was observed because of that.	imanay
181	07 Apr 19:25 Spark-gaps summary	ISR		2015_04 MST - ISR -EEJ	Spark Gaps	I. Manay	new	2015-04-07T19:36:28-05:00	2015-04-07T19:36:28-05:00	"1) 07 Apr 10:28 spark gaps adjustment.
2) 07 Apr 12:50 spark gaps adjustment.
3) 07 Apr 15:15 spark gaps adjustment.
4) 07 Apr 17:05 spark gaps adjustment.
5) 07 Apr 19:25 spark gaps adjustment."	imanay
189	08 Apr 07:30 Spark Gaps adjustment	ISR		2015_04 MST - ISR -EEJ	Spark Gaps		new	2015-04-08T06:28:28-05:00	2015-04-08T06:32:05-05:00	"21:30 Spark gaps adjustment
23:30     ""   ""   ""
03:30     ""   ""   ""
05:20     ""   ""   ""
07:30     ""   ""   """	avaldez
176	06 Apr 12:00 Log created	ISR		2015_04 MST - ISR -EEJ	Start experiment		new	2015-04-06T12:23:16-05:00	2015-04-06T12:23:16-05:00	"The log for the MST-ISR-EEJ experiment has been created.
Local User: P. Condor
Campaign days: 07-10 April 2015"	ryanque
178	07 Apr 07:20 Experiment starts	ISR		2015_04 MST - ISR -EEJ	Start experiment	I. Manay	new	2015-04-07T19:03:40-05:00	2015-04-07T19:03:40-05:00		imanay
180	07 Apr 12:50 Recover of the transmitters	ISR		2015_04 MST - ISR -EEJ	Transmitters	I. Manay	new	2015-04-07T19:13:32-05:00	2015-04-07T19:13:32-05:00	Experiment was restarted after a transmitter fall at 12:20.	imanay
182	07 Apr 19:30 Transmitter Power measurements	ISR		2015_04 MST - ISR -EEJ	Transmitters		new	2015-04-07T19:44:20-05:00	2015-04-07T19:44:20-05:00	"	
MST + ISR + EEJ
07/04/2015

06:40 LV ON
06:55 HV ON
07:00 TX Power sample (-70 dB coupling)
Tx2 +4.8 dBm
Tx4 +4.2 dBm
Line voltage and power: 4050 VAC, 300 KW
08:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.6 dBm
Line voltage and power: 4050 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx2 +5.1 dBm
Tx4 +4.6 dBm
Line voltage and power: 4050 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.6 dBm
Line voltage and power: 4050 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +4.8 dBm
Tx4 +4.6 dBm
Line voltage and power: 4050 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +4.8 dBm
Tx4 +4.6 dBm
Line voltage and power: 4050 VAC, 300 KW
12:16 TX2 OFF (HP sensor)
13:00 TX Power sample (-70 dB coupling)
Tx2 +4.9 dBm
Tx4 +4.5 dBm
Line voltage and power: 4050 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +4.8 dBm
Tx4 +4.5 dBm
Line voltage and power: 4050 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +4.9 dBm
Tx4 +4.5 dBm
Line voltage and power: 4050 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.5 dBm
Line voltage and power: 4040 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.5 dBm
Line voltage and power: 4050 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.6 dBm
Line voltage and power: 4080 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.6 dBm
Line voltage and power: 4060 VAC, 300 KW


"	rtadeo
184	07 Apr 23:05 Transmitter Power Measurements	ISR		2015_04 MST - ISR -EEJ	Transmitters		new	2015-04-07T23:11:19-05:00	2015-04-07T23:11:19-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.5 dBm
Line voltage and power: 4040 VAC, 300 Kw
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.5 dBm
Line voltage and power: 4040 VAC, 300 Kw
22:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx2 +4.5 dBm
Line voltage and power: 4080 VAC, 310 Kw
23:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx2 +4.5 dBm
Line voltage and power: 4080 VAC, 310 Kw"	vquesada
185	07 Apr 03:55 High voltage switch failure	ISR		2015_04 MST - ISR -EEJ	Transmitters		new	2015-04-08T04:01:10-05:00	2015-04-08T04:01:10-05:00	"00:07 High voltage switch failure in a phase limiting resistor 4160 VAC
03:25 HV ON Txs OK."	vquesada
188	08 Apr 00:03 HIgh Voltage Switch failure	ISR		2015_04 MST - ISR -EEJ	Transmitters		new	2015-04-08T06:28:19-05:00	2015-04-08T06:28:19-05:00	"There was a fuse break on PLC
High voltage switch failure in a phase limiting resistor 4160 VAC/
We bypass the switch and the problem was solve AT 3:30AM"	avaldez
191	08 Apr 07:00 Transmitter Power Measurements	ISR		2015_04 MST - ISR -EEJ	Transmitters		new	2015-04-08T07:09:05-05:00	2015-04-08T07:09:05-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx2 +4.5 dBm
Line voltage and power: 4080 VAC, 310 Kw
00:07 HV OFF
00:07 High voltage switch failure in a phase limiting resistor 4160 VAC
03:25 HV ON Txs OK. 
03:25 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.4 dBm
Line voltage and power: 4040 VAC, 300 Kw
04:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx2 +4.6 dBm
Line voltage and power: 4080 VAC, 310 Kw
05:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx2 +4.6 dBm
Line voltage and power: 4080 VAC, 310 Kw
06:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx2 +4.6 dBm
Line voltage and power: 4080 VAC, 310 Kw
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx2 +4.6 dBm
Line voltage and power: 4080 VAC, 310 Kw.




"	vquesada
203	14 Abr 20:00 Ch B had high noise	ISR		2015_04_1 MST - ISR - EEJ	Acquisition system	P. Condor	new	2015-04-15T05:42:48-05:00	2015-04-15T05:42:48-05:00	Ch B had high noise but it was repaired doing adjustment in the spark gaps.	pcondor
213	15 Abr 13:40 Acquisition software halted	ISR		2015_04_1 MST - ISR - EEJ	Acquisition system		new	2015-04-15T20:02:50-05:00	2015-07-30T12:56:39-05:00	System halted for 10 minutes	jverastegui
214	15 Abr 14:00 Acquisition software halted	ISR		2015_04_1 MST - ISR - EEJ	Acquisition system		new	2015-04-15T20:03:48-05:00	2015-07-30T12:57:58-05:00		jverastegui
216	15 Abr 16:00 Acquisition system hard drive changed.	ISR		2015_04_1 MST - ISR - EEJ	Acquisition system		new	2015-04-15T20:08:53-05:00	2015-04-15T20:08:53-05:00		jverastegui
217	15 Abr 16:10 End of the hard drive change.	ISR		2015_04_1 MST - ISR - EEJ	Acquisition system		new	2015-04-15T20:09:32-05:00	2015-04-15T20:09:32-05:00		jverastegui
194	13 Apr 14:25 Antenna VSWR	ISR		2015_04_1 MST - ISR - EEJ	Antennas	ryanque	new	2015-04-13T14:37:11-05:00	2015-04-13T14:37:11-05:00	"SUP 1.01
SDN 1.01
EDN 1.01
EUP 1.04
NUP 1.08
NDN 1.02
WDN 1.02
WUP 1.01"	ryanque
226	16 Apr 15:14 Spark gap summary	ISR		2015_04_1 MST - ISR - EEJ	Antennas	ryanque	new	2015-04-16T18:44:31-05:00	2015-04-16T18:51:23-05:00	"09:00 Spark gap calibration
12:15 Spark gap calibration
15:14 Spark gap calibration
"	ryanque
448	30 Jul 13:00 Resume MST-ISR-EEJ Apr 2015	ISR		2015_04_1 MST - ISR - EEJ	End experiment		new	2015-07-30T13:56:23-05:00	2015-07-30T13:58:33-05:00	"The report of MST-ISR-EEJ
April 14 to 17 2015"	ryanque
197	14 Apr 09:55 adjustment of the vipir clock	ISR		2015_04_1 MST - ISR - EEJ	General	I. Manay	new	2015-04-14T10:20:41-05:00	2015-04-14T10:20:41-05:00	It was seven minutes ahead of universal time.	imanay
201	14 Apr 19:59 Operation resume	ISR		2015_04_1 MST - ISR - EEJ	General	I. Manay	new	2015-04-14T19:58:59-05:00	2015-04-14T19:58:59-05:00	"Experiment: MST-ISR-EEJ
1) 07:15 - 20:00
2) Operation Hours: 12 h 45 min.
3) Operation incomplete: 2 min.
4) Reasons:
-Transmitter fall."	imanay
207	15 Abr 08:00 Operation Resume	ISR		2015_04_1 MST - ISR - EEJ	General	P. Condor	new	2015-04-15T08:04:57-05:00	2015-04-15T08:04:57-05:00	"Person in Charge: P. Condor.
Experiment: Mst-Isr-EEj
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
220	15 Abr 19:50 Operation resume	ISR		2015_04_1 MST - ISR - EEJ	General		new	2015-04-15T20:11:21-05:00	2015-07-30T12:59:19-05:00	"Person in Charge: J. Verastegui
Experiment: Mst-Isr-EEj
1) 08:00 - 20:00
2) Operation Hours: 10h 50 min
3) Operation incomplete: 1h 10 min
4) Reasons:
TX revision of power supply (40 minutes)
Acquisition system stopped (20 minutes)
Change of disk (10 minutes)"	jverastegui
225	16 Abr 08:00 Operation Resume	ISR		2015_04_1 MST - ISR - EEJ	General		new	2015-04-16T08:04:15-05:00	2015-04-16T08:04:15-05:00	"Person in Charge: J. Oscanoa
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	joscanoa
230	16 Apr 20:22 Operation Resume	ISR		2015_04_1 MST - ISR - EEJ	General	ryanque	new	2015-04-16T20:34:52-05:00	2015-07-27T17:47:39-05:00	"Person in Charge: R. Yanque
Experiment: MST-ISR-EEJ
1) 08:00 - 20:00
2) Operation Hours: 11h 30 min
3) Operation incomplete: 30 min
4) Reasons: Due to line failure"	ryanque
238	17 Apr 07:59 Operation Resume	ISR		2015_04_1 MST - ISR - EEJ	General	P. Condor	new	2015-04-17T07:43:00-05:00	2015-04-17T07:43:00-05:00	"Person in Charge: P. Condor
Experiment: Mst-Isr-Eej
1) 20:00 - 08:00
2) Operation Hours: 10h 57 min
3) Operation incomplete: 1h 03 min
4) Reasons:
a) Tx Off: 12 min
b) Tx off: 29 min
c) Tx off: 22 min"	pcondor
242	17 Apr 19:59 Operation resume	ISR		2015_04_1 MST - ISR - EEJ	General	I. Manay	new	2015-04-17T20:12:31-05:00	2015-04-17T20:12:31-05:00	"Experiment: MST-ISR-EEJ
1) 08:00 - 20:00
2) Operation Hours: 11 h 57 min.
3) Operation incomplete: 3 min.
4) Reasons:
-Transmitter fall"	imanay
244	05 May 11:40 Operativity report	ISR		2015_04_1 MST - ISR - EEJ	General		new	2015-05-05T12:48:38-05:00	2015-05-05T12:48:38-05:00	"Operativity Report

07 -10 April
Stop hours 50.9 Hours
KPI 0.30
Cancelled

14 -17 April
Stop hours 1.6 Hours
KPI 0.98
"	ryanque
208	15 Abr 10:00 VIPIR stopped for a few minutes.	Other Instruments		2015_04_1 MST - ISR - EEJ	Other Instruments		new	2015-04-15T19:57:35-05:00	2015-04-15T19:57:35-05:00		jverastegui
222	15 Abr 23:59 RTI and Spectra Plots	ISR		2015_04_1 MST - ISR - EEJ	Plot		new	2015-04-16T00:30:57-05:00	2015-04-16T00:30:57-05:00	RTI and Spectra Plots	joscanoa
204	14 Abr 23:59 Plots of rtis and spectras.	ISR		2015_04_1 MST - ISR - EEJ	Process/Analysis Program	P. Condor	new	2015-04-15T05:43:56-05:00	2015-04-15T05:43:56-05:00	Plots of rtis and spectras.	pcondor
234	17 Abr 00:00 Plots of rtis and spectras	ISR		2015_04_1 MST - ISR - EEJ	Process/Analysis Program	P. Condor	new	2015-04-17T03:56:55-05:00	2015-04-17T03:56:55-05:00	Plots of rtis and spectras of 16-04-2015	pcondor
198	14 Apr 14:42 Interference at channel A	ISR		2015_04_1 MST - ISR - EEJ	Reception	I. Manay	new	2015-04-14T18:43:30-05:00	2015-04-14T18:43:30-05:00	Adjustment of the A channel was the solution. 	imanay
212	15 Abr 11:40 Channel 4 cable adjustment.	ISR		2015_04_1 MST - ISR - EEJ	Reception		new	2015-04-15T20:01:35-05:00	2015-04-15T20:01:35-05:00		jverastegui
199	14 Apr 18:36 Spark-gaps summary	ISR		2015_04_1 MST - ISR - EEJ	Spark Gaps	W. Rojas	new	2015-04-14T18:48:05-05:00	2015-04-14T18:48:05-05:00	"1) 14 Apr 09:17 spark gaps adjustment.
2) 14 Apr 11:45 spark gaps adjustment.
3) 14 Apr 14:13 spark gaps adjustment.
4) 14 Apr 16:21 spark gaps adjustment.
5) 14 Apr 18:36 spark gaps adjustment."	imanay
205	15 Abr 05:00 Spark gaps adjustment	ISR		2015_04_1 MST - ISR - EEJ	Spark Gaps	A. Huamani	new	2015-04-15T05:52:22-05:00	2015-04-15T08:05:53-05:00	"14-04-2015
21:30 spark gaps adjustment
23:50 spark gaps adjustment
15-04-2015
02:35 spark gaps adjustment
05:00 spark gaps adjustment
07:25 spark gaps adjustment"	pcondor
211	15 Abr 11:38 Spark gaps adjustment	ISR		2015_04_1 MST - ISR - EEJ	Spark Gaps		new	2015-04-15T20:00:48-05:00	2015-04-15T20:00:48-05:00		jverastegui
215	15 Abr 14:22 Spark gaps adjustmen.	ISR		2015_04_1 MST - ISR - EEJ	Spark Gaps		new	2015-04-15T20:07:56-05:00	2015-04-15T20:07:56-05:00		jverastegui
219	15 Abr 19:30 Spark gaps adjustment.	ISR		2015_04_1 MST - ISR - EEJ	Spark Gaps		new	2015-04-15T20:10:24-05:00	2015-07-30T12:55:13-05:00		jverastegui
224	16 Apr 06:15 Spark gaps summary	ISR		2015_04_1 MST - ISR - EEJ	Spark Gaps		new	2015-04-16T07:34:14-05:00	2015-04-16T07:34:14-05:00	"1) 15 Apr 21:00 spark gaps adjustment.
2) 16 Apr 00:00 spark gaps adjustment.
3) 16 Apr 03:00 spark gaps adjustment.
4) 16 Apr 06:15 spark gaps adjustment.
"	joscanoa
237	17 Apr 07:00 Spark gaps adjustment	ISR		2015_04_1 MST - ISR - EEJ	Spark Gaps	A. Coronado	new	2015-04-17T07:33:20-05:00	2015-04-17T07:33:20-05:00	"16-04-2015
21:15 Spark gaps adjustment
17-04-2015
00:14 Spark gaps adjustment
04:07 Spark gaps adjustment
07:00 Spark gaps adjustment"	pcondor
241	17 Apr 18:36 Spark-gaps summary	ISR		2015_04_1 MST - ISR - EEJ	Spark Gaps	I. Manay	new	2015-04-17T19:59:09-05:00	2015-04-17T19:59:09-05:00	"1) 17 Apr 09:44 spark gaps adjustment.
2) 17 Apr 12:00 spark gaps adjustment.
3) 17 Apr 14:40 spark gaps adjustment.
4) 17 Apr 17:21 spark gaps adjustment.
5) 17 Apr 18:36 spark gaps adjustment."	imanay
193	13 Apr 14:23 Log created	ISR		2015_04_1 MST - ISR - EEJ	Start experiment	ryanque	new	2015-04-13T14:34:15-05:00	2015-04-13T14:35:40-05:00	"The log has been created for the MST-ISR-EEJ campaign.
L. User P. Condor
VIPIR is taking data simultaneosly"	ryanque
195	14 Apr 07:15 Restart of the experiment	ISR		2015_04_1 MST - ISR - EEJ	Start experiment	I. Manay	new	2015-04-14T07:53:15-05:00	2015-04-14T07:53:15-05:00		imanay
196	14 Apr 07:43 Fall of the transmitters	ISR		2015_04_1 MST - ISR - EEJ	Transmitters	I. Manay	new	2015-04-14T08:28:42-05:00	2015-04-14T08:28:42-05:00	PA2 was out during a minute.	imanay
200	14 Apr 19:00 Transmitter Power Measurements	ISR		2015_04_1 MST - ISR - EEJ	Transmitters		new	2015-04-14T19:29:52-05:00	2015-04-14T19:29:52-05:00	"04/14/2015
 MST - ISR - EEJ
06:40 LV ON
06:50 HV ON
07:00 TX Power sample (-70 dB coupling)
 Tx2 +4.9 dBm
 Tx4 +4.5 dBm
Line voltage and power: 4050 VAC, 300 Kw
08:00 TX Power sample (-70 dB coupling)
 Tx2 +4.8 dBm
 Tx4 +4.3 dBm
Line voltage and power: 4050 VAC, 300 Kw
09:00 TX Power sample (-70 dB coupling)
 Tx2 +4.8 dBm
 Tx4 +4.3 dBm
Line voltage and power: 4050 VAC, 300 Kw
10:00 TX Power sample (-70 dB coupling)
 Tx2 +4.9 dBm
 Tx4 +4.5 dBm
Line voltage and power: 4080 VAC, 300 Kw
11:00 TX Power sample (-70 dB coupling)
 Tx2 +4.8 dBm
 Tx4 +4.5 dBm
Line voltage and power: 4050 VAC, 300 Kw
12:00 TX Power sample (-70 dB coupling)
 Tx2 +4.8 dBm
 Tx4 +4.5 dBm
Line voltage and power: 4050 VAC, 300 Kw
13:00 TX Power sample (-70 dB coupling)
 Tx2 +4.6 dBm
 Tx4 +4.6 dBm
Line voltage and power: 4050 VAC, 300 Kw
14:00 TX Power sample (-70 dB coupling)
 Tx2 +4.5 dBm
 Tx4 +4.6 dBm
Line voltage and power: 4050 VAC, 300 Kw
15:00 TX Power sample (-70 dB coupling)
 Tx2 +4.6 dBm
 Tx4 +4.5 dBm
Line voltage and power: 4050 VAC, 300 Kw
16:00 TX Power sample (-70 dB coupling)
 Tx2 +4.6 dBm
 Tx4 +4.4 dBm
Line voltage and power: 4050 VAC, 300 Kw
17:00 TX Power sample (-70 dB coupling)
 Tx2 +4.8 dBm
 Tx4 +4.5 dBm
Line voltage and power: 4070 VAC, 300 Kw
18:00 TX Power sample (-70 dB coupling)
 Tx2 +4.8 dBm
 Tx4 +4.5 dBm
Line voltage and power: 4080 VAC, 300 Kw
19:00 TX Power sample (-70 dB coupling)
 Tx2 +4.8 dBm
 Tx4 +4.5 dBm
Line voltage and power: 4070 VAC, 300 Kw











"	rtadeo
202	14 Apr 23:05 Transmitter Power Measurements	ISR		2015_04_1 MST - ISR - EEJ	Transmitters		new	2015-04-14T23:15:37-05:00	2015-04-14T23:15:37-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.5 dBm
Line voltage and power: 4040 VAC, 300 Kw
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.5 dBm
Line voltage and power: 4040 VAC, 300 Kw
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx2 +4.8 dBm
Line voltage and power: 4080 VAC, 310 Kw
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx2 +4.8 dBm
Line voltage and power: 4080 VAC, 310 Kw"	vquesada
206	15 Apr 07:05 Transmitter Power Measurements	ISR		2015_04_1 MST - ISR - EEJ	Transmitters		new	2015-04-15T07:16:08-05:00	2015-04-15T07:16:08-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx2 +4.7 dBm
Line voltage and power: 4050 VAC, 310 Kw
01:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx2 +4.7 dBm
Line voltage and power: 4050 VAC, 310 Kw
02:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.6 dBm
Line voltage and power: 4050 VAC, 310 Kw
03:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.6 dBm
Line voltage and power: 4050 VAC, 310 Kw
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx2 +4.8 dBm
Line voltage and power: 4080 VAC, 310 Kw
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx2 +4.8 dBm
Line voltage and power: 4080 VAC, 310 Kw
06:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.6 dBm
Line voltage and power: 4050 VAC, 310 Kw
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.6 dBm
Line voltage and power: 4050 VAC, 310 Kw"	vquesada
209	15 Abr 10:56 Transmitter turned off.	ISR		2015_04_1 MST - ISR - EEJ	Transmitters		new	2015-04-15T19:58:56-05:00	2015-04-15T19:58:56-05:00		jverastegui
210	15 Abr 11:38 Transmitters turned on again.	ISR		2015_04_1 MST - ISR - EEJ	Transmitters		new	2015-04-15T19:59:46-05:00	2015-04-15T19:59:46-05:00		jverastegui
218	15 Apr 19:50 Transmitter power measurements	ISR		2015_04_1 MST - ISR - EEJ	Transmitters		new	2015-04-15T20:09:57-05:00	2015-04-15T20:09:57-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx2 +4.4 dBm
Line voltage and power: 4000 VAC, 300 Kw
10:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx2 +4.4 dBm
Line voltage and power: 4000 VAC, 300 Kw
11:08 Problem detected at 20 KV plate power supply. Limiter resistor failure at rectifier stage.
11:38 TX ON
12:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.5 dBm
Line voltage and power: 4060 VAC, 310 Kw
14:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.4 dBm
Line voltage and power: 4020 VAC, 300 Kw
15:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.4 dBm
Line voltage and power: 4030 VAC, 310 Kw
16:00 RF OFF (HDD change at adquisition system)
17:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.4 dBm
Line voltage and power: 4050 VAC, 310 Kw
18:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.3 dBm
Line voltage and power: 4020 VAC, 300 Kw
19:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx2 +4.4 dBm
Line voltage and power: 4080 VAC, 310 Kw"	ryaya
221	15 Apr 23:00 Transmitter Power Measurements	ISR		2015_04_1 MST - ISR - EEJ	Transmitters		new	2015-04-15T23:11:44-05:00	2015-04-15T23:11:44-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +5.2 dBm
Tx4 +4.5 dBm
Line voltage and power: 4100 VAC, 315 Kw
21:00 TX Power sample (-70 dB coupling)
Tx2 +5.2 dBm
Tx4 +4.5 dBm
Line voltage and power: 4100 VAC, 315 Kw
22:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.5 dBm
Line voltage and power: 4100 VAC, 315 Kw
23:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.5 dBm
Line voltage and power: 4100 VAC, 315 Kw"	vquesada
223	16 Apr 07:00 Transmitter Power Measurements	ISR		2015_04_1 MST - ISR - EEJ	Transmitters		new	2015-04-16T07:14:18-05:00	2015-04-16T07:14:18-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx2 +5.2 dBm
Tx4 +4.6 dBm
Line voltage and power: 4100 VAC, 315 Kw
01:00 TX Power sample (-70 dB coupling)
Tx2 +5.2 dBm
Tx4 +4.6 dBm
Line voltage and power: 4100 VAC, 315 Kw
02:00 TX Power sample (-70 dB coupling)
Tx2 +5.2 dBm
Tx4 +4.6 dBm
Line voltage and power: 4100 VAC, 315 Kw
03:00 TX Power sample (-70 dB coupling)
Tx2 +5.2 dBm
Tx4 +4.6 dBm
Line voltage and power: 4100 VAC, 315 Kw
04:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.4 dBm
Line voltage and power: 4050 VAC, 300 Kw
05:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.4 dBm
Line voltage and power: 4050 VAC, 300 Kw
06:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.4 dBm
Line voltage and power: 4050 VAC, 300 Kw
07:00 TX Power sample (-70 dB coupling)
Tx2 +5.0 dBm
Tx4 +4.4 dBm
Line voltage and power: 4050 VAC, 300 Kw
"	vquesada
227	16 Apr 15:25 Transmitter failure	ISR		2015_04_1 MST - ISR - EEJ	Transmitters	ryanque	new	2015-04-16T18:47:49-05:00	2015-07-27T17:54:45-05:00	"TX 4 Failed. The vaccion pump is not working, the vaccion pump of transmitter 3 is used in TX 4
15:55 TX are operating
Total time: 30 minutes"	ryanque
228	16 Apr 19:30 Transmitter power measurements	ISR		2015_04_1 MST - ISR - EEJ	Transmitters		new	2015-04-16T19:48:21-05:00	2015-04-16T19:48:21-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx2 +4.3 dBm
Line voltage and power: 4000 VAC, 300 Kw
10:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.3 dBm
Line voltage and power: 4020 VAC, 300 Kw
11:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.3 dBm
Line voltage and power: 4030 VAC, 300 Kw
12:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.3 dBm
Line voltage and power: 4050 VAC, 300 Kw
14:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.3 dBm
Line voltage and power: 4000 VAC, 300 Kw
15:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx2 +4.2 dBm
Line voltage and power: 3990 VAC, 300 Kw
15:25 Problem detected at Driver 4, disables PA 4 unit and PA 4 VACION pump failed. VACION replaced and transmitters works fine.
15:45 HV ON
16:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.3 dBm
Line voltage and power: 4040 VAC, 300 Kw
17:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx2 +4.2 dBm
Line voltage and power: 4010 VAC, 300 Kw
18:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx2 +4.3 dBm
Line voltage and power: 4080 VAC, 300 Kw
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx2 +4.2 dBm
Line voltage and power: 4080 VAC, 300 Kw
19:20 CROWBAR alarm detected"	ryaya
229	16 Apr 20:15 Transmitter failures	ISR		2015_04_1 MST - ISR - EEJ	Transmitters	ryanque	new	2015-04-16T20:30:59-05:00	2015-04-16T20:30:59-05:00	"19:23 Transmitter failure dur to line voltage
19:25 Transmitter on

20:03 Transmitter failure due to line voltage
20:15 Transmitter on"	ryanque
231	16 Abr 21:27 Problem with transmitter	ISR		2015_04_1 MST - ISR - EEJ	Transmitters	P. Condor	new	2015-04-17T03:50:21-05:00	2015-04-17T03:50:21-05:00	Problem with transmitter. Last less 1 minute.	pcondor
232	17 Abr 00:28 Problem with transmitter	ISR		2015_04_1 MST - ISR - EEJ	Transmitters	P. Condor	new	2015-04-17T03:51:42-05:00	2015-04-17T03:51:42-05:00	Problem with transmitter	pcondor
233	17 Abr 00:57 Transmitter is on	ISR		2015_04_1 MST - ISR - EEJ	Transmitters	P. Condor	new	2015-04-17T03:54:55-05:00	2015-04-17T03:54:55-05:00	 Transmitter is on	pcondor
235	17 Apr 01:54 Problem with transmitter	ISR		2015_04_1 MST - ISR - EEJ	Transmitters	P. Condor	new	2015-04-17T04:01:13-05:00	2015-04-17T04:01:13-05:00	Problem with transmitter	pcondor
236	17 Apr 02:16 Transmitter is on.	ISR		2015_04_1 MST - ISR - EEJ	Transmitters	P. Condor	new	2015-04-17T04:02:47-05:00	2015-04-17T04:02:47-05:00	Transmitter is on.	pcondor
239	17 Apr 07:30 Transmitter power measurements	ISR		2015_04_1 MST - ISR - EEJ	Transmitters		new	2015-04-17T08:15:44-05:00	2015-04-17T08:15:44-05:00	"2015_04_1 MST - ISR - EEJ  

20:00 TX Power sample (-70 dB coupling)
 Tx2 +5.0 dBm
 Tx4 +4.2 dBm
 Line voltage and power: 4050 VAC, 300 Kw
21:00 TX Power sample (-70 dB coupling)
 Tx2 +5.0 dBm
 Tx4 +4.2 dBm
 Line voltage and power: 4050 VAC, 300 Kw
21:27 Screen source of TX4 is disabled
22:00 TX Power sample (-70 dB coupling)
 Tx2 +5.0 dBm
 Tx4 +4.2 dBm
 Line voltage and power: 4050 VAC, 300 Kw
23:00 TX Power sample (-70 dB coupling)
 Tx2 +5.1 dBm
 Tx4 +4.2 dBm
 Line voltage and power: 4050 VAC, 300 Kw
04/17/2014
00:00 TX Power sample (-70 dB coupling)
 Tx2 +5.2 dBm
 Tx4 +4.2 dBm
 Line voltage and power: 4050 VAC, 300 Kw
00:30 Crowbar (Interlock PA 4)
01:00 TX Power sample (-70 dB coupling)
 Tx2 +4.8 dBm
 Tx4 +4.1 dBm
 Line voltage and power: 4000 VAC, 300 Kw
01:05 Screen source of TX4 is disabled
02:00 TX Power sample (-70 dB coupling)
 Tx2 +4.8 dBm
 Tx4 +4.1 dBm
 Line voltage and power: 4000 VAC, 300 Kw
02:30 Crowbar (Interlock PA 4)
03:00 TX Power sample (-70 dB coupling)
 Tx2 +4.8 dBm
 Tx4 +4.1 dBm
 Line voltage and power: 4000 VAC, 300 Kw
04:00 TX Power sample (-70 dB coupling)
 Tx2 +4.5 dBm
 Tx4 +4.0 dBm
 Line voltage and power: 4000 VAC, 300 Kw
05:00 TX Power sample (-70 dB coupling)
 Tx2 +4.5 dBm
 Tx4 +4.1 dBm
 Line voltage and power: 4000 VAC, 300 Kw
06:00 TX Power sample (-70 dB coupling)
 Tx2 +4.7 dBm
 Tx4 +4.1 dBm
 Line voltage and power: 4050 VAC, 300 Kw
07:00 TX Power sample (-70 dB coupling)
 Tx2 +4.7 dBm
 Tx4 +4.2 dBm
 Line voltage and power: 4050 VAC, 300 Kw
"	rtadeo
240	17 Apr 12:46 Fall of the transmitters	ISR		2015_04_1 MST - ISR - EEJ	Transmitters	I. Manay	new	2015-04-17T18:42:41-05:00	2015-04-17T18:42:41-05:00	It was restarted at 12:49.	imanay
243	17 Apr 20:00 Transmitter Power Measurements	ISR		2015_04_1 MST - ISR - EEJ	Transmitters		new	2015-04-17T20:13:14-05:00	2015-04-17T20:13:14-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx2 +4.4 dBm
Tx4 +4.2 dBm
Line voltage and power: 4040 VAC, 300 Kw
09:00 TX Power sample (-70 dB coupling)
Tx2 +4.4 dBm
Tx4 +4.2 dBm
Line voltage and power: 4040 VAC, 300 Kw
10:00 TX Power sample (-70 dB coupling)
Tx2 +4.4 dBm
Tx4 +4.2 dBm
Line voltage and power: 4040 VAC, 300 Kw
11:00 TX Power sample (-70 dB coupling)
Tx2 +4.4 dBm
Tx4 +4.2 dBm
Line voltage and power: 4040 VAC, 300 Kw
12:00 TX Power sample (-70 dB coupling)
Tx2 +4.7 dBm
Tx4 +4.3 dBm
Line voltage and power: 4080 VAC, 310 Kw
12:46 Crowbar
13:00 TX Power sample (-70 dB coupling)
Tx2 +4.6 dBm
Tx4 +4.2 dBm
Line voltage and power: 4050 VAC, 300 Kw
14:00 TX Power sample (-70 dB coupling)
Tx2 +4.6 dBm
Tx4 +4.2 dBm
Line voltage and power: 4050 VAC, 300 Kw
15:00 TX Power sample (-70 dB coupling)
Tx2 +4.8 dBm
Tx4 +4.4 dBm
Line voltage and power: 4080 VAC, 310 Kw
16:00 TX Power sample (-70 dB coupling)
Tx2 +4.8 dBm
Tx4 +4.4 dBm
Line voltage and power: 4080 VAC, 310 Kw
17:00 TX Power sample (-70 dB coupling)
Tx2 +4.8 dBm
Tx4 +4.4 dBm
Line voltage and power: 4080 VAC, 310 Kw
18:00 TX Power sample (-70 dB coupling)
Tx2 +4.5 dBm
Tx4 +4.3 dBm
Line voltage and power: 4040 VAC, 300 Kw
19:00 TX Power sample (-70 dB coupling)
Tx2 +4.5 dBm
Tx4 +4.3 dBm
Line voltage and power: 4040 VAC, 300 Kw
20:00 HV OFF
20:15 LV OFF
"	vquesada
257	26 May 17:49 EW Drift Acquisition stops	ISR		2015_05 ISR + Imaging	Acquisition system		new	2015-05-26T19:21:12-05:00	2015-05-26T19:21:12-05:00	"Ares acquisition stops. 
It is restarted in 2 minutes."	ryanque
262	27 May 00:10 Imaging experiment stopped by us.	ISR+Imaging		2015_05 ISR + Imaging	Acquisition system		new	2015-05-27T06:43:28-05:00	2015-05-27T06:53:13-05:00		jverastegui
275	28 May 00:40 Imaging experiment stopped by us.	ISR		2015_05 ISR + Imaging	Acquisition system		new	2015-05-28T03:50:58-05:00	2015-05-28T03:50:58-05:00		murco
284	29 May 00:36 Imaging Off	ISR		2015_05 ISR + Imaging	Acquisition system	P. Condor	new	2015-05-29T07:40:13-05:00	2015-05-29T07:40:13-05:00	Imaging off	pcondor
297	26 May 00:38 Reset Pc Ares	ISR		2015_05 ISR + Imaging	Acquisition system	P. Condor	new	2015-06-09T03:38:05-05:00	2015-06-09T03:38:05-05:00	Reset Pc Ares because it was shutdown 10 minute ago	pcondor
300	25 May 23:26 Change of cable ChB	ISR		2015_05 ISR + Imaging	Acquisition system	P. Condor	new	2015-06-09T03:55:36-05:00	2015-06-09T03:55:36-05:00	Change cable of ChB - EW_Drifts. Because there is high noise when move it.	pcondor
301	25 May 22:20 Test in Channel B and D -EW_Drifts	ISR		2015_05 ISR + Imaging	Acquisition system	P. Condor	new	2015-06-09T03:58:33-05:00	2015-06-09T03:58:33-05:00	Test in Channel B and D -EW_Drifts because have high noise. Change Tr and nothing.	pcondor
302	25 May 22:15 Change of TR -Faraday	ISR		2015_05 ISR + Imaging	Acquisition system	P. Condor	new	2015-06-09T04:01:32-05:00	2015-06-09T04:01:32-05:00	Change of TR -Faraday because a channel have high noise.	pcondor
247	25 May 21:00 Antenna VSWR	ISR		2015_05 ISR + Imaging	Antennas		new	2015-05-26T08:59:17-05:00	2015-05-26T08:59:17-05:00	"Antenna VSWR 
EUp 1.01
EDn 1.05
SDn 1.05
SUp 1.02
NUp 1.10
NDn 1.10
WDn 1.04
WUp 1.07"	ryanque
254	26 May 08:00 Operation Resume	ISR		2015_05 ISR + Imaging	General		new	2015-05-26T19:11:51-05:00	2015-06-29T02:07:34-05:00	"Experiment: EW_Drifts-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 10 h 40 min.
3) Operation incomplete: 80 min.
4) Reasons:
-Transmitter fall: 40 min
start experiment late: 40 min"	ryanque
260	26 May 20:00 Operation Resume	ISR		2015_05 ISR + Imaging	General		new	2015-05-26T19:46:26-05:00	2015-06-29T02:03:13-05:00	"Experiment: MST-ISR-EEJ
1) 08:00 - 20:00
2) Operation Hours: 11 h 45 min.
3) Operation incomplete: 15 min.
4) Reasons:
-Transmitter fall
-Cable Change
-TR Change"	ryanque
278	28 May 08:00 Operation Resume	ISR		2015_05 ISR + Imaging	General		new	2015-05-28T07:05:42-05:00	2015-06-29T02:15:11-05:00	"Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 11 h 35 min.
3) Operation incomplete: 25 min.
4) Reasons:
-Transmitter fall"	murco
287	29 May 08:00 Operation Resume	ISR		2015_05 ISR + Imaging	General	P. Condor	new	2015-05-29T08:02:37-05:00	2015-05-29T08:02:37-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
303	26 May 07:59 Operation Resume	ISR		2015_05 ISR + Imaging	General	P. Condor	new	2015-06-09T04:16:01-05:00	2015-06-09T04:16:01-05:00	"Experiment: EW_Drifts-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 10 h 40 min.
3) Operation incomplete: 80 min.
4) Reasons:
-Transmitter fall: 40 min
- start experiment late:  40 min"	pcondor
261	26 May 23:59 Plots of rtis and spectras	ISR+Imaging		2015_05 ISR + Imaging	Plot		new	2015-05-27T06:38:12-05:00	2015-05-27T06:38:12-05:00		jverastegui
274	27 May 23:59  Plots of the experiment	ISR+Imaging	JRO Staff	2015_05 ISR + Imaging	Plot		new	2015-05-28T03:06:50-05:00	2015-05-28T03:06:50-05:00		murco
250	25 May 22:25 EW Drift	ISR		2015_05 ISR + Imaging	Process/Analysis Program		new	2015-05-26T19:02:21-05:00	2015-05-26T19:02:21-05:00	"TR Changed on Farady
Channel B & D on EW Drift high level"	ryanque
282	28 May 24:00 Plots of Rtis and spectras	ISR		2015_05 ISR + Imaging	Process/Analysis Program	P. Condor	new	2015-05-29T07:32:41-05:00	2015-06-29T02:02:18-05:00	Plots of rti, spectras and results.	pcondor
299	25 May 23:59 Plots rtis and spectras.	ISR		2015_05 ISR + Imaging	Process/Analysis Program	P. Condor	new	2015-06-09T03:44:48-05:00	2015-06-09T03:44:48-05:00	Plots rtis and spectras	pcondor
252	25 May 23:41 Faraday attenuation	ISR		2015_05 ISR + Imaging	Reception		new	2015-05-26T19:07:46-05:00	2015-05-26T19:07:46-05:00		ryanque
258	26 May 18:12 Changes in Imaging	ISR		2015_05 ISR + Imaging	Reception		new	2015-05-26T19:23:28-05:00	2015-05-26T19:23:28-05:00	"Imaging has the following attenuation
CH A 0
Ch B 1
Ch C 0
Ch D 0
Ch E 4
Ch F 0
Ch G 0
Ch H 6"	ryanque
259	26 May 18:54 Faraday attenuation	ISR		2015_05 ISR + Imaging	Reception		new	2015-05-26T19:25:26-05:00	2015-05-26T19:25:26-05:00	"Cable in Faraday Ch B is changed with EW Drift Ch A
Faraday Attenuation
Ch A 6 
Ch B 12
"	ryanque
264	27 May 04:20 Some interference detected on channel A of EW Drift	ISR+Imaging		2015_05 ISR + Imaging	Reception		new	2015-05-27T06:49:41-05:00	2015-05-27T06:51:44-05:00		jverastegui
266	27 May 05:10 Changing T/R from the channel 1 (A) from EW_Drift	ISR+Imaging		2015_05 ISR + Imaging	Reception		new	2015-05-27T06:58:57-05:00	2015-05-27T06:58:57-05:00		jverastegui
267	27 May 05:17 Wrong T/R changed, fixing the error now.	ISR+Imaging		2015_05 ISR + Imaging	Reception		new	2015-05-27T07:00:31-05:00	2015-05-27T07:00:31-05:00		ryanque
268	27 May 05:28 Interference persist on the channel A	ISR+Imaging		2015_05 ISR + Imaging	Reception		new	2015-05-27T07:02:01-05:00	2015-05-27T07:02:01-05:00		jverastegui
269	27 May 05:37 Changing channel A T/R load.	ISR+Imaging		2015_05 ISR + Imaging	Reception		new	2015-05-27T07:03:41-05:00	2015-05-27T07:03:41-05:00		jverastegui
270	27 May 05:40 Interference is gone.	ISR+Imaging		2015_05 ISR + Imaging	Reception		new	2015-05-27T07:05:18-05:00	2015-05-27T07:05:18-05:00		jverastegui
281	28 May 22:14 Ch A-EW_drifts TR is changed	ISR		2015_05 ISR + Imaging	Reception	P. Condor	new	2015-05-29T07:11:42-05:00	2015-05-29T07:11:42-05:00	Ch A-EW_drifts TR is changed because has low noise,after everything ok. Ch A y B have 23 db noise	pcondor
285	29 May 04:36 Ch A Faraday is attenuated 1 db	ISR		2015_05 ISR + Imaging	Reception	P. Condor	new	2015-05-29T07:46:07-05:00	2015-05-29T07:46:07-05:00	Ch A Faraday is attenuated 1 db (from 6 to 7)	pcondor
288	25 May 8:17 Channel B was attenuated in DRIFTS	ISR		2015_05 ISR + Imaging	Reception		new	2015-06-08T17:20:52-05:00	2015-06-29T01:56:42-05:00	"The attenuation of Channel B was 1 dB, now the attenuation is 2dB
Level of noise:
A 23.56dB
B 24.13dB
C 24.17dB
D 24.28dB
"	dcordova
290	26 May 10:50 Interference in channel A	ISR		2015_05 ISR + Imaging	Reception		new	2015-06-08T17:26:40-05:00	2015-06-29T01:53:18-05:00	It was observed an interference in channel A	dcordova
253	26 May 06:30 Spark Gaps Adjustment	ISR		2015_05 ISR + Imaging	Spark Gaps		new	2015-05-26T19:10:52-05:00	2015-06-29T02:09:45-05:00	"26 May
00:00 Spark gaps adjustment
03:10 Spark gaps adjustment
06:30 Spark gaps adjustment"	ryanque
256	26 May 15:36 Spark Gap calibration	ISR		2015_05 ISR + Imaging	Spark Gaps		new	2015-05-26T19:19:30-05:00	2015-05-26T19:19:30-05:00	"09:23 Spark Gap Adjustment
12:28 Spark Gap Adjustment
15:36 Spark Gap Adjustment"	ryanque
263	27 May 01:10 Spark Gap calibration	ISR+Imaging		2015_05 ISR + Imaging	Spark Gaps		new	2015-05-27T06:46:02-05:00	2015-05-27T06:51:56-05:00		jverastegui
265	27 May 04:40 Spark Gap calibration	ISR+Imaging		2015_05 ISR + Imaging	Spark Gaps		new	2015-05-27T06:55:40-05:00	2015-05-27T06:55:40-05:00		jverastegui
272	27 May 07:30 Spark Gap calibration	ISR+Imaging		2015_05 ISR + Imaging	Spark Gaps		new	2015-05-27T08:26:01-05:00	2015-05-27T08:26:01-05:00		jverastegui
276	28 May 07:00 Spark Gaps Adjustment	ISR		2015_05 ISR + Imaging	Spark Gaps		new	2015-05-28T06:55:29-05:00	2015-06-29T01:51:42-05:00	"May 27:
21:13 Spark Gap Adjustment

May 28:
00:19 Spark Gap Adjustment
03:21 Spark Gap Adjustment
06:23 Spark Gap Adjustment"	murco
286	29 May 06:57 Spark gaps adjustment	ISR		2015_05 ISR + Imaging	Spark Gaps	A. Coronado	new	2015-05-29T07:49:00-05:00	2015-05-29T07:49:00-05:00	"28 May
21:45 Spark gaps adjustment
29 May
00:52 Spark gaps adjustment
03:58 Spark gaps adjustment
06:57 Spark gaps adjustment"	pcondor
289	25 May 10:20 Spark gap calibration in TR's and ATR's	ISR		2015_05 ISR + Imaging	Spark Gaps	Americo Huamani	new	2015-06-08T17:22:30-05:00	2015-06-29T01:59:37-05:00		dcordova
245	25 May 20:00 Log created	ISR		2015_05 ISR + Imaging	Start experiment		new	2015-05-26T08:53:31-05:00	2015-05-26T08:53:31-05:00	"Log Created
Campaign ISR + Imaging
Days: Mon 25 to Fri 29 May 2015
L. User: P. Condor
User: D. Hysell"	ryanque
249	26 May 19:00 Transmitter Power Measurements	ISR		2015_05 ISR + Imaging	Transmitters		new	2015-05-26T19:01:30-05:00	2015-05-26T19:01:30-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1,5.5 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 320 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1,5.5 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 320 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.0,5.6 dBm
Tx4 +5.9 dBm
Line voltage and power: 4050 VAC, 310 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.0,5.6 dBm
Tx4 +5.9 dBm
Line voltage and power: 4050 VAC, 310 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx2 +2.1,6.2 dBm
Tx4 +6.1 dBm
Line voltage and power: 4100 VAC, 320 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx2 +2.1,6.2 dBm
Tx4 +6.1 dBm
Line voltage and power: 4100 VAC, 320 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.0,5.6 dBm
Tx4 +6.1 dBm
Line voltage and power: 4100 VAC, 320 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.0,5.6 dBm
Tx4 +6.1 dBm
Line voltage and power: 4100 VAC, 320 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx2 +1.9,5.6 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 320 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx2 +1.9,5.6 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 320 KW
17:20 Driver 3 ON
17:51  RF OFF
17:58  RF ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1 dBm
Tx4 +6.1 dBm
D3  -6.1 dBm
Line voltage and power: 4100 VAC, 320 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1 dBm
Tx4 +6.1 dBm
D3  -6.1 dBm
Line voltage and power: 4100 VAC, 320 KW"	vquesada
251	25 May 23:10 TX 4	ISR		2015_05 ISR + Imaging	Transmitters		new	2015-05-26T19:04:55-05:00	2015-05-26T19:04:55-05:00	"22:25 Trnasmitter 4 Driver Down
23:10 Transmitter 4 Operating"	ryanque
271	27 May 07:00 Transmitter Power Measurements	ISR+Imaging		2015_05 ISR + Imaging	Transmitters		new	2015-05-27T07:40:12-05:00	2015-05-27T07:40:12-05:00	"
20:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1 dBm
Tx4 +6.1 dBm
Dr3 -6.0 dBm
Line voltage and power: 4100 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1 dBm
Tx4 +6.1 dBm
Dr3 -6.0 dBm
Line voltage and power: 4100 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1 dBm
Tx4 +6.1 dBm
Dr3 -6.0 dBm
Line voltage and power: 0600 VAC, 300 KW
22:30 OFF Dr3(IMG.)
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +5.7,+2.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 310 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +5.7,+2.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 310 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +5.7,+2.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 310 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +5.7,+2.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 310 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +5.7,+2.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 310 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +5.7,+2.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 310 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +5.7,+2.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 310 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +5.7,+2.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 310 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +5.7,+2.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 310 KW

"	rtadeo
273	27 May 23:32 Transmitter Power Measurements	ISR		2015_05 ISR + Imaging	Transmitters		new	2015-05-27T23:34:18-05:00	2015-05-27T23:34:18-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 320 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 320 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1 dBm
Tx4 +6.1 dBm
Line voltage and power: 4100 VAC, 320 KW
22:55 screen PA 2 Off.
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1 dBm
Tx4 +6.1 dBm
Line voltage and power: 4100 VAC, 320 KW"	vquesada
277	28 May 07:00 Transmitter Power Measurements	ISR		2015_05 ISR + Imaging	Transmitters		new	2015-05-28T07:02:22-05:00	2015-05-28T07:02:22-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1 dBm
Tx4 +6.1 dBm
Line voltage and power: 4100 VAC, 320 KW
00:40 Imaging Atrad OFF
01:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1,6.0 dBm
Tx4 +6.1 dBm
Line voltage and power: 4080 VAC, 310 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.0,5.7 dBm
Tx4 +5.9 dBm
Line voltage and power: 4080 VAC, 310 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.0,5.7 dBm
Tx4 +5.9 dBm
Line voltage and power: 4080 VAC, 310 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.0,5.8 dBm
Tx4 +5.9 dBm
Line voltage and power: 4080 VAC, 310 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.0,5.7 dBm
Tx4 +5.9 dBm
Line voltage and power: 4080 VAC, 310 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx2 +2.2,5.7 dBm
Tx4 +6.3 dBm
Line voltage and power: 4100 VAC, 320 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx2 +2.2,5.7 dBm
Tx4 +6.3 dBm
Line voltage and power: 4100 VAC, 320 KW
"	vquesada
279	28 May 19:00 Transmitter Power Measurements	ISR+Imaging		2015_05 ISR + Imaging	Transmitters		new	2015-05-28T19:42:57-05:00	2015-05-28T19:42:57-05:00	"
08:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1; +5.8 dBm
Tx4 +6.1 dBm
Line voltage and power: 4080 VAC, 310 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.2; +5.8 dBm
Tx4 +6.1 dBm
Line voltage and power: 4080 VAC, 310 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.2; +5.8 dBm
Tx4 +6.1 dBm
Line voltage and power: 4080 VAC, 310 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1; +5.6 dBm
Tx4 +6.0 dBm
Line voltage and power: 4080 VAC, 310 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1; +5.5 dBm
Tx4 +6.1 dBm
Line voltage and power: 4080 VAC, 310 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1; +5.5 dBm
Tx4 +6.1 dBm
Line voltage and power: 4080 VAC, 310 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1; +5.5 dBm
Tx4 +6.2 dBm
Line voltage and power: 4100 VAC, 310 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1; +5.5 dBm
Tx4 +6.2 dBm
Line voltage and power: 4100 VAC, 310 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx2 +2.1; +5.8 dBm
Tx4 +6.1 dBm
Line voltage and power: 4080 VAC, 310 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx2 +2.1; +5.8 dBm
Tx4 +6.1 dBm
Line voltage and power: 4080 VAC, 310 KW
17:30 IMAGING ""ON""
18:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx2 +2.1 dBm
Tx4 +6.1 dBm
Line voltage and power: 4100 VAC, 310 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.2 dBm
Tx4 +6.2 dBm
Line voltage and power: 4100 VAC, 310 KW






"	rtadeo
280	28 May 23:00 Transmitter Power Measurements	ISR		2015_05 ISR + Imaging	Transmitters		new	2015-05-28T23:03:09-05:00	2015-05-28T23:03:09-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.2 dBm
Tx4 +6.2 dBm
Atrad 2
Line voltage and power: 4080 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.2 dBm
Tx4 +6.2 dBm
Atrad 2
Line voltage and power: 4080 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.2 dBm
Tx4 +6.2 dBm
Atrad 2
Line voltage and power: 4080 VAC, 310 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.2 dBm
Tx4 +6.2 dBm
Atrad 2
Line voltage and power: 4080 VAC, 310 KW"	vquesada
283	29 May 07:30 Transmitter Power Measurements	ISR		2015_05 ISR + Imaging	Transmitters		new	2015-05-29T07:34:21-05:00	2015-05-29T07:34:21-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx2 +2.1 dBm
Tx4 +6.0 dBm
Line voltage and power: 4050 VAC, 310 KW
00:37 Atrad 2 OFF Imaging
01:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx2 +2.2,5.9 dBm
Tx4 +6.1 dBm
Line voltage and power: 4100 VAC, 320 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx2 +2.2,5.9 dBm
Tx4 +6.1 dBm
Line voltage and power: 4100 VAC, 320 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx2 +2.3,6.2 dBm
Tx4 +6.2 dBm
Line voltage and power: 4100 VAC, 320 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx2 +2.3,6.2 dBm
Tx4 +6.2 dBm
Line voltage and power: 4100 VAC, 320 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx2 +2.1,5.8 dBm
Tx4 +6.2 dBm
Line voltage and power: 4100 VAC, 320 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx2 +2.1,5.8 dBm
Tx4 +6.2 dBm
Line voltage and power: 4100 VAC, 320 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx2 +2.1,5.8 dBm
Tx4 +6.2 dBm
Line voltage and power: 4100 VAC, 320 KW
08:00 HV OFF
08:15 LV OFF"	vquesada
296	09 Jun 01:21 We change TR of Ch E	ISR		2015_06 Valley Experiment	Acquisition system	P. Condor	new	2015-06-09T03:31:28-05:00	2015-06-09T03:31:28-05:00	We change TR of Ch E because it had high noise. But It does not chsnge nothing.	pcondor
306	09 Jun 07:48 Attenuation ch E	ISR		2015_06 Valley Experiment	Acquisition system	P. Condor	new	2015-06-09T07:56:18-05:00	2015-06-09T07:56:18-05:00	Atenuation 2db ch E	pcondor
307	10 Jun 08:10 Restart Adquisition	ISR		2015_06 Valley Experiment	Acquisition system	P. Condor	new	2015-06-10T19:21:35-05:00	2015-06-10T19:21:35-05:00	Restart Adquisition after everything is ok in antenna and transmitter.	pcondor
321	12 Jun 07:36 Plots coherence and cross spectra	ISR		2015_06 Valley Experiment	Acquisition system	P. Condor	new	2015-06-12T07:48:07-05:00	2015-06-12T07:48:07-05:00	Plots coherence and cross spectra with map of coherence and phase for short and long pulse.	pcondor
291	08 Jun 13:00 Antenna VSWR	ISR		2015_06 Valley Experiment	Antennas	I. Manay	new	2015-06-08T17:47:01-05:00	2015-06-08T17:47:01-05:00	"Antenna VSWR 
EUp 1.13
EDn 1.05
SDn 1.06
SUp 1.08
NUp 1.09
NDn 1.09
WDn 1.10
WUp 1.08"	imanay
294	08 Jun 23:25 Tx is off to check antenna	ISR		2015_06 Valley Experiment	Antennas	P. Condor	new	2015-06-09T03:22:44-05:00	2015-06-09T03:28:02-05:00	Tx is off to check antenna	pcondor
295	08 Jun 23:36 Tx is On.	ISR		2015_06 Valley Experiment	Antennas	P. Condor	new	2015-06-09T03:27:26-05:00	2015-06-09T03:27:26-05:00	Tx is On. Net was doing short circuit the Modulo 2-South	pcondor
449	30 Jul 14:00 Operativity Resume	ISR		2015_06 Valley Experiment	End experiment		new	2015-07-30T14:26:29-05:00	2015-07-30T14:26:29-05:00	"Valley Experiment
08 to 12 Jun 2015"	ryanque
305	09 Jun 07:59 Operation Resume	ISR		2015_06 Valley Experiment	General	P. Condor	new	2015-06-09T07:54:42-05:00	2015-06-09T07:54:42-05:00	"Person in Charge: P. Condor.
Experiment: Valley
1) 20:00 - 08:00
2) Operation Hours: 11h 49 min
3) Operation incomplete: 11 min
4) Reasons:
- Tx off for revision of antenna."	pcondor
310	10 Jun 20:00 Operation Resume	ISR		2015_06 Valley Experiment	General	P. Condor	new	2015-06-10T20:08:37-05:00	2015-06-10T20:08:37-05:00	"Person in Charge: P. Condor.
Experiment: Valley
1) 08:00 - 20:00
2) Operation Hours: 11h 50 min
3) Operation incomplete: 10 min
4) Reasons:
_ Start at 08:10"	pcondor
315	11 Jun 08:00 Operation Resume	ISR		2015_06 Valley Experiment	General	avaldez	new	2015-06-11T07:49:46-05:00	2015-06-11T07:49:46-05:00	"

Person in Charge: A. Valdez
Experiment: Valley
1) 20:00 - 08:00
2) Operation Hours: 11h 59 min
3) Operation incomplete: 1 min
4) Reasons:
-Transmitter fall at 07:09 am

"	avaldez
318	11 Jun 19:59 Operation resume	ISR		2015_06 Valley Experiment	General	I. Manay	new	2015-06-11T19:57:56-05:00	2015-06-11T19:57:56-05:00	"Experiment: Valley
1) 08:00 - 20:00
2) Operation Hours: 12 h.
3) Operation incomplete: 0 min.
4) Reasons:
-None"	imanay
323	12 Jun 08:00 Operation Resume	ISR		2015_06 Valley Experiment	General	P. Condor	new	2015-06-12T08:05:28-05:00	2015-06-12T08:05:28-05:00	"Person in Charge: P. Condor.
Experiment: Valley
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
313	11 Jun 00:01 Plots of experiment	ISR		2015_06 Valley Experiment	Plot	avaldez	new	2015-06-11T07:41:17-05:00	2015-06-11T07:41:17-05:00		avaldez
304	09 Jun 07:37 Spark Gaps adjustment	ISR		2015_06 Valley Experiment	Spark Gaps	A. Belleza	new	2015-06-09T07:51:19-05:00	2015-06-09T07:51:19-05:00	"08 Jun
22:30 Spark Gaps adjustment
09 Jun
01:45 Spark Gaps adjustment
04:00 Spark Gaps adjustment
06:00 Spark Gaps adjustment"	pcondor
308	10 Jun 19:09 Spark gaps adjustment	ISR		2015_06 Valley Experiment	Spark Gaps	W. Rojas	new	2015-06-10T19:23:10-05:00	2015-06-10T19:23:10-05:00	"11:22 Spark gaps adjustment
13:36 Spark gaps adjustment
16:26 Spark gaps adjustment
10:09 Spark gaps adjustment"	pcondor
314	11 Jun 07:09 Spark Gaps adjustment	ISR		2015_06 Valley Experiment	Spark Gaps	avaldez	new	2015-06-11T07:47:10-05:00	2015-06-11T07:47:10-05:00	"Resume
- 21:56 pm 10 JUN
- 01:03 AM 11 JUN
- 04:07 AM 11 JUN
- 07:09 AM 11 JUN"	avaldez
316	11 Jun 19:26 Spark-gaps summary	ISR		2015_06 Valley Experiment	Spark Gaps	A. Huamani	new	2015-06-11T19:35:15-05:00	2015-06-11T19:35:15-05:00	"1) 11 Jun 10:00 spark gaps adjustment.
2) 11 Jun 13:30 spark gaps adjustment.
3) 11 Jun 16:00 spark gaps adjustment.
4) 11 Jun 19:00 spark gaps adjustment."	imanay
320	12 Jun 06:28 Spark gaps adjustment	ISR		2015_06 Valley Experiment	Spark Gaps	A. Belleza	new	2015-06-12T07:45:32-05:00	2015-06-12T07:45:32-05:00	"11 Jun
21:31 Spark gaps adjustment
12 Jun
00:22 Spark gaps adjustment
03:16 Spark gaps adjustment
06:28 Spark gaps adjustment"	pcondor
246	29 May 20:00 Log created	ISR		2015_06 Valley Experiment	Start experiment		new	2015-05-26T08:55:36-05:00	2015-05-26T08:55:36-05:00	"Log created
Campaign Valley Experiment
L. User: M. Milla
User: E. Kudeki"	ryanque
293	08 Jun 19:30 Transmitter power measurements and events	ISR		2015_06 Valley Experiment	Transmitters		new	2015-06-08T19:26:57-05:00	2015-06-29T01:58:40-05:00	"14:30 LV ON
15:05 HV ON
15:25 TX Power sample (-70 dB coupling)
Tx2 +6.3 dBm
Tx4 +6.0 dBm
Line voltage and power: 4100 VAC, 350 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Line voltage and power: 4070 VAC, 350 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.1 dBm
Line voltage and power: 4100 VAC, 360 KW"	ryaya
309	10 Jun 19:30 Transmitter power measurements	ISR		2015_06 Valley Experiment	Transmitters		new	2015-06-10T19:36:51-05:00	2015-06-10T19:36:51-05:00	"08:10 LV ON
08:30 HV ON
10:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.8 dBm
11:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.8 dBm
Line voltage and power: 4040 VAC, 340 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.7 dBm
Line voltage and power: 4080 VAC, 340 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.6 dBm
Line voltage and power: 4020 VAC, 340 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.5 dBm
Line voltage and power: 4060 VAC, 350 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.4 dBm
Line voltage and power: 4030 VAC, 340 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.5 dBm
Line voltage and power: 4050 VAC, 340 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.5 dBm
Line voltage and power: 4040 VAC, 340 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.4 dBm
Line voltage and power: 4050 VAC, 340 KW"	ryaya
311	10 Jun 23:00 Transmitter Power Measurements	ISR		2015_06 Valley Experiment	Transmitters		new	2015-06-10T23:08:18-05:00	2015-06-10T23:08:18-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.5 dBm
Line voltage and power: 4040 VAC, 340 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.5 dBm
Line voltage and power: 4040 VAC, 340 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.3 dBm
Line voltage and power: 4050 VAC, 340 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.3 dBm
Line voltage and power: 4050 VAC, 340 KW"	vquesada
312	11 Jun 07:00 Transmitter Power Measurements	ISR		2015_06 Valley Experiment	Transmitters		new	2015-06-11T07:09:03-05:00	2015-06-11T07:09:03-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.4 dBm
Line voltage and power: 4090 VAC, 340 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.4 dBm
Line voltage and power: 4090 VAC, 340 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.4 dBm
Line voltage and power: 4090 VAC, 340 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.4 dBm
Line voltage and power: 4090 VAC, 340 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +6.1 dBm
Tx4 +5.3 dBm
Line voltage and power: 4080 VAC, 340 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +6.1 dBm
Tx4 +5.3 dBm
Line voltage and power: 4080 VAC, 340 KW
05:22 Crowbar
06:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +5.5 dBm
Line voltage and power: 4090 VAC, 340 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +5.5 dBm
Line voltage and power: 4090 VAC, 340 KW"	vquesada
317	11 Jun 19:00 Transmitter Power Measurements	ISR		2015_06 Valley Experiment	Transmitters		new	2015-06-11T19:37:40-05:00	2015-06-11T19:37:40-05:00	"
08:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.3 dBm
Line voltage and power: 4040 VAC, 330 KW
09:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.3 dBm
Line voltage and power: 4040 VAC, 330 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.2 dBm
Line voltage and power: 4040 VAC, 330 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +5.7 dBm
Tx4 +5.2 dBm
Line voltage and power: 4040 VAC, 330 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +5.7 dBm
Tx4 +5.1 dBm
Line voltage and power: 4040 VAC, 330 KW
13:00 TX Power sample (-70 dB coupling)
Tx2 +5.7 dBm
Tx4 +5.1 dBm
Line voltage and power: 4040 VAC, 330 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +5.7 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 330 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +5.7 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 330 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 330 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.2 dBm
Line voltage and power: 4080 VAC, 330 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.1 dBm
Line voltage and power: 4080 VAC, 330 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.1 dBm
Line voltage and power: 4060 VAC, 320 KW


"	rtadeo
319	12 Jun 23:05 Transmitter Power Measurements	ISR		2015_06 Valley Experiment	Transmitters		new	2015-06-11T23:12:24-05:00	2015-06-11T23:12:24-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.3 dBm
Line voltage and power: 4080 VAC, 340 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.3 dBm
Line voltage and power: 4080 VAC, 340 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +5.4 dBm
Line voltage and power: 4090 VAC, 340 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +5.4 dBm
Line voltage and power: 4090 VAC, 340 KW
"	vquesada
322	12 Jun 07:50 Transmitter Power Measurements	ISR		2015_06 Valley Experiment	Transmitters		new	2015-06-12T07:59:27-05:00	2015-06-12T07:59:27-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +5.4 dBm
Line voltage and power: 4090 VAC, 340 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +5.4 dBm
Line voltage and power: 4090 VAC, 340 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +5.4 dBm
Line voltage and power: 4090 VAC, 340 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +5.4 dBm
Line voltage and power: 4090 VAC, 340 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +6.5 dBm
Tx4 +5.3 dBm
Line voltage and power: 4090 VAC, 340 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +6.5 dBm
Tx4 +5.3 dBm
Line voltage and power: 4090 VAC, 340 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 340 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 340 KW
08:00 HV OFF
08:15 LV OFF

"	vquesada
336	08 Jul 08:30 Reset JARS System	ISR		2015_07 MST-ISR-EEJ	Acquisition system		new	2015-07-08T11:00:24-05:00	2015-08-17T13:52:47-05:00	"Reset JARS System
"	abelleza
339	08 Jul 13:58 change drive system PC-JARS	ISR		2015_07 MST-ISR-EEJ	Acquisition system		new	2015-07-08T20:16:17-05:00	2015-07-30T16:49:03-05:00	"13:10 change drive system PC-JARS (10 minutes)
13:58 Processing program (5 minutes)"	abelleza
351	10 Jul 00:32 Acquisition system was re-started	ISR		2015_07 MST-ISR-EEJ	Acquisition system	I. Manay	new	2015-07-10T01:48:26-05:00	2015-07-10T01:48:26-05:00	Due to change of disk, the system was stopped for 12 minutes: 00:20 - 00:32.	imanay
352	10 Jul 06:34 Acquisition was restarted	ISR		2015_07 MST-ISR-EEJ	Acquisition system	I. Manay	new	2015-07-10T07:51:32-05:00	2015-07-10T07:51:32-05:00	Acquisition system restarted itself. There were not data during 3 minutes: From 06:34 to 06:37.	imanay
325	06 Jul 15:47 VSWR Antenna	ISR		2015_07 MST-ISR-EEJ	Antennas	ryanque	new	2015-07-06T16:07:53-05:00	2015-07-06T16:07:53-05:00	"SUP: 1.08
SDW: 1.04
EDW: 1.09
EUP: 1.06
NUP: 1.04
NDW: 1.04
WDW: 1.06
WUP: 1.04"	ryanque
450	30 Jul 17:00 Operativity	ISR		2015_07 MST-ISR-EEJ	End experiment		new	2015-07-30T17:15:22-05:00	2015-07-30T17:15:22-05:00	"MST ISR EEJ
14 to 17 July"	ryanque
457	20 Aug 10:00 Final Report	ISR		2015_07 MST-ISR-EEJ	End experiment		new	2015-08-20T13:08:49-05:00	2015-08-20T13:08:49-05:00	"The report of the campaign is included.
There is some interference every day between 12 noon and 4 pm."	ryanque
328	07 Jul 14:55 Transmitters were off	ISR		2015_07 MST-ISR-EEJ	General	I. Manay	new	2015-07-07T19:41:44-05:00	2015-07-07T19:41:44-05:00	The transmitters were off during 40 minutes, 14:15 to 14:55 due to interferences at the  C and D channels. A bad connection at the ues was found.	imanay
330	07 Jul 19:59 Operation Resume	ISR		2015_07 MST-ISR-EEJ	General	I. Manay	new	2015-07-07T20:23:45-05:00	2015-07-30T15:46:02-05:00	"Person in Charge: I. Manay.
Experiment: MST_ISR_EEJ
1) 14:55 - 20:00
2) Operation Hours: 5h  5min
3) Operation incomplete:6h 55min
4) Reasons:
Wrong connection U´s 3h 40 min
Low Power 3h 15 min "	imanay
333	08 Jul 08:00 Operation Resume	ISR	Others	2015_07 MST-ISR-EEJ	General		new	2015-07-08T06:10:53-05:00	2015-08-17T15:10:03-05:00	" Person in Charge: A. VALDEZ.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	avaldez
345	09 July 08:00 Operation Resume	ISR		2015_07 MST-ISR-EEJ	General		new	2015-07-09T08:04:46-05:00	2015-07-30T16:37:18-05:00	"Person in Charge: M. URCO

Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	murco
346	09 July 20:00 Operation Resume	ISR	Others	2015_07 MST-ISR-EEJ	General	avaldez	new	2015-07-09T19:50:28-05:00	2015-07-30T16:40:27-05:00	" Description

Person in Charge: A. VALDEZ

Experiment: MST-ISR-EEJ
1) 08:00 - 20:00
2) Operation Hours: 11h 35 min
3) Operation incomplete: 25 min
4) Reasons:
Problems with fusible of source.
TX is off to check antenna"	avaldez
348	09 Jul 16:15 Interference disappear	ISR		2015_07 MST-ISR-EEJ	General	avaldez	new	2015-07-09T19:56:36-05:00	2015-08-17T15:09:25-05:00	16:15 Interference disappear	avaldez
355	10 Jul 07:59 Operation Resume	ISR		2015_07 MST-ISR-EEJ	General	I. Manay	new	2015-07-10T08:17:18-05:00	2015-07-10T08:17:18-05:00	"Person in Charge: I. Manay.
Experiment: MST_ISR_EEJ
1) 20:00 - 08:00
2) Operation Hours: 12h
3) Operation incomplete: 15 min
4) Reasons:
-The acquisition PC was out of space for data, a new disk was installed.
-The acquisition program restarted itself."	imanay
356	10 Jul 11:00 Start interference	ISR		2015_07 MST-ISR-EEJ	General	P. Condor	new	2015-07-10T19:14:05-05:00	2015-07-10T19:14:05-05:00	"Start interference more in Ch 4 and in MST mode.
End at 16:00 hours."	pcondor
361	10 Jul 20:03 Operation Resume	ISR		2015_07 MST-ISR-EEJ	General	P. Condor	new	2015-07-10T20:25:02-05:00	2015-07-10T20:25:02-05:00	"Person in Charge: P. Condor.
Experiment: MST-ISR-EEJ
1) 08:00 - 20:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
332	07 Jul 23:59 Figures of Experiment	ISR		2015_07 MST-ISR-EEJ	Plot		new	2015-07-08T05:52:56-05:00	2015-07-08T05:52:56-05:00		avaldez
343	08 Jul 23:59 Experiment plots	ISR	JRO Staff	2015_07 MST-ISR-EEJ	Plot		new	2015-07-09T07:55:55-05:00	2015-08-17T15:12:03-05:00		murco
350	09 Jul 23:59 Experiment plots	ISR		2015_07 MST-ISR-EEJ	Plot	I. Manay	new	2015-07-10T01:20:06-05:00	2015-07-10T01:20:06-05:00		imanay
337	08 Jul 08:30 Run Prosessing Program	ISR		2015_07 MST-ISR-EEJ	Process/Analysis Program		new	2015-07-08T11:01:47-05:00	2015-08-17T13:53:33-05:00	Run Prosessing Program 	abelleza
340	08 Jul 20:00 Operation Resume	ISR		2015_07 MST-ISR-EEJ	Process/Analysis Program		new	2015-07-08T20:17:34-05:00	2015-07-30T16:51:40-05:00	"Person in Charge: A. Belleza

Experiment: MST-ISR-EEJ
1) 08:00 - 20:00
2) Operation Hours: 11h 45 min
3) Operation incomplete: 15 min
4) Reasons:
Change of disk (10 minutes)
Processing program (5 minutes)"	abelleza
358	10 Jul 20:00 Plots	ISR		2015_07 MST-ISR-EEJ	Process/Analysis Program	P. Condor	new	2015-07-10T20:20:26-05:00	2015-07-10T20:20:26-05:00	Plots of rtis and spectras.	pcondor
359	10 Jul 20:00 Plots	ISR		2015_07 MST-ISR-EEJ	Process/Analysis Program	P. Condor	new	2015-07-10T20:21:25-05:00	2015-07-10T20:21:25-05:00	Plots of rtis and spectras.	pcondor
329	07 Jul 18:00 Spark-gaps summary	ISR		2015_07 MST-ISR-EEJ	Spark Gaps	W. Rojas	new	2015-07-07T19:45:35-05:00	2015-07-07T19:45:35-05:00	"ATR's adjustment:

1) 07 Jul 12:30 spark gaps adjustment.
2) 07 Jul 15:00 spark gaps adjustment.
3) 07 Jul 18:00 spark gaps adjustment."	imanay
334	08 Jul 07:00  Spark gaps adjustment	ISR	JRO Staff	2015_07 MST-ISR-EEJ	Spark Gaps		new	2015-07-08T06:16:11-05:00	2015-08-17T15:11:17-05:00	"07 July
20:00 Spark gaps adjustment
22:00  Sparl gaps adjustem
00:00 Spark gaps adjustment
02:02 Spark gaps adjustment
04:12 Sark gaps adjustment"	avaldez
344	09 Jul 08:00 Spark-gaps summary	ISR	JRO Staff	2015_07 MST-ISR-EEJ	Spark Gaps		new	2015-07-09T08:02:17-05:00	2015-07-30T16:38:14-05:00	"ATR's adjustment:
1) 08 Jul 21:12 spark gaps adjustment.
2) 08 Jul 23:17 spark gaps adjustment.
3) 09 Jul 01:15 spark gaps adjustment.
3) 09 Jul 03:13 spark gaps adjustment.
3) 09 Jul 05:20 spark gaps adjustment.
3) 09 Jul 07:17 spark gaps adjustment."	murco
347	09 July 20:00 Spark gaps adjustment	ISR	Others	2015_07 MST-ISR-EEJ	Spark Gaps	avaldez	new	2015-07-09T19:53:47-05:00	2015-07-09T19:53:47-05:00	"09 July
09:19 Spark gaps adjustment
11:30 SparK gaps adjustem
14:06 Spark gaps adjustment
17:14 Spark gaps adjustment
19:10 Sark gaps adjustment"	avaldez
353	10 Jul 06:40 Spark-gaps summary	ISR		2015_07 MST-ISR-EEJ	Spark Gaps	J. Lavado	new	2015-07-10T07:55:51-05:00	2015-07-10T07:55:51-05:00	"ATR's adjustment:
1) 09 Jul 20:40 spark gaps adjustment.
2) 09 Jul 23:50 spark gaps adjustment.
3) 10 Jul 03:00 spark gaps adjustment.
4) 10 Jul 06:40 spark gaps adjustment."	imanay
357	10 Jul 17:30 Spark gaps adjustment	ISR		2015_07 MST-ISR-EEJ	Spark Gaps	A. Huamani	new	2015-07-10T19:17:20-05:00	2015-07-10T19:17:20-05:00	"Spark gaps adjustment
09:30 Spark gaps adjustment
11:30 Spark gaps adjustment
13:30 Spark gaps adjustment
15:30 Spark gaps adjustment
17:30 Spark gaps adjustment"	pcondor
324	06 Jul 15:14 Log Created MST-ISR-EEJ	ISR		2015_07 MST-ISR-EEJ	Start experiment	ryanque	new	2015-07-06T15:34:12-05:00	2015-07-06T15:34:12-05:00	"Log created for MST-ISR-EEJ
Campaign start: Tuesday July 07 2015
Campaign ends : Friday  July 10 2015
"	ryanque
327	07 Jul 11:15 Start of the experiment	ISR		2015_07 MST-ISR-EEJ	Start experiment	I. Manay	new	2015-07-07T19:36:36-05:00	2015-07-30T15:39:34-05:00	"Updates of the experiment:
- North and south quarter, up polarization with ABS system.
- 800Kw TR's replaced spark-gaps system.
- In channel C with power amplifier at the field"	imanay
326	07 Jul 19:00 Transmitter Power Measurements	ISR		2015_07 MST-ISR-EEJ	Transmitters		new	2015-07-07T19:22:28-05:00	2015-07-07T19:22:28-05:00	"09:00 LV ON (TR(s) are being used solid state.)
09:10 HV ON
10:40 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.7 dBm
Line voltage and power: 4100 VAC, 285 KW
11:40 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +3.7 dBm
Line voltage and power: 4100 VAC, 285 KW
13:40 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.6 dBm
Line voltage and power: 4050 VAC, 280 KW
14:15  HV OFF (failure of the transmission line)
14:45  HV ON
14:45 TX Power sample (-70 dB coupling)
Tx2 +3.2 dBm
Tx4 +3.4 dBm
Line voltage and power: 4050 VAC, 280 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.2 dBm
Line voltage and power: 4050 VAC, 280 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +3.2 dBm
Tx4 +3.5 dBm
Line voltage and power: 4050 VAC, 280 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +3.3 dBm
Tx4 +3.5 dBm
Line voltage and power: 4050 VAC, 280 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.6 dBm
Line voltage and power: 4100 VAC, 285 KW
"	rtadeo
331	07 Jul 23:00 Transmitter Power Measurements	ISR		2015_07 MST-ISR-EEJ	Transmitters		new	2015-07-07T23:21:02-05:00	2015-07-07T23:21:02-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.6 dBm
Line voltage and power: 4090 VAC, 290 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.6 dBm
Line voltage and power: 4090 VAC, 290 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4090 VAC, 290 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4090 VAC, 290 KW"	vquesada
335	08 Jul 07:00 Transmitter Power Measurements	ISR		2015_07 MST-ISR-EEJ	Transmitters		new	2015-07-08T07:19:00-05:00	2015-07-08T07:19:00-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.6 dBm
Line voltage and power: 4090 VAC, 290 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.6 dBm
Line voltage and power: 4090 VAC, 290 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.6 dBm
Line voltage and power: 4090 VAC, 290 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.6 dBm
Line voltage and power: 4090 VAC, 290 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +3.4 dBm
Tx4 +3.5 dBm
Line voltage and power: 4050 VAC, 280 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +3.4 dBm
Tx4 +3.5 dBm
Line voltage and power: 4050 VAC, 280 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4100 VAC, 295 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4100 VAC, 295 KW

"	vquesada
338	08 Jul 19:30 Transmitter power measurements	ISR		2015_07 MST-ISR-EEJ	Transmitters		new	2015-07-08T19:57:40-05:00	2015-07-08T19:57:40-05:00	"08:30 RF OFF (Adquisition system)
08:31 RF ON
09:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.6 dBm
Line voltage and power: 4090 VAC, 270 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.7 dBm
Line voltage and power: 4090 VAC, 270 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +3.4 dBm
Tx4 +3.6 dBm
Line voltage and power: 4050 VAC, 270 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.6 dBm
Line voltage and power: 4030 VAC, 270 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.7 dBm
Line voltage and power: 4030 VAC, 270 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.7 dBm
Line voltage and power: 4030 VAC, 270 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.7 dBm
Line voltage and power: 4090 VAC, 280 KW
15:30 RF OFF (Adquisition system)
15:47 RF ON
16:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.7 dBm
Line voltage and power: 4030 VAC, 270 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.7 dBm
Line voltage and power: 4080 VAC, 270 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4070 VAC, 280 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.8 dBm
Line voltage and power: 4100 VAC, 280 KW"	ryaya
341	08 Jul 23:00 Transmitter Power Measurements	ISR		2015_07 MST-ISR-EEJ	Transmitters		new	2015-07-08T23:20:44-05:00	2015-07-08T23:20:44-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4060 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4060 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 4100 VAC, 290 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 4100 VAC, 290 KW
"	vquesada
342	09 Jul 07:00 Transmitter Power Measurements	ISR		2015_07 MST-ISR-EEJ	Transmitters		new	2015-07-09T07:20:45-05:00	2015-07-09T07:20:45-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 4100 VAC, 290 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 4100 VAC, 290 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4090 VAC, 290 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4090 VAC, 290 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4050 VAC, 285 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4050 VAC, 285 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4090 VAC, 290 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4090 VAC, 290 KW
"	vquesada
349	09 Jul 19:30 Transmitter power measurements	ISR		2015_07 MST-ISR-EEJ	Transmitters		new	2015-07-09T20:15:54-05:00	2015-07-09T20:16:54-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4100 VAC, 280 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4070 VAC, 280 KW
11:00 Problem with Driver 2 plate power supply, the output fuse blew up. The fuse was replaced and the operation continues
12:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.8 dBm
Line voltage and power: 4100 VAC, 280 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4040 VAC, 280 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.8 dBm
Line voltage and power: 4050 VAC, 280 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4060 VAC, 280 KW
17:00 Problem with the PA 2 screen power supply, some kind of arcing was detected at the switch yard, but nothing was found. Transmitter restarted operating normally.
18:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.8 dBm
Line voltage and power: 4040 VAC, 280 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4070 VAC, 280 KW"	ryaya
354	10 Jul 07:50 Transmitter power measurements	ISR		2015_07 MST-ISR-EEJ	Transmitters		new	2015-07-10T08:10:31-05:00	2015-07-10T08:10:31-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4090 VAC, 285 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4090 VAC, 285 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.9 dBm
Line voltage and power: 4090 VAC, 285 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.9 dBm
Line voltage and power: 4090 VAC, 285 KW
10/07/2015
00:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4090 VAC, 285 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.8 dBm
Line voltage and power: 4090 VAC, 280 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.8 dBm
Line voltage and power: 4090 VAC, 280 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.8 dBm
Line voltage and power: 4090 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.9 dBm
Line voltage and power: 4100 VAC, 285 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.9 dBm
Line voltage and power: 4100 VAC, 285 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.9 dBm
Line voltage and power: 4100 VAC, 285 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.9 dBm
Line voltage and power: 4100 VAC, 285 KW
"	rtadeo
360	10 Jul 20:00 Transmitter Power Measurements	ISR		2015_07 MST-ISR-EEJ	Transmitters		new	2015-07-10T20:22:41-05:00	2015-07-10T20:22:41-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4080 VAC, 280 KW
09:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 4080 VAC, 280 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 4080 VAC, 280 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 4080 VAC, 280 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 4100 VAC, 290 KW
13:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 4100 VAC, 290 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 4080 VAC, 285 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 4080 VAC, 285 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +4.0 dBm
Line voltage and power: 4100 VAC, 290 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +4.0 dBm
Line voltage and power: 4100 VAC, 290 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4050 VAC, 280 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4050 VAC, 280 KW
20:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.7 dBm
Line voltage and power: 4050 VAC, 280 KW
20:00  HV  OFF
20:15  LV  OFF
"	vquesada
454	08 Jul 15:30 Transmitter Off	ISR		2015_07 MST-ISR-EEJ	Transmitters	A. Belleza	new	2015-08-17T14:00:17-05:00	2015-08-17T14:00:17-05:00	Transmitter off for revision of lines.	pcondor
455	09 Jul 11:04 Transmitter off	ISR		2015_07 MST-ISR-EEJ	Transmitters	A. Valdez	new	2015-08-17T15:03:38-05:00	2015-08-17T15:03:38-05:00	Transmitter off.	pcondor
456	09 Jul 16:58 Transmitter off	ISR		2015_07 MST-ISR-EEJ	Transmitters	A. Valdez	new	2015-08-17T15:05:02-05:00	2015-08-17T15:05:02-05:00	Transmitter off	pcondor
363	13 Jul 12:30 Antenna VSWR	ISR		2015_07_1 Support CNOFS	Antennas	ryanque	new	2015-07-13T13:19:32-05:00	2015-07-13T13:19:32-05:00	"Antenna VSWR
WUp 1.03
WDn 1.09
NDn 1.07
NUp 1.02
EUp 1.04
EDn 1.04
SDn 1.05
SUp 1.05"	ryanque
387	16 Jul 17:28 Spark Gap Adjustment	ISR		2015_07_1 Support CNOFS	Antennas		new	2015-07-16T18:30:07-05:00	2015-07-16T18:30:07-05:00	"11:30 Spark Gap Adjustment
14:35 Spark Gap Adjustment
17:28 Spark Gap Adjustment"	ryanque
447	27 Jul 17:50 Data was uploaded to PUMA	ISR		2015_07_1 Support CNOFS	End experiment		new	2015-07-30T12:22:50-05:00	2015-07-30T12:22:50-05:00	"The data was uploaded to PUMA
2015_07/SupportCNOFS
"	ryanque
451	30 Jul 17:30 Operativity DP Faraday July	ISR		2015_07_1 Support CNOFS	End experiment		new	2015-07-30T17:50:04-05:00	2015-07-30T17:50:04-05:00	"DP Faraday July 2015
Support CNOFS
13 to 17 July"	ryanque
453	12 Aug 10:00 Final Report	ISR		2015_07_1 Support CNOFS	End experiment		new	2015-08-12T13:02:24-05:00	2015-08-12T13:02:24-05:00	"The report has been uploaded.
There is interference in channel B, as in 2013 campaign. In this campaign there is also interference in the pulse measurement channel."	ryanque
365	13 Jul 19:55 Operation Resume	ISR		2015_07_1 Support CNOFS	General	P. Condor	reopened	2015-07-14T00:16:50-05:00	2015-08-11T17:08:42-05:00	"Person in Charge: A. Valdez.
Experiment: Faraday H2
1) 08:00 - 20:00
2) Operation Hours: 0 min
3) Operation incomplete: 
4) Reasons:
Experiment has problems"	pcondor
370	14 Jul 07:59 Operation Resume	ISR		2015_07_1 Support CNOFS	General	P. Condor	new	2015-07-14T08:14:12-05:00	2015-07-30T17:24:11-05:00	"Person in Charge: P. Condor.
Experiment: Faraday H2
1) 20:00 - 08:00
2) Operation Hours: 11h 10 min
3) Operation incomplete: 50 min
4) Reasons:
Failure of Hybrid"	pcondor
373	14 Jul 19:59 Operation Resume	ISR		2015_07_1 Support CNOFS	General	I. Manay	new	2015-07-14T20:00:25-05:00	2015-07-14T20:00:25-05:00	"Person in Charge: I. Manay.
Experiment: LP_Faraday
1) 08:00 - 20:00 
2) Operation Hours: 12h
3) Operation incomplete: 0 min
4) Reasons:
None"	imanay
377	15 Jul 07:59 Operation Resume	ISR		2015_07_1 Support CNOFS	General	A. Belleza	new	2015-07-15T08:54:32-05:00	2015-07-15T08:54:32-05:00	"Person in Charge: A. Belleza.
Experiment: LP Faraday H2
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	imanay
385	16 Jul 08:00 Operation Resume	ISR		2015_07_1 Support CNOFS	General		new	2015-07-16T08:15:08-05:00	2015-08-11T17:45:17-05:00	"Person in Charge: Julio Oscanoa.
Experiment: Faraday H2
1) 20:00 - 08:00
2) Operation Hours: 4h 50 min
3) Operation incomplete: 0 min
4) Reasons
Bad quality of channel B data"	joscanoa
393	17 Jul 08:00 Operation Resume	ISR	Others	2015_07_1 Support CNOFS	General	avaldez	new	2015-07-17T07:33:55-05:00	2015-07-17T07:33:55-05:00	"Person in Charge: Alexander Valdez
Experiment: Faraday H2
1) 20:00 - 08:00
2) Operation Hours: 11h 45 min
3) Operation incomplete: 15 min
4) Reasons:
- 01:45am During 5 minutes, we remove the pulse rf and change the hybrid and  compensator to fix the noise problem in channel b
- 02:58am During 5 minutes, we remove the pulse rf to clean the tungsteno.
- 06:00am During 5 minutes, we remove the pulse rf to clean the tungsteno.

5)Comment:
From 01:15 to 03:00 there is a noise fluctuation in channel B.
This was fixed after clean the tungsteno and make the spark gaps adjustment,only channel B was affected."	avaldez
394	15 Jul 20:00 Operation Resume	ISR		2015_07_1 Support CNOFS	General		reopened	2015-07-17T11:44:16-05:00	2015-08-11T17:18:51-05:00	"Person in Charge: J. Ortiz
Experiment: Faraday H2
1) 08:00 - 20:00
2) Operation Hours: 12h
3) Operation incomplete: 0
4) Reasons:
5)Comment:
"	ryanque
398	17 Jul 19:59 Operation Resume	ISR		2015_07_1 Support CNOFS	General	I. Manay	new	2015-07-17T20:31:02-05:00	2015-07-17T20:31:02-05:00	"Person in Charge: I. Manay.
Experiment: LP_Faraday
1) 08:00 - 20:00 
2) Operation Hours: 12h
3) Operation incomplete: 0 min
4) Reasons:
None"	imanay
445	21 Jul 23:59 Plots	ISR		2015_07_1 Support CNOFS	General	D. Lume	new	2015-07-27T12:17:35-05:00	2015-07-27T13:50:39-05:00		imanay
376	15 Jul 00:01 Plots	ISR		2015_07_1 Support CNOFS	Plot	A. Belleza	new	2015-07-15T08:43:21-05:00	2015-07-15T08:43:21-05:00		imanay
382	15 Jul 23:59 Plots	ISR		2015_07_1 Support CNOFS	Plot		new	2015-07-16T00:26:00-05:00	2015-07-16T00:26:00-05:00	Plots	joscanoa
390	17 Jul 00:01 Plots of experiment	ISR	Others	2015_07_1 Support CNOFS	Plot	avaldez	new	2015-07-17T07:10:17-05:00	2015-08-12T12:37:32-05:00		avaldez
397	17 Jul 19:30 plots	ISR		2015_07_1 Support CNOFS	Plot	I. Manay	new	2015-07-17T19:49:44-05:00	2015-07-17T19:49:44-05:00		imanay
367	13 Jul 23:59 Plots	ISR		2015_07_1 Support CNOFS	Process/Analysis Program	P. Condor	new	2015-07-14T00:35:34-05:00	2015-07-14T00:35:34-05:00	Plots of noisem rti and powers.	pcondor
369	14 Jul 06:55 Spark gaps adjustment	ISR		2015_07_1 Support CNOFS	Spark Gaps	J. Lavado	new	2015-07-14T08:08:50-05:00	2015-07-14T08:08:50-05:00	"13 Jul
21:54 spark gaps adjustment
14 Jul
00:38 spark gaps adjustment
04:10 spark gaps adjustment
06:55 spark gaps adjustment"	pcondor
372	14 Jul 19:25 Spark-gaps summary	ISR		2015_07_1 Support CNOFS	Spark Gaps	A. Coronado	new	2015-07-14T19:58:40-05:00	2015-07-14T19:58:40-05:00	"ATR's adjustment:
1) 14 Jul 10:14 spark gaps adjustment.
2) 14 Jul 13:18 spark gaps adjustment.
3) 14 Jul 16:18 spark gaps adjustment.
4) 14 Jul 19:25 spark gaps adjustment."	imanay
375	15 Jul 06:30 Spark-gaps summary	ISR		2015_07_1 Support CNOFS	Spark Gaps	A. Belleza	new	2015-07-15T08:38:50-05:00	2015-07-15T08:38:50-05:00	"ATR's adjustment:
1) 14 Jul 22:40 spark gaps adjustment.
2) 15 Jul 02:39 spark gaps adjustment.
3) 15 Jul 06:30 spark gaps adjustment."	imanay
379	15 Jul 19:00 Spark-gaps summary	ISR		2015_07_1 Support CNOFS	Spark Gaps	jortiz	new	2015-07-15T19:18:20-05:00	2015-07-15T19:18:20-05:00	"ATR's adjustment:
1) 15 Jul 09:39 spark gaps adjustment.
2) 15 Jul 12:30 spark gaps adjustment.
3) 15 Jul 15:34 spark gaps adjustment.
4) 15 Jul 18:54 spark gaps adjustment."	jortiz
384	16 Jul 07:00 Spark-gaps summary	ISR		2015_07_1 Support CNOFS	Spark Gaps		new	2015-07-16T07:46:38-05:00	2015-07-16T07:46:38-05:00	"ATR's adjustment:
1) 15 Jul 22:00 spark gaps adjustment.
2) 16 Jul 01:00 spark gaps adjustment.
3) 16 Jul 03:10 spark gaps adjustment.
4) 16 Jul 06:20 spark gaps adjustment."	joscanoa
392	17 Jul 07:00 Spark-gaps summary	ISR		2015_07_1 Support CNOFS	Spark Gaps	avaldez	new	2015-07-17T07:25:37-05:00	2015-08-12T12:37:00-05:00	"16 July
19:30 Spark gaps adjustment
21:00 Spark gaps adjustment
17 July
00:10 Spark gaps adjustment
02:58 Spark gaps adjustment and clean the tungsteno.
06:02 Spark gaps adjustment and clean the tungsteno.
"	AValdez
396	17 Jul 19:05 Spark-gaps summary	ISR		2015_07_1 Support CNOFS	Spark Gaps	W. Rojas	new	2015-07-17T19:43:25-05:00	2015-07-17T19:43:25-05:00	"ATR's adjustment:
1) 17 Jul 09:20 spark gaps adjustment.
2) 17 Jul 12:18 spark gaps adjustment.
3) 17 Jul 15:25 spark gaps adjustment.
4) 17 Jul 18:38 spark gaps adjustment."	imanay
362	13 Jul 12:20 Log Created Hybrid Mode	ISR		2015_07_1 Support CNOFS	Start experiment		new	2015-07-13T13:17:52-05:00	2015-07-13T13:17:52-05:00	"Log created
Hybrid Mode
LP & DP Faraday
Mon 13 to Fri 17 July 2015"	ryanque
366	13 Jul 20:50 Start of Experiment	ISR		2015_07_1 Support CNOFS	Start experiment	P. Condor	new	2015-07-14T00:32:49-05:00	2015-08-11T16:49:01-05:00	Change of hybrido because data no is good. Tx is off. After Tx is on and data is good from this time.	pcondor
364	13 Jul 19:00 Transmitter Power Measurements	ISR		2015_07_1 Support CNOFS	Transmitters		new	2015-07-13T19:21:16-05:00	2015-07-13T19:21:16-05:00	"16:20 LV  ON
16:42 HV  ON
17:00 TX Power sample (-70 dB coupling)
Tx2 +6.8 dBm
Tx4 -3.2 dBm
Line voltage and power: 4100 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx2  38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx2  38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW"	vquesada
368	14 Jul 07:30 Transmitter Power Measurements	ISR		2015_07_1 Support CNOFS	Transmitters		new	2015-07-14T08:00:26-05:00	2015-07-14T08:00:26-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
14/07/2015
00:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.6 dBm
Line voltage and power: 4100 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.6 dBm
Line voltage and power: 4100 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.6 dBm
Line voltage and power: 4100 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.6 dBm
Line voltage and power: 4100 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
"	rtadeo
371	14 Jul 19:25 Transmitter Power Measurements	ISR		2015_07_1 Support CNOFS	Transmitters		new	2015-07-14T19:46:03-05:00	2015-07-14T19:46:03-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx2 38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx2 38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4080 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4080 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 40 Kw
Tx4 -2.3 dBm
Line voltage and power: 4100 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx2 40 Kw
Tx4 -2.3 dBm
Line voltage and power: 4100 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4050 VAC, 300 KW"	vquesada
374	15 Jul 07:30 Transmitter Power Measurements	ISR		2015_07_1 Support CNOFS	Transmitters		new	2015-07-15T08:18:38-05:00	2015-07-15T08:18:38-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
00:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
00:35 crowbar HV
01:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW"	rtadeo
378	15 Jul 08:29 Transmitters were off	ISR		2015_07_1 Support CNOFS	Transmitters	jortiz	assigned	2015-07-15T09:09:25-05:00	2015-07-15T09:11:56-05:00	The transmitters were off during 2 minutes, 08:29 to 08:31 due to variance in line tension from power company.	jortiz
380	15 Jul 19:20 Transmitter power measurement	ISR		2015_07_1 Support CNOFS	Transmitters		new	2015-07-15T19:38:44-05:00	2015-07-15T19:38:44-05:00	"08:25 Crowbar, transient at line voltage
09:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.6 dBm
Line voltage and power: 4070 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4070 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.6 dBm
Line voltage and power: 4050 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4030 VAC, 290 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 290 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4100 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4100 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 40 Kw
Tx4 -2.4 dBm
Line voltage and power: 4100 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.3 dBm
Line voltage and power: 4110 VAC, 300 KW"	ryaya
381	15 Jul 23:05 Transmitter Power Measurement	ISR		2015_07_1 Support CNOFS	Transmitters		new	2015-07-15T23:27:10-05:00	2015-07-15T23:27:10-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4090 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4090 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4080 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4080 VAC, 300 KW

"	vquesada
383	16 Jul 07:00 Transmitter Power Measurement	ISR		2015_07_1 Support CNOFS	Transmitters		new	2015-07-16T07:22:23-05:00	2015-07-16T07:22:23-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4090 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4090 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 40 Kw
Tx4 -2.3 dBm
Line voltage and power: 4100 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 40 Kw
Tx4 -2.3 dBm
Line voltage and power: 4100 VAC, 300 KW
03:44 Crowbar, transient at line voltage
04:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4060 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4060 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4090 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4090 VAC, 300 KW"	vquesada
388	16 Jul 19:00 Transmitter Power Measurement	ISR		2015_07_1 Support CNOFS	Transmitters		new	2015-07-16T19:29:29-05:00	2015-07-16T19:29:29-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4090 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4050 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4100 VAC, 300 KW



"	rtadeo
389	16 Jul 20:00 Operation Resume	ISR		2015_07_1 Support CNOFS	Transmitters		new	2015-07-16T23:24:14-05:00	2015-08-11T17:47:04-05:00	"Person in Charge: R. Yanque
Experiment: Faraday H2
1) 08:00 - 20:00
2) Operation Hours: 11h 35 min
3) Operation incomplete: 0 min
4) Reasons
Bad data due to channel B noise."	ryanque
391	17 Jul 07:00 Transmitter Power Measurement	ISR		2015_07_1 Support CNOFS	Transmitters		new	2015-07-17T07:23:07-05:00	2015-07-30T17:42:44-05:00	"16 July
20:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4100 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4100 VAC, 300 KW
17 July
00:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4080 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4080 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4080 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4080 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4080 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 39 Kw
Tx4 -2.4 dBm
Line voltage and power: 4080 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 40 Kw
Tx4 -2.3 dBm
Line voltage and power: 4100 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 40 Kw
Tx4 -2.3 dBm
Line voltage and power: 4100 VAC, 300 KW
"	vquesada
395	17 Jul 19:00 Transmitter Power Measurement	ISR		2015_07_1 Support CNOFS	Transmitters		new	2015-07-17T19:29:53-05:00	2015-07-17T19:29:53-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx2   40 Kw
Tx4 -2.4 dBm
Line voltage and power: 4100 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4100 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx2   40 Kw
Tx4 -2.4 dBm
Line voltage and power: 4100 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx2   40 Kw
Tx4 -2.4 dBm
Line voltage and power: 4100 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4090 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx2   38 Kw
Tx4 -2.5 dBm
Line voltage and power: 4090 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4090 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4090 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4090 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4090 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4090 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx2   39 Kw
Tx4 -2.5 dBm
Line voltage and power: 4090 VAC, 300 KW
14:00 TX OFF
"	rtadeo
408	20 Jul 16:30 Start Imaging	ISR		2015_07_2 Support ISR School	Acquisition system	P. Condor	new	2015-07-21T10:03:52-05:00	2015-10-15T13:11:38-05:00	Imaging On. We do calibration of noise and after Imaging is all OK.	pcondor
409	21 Jul 08:00 Imaging Off and restart Faraday	ISR		2015_07_2 Support ISR School	Acquisition system	P. Condor	new	2015-07-21T10:05:55-05:00	2015-07-21T10:05:55-05:00	"Imaging Off and restart Faraday because it is desynchronized.

"	pcondor
410	21 Jul 08:08 Ch B - Faraday is attenuated 2 db	ISR		2015_07_2 Support ISR School	Acquisition system	P. Condor	new	2015-07-21T10:12:07-05:00	2015-07-21T10:12:07-05:00	Ch B - Faraday is attenuated 2 db	pcondor
411	21 Jul 08:09 We changed ChA for Ch B faraday	ISR		2015_07_2 Support ISR School	Acquisition system	P. Condor	new	2015-07-21T10:13:57-05:00	2015-07-21T10:13:57-05:00	We changed ChA for Ch B faraday. After is returned.	pcondor
428	22 Jul 08:20 Restart Faraday	ISR		2015_07_2 Support ISR School	Acquisition system	P. Condor	new	2015-07-22T19:38:15-05:00	2015-07-22T19:38:15-05:00	Restart Faraday because Farday was off from yesterday at 21 hours.	pcondor
429	22 Jul 10:00 Reset batch Faraday for desinchronization	ISR		2015_07_2 Support ISR School	Acquisition system	P. Condor	new	2015-07-22T19:40:59-05:00	2015-07-22T19:40:59-05:00	Reset batch Faraday for desinchronization	pcondor
430	22 Jul 11:00 Attenuation in Faraday	ISR		2015_07_2 Support ISR School	Acquisition system	P. Condor	new	2015-07-22T19:43:16-05:00	2015-07-22T19:43:16-05:00	"Attenuation in Faraday
CH A 3 db
Ch B 8 db"	pcondor
431	22 Jul 14:59 Reset pc Faraday	ISR		2015_07_2 Support ISR School	Acquisition system	P. Condor	new	2015-07-22T19:45:45-05:00	2015-07-22T19:45:45-05:00	 Reset pc Faraday because it was desinchronizated	pcondor
432	22 Jul 16:15 Restart Faraday	ISR		2015_07_2 Support ISR School	Acquisition system	P. Condor	new	2015-07-22T19:48:10-05:00	2015-07-22T19:48:10-05:00	Restart Faraday for desynchronization.	pcondor
433	22 Jul 17:31 Start Imaging	ISR		2015_07_2 Support ISR School	Acquisition system	P. Condor	new	2015-07-22T19:50:56-05:00	2015-07-22T19:50:56-05:00	 Start Imaging	pcondor
440	23 Jul 06:30 Stop Imaging	ISR		2015_07_2 Support ISR School	Acquisition system		new	2015-07-23T06:18:23-05:00	2015-07-23T16:50:24-05:00	Stop Imaging at JARS	abelleza
400	20 Jul 12:34 VSWR Antenna	ISR		2015_07_2 Support ISR School	Antennas		new	2015-07-20T12:46:56-05:00	2015-07-20T12:46:56-05:00	"WUp 1.04
WDn 1.05
NDn 1.04
NUp 1.06
EUp 1.06
EDn 1.08
SDn 1.05
SUp 1.01

ABS North Quarter all Ok.
Problems with the display in the following modules 
11 (N7)  The value that is read is different from what the module displays, which is correct.
26 (N14) Doesn´t connecto to the module, but the module displays correct.

ABS South Quarter one module with cables.
40 (S4) Both up and down are with cables."	ryanque
407	20 Jul 18:00 Change of Hybrid	ISR		2015_07_2 Support ISR School	Antennas	P. Condor	new	2015-07-21T10:02:11-05:00	2015-07-21T10:02:11-05:00	We change Hybrid of Faraday. But Faraday no produce good Te.	pcondor
416	21 Jul 08:00 Spark Gap Summary	ISR		2015_07_2 Support ISR School	Antennas		new	2015-07-21T19:12:50-05:00	2015-07-21T19:12:50-05:00	"July 20
21:35 ATR Spark Gap adjustment
July 21
00:40 ATR Spark Gap adjustment
03:44 ATR Spark Gap adjustment
06:36 ATR Spark Gap adjustment"	ryanque
417	21 Jul 11:37 Attenuations	ISR		2015_07_2 Support ISR School	Antennas		new	2015-07-21T19:17:20-05:00	2015-07-21T19:17:20-05:00	"EW Drift (03 Pre-amps)
ChA 0 dB
ChB 1 dB
ChC 0 dB
ChD 1 dB
Faraday (04 Pre-amps)
ChA 4 dB
ChB 8 dB
Imaging (02 Pre-amps)
ChA 0 dB
ChB 2 dB
ChC 0 dB
ChD 0 dB
ChE 6 dB
ChF 3 dB
ChG 3 dB
ChH 9 dB
"	ryanque
419	21 Jul 18:37 Spark Gaps resume	ISR		2015_07_2 Support ISR School	Antennas		new	2015-07-21T19:24:21-05:00	2015-07-21T19:24:21-05:00	"09:39 Spark Gap adjustment
12:34 Spark Gap adjustment
15:57 Spark Gap adjustment
18:37 Spark Gap adjustment"	ryanque
421	21 Jul 22:10 Spark Gap Adjustment	ISR		2015_07_2 Support ISR School	Antennas		new	2015-07-22T07:01:50-05:00	2015-07-22T07:14:52-05:00		dlume
422	21 Jul 22:20 Galaxy pass	ISR		2015_07_2 Support ISR School	Antennas		new	2015-07-22T07:03:40-05:00	2015-07-22T07:03:40-05:00		dlume
424	22 Jul 01:17 Spark Gap Adjustment	ISR		2015_07_2 Support ISR School	Antennas		new	2015-07-22T07:10:34-05:00	2015-07-22T07:14:35-05:00		dlume
425	22 Jul 04:40 Spark Gap Adjustment	ISR		2015_07_2 Support ISR School	Antennas		new	2015-07-22T07:16:45-05:00	2015-07-22T07:16:45-05:00		dlume
443	23 Jul 08:20 Experiment ended	ISR		2015_07_2 Support ISR School	End experiment		new	2015-07-23T16:55:13-05:00	2015-07-23T16:55:13-05:00	The experiment has ended at 08:20	ryanque
452	31 Jul 11:40 Operativity ISR+Imaging July	ISR		2015_07_2 Support ISR School	End experiment		new	2015-07-31T12:06:24-05:00	2015-07-31T12:06:24-05:00	"ISR+Imaging
Support ISR School
20 to 23 July 2015"	ryanque
597	14 Oct 14:00 Report Campaign	ISR		2015_07_2 Support ISR School	End experiment		new	2015-10-15T13:44:55-05:00	2015-10-15T13:44:55-05:00	"The report campaign is attached.
In this campaign we had to extend one day due to one night Farday was not reseted.
We also had problems the first day to the flip was not conected for Faraday."	ryanque
415	21 Jul 08:00 Operation Resume	ISR		2015_07_2 Support ISR School	General		new	2015-07-21T19:04:59-05:00	2015-07-21T19:04:59-05:00	"Person in Charge: A. Belleza.
Experiment: ISR+Imaging
1) 20:00 - 08:00 
2) Operation Hours: 12h
3) Operation incomplete: 0 min
4) Reasons:
5) Comments:
Faraday was not well configured.
The temperature was not calculated"	ryanque
420	21 Jul 20:00 Operation Resume	ISR		2015_07_2 Support ISR School	General		new	2015-07-21T19:29:47-05:00	2015-07-31T11:57:56-05:00	"Person in Charge: R. Yanque.
Experiment: ISR+Imaging
1) 08:00 - 20:00 
2) Operation Hours: 10:37h
3) Operation incomplete:
4) Reasons:
Faraday wasn´t setted completely
Due to short Transmitter failure"	ryanque
427	22 Jul 08:00 Operation Resume	ISR		2015_07_2 Support ISR School	General		new	2015-07-22T08:02:04-05:00	2015-07-22T10:07:28-05:00	"Person in Charge: D. Lume.
Experiment: ISR+Imaging
1) 20:00 - 08:00 
2) Operation Hours: 1:33h
3) Operation incomplete: 11:27 min
4) Reasons:
Faraday Acquisition system stopped"	dlume
437	22 Jul 19:59 Operation resume	ISR		2015_07_2 Support ISR School	General	P. Condor	new	2015-07-22T19:59:24-05:00	2015-07-22T19:59:24-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift-Faraday-Imaging
1) 08:00 - 20:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 240 min
4) Reasons:
_ Tx off for change disk and visitors"	pcondor
442	23 Jul 08:00 Operation Resume	ISR		2015_07_2 Support ISR School	General		new	2015-07-23T16:54:06-05:00	2015-07-23T16:54:06-05:00	"Person in Charge: A. Belleza
Experiment: EW_Drift-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0
4) Reasons:"	ryanque
444	27 Jul 11:30 Data was uploaded to PUMA	ISR		2015_07_2 Support ISR School	General	I. Manay	new	2015-07-27T11:31:44-05:00	2015-07-27T14:03:17-05:00	"EW_Drift:
Nro. files: 1156, Size: 82.2 GB

Faraday:
Nro files: 391, Size: 19.8 GB

Imaging:
Nro files: 312, Size: 240GB
"	imanay
418	21 Jul 17:40 Start Imaging	ISR		2015_07_2 Support ISR School	Other Instruments		new	2015-07-21T19:19:03-05:00	2015-07-21T19:19:03-05:00	Imaging is started	ryanque
423	21 Jul 23:59 Stop Imaging	ISR		2015_07_2 Support ISR School	Other Instruments		new	2015-07-22T07:06:30-05:00	2015-07-22T07:07:48-05:00		dlume
439	22 Jul 23:59 Load Plots	ISR+Imaging		2015_07_2 Support ISR School	Plot		new	2015-07-23T00:32:34-05:00	2015-07-23T16:51:42-05:00	Load Plots	abelleza
401	20 Jul 17:19 Farday	ISR		2015_07_2 Support ISR School	Process/Analysis Program		new	2015-07-20T17:21:04-05:00	2015-07-20T17:21:04-05:00		pcondor
404	21 Jul 09:23 Plot Faraday OK	ISR		2015_07_2 Support ISR School	Process/Analysis Program	P. Condor	new	2015-07-21T09:26:24-05:00	2015-07-21T09:26:24-05:00	Parameters	pcondor
406	20 Jul 16:05 Start with TX	ISR		2015_07_2 Support ISR School	Process/Analysis Program	P. Condor	new	2015-07-21T10:00:20-05:00	2015-07-21T10:00:20-05:00	Start acquisition with Tx. EW_Drift is ok but Faraday no give good Te.	pcondor
412	21 Jul 08:26 TR Faraday is changed and a flip is connected in faraday that was not put	ISR		2015_07_2 Support ISR School	Process/Analysis Program	P.Condor	new	2015-07-21T10:18:02-05:00	2015-07-21T10:18:02-05:00	TR Faraday is changed and a flip is connected in faraday that was not put. Then faraday is ok producing good Ne and Te.	pcondor
434	22 Jul 17:29 Spark gaps Adjustment	ISR		2015_07_2 Support ISR School	Spark Gaps	A. Coronado	new	2015-07-22T19:52:56-05:00	2015-07-22T19:52:56-05:00	"11:28  Spark gaps Adjustment
14:31  Spark gaps Adjustment
17:29  Spark gaps Adjustment"	pcondor
399	20 Jul 12:30 Log created	ISR		2015_07_2 Support ISR School	Start experiment		new	2015-07-20T12:36:36-05:00	2015-07-20T12:36:36-05:00	"ISR + Imaging
Support ISR School
L. User: P. Condor
Mon 20 to Wed 22
"	ryanque
402	20 Jul 19:00 Transmitter Power Measurement	ISR		2015_07_2 Support ISR School	Transmitters		new	2015-07-20T19:02:31-05:00	2015-07-20T19:02:31-05:00	"14:35 LV ON
16:00 HV ON
16:05 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.4,3.7 dBm
Tx4 +1.2 dBm
Line voltage and power: 4040 VAC, 310 KW
16:30 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.4,3.5 dBm
Tx4 +1.2 dBm
Line voltage and power: 4040 VAC, 310 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
Line voltage and power: 4040 VAC, 310 KW
17:55 Driver3 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
D3 -9.2 dBm
Line voltage and power: 4080 VAC, 320 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
D3 -9.2 dBm
Line voltage and power: 4080 VAC, 320 KW


"	vquesada
403	21 Jul 07:30 Transmitter Power Measurement	ISR		2015_07_2 Support ISR School	Transmitters		new	2015-07-21T08:04:23-05:00	2015-07-21T08:04:23-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.4 dBm
Tx4 +0.5 dBm
Dr3 -9.0 dBm
Line voltage and power: 4100 VAC, 300 KW
20:23 Falla de Linea de transmision 6""
21:08 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.3 dBm
Tx4 +1.1 dBm
Dr3 -9.0 dBm
Line voltage and power: 4100 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.2 dBm
Tx4 +1.1 dBm
Dr3 -9.0 dBm
Line voltage and power: 4100 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
Dr3 -9.0 dBm
Line voltage and power: 4100 VAC, 300 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
Dr3 -9.0 dBm
Line voltage and power: 4100 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
Dr3 -9.0 dBm
Line voltage and power: 4100 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx2 +1.5 dBm
Tx4 +1.1 dBm
Dr3 -8.0 dBm
Line voltage and power: 4100 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.3 dBm
Tx4 +1.1 dBm
Dr3 -8.3 dBm
Line voltage and power: 4080 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.3 dBm
Tx4 +1.1 dBm
Dr3 -8.3 dBm
Line voltage and power: 4080 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.3 dBm
Tx4 +1.1 dBm
Dr3 -8.3 dBm
Line voltage and power: 4080 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.3 dBm
Tx4 +1.1 dBm
Dr3 -8.3 dBm
Line voltage and power: 4080 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.3 dBm
Tx4 +1.1 dBm
Dr3 -8.3 dBm
Line voltage and power: 4080 VAC, 300 KW
07:38 Falla Screen PA1"	rtadeo
413	21 Jul 10:00 Low power at PA2 and PA4	ISR+Imaging	Others	2015_07_2 Support ISR School	Transmitters	Rommel	new	2015-07-21T10:19:01-05:00	2015-07-21T10:19:01-05:00	PA2 and PA4 have been selected for transmitting the Faraday pulses. They both present a low power output compared to the last EWD-FARADAY experiment, the difference is close to 1dB. The normal output power is 2.4 dBm at the output sample for PA 4 and 2.2 dBm/5.8 dBm (Combined pulses) for PA2; now we have 1.2dBm for PA4 and 1.4dBm/3.6 dBm for PA2. We could not solve this problem tunning both units, they are saturated, but this is not the case with PA1 (EW Drift pulses), this transmitter shows normal power output (6.0 dBm for the last experiment and 6.6 dBm for this experiment). The only difference is that PA1 is using E-W antennas with traditional cables and PA4 and PA2 are using the N-S antennas with the new ABS system.	ryaya
414	21 Jul 19:00 Transmitter Power Measurement	ISR		2015_07_2 Support ISR School	Transmitters		new	2015-07-21T19:02:45-05:00	2015-07-21T19:02:45-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.5,3.6 dBm
Tx4 +1.1 dBm
Line voltage and power: 4080 VAC, 310 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.5,3.6 dBm
Tx4 +1.1 dBm
Line voltage and power: 4080 VAC, 310 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.5,3.7 dBm
Tx4 +1.2 dBm
Line voltage and power: 4040 VAC, 310 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.5,3.7 dBm
Tx4 +1.2 dBm
Line voltage and power: 4040 VAC, 310 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +1.5,3.7 dBm
Tx4 +1.2 dBm
Line voltage and power: 4060 VAC, 310 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +1.5,3.7 dBm
Tx4 +1.2 dBm
Line voltage and power: 4060 VAC, 310 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +1.5,3.7 dBm
Tx4 +1.3 dBm
Line voltage and power: 4050 VAC, 310 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +1.5,3.7 dBm
Tx4 +1.3 dBm
Line voltage and power: 4050 VAC, 310 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.6,3.8 dBm
Tx4 +1.4 dBm
Line voltage and power: 4080 VAC, 310 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.6,3.8 dBm
Tx4 +1.4 dBm
Line voltage and power: 4080 VAC, 310 KW
17:45 Driver 3 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.3 dBm
D3  -8.2
Line voltage and power: 4080 VAC, 310 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.3 dBm
D3  -8.2
Line voltage and power: 4080 VAC, 310 KW"	vquesada
426	22 Jul 07:25 Transmitter Power Measurement	ISR		2015_07_2 Support ISR School	Transmitters		new	2015-07-22T07:27:34-05:00	2015-07-22T07:27:34-05:00	"18:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.3 dBm
Dr3 -8.2 dBm
Line voltage and power: 4080 VAC, 310 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.3 dBm
Dr3 -8.2 dBm
Line voltage and power: 4080 VAC, 310 KW
20:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.3 dBm
Dr3 -8.2 dBm
Line voltage and power: 4080 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.3 dBm
Dr3 -8.2 dBm
Line voltage and power: 4080 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
Dr3 -8.2 dBm
Line voltage and power: 4080 VAC, 310 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
Dr3 -8.2 dBm
Line voltage and power: 4080 VAC, 310 KW

22/07/2015
00:00 OFF Driver (Imaging)
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.4 /+3.6 dBm
Tx4 +1.2 dBm
Line voltage and power: 4080 VAC, 310 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.4 /+3.6 dBm
Tx4 +1.2 dBm
Line voltage and power: 4080 VAC, 310 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.4 /+3.6 dBm
Tx4 +1.2 dBm
Line voltage and power: 4080 VAC, 310 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.4 /+3.6 dBm
Tx4 +1.2 dBm
Line voltage and power: 4080 VAC, 310 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.4 /+3.6 dBm
Tx4 +1.2 dBm
Line voltage and power: 4080 VAC, 310 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.4 /+3.2 dBm
Tx4 +1.2 dBm
Line voltage and power: 4080 VAC, 310 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.4 /+3.2 dBm
Tx4 +1.2 dBm
Line voltage and power: 4080 VAC, 310 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.4 /+3.2 dBm
Tx4 +1.1 dBm
Line voltage and power: 4080 VAC, 310 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.4 /+3.2 dBm
Tx4 +1.1 dBm
Line voltage and power: 4080 VAC, 310 KW
"	rtadeo
435	22 Jul 19:50 Tx off	ISR		2015_07_2 Support ISR School	Transmitters	P. Condor	new	2015-07-22T19:55:37-05:00	2015-07-22T19:55:37-05:00	" Tx off at:
09 to change disk
10, 12 and 15 hours for visit"	pcondor
436	22 Jul 19:45 Transmitter power measurements	ISR		2015_07_2 Support ISR School	Transmitters		new	2015-07-22T19:56:02-05:00	2015-07-22T19:56:02-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.6,3.7 dBm
Tx4 +1.2 dBm
Line voltage and power: 4020 VAC, 300 KW
09:14 RF OFF (Adq. request)
09:46 RF ON
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6,3.7 dBm
Tx4 +1.3 dBm
Line voltage and power: 4020 VAC, 300 KW
10:27 RF OFF (Radar school request)
11:05 RF ON
11:23 Problem at PA1 screen power supply
11:44 RF OFF (Radar school request)
12:27 RF ON
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.6,3.6 dBm
Tx4 +1.4 dBm
Line voltage and power: 4100 VAC, 310 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.6,3.8 dBm
Tx4 +1.2 dBm
Line voltage and power: 4060 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.6,3.7 dBm
Tx4 +1.4 dBm
Line voltage and power: 40100 VAC, 300 KW
15:17 RF OFF (Radar school request)
15:57 RF ON
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.6,3.8 dBm
Tx4 +1.4 dBm
Line voltage and power: 4060 VAC, 300 KW
17:30 Driver 3 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.4 dBm
Tx4 +1.2 dBm
D3 -7.8 dBm
Line voltage and power: 4010 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.5 dBm
Tx4 +1.4 dBm
D3 -7.9 dBm
Line voltage and power: 4060 VAC, 300 KW"	ryaya
438	22 Jul 23:00 Transmitter Power Measurement	ISR		2015_07_2 Support ISR School	Transmitters		new	2015-07-22T23:07:47-05:00	2015-07-22T23:07:47-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
D3  -8.0 dBm
Line voltage and power: 4060 VAC, 320 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
D3  -8.0 dBm
Line voltage and power: 4060 VAC, 320 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.5 dBm
Tx4 +1.1 dBm
D3  -8.1 dBm
Line voltage and power: 4050 VAC, 320 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.5 dBm
Tx4 +1.1 dBm
D3  -8.1 dBm
Line voltage and power: 4050 VAC, 320 KW"	vquesada
441	23 Jul 07:00 Transmitter Power Measurement	ISR		2015_07_2 Support ISR School	Transmitters		new	2015-07-23T07:03:30-05:00	2015-07-23T07:03:30-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.5 dBm
Tx4 +1.1 dBm
D3 -8.1 dBm
Line voltage and power: 4050 VAC, 320 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.5 dBm
Tx4 +1.1 dBm
D3 -8.1 dBm
Line voltage and power: 4050 VAC, 320 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.7 dBm
Tx4 +1.2 dBm
D3 -7.8 dBm
Line voltage and power: 4100 VAC, 330 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.7 dBm
Tx4 +1.2 dBm
D3 -7.8 dBm
Line voltage and power: 4100 VAC, 330 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
D3 -7.9 dBm
Line voltage and power: 4090 VAC, 320 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
D3 -7.9 dBm
Line voltage and power: 4090 VAC, 320 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6 dBm
Tx4 +1.2 dBm
D3 -7.9 dBm
Line voltage and power: 4090 VAC, 320 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6,3.7 dBm
Tx4 +1.2 dBm
Line voltage and power: 4090 VAC, 320 KW"	vquesada
467	26 Ago 20:26 Faraday loss synchronization	ISR		2015_08 Support CNOFS	Acquisition system	P. Condor	new	2015-08-27T04:27:33-05:00	2015-08-27T04:27:33-05:00	Faraday loss synchronization for little minutes.	pcondor
476	27 Ago 07:10 Turn off Imaging	ISR		2015_08 Support CNOFS	Acquisition system	P. Condor	new	2015-08-27T07:41:45-05:00	2015-08-27T07:41:45-05:00	Turn off Imaging	pcondor
477	27 Ago 07:20 Noise levels	ISR		2015_08 Support CNOFS	Acquisition system	P. Condor	new	2015-08-27T07:43:38-05:00	2015-08-27T07:43:38-05:00	"EW_Drifts 
A:20.77 
B:20.79 
C:21.42 
D:21.35 

Faraday 
A:16.17
B:16.80"	pcondor
481	27 Aug 08:16 Faraday acquisition was restarted	ISR+Imaging		2015_08 Support CNOFS	Acquisition system	I. Manay	new	2015-08-27T09:36:35-05:00	2015-08-27T09:36:35-05:00	Automatic restart failed, it was manually restarted.	imanay
482	27 Aug 11:44 Faraday acquisition was restarted	ISR+Imaging		2015_08 Support CNOFS	Acquisition system	I. Manay	new	2015-08-27T13:20:27-05:00	2015-08-27T13:20:27-05:00	Automatic restart failed, it was manually restarted.	imanay
459	24 Aug 14:28 VSWR Antenna	ISR		2015_08 Support CNOFS	Antennas		new	2015-08-24T14:46:47-05:00	2015-08-25T12:28:11-05:00	"WUp 1.02
WDn 1.07
NDn 1.05
NUp 1.04
EUp 1.09
EDn 1.04
SDn 1.06
SUp 1.02"	ryanque
487	27 Aug 19:15 Change of reception hybrid	ISR+Imaging		2015_08 Support CNOFS	Antennas	W. Rojas	new	2015-08-27T19:44:30-05:00	2015-08-27T19:44:30-05:00	As test, reception hybrid of faraday experiment was changed. Channel A of faraday experiment with weird behaviour.	imanay
469	26 Ago 22:00 Interference for Moon	ISR		2015_08 Support CNOFS	General	P. Condor	new	2015-08-27T04:57:37-05:00	2015-08-27T04:57:37-05:00	Interference for Moon	pcondor
475	27 Ago 06:27 Pass CNOFS	ISR		2015_08 Support CNOFS	General	P. Condor	new	2015-08-27T07:40:58-05:00	2015-08-27T07:40:58-05:00	Pass CNOFS	pcondor
480	27 Ago 08:00 Operation resume	ISR		2015_08 Support CNOFS	General	P. Condor	new	2015-08-27T08:17:49-05:00	2015-08-27T08:17:49-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
489	27 Aug 19:59 Operation Resume	ISR+Imaging		2015_08 Support CNOFS	General	I. Manay	new	2015-08-27T20:25:32-05:00	2015-08-27T20:25:32-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 08:00 - 20:00 
2) Operation Hours: 12h
3) Operation incomplete: 13 min
4) Reasons:
-Fall of the transmitters.
-Change of reception hybrid of faraday experiment"	imanay
493	28 Agu 07:30 OPERATION RESUME	ISR+Imaging		2015_08 Support CNOFS	General	AVALDEZ	new	2015-08-28T07:36:24-05:00	2015-08-28T07:36:24-05:00	"Person in Charge: AVALDEZ.
Experiment: EW_DRIFT FARADAY IMAGING
1) 20:00 - 08:00
2) Operation Hours: 12h
3) Operation incomplete: 0 min
4) Reasons:
-There was no problem during the experiment."	avaldez
495	31 Aug 15:21 Data uploaded to PUMA	ISR+Imaging		2015_08 Support CNOFS	General	I. Manay	new	2015-08-31T15:44:24-05:00	2015-08-31T15:44:24-05:00	"Faraday  : 523 files, 27.1 GB
Ew_drift : 1316 files, 94 GB.
Imaging  : 382 files, 300 GB."	imanay
484	27 Aug 16:00 Plots of the experiments	ISR+Imaging		2015_08 Support CNOFS	Plot	I. Manay	new	2015-08-27T16:25:21-05:00	2015-08-27T16:25:21-05:00		imanay
491	27 Agu 23:59 Last Plots of the Experiment	ISR		2015_08 Support CNOFS	Plot	AVALDEZ	new	2015-08-28T07:25:35-05:00	2015-08-28T07:25:35-05:00		avaldez
468	26 Ago 21:01 Noise levels	ISR		2015_08 Support CNOFS	Process/Analysis Program	P. Condor	new	2015-08-27T04:56:35-05:00	2015-08-27T04:56:35-05:00	"EW_Drifts         Faraday          Imaging
A:24.90           A:18.22          1:22.43    5:26.10
B:25.40           B:20.74          2:25.54    6:22.24
C:25.39                            3:23.09    7:24.85
D:25.55                            4:23.29    8:25.06
"	pcondor
470	26 Ago 23:01 Noise levels	ISR		2015_08 Support CNOFS	Process/Analysis Program	P. Condor	new	2015-08-27T05:04:55-05:00	2015-08-27T05:04:55-05:00	"EW_Drifts 
A:21.96  
B:22.11 
C:22.45         
D:22.48 
        
Faraday 
A:17.65
B:17.83

Imaging
1:19.19   5:22.96
2:21.95   6:18.70
3:20.09   7:21.58
4:19.61   8:21.69"	pcondor
471	27 Ago 00:00 Plots	ISR		2015_08 Support CNOFS	Process/Analysis Program	P. Condor	new	2015-08-27T05:24:59-05:00	2015-08-27T05:24:59-05:00	Plots of rti, noise and spectras	pcondor
472	27 Ago 02:23 Noise levels	ISR		2015_08 Support CNOFS	Process/Analysis Program	P. Condor	new	2015-08-27T05:40:13-05:00	2015-08-27T05:40:13-05:00	"EW_Drifts 
A:21.30 
B:21.40 
C:21.91 
D:21.81 

Faraday 
A:16.35
B:17.21

Imaging
1:17.91 
2:20.89 
3:19.19 
4:18.71 
5:22.07
6:17.77
7:20.54
8:20.68"	pcondor
473	27 Ago 04:03 Noise Levels	ISR		2015_08 Support CNOFS	Process/Analysis Program	P. Condor	new	2015-08-27T05:43:35-05:00	2015-08-27T05:43:35-05:00	"EW_Drifts 
A:20.90 
B:20.92 
C:21.31 
D:21.21 

Faraday 
A:15.82
B:16.71

Imaging
1:17.54 
2:20.51 
3:18.96 
4:18.24 
5:21.56
6:17.47
7:20.41
8:20.54"	pcondor
479	27 Ago 07:40 Plots rtis, noise and spectra	ISR		2015_08 Support CNOFS	Process/Analysis Program	P. Condor	new	2015-08-27T07:53:10-05:00	2015-08-27T07:53:10-05:00	Plots rtis, noise and spectra	pcondor
485	27 Aug 19:00 Noise levels	ISR+Imaging		2015_08 Support CNOFS	Reception	I. Manay	new	2015-08-27T19:03:52-05:00	2015-08-27T19:22:52-05:00	"
||= =||= ew_drift =||= faraday =||= imaging =||
|| 09:07 || ||   ||
|| A || 22.06 || 17.26 || ||
|| B || 22.19 || 18.03 || ||
|| C || 22.26 || || ||
|| D || 22.27 || || ||
|| 11:30 || ||   ||
|| A || 21.39 || 15.04 || ||
|| B || 20.88 || 15.96 || ||
|| C || 20.81 || || ||
|| D || 20.76 || || ||
|| 16:00 || ||   ||
|| A || 21.54 || 16.39 || ||
|| B || 22.28 || 16.81 || ||
|| C || 21.88 || || ||
|| D || 21.86 || || ||
|| 19:00 || ||   ||
|| A || 23.70 || 17.21 || 21.08 ||
|| B || 23.89 || 19.35 || 24.83 ||
|| C || 24.22 || || 22.78 ||
|| D || 24.42 || || 22.28 ||
|| E ||  || || 25.50 ||
|| F ||  || || 21.16 ||
|| G ||  || || 23.65 ||
|| H ||  || || 24.51 ||"	imanay
478	27 Ago 07:30 Spark gaps summary	ISR		2015_08 Support CNOFS	Spark Gaps	J. Lavado	new	2015-08-27T07:49:57-05:00	2015-08-27T07:49:57-05:00	"26 aug
21:36 Spark Gap adjustment
27 Aug
01:20 Spark Gap adjustment
04:30 Spark Gap adjustment"	pcondor
486	27 Aug 19:00 Spark-gaps summary	ISR+Imaging		2015_08 Support CNOFS	Spark Gaps	W. Rojas	new	2015-08-27T19:19:34-05:00	2015-08-27T19:49:37-05:00	"ATR's adjustment:
1) 27 Aug 08:54 spark gaps adjustment.
2) 27 Aug 12:00 spark gaps adjustment.
3) 27 Aug 15:07 spark gaps adjustment.
4) 27 Aug 19:04 spark gaps adjustment."	imanay
492	28 Agu 07:20 Spark gaps adjustment	ISR+Imaging		2015_08 Support CNOFS	Spark Gaps	AVALDEZ	new	2015-08-28T07:36:08-05:00	2015-08-28T07:36:08-05:00	" ATR's adjustment:
1) 27 Aug 22:09 spark gaps adjustment.
2) 28 Aug 01:07 spark gaps adjustment.
3) 28 Aug 04:11 spark gaps adjustment.
4) 28 Aug 07:40 spark gaps adjustment."	avaldez
458	24 Aug 14:20 Log created	ISR		2015_08 Support CNOFS	Start experiment		new	2015-08-24T14:45:24-05:00	2015-08-24T14:45:24-05:00	"The campaign CNOFS Support
25-28 August 2015
Mode: ISR + Imaging"	ryanque
460	25 Agu 14:00 Plots of the Experiment	ISR		2015_08 Support CNOFS	Start experiment	avaldez	new	2015-08-25T16:11:01-05:00	2015-08-25T16:11:01-05:00		avaldez
461	25 Aug 19:00 Transmitter Power Measurement	ISR		2015_08 Support CNOFS	Transmitters		new	2015-08-25T19:17:25-05:00	2015-08-26T12:08:12-05:00	"07:00 LV  ON
07:10 HV  ON
07:20 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +5.5,0.9 dBm
Tx4 +1.0 dBm
Line voltage and power: 4080 VAC, 320 KW
08:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +4.8,0.9 dBm
Tx4 +2.1 dBm
Line voltage and power: 4080 VAC, 320 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx2 +5.3,1.7 dBm
Tx4 +2.1 dBm
Line voltage and power: 4080 VAC, 320 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx2 +5.3,1.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4080 VAC, 320 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx2 +5.3,1.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4080 VAC, 320 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx2 +5.4,1.7 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 320 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx2 +5.4,1.7 dBm
Tx4 +2.4 dBm
Line voltage and power: 4100 VAC, 320 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +5.3,1.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4040 VAC, 310 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +5.3,1.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4040 VAC, 310 KW
15:35 Driver source transformer fails Tx1 Y Tx2
16:35 RF ON
16:30 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +5.0,1.4 dBm
Tx4 +2.0 dBm
Line voltage and power: 4050 VAC, 320 KW
16:49 HV OFF
17:10 HV ON
17:18 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +5.3,1.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4040 VAC, 310 KW
17:38 Driver 3 ON 
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx2 +1.7 dBm
Tx4 +1.9 dBm
D3 -7.0
Line voltage and power: 4040 VAC, 310 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx2 +1.7 dBm
Tx4 +1.9 dBm
D3 -7.0  dBm
Line voltage and power: 4040 VAC, 310 KW









"	vquesada
463	26 Aug 07:30 Transmitter Power Measurement	ISR+Imaging		2015_08 Support CNOFS	Transmitters		new	2015-08-26T07:54:37-05:00	2015-08-26T07:54:37-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx2 +1.7 dBm
Tx4 +1.9 dBm
Dr3 -7.0 dBm
Line voltage and power: 4040 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx2 +1.7 dBm
Tx4 +1.9 dBm
Dr3 -7.0 dBm
Line voltage and power: 4040 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx2 +1.7 dBm
Tx4 +1.9 dBm
Dr3 -7.0 dBm
Line voltage and power: 4040 VAC, 310 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.0 dBm
Dr3 -6.9 dBm
Line voltage and power: 4040 VAC, 320 KW
23:26 failure PA 2
23:35 failure PA 2
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.0 dBm
Dr3 -6.9 dBm
Line voltage and power: 4050 VAC, 320 KW
00:15 Imaging OFF
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.6 dBm / +5.0 dBm
Tx4 +2.0 dBm
Line voltage and power: 4040 VAC, 320 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.6 dBm / +5.0 dBm
Tx4 +2.0 dBm
Line voltage and power: 4040 VAC, 320 KW
02:35 failure PA 2
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.6 dBm / +5.2 dBm
Tx4 +2.2 dBm
Line voltage and power: 4040 VAC, 320 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.5 dBm / +5.2 dBm
Tx4 +2.2 dBm
Line voltage and power: 4040 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.5 dBm / +5.2 dBm
Tx4 +2.2 dBm
Line voltage and power: 4040 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.5 dBm / +5.2 dBm
Tx4 +2.0 dBm
Line voltage and power: 4040 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.5 dBm / +5.2 dBm
Tx4 +2.0 dBm
Line voltage and power: 4040 VAC, 300 KW

"	rtadeo
466	26 Aug 19:10 Transmitter power measurements	ISR+Imaging		2015_08 Support CNOFS	Transmitters		new	2015-08-26T19:25:10-05:00	2015-08-26T19:25:10-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +5.3,1.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4020 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +5.2,1.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4080 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +5.0,1.5 dBm
Tx4 +2.1 dBm
Line voltage and power: 4020 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.2,1.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4080 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx2 +5.0,1.5 dBm
Tx4 +2.1 dBm
Line voltage and power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.2,1.6 dBm
Tx4 +2.2 dBm
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.3,1.7 dBm
Tx4 +2.3 dBm
Line voltage and power: 4050 VAC, 300 KW
17:35 Driver 3 ON 
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +1.8 dBm
Tx4 +2.2 dBm
D3 -6.8
Line voltage and power: 4080 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.8 dBm
Tx4 +2.3 dBm
D3 -6.8 dBm
Line voltage and power: 4100 VAC, 300 KW"	ryaya
474	27 Aug 07:00 Transmitter Power Measurement	ISR+Imaging		2015_08 Support CNOFS	Transmitters		new	2015-08-27T07:37:10-05:00	2015-08-27T07:37:10-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx2 +1.8 dBm
Tx4 +2.3 dBm
Dr3 -6.8 dBm
Line voltage and power: 4025 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.8 dBm
Tx4 +2.3 dBm
Dr3 -6.8 dBm
Line voltage and power: 4040 VAC, 300 KW
21:40 Screen PA2
21:58 Screen PA2
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
Dr3 -6.8 dBm
Line voltage and power: 4040 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
Dr3 -6.8 dBm
Line voltage and power: 4040 VAC, 300 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
Dr3 -6.8 dBm
Line voltage and power: 4040 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
Dr3 -6.8 dBm
Line voltage and power: 4040 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
Dr3 -6.8 dBm
Line voltage and power: 4040 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
Dr3 -6.8 dBm
Line voltage and power: 4040 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +1.8 dBm
Tx4 +2.2 dBm
Dr3 -6.7 dBm
Line voltage and power: 4040 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +1.8 dBm
Tx4 +2.2 dBm
Dr3 -6.7 dBm
Line voltage and power: 4040 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +1.8 dBm
Tx4 +2.2 dBm
Dr3 -6.7 dBm
Line voltage and power: 4040 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +1.8 dBm
Tx4 +2.2 dBm
Dr3 -6.7 dBm
Line voltage and power: 4040 VAC, 300 KW
"	rtadeo
483	27 Aug 15:16 Fall of transmitters	ISR+Imaging		2015_08 Support CNOFS	Transmitters	I. Manay	new	2015-08-27T16:07:31-05:00	2015-08-27T16:07:31-05:00	Transmitters were restablished at 15:27.	imanay
488	27 Aug 19:30 Transmitter power measurements	ISR+Imaging		2015_08 Support CNOFS	Transmitters		new	2015-08-27T19:53:39-05:00	2015-08-27T19:53:39-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx2 +5.1,1.6 dBm
Tx4 +2.2 dBm
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +5.3,1.8 dBm
Tx4 +2.2 dBm
Line voltage and power: 4010 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.3,1.8 dBm
Tx4 +2.2 dBm
Line voltage and power: 4000 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.1,1.5 dBm
Tx4 +2.1 dBm
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx2 +5.0,1.3 dBm
Tx4 +2.1 dBm
Line voltage and power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx2 +5.0,1.3 dBm
Tx4 +2.1 dBm
Line voltage and power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.3,1.7 dBm
Tx4 +2.3 dBm
Line voltage and power: 4080 VAC, 300 KW
15:18 Failure at the PA 2 interlock
15:25 TX's ON
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.1,1.6 dBm
Tx4 +2.2 dBm
Line voltage and power: 4080 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.0,1.5 dBm
Tx4 +2.2 dBm
Line voltage and power: 4030 VAC, 300 KW
17:35 Driver 3 ON 
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +1.4 dBm
Tx4 +2.0 dBm
D3 -6.6
Line voltage and power: 4020 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
D3 -6.4 dBm
Line voltage and power: 4050 VAC, 300 KW
19:12 RF OFF (Adquisition request)
19:17 RF ON
19:25 Failure at PA 2 screen power supply"	ryaya
490	27 Aug 23:00 Transmitter Power Measurement	ISR		2015_08 Support CNOFS	Transmitters		new	2015-08-27T23:19:03-05:00	2015-08-27T23:19:03-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +1.3 dBm
Tx4 +1.9 dBm
D3 -7.1 dBm
Line voltage and power: 4080 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +1.3 dBm
Tx4 +1.9 dBm
D3 -7.1 dBm
Line voltage and power: 4080 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
D3 -7.0 dBm
Line voltage and power: 4090 VAC, 310 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
D3 -7.0 dBm
Line voltage and power: 4090 VAC, 310 KW"	vquesada
494	28 Aug 08:00 Transmitter Power Measurement	ISR		2015_08 Support CNOFS	Transmitters		new	2015-08-28T08:25:35-05:00	2015-08-28T08:25:35-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +1.3 dBm
Tx4 +1.9 dBm
D3 -7.1 dBm
Line voltage and power: 4080 VAC, 310 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +1.3 dBm
Tx4 +1.9 dBm
D3 -7.1 dBm
Line voltage and power: 4080 VAC, 310 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
D3 -7.0 dBm
Line voltage and power: 4090 VAC, 310 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
D3 -7.0 dBm
Line voltage and power: 4090 VAC, 310 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +1.6 dBm
Tx4 +2.1 dBm
D3 -7.1 dBm
Line voltage and power: 4050 VAC, 310 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +1.6 dBm
Tx4 +2.1 dBm
D3 -7.1 dBm
Line voltage and power: 4050 VAC, 310 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.7 dBm
Tx4 +2.2 dBm
D3 -7.0 dBm
Line voltage and power: 4090 VAC, 310 KW
06:25 Driver 3 OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx2 +1.6,5.2 dBm
Tx4 +2.2 dBm
Line voltage and power: 4090 VAC, 310 KW
08:07 HV OFF
08:20 LV OFF





"	vquesada
499	22 Sep 11:17 Faraday acquisition was restarted	ISR+Imaging		2015_09_1 Support CNOFS	Acquisition system	I. Manay	new	2015-09-22T18:40:32-05:00	2015-09-22T18:40:53-05:00	"The acquisition of the Faraday system was restarted twice:
08:16 and 11:17"	imanay
522	23 Sep 18:00 Imaging system turned on	ISR+Imaging		2015_09_1 Support CNOFS	Acquisition system		new	2015-09-23T20:04:11-05:00	2015-09-23T20:04:11-05:00		jverastegui
527	23 Sep 21:50 Restart Faraday Pc	ISR		2015_09_1 Support CNOFS	Acquisition system	P. Condor	new	2015-09-24T05:52:07-05:00	2015-09-24T05:52:07-05:00	Restart Faraday Pc because it was not working from 21:46	pcondor
528	23 Sep 22:10 Restart Faraday	ISR		2015_09_1 Support CNOFS	Acquisition system	P. Condor	new	2015-09-24T05:56:05-05:00	2015-09-24T05:56:05-05:00	 Restart Faraday batch because it was desynchronized.	pcondor
529	23 Sep 22:14 Reset of Faraday Pc	ISR		2015_09_1 Support CNOFS	Acquisition system	P. Condor	new	2015-09-24T06:00:38-05:00	2015-09-24T06:00:38-05:00	Reset of Faraday Pc and we run after the batch.	pcondor
530	23 Sep 23:15 Restart EW Drift and Faraday batches	ISR		2015_09_1 Support CNOFS	Acquisition system	P. Condor	new	2015-09-24T06:03:15-05:00	2015-09-24T06:03:15-05:00	Restart EW Drift and Faraday batches by problems in the acquisition.	pcondor
533	24 Sep 01:43 Off Imaging	ISR		2015_09_1 Support CNOFS	Acquisition system	P. Condor	new	2015-09-24T06:53:36-05:00	2015-09-24T06:53:36-05:00	Off Imaging	pcondor
535	24 Sep 05:50 Restart EW Drifts and faraday batches	ISR		2015_09_1 Support CNOFS	Acquisition system	P. Condor	new	2015-09-24T06:57:11-05:00	2015-09-24T06:57:11-05:00	Restart EW Drifts and faraday batches	pcondor
497	17 Sep 17:10 VSWR Antenna	ISR		2015_09_1 Support CNOFS	Antennas		new	2015-09-17T17:45:48-05:00	2015-09-17T17:45:48-05:00	"WUp 1.06
WDn 1.07
NDn 1.07
NUp 1.04
EUp 1.03
EDn 1.00
SDn 1.06
SUp 1.04
Module Hysell 1.18 (Will be corrected before Monday Sep 21 2015)"	ryanque
596	07 Oct 17:00 Final Report	ISR		2015_09_1 Support CNOFS	End experiment		new	2015-10-07T18:27:42-05:00	2015-10-07T18:27:42-05:00	"The final report for the 
ISR - Imaging campaign
Sep 2015"	ryanque
504	22 Sep 19:59 Operation Resume	ISR+Imaging		2015_09_1 Support CNOFS	General	I. Manay	new	2015-09-22T20:17:24-05:00	2015-09-22T20:17:24-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 08:00 - 20:00 
2) Operation Hours: 12h
3) Operation incomplete: 6 min
4) Reasons:
-Fall of the transmitters."	imanay
512	23 Sep 07:59 Operation Resume	ISR+Imaging		2015_09_1 Support CNOFS	General	A. Belleza	new	2015-09-23T11:09:06-05:00	2015-09-23T11:09:06-05:00	" Person in Charge: A. Belleza.
Experiment: ISR + Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h
3) Operation incomplete: 10 min
4) Reasons:
-Fall of the transmitters"	imanay
532	24 Sep 00:16 Noise levels	ISR		2015_09_1 Support CNOFS	General	P. Condor	new	2015-09-24T06:49:58-05:00	2015-09-24T06:49:58-05:00	"EW Drifts
A: 22.22 B: 21.79 C:22.48 D: 23.03
FARADAY
A: 17.99 B:18.61
IMAGING
1: 18.25 2:19.10 3:17.81 4:18.11 5:18.74 6:19.86 7:20.38 8: 20.00"	pcondor
534	24 Sep 03:05 Noise levels	ISR		2015_09_1 Support CNOFS	General	P. Condor	new	2015-09-24T06:55:40-05:00	2015-09-24T06:55:40-05:00	"Ew Drifts
A: 21.67 B: 20.90 C: 21.33 D: 21.88
FARADAY
A:16.20 B: 16.64
"	pcondor
536	24 Sep 06:15 Noise levels	ISR		2015_09_1 Support CNOFS	General	P. Condor	new	2015-09-24T06:59:03-05:00	2015-09-24T06:59:03-05:00	"EW DRIFTS
A: 22.03 B: 21.70 C: 22.36 D: 22.94
FARADAY
A: 16.98 B: 17.60"	pcondor
540	24 Sep 07:59 Operation Resume	ISR		2015_09_1 Support CNOFS	General	P. Condor	new	2015-09-24T08:22:58-05:00	2015-09-24T08:22:58-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 11h 56 min
3) Operation incomplete: 4 min
4) Reasons:
 _Reset pcs"	pcondor
541	24 Sep 18:00 Noise levels	ISR+Imaging		2015_09_1 Support CNOFS	General	I. Manay	new	2015-09-24T18:42:37-05:00	2015-09-24T18:43:04-05:00	"
||= =||= ew_drift =||= faraday =||= imaging =||
|| 09:36 || ||   ||
|| A || 22.96 || 15.81 || ||
|| B || 21.66 || 16.24 || ||
|| C || 21.41 || || ||
|| D || 21.87 || || ||
|| 12:47 || ||   ||
|| A || 23.21 || 17.35 || ||
|| B || 22.19 || 17.88 || ||
|| C || 22.58 || || ||
|| D || 23.24 || || ||
|| 18:10 || ||   ||
|| A || 27.76 || 22.69 || 25.01 ||
|| B || 27.34 || 23.57 || 26.54 ||
|| C || 28.17 || || 25.06 ||
|| D || 28.98 || || 25.48 ||
|| E ||  || || 25.48 ||
|| F ||  || || 26.49 ||
|| G ||  || || 26.81 ||
|| H ||  || || 26.94 ||"	imanay
544	24 Sep 19:30 Weird behaviour at ew_drift A channel	ISR+Imaging		2015_09_1 Support CNOFS	General	I. Manay	new	2015-09-24T19:40:55-05:00	2015-09-24T20:12:30-05:00	It was observed that the signal level of the A and B channels were lower than past campaigns. Additionally, the A channel showed random changes of noise level.	imanay
546	24 Sep 19:59 Operation Resume	ISR+Imaging		2015_09_1 Support CNOFS	General	I. Manay	new	2015-09-24T20:19:16-05:00	2015-09-24T20:19:16-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 08:00 - 20:00 
2) Operation Hours: 12h
3) Operation incomplete: 0 min
4) Reasons:
-None"	imanay
550	25 Sep 07:59 Operation Resume	ISR+Imaging		2015_09_1 Support CNOFS	General	AVALDEZ	new	2015-09-25T08:22:21-05:00	2015-09-25T08:22:21-05:00	"Person in Charge: A. Valdez
Experiment: ISR + Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h
3) Operation incomplete: 0 min
4) Reasons:
-None"	avaldez
552	28 Sep 09:00 Data uploaded to PUMA	ISR+Imaging		2015_09_1 Support CNOFS	General	I. Manay	new	2015-09-28T09:33:06-05:00	2015-09-28T09:33:06-05:00	"1) Ew_drift: 1317 files, 93.9GB
2) Faraday:   526 files, 27GB
3) Imaging:   227 files, 177GB"	imanay
501	22 Sep 18:00 Plots of the experiment	ISR+Imaging		2015_09_1 Support CNOFS	Plot	I. Manay	new	2015-09-22T18:47:52-05:00	2015-09-22T18:47:52-05:00		imanay
509	23 Sep 00:01 Plots	ISR+Imaging		2015_09_1 Support CNOFS	Plot	A. Belleza	new	2015-09-23T10:35:35-05:00	2015-09-23T10:35:35-05:00		imanay
526	23 Sep 14:00 Experiments plots	ISR+Imaging		2015_09_1 Support CNOFS	Plot		new	2015-09-23T20:06:44-05:00	2015-09-23T20:06:44-05:00		jverastegui
543	24 Sep 19:00 Plots	ISR+Imaging		2015_09_1 Support CNOFS	Plot	I. Manay	new	2015-09-24T19:35:51-05:00	2015-09-24T19:40:44-05:00		imanay
515	23 Sep 09:04 Faraday plots were restarted, the software were not sending the data to the FTP	ISR+Imaging		2015_09_1 Support CNOFS	Process/Analysis Program		new	2015-09-23T19:58:29-05:00	2015-09-23T19:58:29-05:00		jverastegui
516	23 Sep 09:10 Faraday plot was restarted, the digisonde file used for the plot was not reading	ISR+Imaging		2015_09_1 Support CNOFS	Process/Analysis Program		new	2015-09-23T20:00:09-05:00	2015-09-23T20:00:09-05:00		jverastegui
521	23 Sep 15:41 Faraday plots were restarted, signal chain were not sending the data to the FTP	ISR+Imaging		2015_09_1 Support CNOFS	Process/Analysis Program		new	2015-09-23T20:03:41-05:00	2015-09-23T20:03:41-05:00		jverastegui
531	24 Sep 00:00 Plots	ISR		2015_09_1 Support CNOFS	Process/Analysis Program	P. Condor	new	2015-09-24T06:04:30-05:00	2015-09-24T06:04:30-05:00	Plots of rtis, spectras, noise and others.	pcondor
539	24 Sep 07:40 plots	ISR		2015_09_1 Support CNOFS	Process/Analysis Program	P. Condor	new	2015-09-24T08:11:44-05:00	2015-09-24T08:11:44-05:00	plots of rti, spectras, etc	pcondor
502	22 Sep 18:30 Spark gaps adjustment	ISR+Imaging		2015_09_1 Support CNOFS	Spark Gaps	I. Manay	new	2015-09-22T19:01:22-05:00	2015-09-22T19:01:22-05:00	"ATR's adjustment:
1) 22 Sep 10:08 spark gaps adjustment.
2) 22 Sep 12:32 spark gaps adjustment.
3) 22 Sep 15:32 spark gaps adjustment.
4) 22 Sep 18:30 spark gaps adjustment."	imanay
510	23 Sep 06:50 Spark gaps adjustment	ISR+Imaging		2015_09_1 Support CNOFS	Spark Gaps	A. Belleza	new	2015-09-23T11:03:03-05:00	2015-09-23T11:03:03-05:00	"ATR's adjustment:
1) 22 Sep 21:40 spark gaps adjustment.
2) 23 Sep 00:45 spark gaps adjustment.
3) 23 Sep 03:35 spark gaps adjustment.
4) 23 Sep 06:50 spark gaps adjustment"	imanay
518	23 Sep 09:57 ATR adjustment	ISR+Imaging		2015_09_1 Support CNOFS	Spark Gaps		new	2015-09-23T20:01:15-05:00	2015-09-23T20:01:15-05:00		jverastegui
520	23 Sep 13:05 ATR adjustment	ISR+Imaging		2015_09_1 Support CNOFS	Spark Gaps		new	2015-09-23T20:03:00-05:00	2015-09-23T20:03:00-05:00		jverastegui
525	23 Sep 18:32 ATR adjustment	ISR+Imaging		2015_09_1 Support CNOFS	Spark Gaps		new	2015-09-23T20:06:06-05:00	2015-09-23T20:06:06-05:00		jverastegui
537	24 Sep 06:20 Spark gaps adjustment	ISR		2015_09_1 Support CNOFS	Spark Gaps	J. Lavado	new	2015-09-24T07:02:21-05:00	2015-09-24T07:02:21-05:00	"23 september
21:20 Spark gaps adjustment
24 september
00:25 Spark gaps adjustment
03:32 Spark gaps adjustment
06:20 Spark gaps adjustment"	pcondor
542	24 Sep 18:40 spark gaps adjustment	ISR+Imaging		2015_09_1 Support CNOFS	Spark Gaps	W. Rojas	new	2015-09-24T19:13:29-05:00	2015-09-24T19:13:29-05:00	"ATR's adjustment:
1) 24 Sep 09:38 spark gaps adjustment.
2) 24 Sep 12:38 spark gaps adjustment.
3) 24 Sep 15:40 spark gaps adjustment.
4) 24 Sep 18:40 spark gaps adjustment."	imanay
549	25 Sep 07:30 Spark Gaps adjustment	ISR+Imaging		2015_09_1 Support CNOFS	Spark Gaps	AVALDEZ	new	2015-09-25T07:52:59-05:00	2015-09-25T07:52:59-05:00	"ATR's adjustment:
1) 24 Sep 21:35 spark gaps adjustment.
2) 25 Sep 00:35 spark gaps adjustment.
3) 25 Sep 03:34 spark gaps adjustment.
4) 25 Sep 06:30 spark gaps adjustment."	avaldez
496	17 Sep 17:00 Log created for ISR+Imaging	ISR		2015_09_1 Support CNOFS	Start experiment		new	2015-09-17T17:39:04-05:00	2015-09-17T17:39:04-05:00	"The log has been created for the campaign

ISR+Imaging
Support CNOFS
Sep 22 - 25 2015"	ryanque
498	22 Sep 07:10 Experiment starts	ISR+Imaging		2015_09_1 Support CNOFS	Start experiment	I. Manay	new	2015-09-22T09:09:00-05:00	2015-11-25T13:34:19-05:00	"EW Drift
A 0 dB
B 0 dB
C 0 dB
D 1 dB
Faraday
E 6 dB
F 7 dB
Imaging
A 0 dB
B 2 dB
C 0 dB
D 0 dB
E 1 dB
F 1 dB
G 3 dB
H 8 dB
"	imanay
548	24 Sep 23:59 Plots	ISR+Imaging		2015_09_1 Support CNOFS	Start experiment	AVALDEZ	new	2015-09-25T06:21:36-05:00	2015-09-25T06:21:36-05:00		avaldez
500	22 Sep 16:55 Fall of the transmitters	ISR+Imaging		2015_09_1 Support CNOFS	Transmitters	I. Manay	new	2015-09-22T18:42:55-05:00	2015-09-22T18:44:34-05:00	Transmitters falls twice: 11:45 and 16:55. Almost six minutes.	imanay
503	22 Set 19:00 Transmitter Power Measurement	ISR		2015_09_1 Support CNOFS	Transmitters		new	2015-09-22T19:29:15-05:00	2015-09-22T19:29:15-05:00	"06:50 LV ON
06:55 HV ON
07:10 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.0,1.3 dBm
Tx4 +2.0 dBm
Line voltage and power: 3940 VAC, 310 KW
08:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.6,2.1 dBm
Tx4 +2.0 dBm
Line voltage and power: 3980 VAC, 310 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.6,2.1 dBm
Tx4 +2.0 dBm
Line voltage and power: 3980 VAC, 310 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +5.5,1.9 dBm
Tx4 +1.9 dBm
Line voltage and power: 3910 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +5.5,1.9 dBm
Tx4 +1.9 dBm
Line voltage and power: 3910 VAC, 300 KW
11:48  Failure at PA 1 screen power supply
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx2 +5.4,2.0 dBm
Tx4 +2.2 dBm
Line voltage and power: 3980 VAC, 310 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx2 +5.4,2.0 dBm
Tx4 +2.2 dBm
Line voltage and power: 3980 VAC, 310 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.1,1.6 dBm
Tx4 +1.9 dBm
Line voltage and power: 3840 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx2 +5.1,1.6 dBm
Tx4 +1.9 dBm
Line voltage and power: 3840 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx2 +5.2,1.8 dBm
Tx4 +2.1 dBm
Line voltage and power: 3900 VAC, 310 KW
16:54  Failure at PA 2 screen power supply
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx2 +5.2,1.8 dBm
Tx4 +2.1 dBm
Line voltage and power: 3900 VAC, 310 KW
17:50 Driver 3 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +1.9 dBm
Tx4 +2.3 dBm
D3  -6.6 dBm
Line voltage and power: 3960 VAC, 310 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +1.9 dBm
Tx4 +2.3 dBm
D3  -6.6 dBm
Line voltage and power: 3960 VAC, 310 KW

"	vquesada
508	23 Set 07:50 Transmitter Power Measurement	ISR+Imaging		2015_09_1 Support CNOFS	Transmitters		new	2015-09-23T08:10:56-05:00	2015-09-23T08:10:56-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +1.9 dBm
Tx4 +2.2 dBm
Dr3 -6.6 dBm
Line voltage and power: 3960 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +2.1 dBm
Tx4 +2.0 dBm
Dr3 -6.5 dBm
Line voltage and power: 3960 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +2.1 dBm
Tx4 +2.0 dBm
Dr3 -6.5 dBm
Line voltage and power: 3970 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +2.1 dBm
Tx4 +2.0 dBm
Dr3 -6.5 dBm
Line voltage and power: 3970 VAC, 300 KW
23:11 OFF SCREEN (PA.2)
00:00 OFF Drv3 (IMAGING)
00:05 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +1.8/+5.0 dBm
Tx4 +2.0 dBm
Dr3 -6.5 dBm
Line voltage and power: 3970 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +1.8/+5.0 dBm
Tx4 +2.0 dBm
Dr3 OFF
Line voltage and power: 3980 VAC, 290 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9/+5.1 dBm
Tx4 +2.0 dBm
Dr3 OFF
Line voltage and power: 3980 VAC, 290 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9/+5.1 dBm
Tx4 +2.0 dBm
Dr3 OFF
Line voltage and power: 3980 VAC, 300 KW
03:35 AC LINE FAILURE (CROWBAR hv)
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9/+5.1 dBm
Tx4 +2.0 dBm
Dr3 OFF
Line voltage and power: 3980 VAC, 290 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.9/+5.1 dBm
Tx4 +2.0 dBm
Dr3 OFF
Line voltage and power: 3980 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx2 +1.6/+4.9 dBm
Tx4 +1.8 dBm
Dr3 OFF
Line voltage and power: 3980 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx2 +1.6/+4.9 dBm
Tx4 +1.8 dBm
Dr3 OFF
Line voltage and power: 3980 VAC, 280 KW
07:12 FAULT LINE FOR CHANGE IN AC (TX:OFF)
07:25 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +2.2/+5.3 dBm
Tx4 +2.2 dBm
Dr3 OFF
Line voltage and power: 4000 VAC, 310 KW




"	rtadeo
511	23 Sep 07:22 Fall of transmitters	ISR+Imaging		2015_09_1 Support CNOFS	Transmitters	A. Belleza	new	2015-09-23T11:06:04-05:00	2015-09-23T11:06:04-05:00	Transmitters were off during 10 minutes.	imanay
513	23 Sep 08:50 Transmitter went down	ISR+Imaging		2015_09_1 Support CNOFS	Transmitters		new	2015-09-23T19:55:40-05:00	2015-09-23T19:55:40-05:00		jverastegui
514	23 Sep 08:55 Transmitter turned on	ISR+Imaging		2015_09_1 Support CNOFS	Transmitters		new	2015-09-23T19:56:17-05:00	2015-09-23T19:56:17-05:00		jverastegui
517	23 Sep 19:30 Transmitter power measurements	ISR		2015_09_1 Support CNOFS	Transmitters		new	2015-09-23T20:01:01-05:00	2015-09-23T20:01:01-05:00	"08:15 CROWBAR
08:50 CROWBAR
08:55 Failure at PA 1 screen power supply
09:10 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +5.5,2.4 dBm
Tx4 +2.2 dBm
Line voltage and power: 3980 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +5.6,2.4 dBm
Tx4 +2.3 dBm
Line voltage and power: 3910 VAC, 310 KW
12:20 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.7,2.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 3980 VAC, 310 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx2 +5.7,2.3 dBm
Tx4 +2.3 dBm
Line voltage and power: 3950 VAC, 310 KW
14:10 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx2 +5.4,1.9 dBm
Tx4 +2.2 dBm
Line voltage and power: 3890 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx2 +5.6,2.2 dBm
Tx4 +2.3 dBm
Line voltage and power: 3940 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx2 +5.6,2.2 dBm
Tx4 +2.4 dBm
Line voltage and power: 3960 VAC, 300 KW
18:00 D3 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +2.2 dBm
Tx4 +2.4 dBm
D3 -5.8 dBm
Line voltage and power: 3980 VAC, 300 KW
18:10 Failure at PA2 interlock circuit
18:15 Failure at PA1 screen power supply
19:15 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx2 +2.2 dBm
Tx4 +2.4 dBm
D3 -5.8 dBm
Line voltage and power: 4020 VAC, 300 KW"	ryaya
519	23 Sep 11:00 Transmitter turned off for a connection checking. The channel A noise floor was too strong	ISR+Imaging		2015_09_1 Support CNOFS	Transmitters		new	2015-09-23T20:02:31-05:00	2015-09-23T20:02:31-05:00		jverastegui
523	23 Sep 18:12 Transmitter went down	ISR+Imaging		2015_09_1 Support CNOFS	Transmitters		new	2015-09-23T20:04:38-05:00	2015-09-23T20:04:38-05:00		jverastegui
524	23 Sep 18:23 Transmitter turned on, the protection circuit failed	ISR+Imaging		2015_09_1 Support CNOFS	Transmitters		new	2015-09-23T20:05:31-05:00	2015-09-23T20:05:31-05:00		jverastegui
538	24 Set 07:10 Transmitter Power Measurement	ISR+Imaging		2015_09_1 Support CNOFS	Transmitters		new	2015-09-24T07:36:26-05:00	2015-09-24T07:36:26-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +2.2 dBm
Tx4 +1.2 dBm
Dr3 -6.1 dBm
Line voltage and power: 4060 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +2.2 dBm
Tx4 +1.6 dBm
Dr3 -6.0 dBm
Line voltage and power: 4060 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +2.2 dBm
Tx4 +1.2 dBm
Dr3 -6.1 dBm
Line voltage and power: 4060 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +2.2 dBm
Tx4 +1.2 dBm
Dr3 -6.1 dBm
Line voltage and power: 4060 VAC, 300 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +2.2 dBm
Tx4 +1.2 dBm
Dr3 -6.1 dBm
Line voltage and power: 4060 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +2.2 dBm
Tx4 +1.2 dBm
Dr3 -6.1 dBm
Line voltage and power: 4060 VAC, 300 KW

01:35 off Driver 3 (Imaging)
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +2.2/+5.4 dBm
Tx4 +2.0 dBm
Line voltage and power: 4000 VAC, 310 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +2.2/+5.4 dBm
Tx4 +2.0 dBm
Line voltage and power: 4000 VAC, 310 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx2 +2.1/+5.3 dBm
Tx4 +2.2 dBm
Line voltage and power: 3900 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx2 +2.1/+5.3 dBm
Tx4 +2.2 dBm
Line voltage and power: 3900 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx2 +2.1/+5.3 dBm
Tx4 +2.2 dBm
Line voltage and power: 3900 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +2.5/+5.3 dBm
Tx4 +2.4 dBm
Line voltage and power: 3990 VAC, 300 KW
"	rtadeo
545	24 Sep 19:40 Transmitter power measurements	ISR		2015_09_1 Support CNOFS	Transmitters		new	2015-09-24T20:11:43-05:00	2015-09-24T20:12:18-05:00	"17:35 Driver 3 ON ""Imaging"""	ryaya
547	24 Set 23:00 Transmitter Power Measurement	ISR		2015_09_1 Support CNOFS	Transmitters		new	2015-09-24T23:36:52-05:00	2015-09-24T23:36:52-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +1.9 dBm
Tx4 +2.2 dBm
D3 -6.0 dBm
Line voltage and power: 3960 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +1.9 dBm
Tx4 +2.2 dBm
D3 -6.0 dBm
Line voltage and power: 3960 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +1.9 dBm
Tx4 +2.2 dBm
D3 -6.0 dBm
Line voltage and power: 3960 VAC, 310 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +1.9 dBm
Tx4 +2.2 dBm
D3 -6.0 dBm
Line voltage and power: 3960 VAC, 310 KW"	vquesada
551	25 Set 08:00 Transmitter Power Measurement	ISR		2015_09_1 Support CNOFS	Transmitters		new	2015-09-25T08:33:14-05:00	2015-09-25T08:33:14-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +2.1 dBm
Tx4 +2.3 dBm
D3 -6.1 dBm
Line voltage and power: 3950 VAC, 310 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +2.1 dBm
Tx4 +2.3 dBm
D3 -6.1 dBm
Line voltage and power: 3950 VAC, 310 KW
01:12 Driver 3 OFF
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.4,2.2 dBm
Tx4 +2.4 dBm
Line voltage and power: 3950 VAC, 310 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.4,2.2 dBm
Tx4 +2.4 dBm
Line voltage and power: 3950 VAC, 310 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +5.3,2.0 dBm
Tx4 +2.2 dBm
Line voltage and power: 3950 VAC, 310 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx2 +5.3,2.0 dBm
Tx4 +2.2 dBm
Line voltage and power: 3950 VAC, 310 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.3,2.1 dBm
Tx4 +2.2 dBm
Line voltage and power: 3940 VAC, 310 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx2 +5.3,2.1 dBm
Tx4 +2.2 dBm
Line voltage and power: 3940 VAC, 310 KW
08:00 HV  OFF
08:15 LV  OFF"	vquesada
565	30 Sep 21:18 Noise levels	ISR		2015_09_2 MST-ISR-EEJ	General	P. Condor	new	2015-10-01T02:20:27-05:00	2015-10-01T02:20:27-05:00	"ISR
1:27.91  2:26.50  3:27.20  4:27.71
MST
1:32.36  2:32.80  3:28.29  4:31.22
EEJ
1:26.19  2:25.89  3:25.67  4:27.06"	pcondor
567	01 Oct 00:06 Noise levels	ISR		2015_09_2 MST-ISR-EEJ	General	P. Condor	new	2015-10-01T02:32:18-05:00	2015-10-01T02:32:18-05:00	"Noise
ISR
1:27.16  2:25.36  3:26.49  4:27.16
MST
1:25.83  2:25.06  3:25.24  4:26.65
EEJ
1:25.48  2:24.85  3:24.90  4:26.40"	pcondor
569	01 Oct 03:07 Noise levels	ISR		2015_09_2 MST-ISR-EEJ	General	P. Condor	new	2015-10-01T07:25:36-05:00	2015-10-01T07:25:36-05:00	"Noise
ISR
1:27.21  2:24.46  3:26.07  4:26.79
MST
1:25.19  2:24.16  3:24.83  4:26.09
EEJ
1:25.06  2:24.06  3:24.48  4:25.92"	pcondor
570	01 Oct 06:16 Noise levels	ISR		2015_09_2 MST-ISR-EEJ	General	P. Condor	new	2015-10-01T07:29:28-05:00	2015-10-01T07:29:28-05:00	"NOISE
ISR
1:27.77  2:26.00  3:26.91  4:27.74
MST
1:26.23  2:25.69  3:25.62  4:27.22
EEJ
1:26.05  2:25.54  3:25.44  4:27.01"	pcondor
574	01 Oct 08:00 Operation resume	ISR		2015_09_2 MST-ISR-EEJ	General	P. Condor	new	2015-10-01T08:27:51-05:00	2015-10-01T08:27:51-05:00	"Person in Charge: P. Condor.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 11h 58 min
3) Operation incomplete: 2 min
4) Reasons:
_ Problem with Tx "	pcondor
575	01 Oct 09:07 Noise levels	ISR		2015_09_2 MST-ISR-EEJ	General	dlume	assigned	2015-10-01T14:37:14-05:00	2015-10-01T17:56:07-05:00	"NOISE
ISR
1:27.05 2:27.42 3:25.88 4:26.26
MST
1:25.23 2:26.11 3:24.67 4:25.95
EEJ
1:24.94 2:24.69 3:24.42 4:25.47"	dlume
578	01 Oct 12:08 Noise level	ISR		2015_09_2 MST-ISR-EEJ	General	dlume	assigned	2015-10-01T14:43:57-05:00	2015-10-01T17:55:10-05:00	"NOISE
ISR
1:27.61 2:25.46 3:26.52 4:26.78
MST
1:25.95 2:25.21 3:25.19 4:26.51
EEJ
1:25.75 2:24.85 3:24.82 4:25.99"	dlume
581	01 Oct 16:16 Noise level	ISR		2015_09_2 MST-ISR-EEJ	General	dlume	new	2015-10-01T19:36:01-05:00	2015-10-01T19:36:01-05:00	"NOISE
ISR
1:28.83 2:27.51 3:28.25 4:27.99
MST
1:27.12 2:26.96 3:26.79 4:27.54
EEJ
1:27.03 2:26.82 3:26.64 4:27.43"	dlume
582	01 Oct 17:10 Change storage disk	ISR		2015_09_2 MST-ISR-EEJ	General	dlume	new	2015-10-01T19:39:33-05:00	2015-10-01T19:39:33-05:00		dlume
584	01 Oct 18:07 Noise level	ISR		2015_09_2 MST-ISR-EEJ	General	dlume	new	2015-10-01T19:43:28-05:00	2015-10-01T19:43:28-05:00	"NOISE
ISR
1:32.37 2:31.45 3:31.13 4:32.03
MST
1:30.51 2:29.89 3:31.28 4:31.40
EEJ
1:30.31 2:31.18 3:29.38 4:31.04"	dlume
586	01 Oct 20:00 Operation resume	ISR		2015_09_2 MST-ISR-EEJ	General	dlume	new	2015-10-01T20:30:41-05:00	2015-10-01T20:30:41-05:00	"Person in Charge: P. Condor.
Experiment: MST-ISR-EEJ
1) 08:00 - 20:00
2) Operation Hours: 11h 57 min
3) Operation incomplete: 3 min
4) Reasons:
Change Storage Disk"	dlume
592	02 Oct 17:30 Noise levels	ISR		2015_09_2 MST-ISR-EEJ	General	I. Manay	new	2015-10-02T18:28:04-05:00	2015-10-02T18:28:04-05:00	"||= =||= mst =||= isr =||= eej =||
|| 09:30 || ||   ||
|| A || 24.9 || 26.9 || 24.76 ||
|| B || 24.25 || 24.55 || 23.98 ||
|| C || 24.31 || 25.72 || 24.10 ||
|| D || 25.81 || 26.05 || 25.27 ||
|| 14:00 || ||   ||
|| A || 26.09 || 27.54 || 25.69 ||
|| B || 25.46 || 26.07 || 25.4 ||
|| C || 25.35 || 26.85 || 25.15 ||
|| D || 26.82 || 27.28 || 26.34 ||
|| 17:35 || ||   ||
|| A || 30.87 || 32.6 || 30.91 ||
|| B || 30.63 || 31.1 || 30.49 ||
|| C || 30.97 || 31.91 || 30.5 ||
|| D || 31.53 || 31.81 || 30.98 ||"	imanay
595	02 Oct 19:59 Operation Resume	ISR		2015_09_2 MST-ISR-EEJ	General	I. Manay	new	2015-10-02T20:29:59-05:00	2015-10-02T20:29:59-05:00	"Person in Charge: I. Manay.
Experiment: MST + ISR + EEJ
1) 08:00 - 20:00 
2) Operation Hours: 12h
3) Operation incomplete: 0 min
4) Reasons:
-None"	imanay
558	29 Sep 23:30 Upload Plots	ISR		2015_09_2 MST-ISR-EEJ	Plot		new	2015-09-29T23:57:30-05:00	2015-09-29T23:57:30-05:00	29 Sep 23:30 Upload Plots	abelleza
561	30 Sep 14:00 Upload Plots	ISR		2015_09_2 MST-ISR-EEJ	Plot		new	2015-09-30T14:24:49-05:00	2015-09-30T14:24:49-05:00	30 Sep 14:00 Upload Plots	joscanoa
579	01 Oct 14:12 Plots	ISR		2015_09_2 MST-ISR-EEJ	Plot	dlume	assigned	2015-10-01T14:47:13-05:00	2015-10-01T17:52:20-05:00		dlume
588	01 Oct 23:40 Upload Plots	ISR		2015_09_2 MST-ISR-EEJ	Plot		new	2015-10-02T00:10:31-05:00	2015-10-02T00:14:25-05:00	01 Oct 23:40 Upload Plots	abelleza
591	02 Oct 16:30 Plots	ISR		2015_09_2 MST-ISR-EEJ	Plot	I. Manay	new	2015-10-02T17:12:17-05:00	2015-10-02T17:12:17-05:00		imanay
566	01 Oct 00:00 Plots	ISR		2015_09_2 MST-ISR-EEJ	Process/Analysis Program	P. Condor	new	2015-10-01T02:22:36-05:00	2015-10-01T02:22:36-05:00	Plots of rti and spectra of MST, ISR and EEJ.	pcondor
573	01 Oct 07:50 Plots	ISR		2015_09_2 MST-ISR-EEJ	Process/Analysis Program	P. Condor	new	2015-10-01T08:22:28-05:00	2015-10-01T08:22:28-05:00	Rtis and spectras	pcondor
557	29 Sep 18:00 Spark-gaps summary	ISR		2015_09_2 MST-ISR-EEJ	Spark Gaps	AVALDEZ	new	2015-09-29T19:18:56-05:00	2015-09-29T19:18:56-05:00	" ATR's adjustment:
1) 29 Sep 09:28 spark gaps adjustment.
2) 29 Sep 12:03 spark gaps adjustment.
3) 29 Sep 14:28 spark gaps adjustment.
4) 29 Sep 17:27 spark gaps adjustment."	avaldez
560	30 Sep 07:30 Spark-gaps (summary)	ISR		2015_09_2 MST-ISR-EEJ	Spark Gaps		new	2015-09-30T08:06:43-05:00	2015-09-30T08:06:43-05:00	"29 Sep 21:15 Spark-gaps Adjustment
29 Sep 23:50 Spark-gaps Adjustment
30 Sep 02:32 Spark-gaps Adjustment
30 Sep 02:50 Spark-gaps Re-Adjustment
30 Sep 04:59 Spark-gaps Adjustment
30 Sep 07:30 Spark-gaps Adjustment
"	abelleza
563	30 Sep 20:00 Spark-gaps (summary)	ISR		2015_09_2 MST-ISR-EEJ	Spark Gaps		new	2015-09-30T20:28:42-05:00	2015-09-30T20:28:42-05:00	"30 Sep 10:03 Spark-gaps Adjustment
30 Sep 12:32 Spark-gaps Adjustment
30 Sep 15:00 Spark-gaps Adjustment
30 Sep 17:32 Spark-gaps Adjustment"	joscanoa
571	01 Oct 06:35 Spark gaps adjustment	ISR		2015_09_2 MST-ISR-EEJ	Spark Gaps	J. Lavado	new	2015-10-01T07:32:43-05:00	2015-10-01T07:32:43-05:00	"30 Sep
20:17 Spark gaps adjustment
22:50 Spark gaps adjustment
01 Oct
01:35 Spark gaps adjustment
04:13 Spark gaps adjustment
06:35 Spark gaps adjustment"	pcondor
576	01 Oct 09:39 Spark gaps adjustment	ISR		2015_09_2 MST-ISR-EEJ	Spark Gaps	dlume	assigned	2015-10-01T14:38:36-05:00	2015-10-01T17:55:40-05:00		dlume
577	01 Oct 12:07 Spark gaps adjustment	ISR		2015_09_2 MST-ISR-EEJ	Spark Gaps	dlume	assigned	2015-10-01T14:39:34-05:00	2015-10-01T17:55:31-05:00		dlume
580	01 Oct 15:00 Spark gaps adjustment	ISR		2015_09_2 MST-ISR-EEJ	Spark Gaps	dlume	new	2015-10-01T19:33:14-05:00	2015-10-01T19:33:14-05:00		dlume
583	01 Oct 17:44 Spark gaps adjustment	ISR		2015_09_2 MST-ISR-EEJ	Spark Gaps	dlume	new	2015-10-01T19:40:45-05:00	2015-10-01T19:40:45-05:00		dlume
590	01 Oct 07:30 Spark-gaps (summary)	ISR		2015_09_2 MST-ISR-EEJ	Spark Gaps		new	2015-10-02T07:59:25-05:00	2015-10-02T07:59:25-05:00	"30 Set 20:00 Spark-gaps Adjustment
30 Set 22:30 Spark-gaps Adjustment
01 Oct 00:30 Spark-gaps Adjustment
01 Oct 03:00 Spark-gaps Adjustment
01 Oct 05:30 Spark-gaps Adjustment
01 Oct 07:25 Spark-gaps Adjustment

By A. Huamani
"	abelleza
593	02 Oct 18:14 Spark-gaps summary	ISR		2015_09_2 MST-ISR-EEJ	Spark Gaps	W. Rojas	new	2015-10-02T18:47:59-05:00	2015-10-02T18:47:59-05:00	"ATR's adjustment:
1) 02 Oct 07:25 spark gaps adjustment.
2) 02 Oct 10:08 spark gaps adjustment.
3) 02 Oct 12:28 spark gaps adjustment.
4) 02 Oct 15:31 spark gaps adjustment.
5) 02 Oct 18:14 spark gaps adjustment."	imanay
553	29 Set 07:00 Log Created	ISR		2015_09_2 MST-ISR-EEJ	Start experiment		new	2015-09-29T19:07:49-05:00	2015-09-29T19:07:49-05:00	"The log was created for the 
MST - ISR - EEJ
29 Set - 02 Oct 2015"	ryanque
554	29 Sep 06:58 Experiment starts	ISR		2015_09_2 MST-ISR-EEJ	Start experiment	AVALDEZ	new	2015-09-29T19:11:45-05:00	2015-09-29T19:11:45-05:00		avaldez
555	29 Sep 07:05 Fall of the transmitters	ISR		2015_09_2 MST-ISR-EEJ	Transmitters	AVALDEZ	new	2015-09-29T19:14:05-05:00	2015-09-29T19:14:05-05:00	Transmitters falls twice: 07:05 and 11:43AM. Almost THREE minutes.	avaldez
556	29 Sep 17:00 SCADA  System of Transmitter  was restarted	ISR		2015_09_2 MST-ISR-EEJ	Transmitters	AVALDEZ	new	2015-09-29T19:17:21-05:00	2015-09-29T19:17:21-05:00	Problems with transmitters.	avaldez
559	30 Set 07:30 Transmitter Power Measurement	ISR		2015_09_2 MST-ISR-EEJ	Transmitters		new	2015-09-30T08:05:36-05:00	2015-09-30T08:05:36-05:00	"29/09/2015
06:50 LV ON
07:00 HV ON
07:00 TX Power sample (-70 dB coupling)
Tx2 +4.2 dBm
Tx4 +4.2 dBm
Line voltage and power: 4090 VAC, 300 KW
08:00 TX Power sample (-70 dB coupling)
Tx2 +4.3 dBm
Tx4 +4.2 dBm
Line voltage and power: 4090 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx2 +4.3 dBm
Tx4 +4.3 dBm
Line voltage and power: 4000 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +4.3 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +4.2 dBm
Tx4 +4.1 dBm
Line voltage and power: 3900 VAC, 300 KW
11:10 FAILURE
11:43 POWER FAILURE SCREEN
12:00 TX Power sample (-70 dB coupling)
Tx2 +4.2 dBm
Tx4 +4.2 dBm
Line voltage and power: 4030 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.2 dBm
Line voltage and power: 4030 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +3.7 dBm
Tx4 +3.8 dBm
Line voltage and power: 3900 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.0 dBm
Line voltage and power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +3.9 dBm
Line voltage and power: 3960 VAC, 300 KW
17:00 HV OFF
17:20 LV OFF
17:25 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +3.9 dBm
Line voltage and power: 4010 VAC, 300 KW
17:30 THE NOISE transmitter is disabled in the SYSTEM
21:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4050 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4050 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3980 VAC, 290 KW

30/09/2015
00:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.1 dBm
Line voltage and power: 4050 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.1 dBm
Line voltage and power: 4050 VAC, 300 KW
01:00 CHANGE IS DETECTED IN THE SOURCE FILAMENT
02:00 TX Power sample (-70 dB coupling)
Tx2 +4.2 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.1 dBm
Line voltage and power: 4050 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 4050 VAC, 300 KW
04:10 phasing
05:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 4000 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4050 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.3 dBm
Line voltage and power: 4000 VAC, 300 KW













"	rtadeo
562	30 Sep 19:30 Transmitter power measurements	ISR		2015_09_2 MST-ISR-EEJ	Transmitters		new	2015-09-30T20:19:55-05:00	2015-09-30T20:19:55-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3980 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 3980 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3930 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3930 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +4.0 dBm
Line voltage and power: 3900 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +4.0 dBm
Line voltage and power: 3920 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3980 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.2 dBm
Line voltage and power: 3900 VAC, 300 KW
19:10 Failure at PA 2 screen power supply"	ryaya
564	30 Sep 23:15 Transmitter power measurements	ISR		2015_09_2 MST-ISR-EEJ	Transmitters		new	2015-09-30T23:49:08-05:00	2015-09-30T23:49:08-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +4.2 dBm
Tx4 +4.3 dBm
Line voltage and power: 4040 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +4.2 dBm
Tx4 +4.3 dBm
Line voltage and power: 4040 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW"	vquesada
568	01 Oct 02:00 Problem with Tx	ISR		2015_09_2 MST-ISR-EEJ	Transmitters	P. Condor	new	2015-10-01T07:22:16-05:00	2015-10-01T07:22:16-05:00	Problem with Tx for two minutes off.	pcondor
572	01 Oct 07:10 Transmitter power measurements	ISR		2015_09_2 MST-ISR-EEJ	Transmitters		new	2015-10-01T07:41:04-05:00	2015-10-01T07:41:04-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
01:58 Crowbar
02:00 TX Power sample (-70 dB coupling)
Tx2 +4.2 dBm
Tx4 +4.3 dBm
Line voltage and power: 4000 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +4.2 dBm
Tx4 +4.3 dBm
Line voltage and power: 4000 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 3950 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 3950 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 3950 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 3950 VAC, 300 KW"	vquesada
585	01 Oct 17:20 Transmitter power measurements	ISR		2015_09_2 MST-ISR-EEJ	Transmitters		new	2015-10-01T19:56:59-05:00	2015-10-01T19:56:59-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 3950 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3920 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3920 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3920 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3920 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +4.0 dBm
Line voltage and power: 3850 VAC, 290 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +3.6 dBm
Tx4 +3.9 dBm
Line voltage and power: 3850 VAC, 290 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +3.4 dBm
Tx4 +3.8 dBm
Line voltage and power: 3850 VAC, 290 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +3.5 dBm
Tx4 +3.9 dBm
Line voltage and power: 3850 VAC, 290 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +4.1 dBm
Line voltage and power: 3940 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 4000 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW



"	rtadeo
587	01 Oct 23:05 Transmitter power measurements	ISR		2015_09_2 MST-ISR-EEJ	Transmitters		new	2015-10-01T23:37:01-05:00	2015-10-01T23:37:01-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 4000 VAC, 300 KW
"	vquesada
589	02 Oct 07:05 Transmitter power measurements	ISR		2015_09_2 MST-ISR-EEJ	Transmitters		new	2015-10-02T07:34:24-05:00	2015-10-02T07:34:24-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3900 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3900 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3900 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 3950 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 3950 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 3950 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +4.1 dBm
Tx4 +4.2 dBm
Line voltage and power: 3950 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3900 VAC, 300 KW"	vquesada
594	02 Oct 19:55 Transmitter power measurements	ISR		2015_09_2 MST-ISR-EEJ	Transmitters		new	2015-10-02T20:28:34-05:00	2015-10-02T20:28:34-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3900 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +4.0 dBm
Line voltage and power: 3900 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +4.0 dBm
Line voltage and power: 3900 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +4.0 dBm
Line voltage and power: 3900 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.1 dBm
Line voltage and power: 3990 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +4.0 dBm
Line voltage and power: 3990 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 3950 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 3950 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +3.8 dBm
Tx4 +3.9 dBm
Line voltage and power: 3950 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.2 dBm
Line voltage and power: 3970 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +4.0 dBm
Tx4 +4.2 dBm
Line voltage and power: 3970 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +4.0 dBm
Line voltage and power: 4000 VAC, 300 KW
20:00 TX Power sample (-70 dB coupling)
Tx2 +3.9 dBm
Tx4 +4.0 dBm
Line voltage and power: 4000 VAC, 300 KW









"	rtadeo
605	10 Dec 09:30 Off DDS Imaging	ISR		2015_12 ISR ISCOD	Acquisition system	P. Condor	new	2015-12-10T20:29:16-05:00	2015-12-10T20:29:16-05:00	DDS Imaging was off. Then rti of Ch. B EW_Drifts low level normal.	pcondor
606	10 Dec 12:27 Off Transmitter	ISR		2015_12 ISR ISCOD	Acquisition system	P. Condor	new	2015-12-10T20:30:33-05:00	2015-12-10T20:30:33-05:00	Tx is off to change time of ARES and TR of Imaging.	pcondor
609	10 Dec 14:19 On VIPIR with new IPP	ISR		2015_12 ISR ISCOD	Acquisition system	P. Condor	new	2015-12-10T20:57:24-05:00	2015-12-10T20:57:24-05:00	VIPIR is on with Ipp of 20 ms or  3000 km	pcondor
611	10 Dec 18:20 Attenuated ch 5 imaging	ISR		2015_12 ISR ISCOD	Acquisition system	P. Condor	new	2015-12-10T21:00:08-05:00	2015-12-10T21:00:08-05:00	Attenuated ch 5 imaging in 5 db	pcondor
643	13 Dec 03:11 OFF IMAGING	ISR		2015_12 ISR ISCOD	Acquisition system	p	new	2015-12-13T04:49:53-05:00	2015-12-13T04:49:53-05:00	Imaging is off	pcondor
656	09 Dec 19:22 Interference observed at the B channel of EW_Drift experiment	ISR+Imaging		2015_12 ISR ISCOD	Acquisition system	A. Valdez	new	2015-12-16T12:02:11-05:00	2015-12-16T12:02:11-05:00	This interference is observed every hour.	imanay
599	09 Dec 12:45 Main JRO Antenna VSWR	ISR		2015_12 ISR ISCOD	Antennas		new	2015-12-09T13:49:18-05:00	2015-12-09T13:49:18-05:00	"WUp 1.04
WDn 1.08
NDn 1.06
NUp 1.12 (*) 
EUp 1.04
EDn 1.06
SDn 1.08
SUp 1.03
(*) With ABS System
"	ryanque
610	10 Dec 17:56 Off tx	ISR		2015_12 ISR ISCOD	Antennas	P. Condor	new	2015-12-10T20:58:52-05:00	2015-12-10T20:58:52-05:00	Off tx to see ch 5 of Imaging and repair	pcondor
601	10 Dec 03:52 - Imaging System Turn Off	ISR		2015_12 ISR ISCOD	End experiment		new	2015-12-10T05:18:38-05:00	2015-12-10T05:18:38-05:00	10 Dec 03:52 - Imaging System Turn Off	abelleza
637	12 Dec 19:42 Operation Resume	ISR		2015_12 ISR ISCOD	End experiment	Dlume	new	2015-12-12T20:45:34-05:00	2015-12-12T20:45:34-05:00	"Person in Charge: A. VALDEZ
Experiment: EW_DRIFT + Imaging
1) 08:00 - 20:00 
2) Operation Hours: 12h
3) Operation incomplete: 
4) Reasons:"	dlume
653	13 JDec 20:00 End of Experiment ISR	ISR	JRO Staff	2015_12 ISR ISCOD	End experiment		new	2015-12-13T21:12:56-05:00	2015-12-13T21:12:56-05:00		murco
668	05 Jan 13:10 Campaign Report	ISR		2015_12 ISR ISCOD	End experiment		new	2016-01-05T14:26:13-05:00	2016-01-05T14:26:13-05:00	"The report corresponding to the December 2015 ISR+Imaging Campaign is attached.
During this campaign due to a failure in transmitter we only ran with EW Drift and Imaging.
There was an interference due to VIPIR, the procedure to correct this will be included in the next Manual Experiment."	ryanque
612	10 Dec 19:12 Noise levels	ISR		2015_12 ISR ISCOD	General	P. Condor	new	2015-12-10T21:02:41-05:00	2015-12-10T21:02:41-05:00	"EW Drifts
A: 20.99 b: 21.52 C: 21.05 D: 20.94
IMAGING
1: 18.94 2:20.86 3:18.28 4:18:48 5:22.25 6:18.42 7: 20.04 8:20.33"	pcondor
614	10 Dec 20:00 Strange interference at B channel of ew_drift experiment	ISR+Imaging		2015_12 ISR ISCOD	General	I. Manay	new	2015-12-11T03:56:26-05:00	2015-12-11T03:56:26-05:00	This interference disappeared after vipir system was shut it down.	imanay
616	10 Dec 23:50 Full checking of B Imaging channel finished.	ISR+Imaging		2015_12 ISR ISCOD	General	I. Manay	new	2015-12-11T04:22:01-05:00	2015-12-11T04:25:12-05:00	Transmitters were off during 70 minutes for a complete checking of the B reception line of the Imaging experiment. It was found that the 10 dB drop was caused by the TR. Imaging experiment was stopped because TR failure and ew_drift experiment was restarted. The TR will be checked.	imanay
620	11 Dec 07:59 Operation Resume	ISR+Imaging		2015_12 ISR ISCOD	General	I. Manay	new	2015-12-11T09:00:01-05:00	2015-12-11T09:00:34-05:00	"Person in Charge: I. Manay.
Experiment: EW_DRIFT + Imaging
1) 20:00 - 08:00 
2) Operation Hours: 12h
3) Operation incomplete: 80 min
4) Reasons:
-Transmitters were off for complete checking of the B reception line of the imaging experiment."	imanay
632	12 Dec 07:40 Operation Resume	ISR		2015_12 ISR ISCOD	General	AValdez	new	2015-12-12T08:31:42-05:00	2015-12-12T08:31:42-05:00	"Person in Charge: A. VALDEZ
Experiment: EW_DRIFT + Imaging
1) 20:00 - 08:00 
2) Operation Hours: 12h
3) Operation incomplete: 
4) Reasons:
"	joscanoa
646	10 Dec 20:01 Operation Resume	ISR		2015_12 ISR ISCOD	General	P. Condor	new	2015-12-13T08:09:54-05:00	2015-12-13T08:09:54-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift-Faraday-Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 39 min
3) Operation incomplete: 21 min
4) Reasons:
 Off Tx "	pcondor
650	13 Dec 07:59 Operation Resume	ISR		2015_12 ISR ISCOD	General	P. Condor	new	2015-12-13T08:58:01-05:00	2015-12-13T08:58:01-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
655	15 Dec 08:00 Data uploaded to PUMA	ISR+Imaging		2015_12 ISR ISCOD	General	I. Manay	new	2015-12-15T09:28:10-05:00	2015-12-15T09:29:59-05:00	"Data was uploaded to PUMA:
1) EW_Drift : 1757 files, 125 GB.
2) Imaging : 352 Files, 276 GB."	imanay
600	09 Dec 23:59 Last Plots of the Experiment	ISR		2015_12 ISR ISCOD	Plot		new	2015-12-10T03:48:36-05:00	2015-12-10T03:48:36-05:00	09 Dec 23:59 Last Plots of the Experiment	abelleza
617	10 Dec 23:59 plots of experiments	ISR+Imaging		2015_12 ISR ISCOD	Plot	I. Manay	new	2015-12-11T04:31:17-05:00	2015-12-11T04:31:17-05:00		imanay
631	11 Dec 23:59 plots of experiments	ISR	JRO Staff	2015_12 ISR ISCOD	Plot	AValdez	new	2015-12-12T08:24:15-05:00	2015-12-12T08:24:15-05:00		joscanoa
634	12 Dec 11:59 Plots of experiments	ISR		2015_12 ISR ISCOD	Plot	DLume	new	2015-12-12T20:13:18-05:00	2015-12-12T20:13:18-05:00		dlume
654	13 Dec 20:00 Operation resume	ISR+Imaging	JRO Staff	2015_12 ISR ISCOD	Plot		new	2015-12-13T21:15:28-05:00	2015-12-13T21:15:28-05:00	"Experiment: ISR + Imaging
1) 08:00 - 20:00
2) Operation Hours: 12 hours"	murco
608	10 Dec 13:30 Not noise in Ch B	ISR		2015_12 ISR ISCOD	Process/Analysis Program	P. Condor	new	2015-12-10T20:32:56-05:00	2015-12-10T20:32:56-05:00	Not noise in Ch B of EW_Drifts after off VIPIR.	pcondor
613	10 Dec 20:00 PLOTS	ISR		2015_12 ISR ISCOD	Process/Analysis Program	P. Condor	new	2015-12-10T21:03:28-05:00	2015-12-10T21:03:28-05:00	rtis ans spectra	pcondor
639	12 Dec 21:03 Noise levels	ISR		2015_12 ISR ISCOD	Process/Analysis Program	P. Condor	new	2015-12-13T01:42:06-05:00	2015-12-13T04:45:25-05:00	"EW_Drifts
A: 20.83 B: 21.34 C: 21.32 D: 21.16
IMAGING
1: 18.88 2:18.39 3:17.93 4: 17.90 5: 19.62 6: 18.13 7: 19.48 8: 20.09"	pcondor
640	13 Dec 00:05 Plots	ISR		2015_12 ISR ISCOD	Process/Analysis Program	P. Condor	new	2015-12-13T01:43:30-05:00	2015-12-13T01:43:30-05:00	Plots of rtis and spectras.	pcondor
641	13 Dec 00:34 Noise levels	ISR		2015_12 ISR ISCOD	Process/Analysis Program	P. Condor	new	2015-12-13T01:49:09-05:00	2015-12-13T01:49:09-05:00	"EW_Drifts
A: 21.36 B: 21.52 C: 21.92 D: 21.91
IMAGING
1: 19.05 2: 18.55 3: 18.17 4: 18.07 5: 18.57 6: 18.32 7: 19.72 8: 20.10"	pcondor
642	13 Dec 03:00 Noise levels	ISR		2015_12 ISR ISCOD	Process/Analysis Program	P. Condor	new	2015-12-13T04:48:29-05:00	2015-12-13T04:48:29-05:00	"EW_DRIFTS
A:20.69 B:21.21 C:21.22 D:21.07
IMAGING
1:18.88 2:18.43 3:18.02 4:17.97 5:18.57 6:18.18 7:19.59 8:20.12"	pcondor
647	13 Dec 06:45 Noise levels	ISR		2015_12 ISR ISCOD	Process/Analysis Program	P. Condor	new	2015-12-13T08:12:07-05:00	2015-12-13T08:12:07-05:00	"EW_DRIFTS
A:21.66 B:21.85 C:22.24 D:22.10"	pcondor
649	13 Dec 07:50 Plots	ISR		2015_12 ISR ISCOD	Process/Analysis Program	P. Condor	new	2015-12-13T08:52:58-05:00	2015-12-13T08:52:58-05:00	Plots of rti and spectra	pcondor
615	10 Dec 22:10 Transmitters were off to change the B field amplifier of the Imaging experiment	ISR		2015_12 ISR ISCOD	Reception	I. Manay	new	2015-12-11T04:09:49-05:00	2015-12-11T04:14:32-05:00	B channel of the Imaging experiment was 10 dB down than the others, this drop started at 21:15. The field amplifier was changed as a test and transmitters were off during 10 minutes. No change was observed after the test.	imanay
602	10 Dec 07:00 Spark-gaps summary	ISR		2015_12 ISR ISCOD	Spark Gaps		new	2015-12-10T08:06:18-05:00	2015-12-10T08:06:18-05:00	"10 Dec 07:00 Spark-gaps summary

    ATR's adjustment:

1) 09 Dec 21:00 spark gaps adjustment.
2) 10 Dec 00:12 spark gaps adjustment.
3) 10 Dec 03:05 spark gaps adjustment.
4) 10 Dec 06:22 spark gaps adjustment.

by Jose Lavado"	abelleza
618	11 Dec 07:00 Spark-gaps summary	ISR+Imaging		2015_12 ISR ISCOD	Spark Gaps	J. Lavado	new	2015-12-11T08:09:40-05:00	2015-12-11T08:09:40-05:00	"ATR's adjustment:
1) 10 Dec 21:51 spark gaps adjustment.
2) 11 Dec 00:40 spark gaps adjustment.
3) 11 Dec 03:40 spark gaps adjustment.
4) 11 Dec 06:47 spark gaps adjustment."	imanay
625	11 Dec 19:20 Spark-gaps summary	ISR+Imaging		2015_12 ISR ISCOD	Spark Gaps		new	2015-12-11T20:24:38-05:00	2015-12-11T20:24:38-05:00	"11 Dec 19:20 Spark-gaps summary

ATR's adjustment:
1) 11 Dec 10:20 spark gaps adjustment.
2) 11 Dec 16:40 spark gaps adjustment.
3) 11 Dec 18:40 spark gaps adjustment.

by Walter Rojas"	joscanoa
630	12 Dec 07:20 Spark-gaps summary	ISR	Others	2015_12 ISR ISCOD	Spark Gaps	AValdez	new	2015-12-12T08:17:56-05:00	2015-12-12T08:22:09-05:00	"11 Dec 19:20 Spark-gaps summary
ATR's adjustment:
1) 11 Dec 20:40 spark gaps adjustment.
2) 11 Dec 22:40 spark gaps adjustment.
3) 12 Dec 00:30 spark gaps adjustment.
4) 12 Dec 02:30 spark gaps  adjustment
5) 12 Dec 04:30 spark gaps  adjustment
6) 12 Dec 06:30 spark gaps  adjustment
by Americo Huamani,"	joscanoa
633	12 Dec 19:06 Spark-gaps summary	ISR		2015_12 ISR ISCOD	Spark Gaps	DLume	new	2015-12-12T20:11:00-05:00	2015-12-12T20:11:00-05:00	"11 Dec 19:20 Spark-gaps summary
ATR's adjustment:
1) 12 Dec 08:40 spark gaps adjustment.
2) 12 Dec 10:30 spark gaps adjustment.
3) 12 Dec 12:39 spark gaps adjustment.
4) 12 Dec 14:42 spark gaps adjustment
5) 12 Dec 16:45 spark gaps adjustment
6) 12 Dec 18:48 spark gaps adjustment
by Walter Rojas,"	dlume
644	10 Dec 18:31 Spark gaps adjustment	ISR		2015_12 ISR ISCOD	Spark Gaps	A. Coronado	new	2015-12-13T08:05:08-05:00	2015-12-13T08:05:08-05:00	"09:25 Spark gaps adjustment
12:19 Spark gaps adjustment
15:50 Spark gaps adjustment
18:31 Spark gaps adjustment"	pcondor
648	13 Dec 06:30 Spark gaps adjustment	ISR		2015_12 ISR ISCOD	Spark Gaps	A. Huamani	new	2015-12-13T08:16:17-05:00	2015-12-13T08:16:17-05:00	"12-12-2015
20:30 Spark gaps adjustment
22:30 Spark gaps adjustment
13-12-2015
00:30 Spark gaps adjustment
02:30 Spark gaps adjustment
04:30 Spark gaps adjustment
06:30 Spark gaps adjustment"	pcondor
652	13 Dec 20:00 Spark-gaps adjustment	ISR	JRO Staff	2015_12 ISR ISCOD	Spark Gaps		new	2015-12-13T21:11:15-05:00	2015-12-13T21:11:15-05:00	"13 Dec 08:58 Spark-gaps adjustment.
13 Dec 11:27 Spark-gaps adjustment.
13 Dec 14:21 Spark-gaps adjustment.
13 Dec 16:54 Spark-gaps adjustment."	murco
598	09 Dec 12:45 Log for ISR December campaign	ISR		2015_12 ISR ISCOD	Start experiment		new	2015-12-09T13:47:31-05:00	2015-12-09T13:47:31-05:00	"ISR ISCOD Campaign
ISR Northen Deep Polar Wind
09 - 13 December 2015
Mode: ISR + Imaging"	ryanque
627	11 Dec 19:59 Operation Resume	ISR+Imaging		2015_12 ISR ISCOD	Start experiment		new	2015-12-11T21:10:22-05:00	2015-12-11T21:10:22-05:00	"Person in Charge: J. Oscanoa.
Experiment: EW_DRIFT + Imaging
1) 08:00 - 20:00 
2) Operation Hours: 12h
3) Operation incomplete: 63 min
4) Reasons:
-Transmitters were off to replace components from the B reception line of the imaging experiment."	joscanoa
635	12 Dec 19:14 Noise levels summary	ISR+Imaging		2015_12 ISR ISCOD	Start experiment	DLume	new	2015-12-12T20:26:17-05:00	2015-12-12T20:27:08-05:00	"Noise levels:

East/West Drifts:
          ChA       ChB      ChC      ChD
09:00   21.05     21.01    21.87    21.26
12:00   22.63     23.30    23.87    23.84
15:11   21.43     21.75    22.24    22.04
17:51   20.56     21.16    21.23    21.18

Imaging:
17:51     Ch0       Ch1      Ch2      Ch3
        19.01     18.37    17.84    18.43
          Ch4       Ch5      Ch6      Ch7
        19.65     17.94    19.52    19.87"	dlume
603	10 Dec 07:00 Transmitter Power Measurements	ISR		2015_12 ISR ISCOD	Transmitters		new	2015-12-10T08:44:31-05:00	2015-12-10T08:44:31-05:00	"09/12/2015
19:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +5.9 dBm
Dr3 -6.5 dBm
Line voltage and power: 4080 VAC, 350 KW
20:32 TX OFF (Revision of the transmission line)
20:52 TX ON
21:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.4 dBm
Dr3 -6.5 dBm
Line voltage and power: 4050 VAC, 330 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.4 dBm
Dr3 -6.5 dBm
Line voltage and power: 4050 VAC, 330 KW
22:05 TX OFF (crowbar by variation in the electrical line)
22:23 TX OFF (crowbar, crowbar cleaning)
23:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.9 dBm
Dr3 -7.2 dBm
Line voltage and power: 4050 VAC, 350 KW
10/12/2015
00:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.9 dBm
Dr3 -7.2 dBm
Line voltage and power: 4050 VAC, 330 KW
01:00 HV OFF (Crowbar)
02:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.7 dBm
Dr3 -7.2 dBm
Line voltage and power: 4070 VAC, 340 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.7 dBm
Dr3 -7.2 dBm
Line voltage and power: 4070 VAC, 340 KW
03:53 OFF Dr3 (Imaging)
04:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +5.9 dBm
Dr3 OFF
Line voltage and power: 4070 VAC, 350 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +5.9 dBm
Dr3 OFF
Line voltage and power: 4070 VAC, 350 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +6.1 dBm
Tx4 +5.9 dBm
Dr3 OFF
Line voltage and power: 4070 VAC, 350 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.8 dBm
Dr3 OFF
Line voltage and power: 4050 VAC, 340 KW










"	rtadeo
604	10 Dec 19:00 Transmitter Power Measurements	ISR		2015_12 ISR ISCOD	Transmitters		new	2015-12-10T20:04:36-05:00	2015-12-10T20:04:36-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Line voltage and power: 4080 VAC, 350 KW
09:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Line voltage and power: 4080 VAC, 350 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Line voltage and power: 4080 VAC, 350 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Line voltage and power: 4080 VAC, 350 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +5.8 dBm
Line voltage and power: 4050 VAC, 350 KW
12:30 HV OFF
12:45 HV ON
13:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Line voltage and power: 4050 VAC, 350 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Line voltage and power: 4050 VAC, 350 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +6.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4050 VAC, 350 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Line voltage and power: 4060 VAC, 350 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Line voltage and power: 4060 VAC, 350 KW
17:50 Driver 3 ON
17:55 HV OFF
18:03 HV ON
18:03 TX Power sample (-70 dB coupling)
Tx2 +6.3 dBm
Tx4 +6.1 dBm
D3  -6.2 dBm
Line voltage and power: 4080 VAC, 350 KW
19:03 TX Power sample (-70 dB coupling)
Tx2 +6.3 dBm
Tx4 +6.1 dBm
D3  -6.2 dBm
Line voltage and power: 4080 VAC, 350 KW"	vquesada
607	10 Dec 12:43 On transmitter	ISR		2015_12 ISR ISCOD	Transmitters	P. Condor	new	2015-12-10T20:31:36-05:00	2015-12-10T20:31:36-05:00	On transmitter	pcondor
621	11 Dec 12:17 Transmitter OFF	ISR+Imaging		2015_12 ISR ISCOD	Transmitters		new	2015-12-11T20:18:02-05:00	2015-12-11T20:18:02-05:00	"Tx is off to restore repaired TR from channel ""B"" and change the spark gaps"	joscanoa
622	11 Dec 12:40 Transmitter ON	ISR+Imaging		2015_12 ISR ISCOD	Transmitters		new	2015-12-11T20:18:38-05:00	2015-12-11T20:18:38-05:00	Transmitter is ON	joscanoa
623	11 Dec 13:40 Transmitter OFF	ISR+Imaging		2015_12 ISR ISCOD	Transmitters		new	2015-12-11T20:21:43-05:00	2015-12-11T20:21:43-05:00	"Tx is off again to fix high noise level at channel ""B"".
The amplifier and TR from channel ""B"" were replaced with the backup of channel ""D"""	joscanoa
624	11 Dec 14:20 Transmitter ON	ISR+Imaging		2015_12 ISR ISCOD	Transmitters		new	2015-12-11T20:22:35-05:00	2015-12-11T20:22:35-05:00	Transmitter is ON	joscanoa
626	11 Dec 19:26 Transmitter power measurements	ISR		2015_12 ISR ISCOD	Transmitters		new	2015-12-11T20:29:04-05:00	2015-12-11T20:29:04-05:00	"
11/12/2015
09:00 TX Power sample (-70 dB coupling)
Tx2 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4050 VAC, 340 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.9 dBm
Line voltage and power: 4050 VAC, 350 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +6.1 dBm
Tx4 +6.0 dBm
Line voltage and power: 4050 VAC, 350 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4050 VAC, 350 KW
12:15 TX OFF (spark gap change)
12:35 TX ON
13:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4050 VAC, 350 KW
13:35  TX OFF (high noise in the channel B Images)
14:15  TX ON  (It changes: TR and low noise amplifier)
15:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.9 dBm
Line voltage and power: 4040 VAC, 340 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.9 dBm
Line voltage and power: 4040 VAC, 340 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +5.9 dBm
Tx4 +5.9 dBm
Line voltage and power: 4040 VAC, 340 KW
17:40  Dr3   -6.1dBm  ON (IMAGING) 
18:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.0 dBm
Dr3 -6.2 dBm
Line voltage and power: 4050 VAC, 350 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.1 dBm
Dr3 -6.2 dBm
Line voltage and power: 4050 VAC, 350 KW



"	rtadeo
628	11 Dec 23:10 Transmitter Power Measurements	ISR		2015_12 ISR ISCOD	Transmitters		new	2015-12-12T00:10:24-05:00	2015-12-12T00:10:24-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +6.3 dBm
Tx4 +6.1 dBm
D3 -6.5 dBm
Line voltage and power: 4080 VAC, 350 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +6.3 dBm
Tx4 +6.1 dBm
D3 -6.5 dBm
Line voltage and power: 4080 VAC, 350 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +6.7 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4100 VAC, 360 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +6.7 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4100 VAC, 360 KW"	vquesada
629	12 Dec 07:10 Transmitter Power Measurements	ISR		2015_12 ISR ISCOD	Transmitters		new	2015-12-12T08:07:08-05:00	2015-12-12T08:07:08-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx2 +6.4 dBm
Tx4 +6.2 dBm
D3 -6.5 dBm
Line voltage and power: 4100 VAC, 360 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +6.4 dBm
Tx4 +6.2 dBm
D3 -6.5 dBm
Line voltage and power: 4100 VAC, 360 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +6.4 dBm
Tx4 +6.2 dBm
D3 -6.5 dBm
Line voltage and power: 4100 VAC, 360 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +6.4 dBm
Tx4 +6.2 dBm
D3 -6.5 dBm
Line voltage and power: 4100 VAC, 360 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +6.5 dBm
Tx4 +6.3 dBm
D3 -6.5 dBm
Line voltage and power: 4100 VAC, 360 KW
04:35 Driver 3 OFF
05:00 TX Power sample (-70 dB coupling)
Tx2 +6.5 dBm
Tx4 +6.3 dBm
Line voltage and power: 4100 VAC, 360 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +6.4 dBm
Tx4 +6.2 dBm
Line voltage and power: 4080 VAC, 360 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +6.4 dBm
Tx4 +6.2 dBm
Line voltage and power: 4080 VAC, 360 KW"	vquesada
636	12 Dec 19:27 Transmitter Power Measurements	ISR		2015_12 ISR ISCOD	Transmitters		new	2015-12-12T20:32:28-05:00	2015-12-12T20:32:28-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.2 dBm
Line voltage and power: 4050 VAC, 340 KW
09:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.2 dBm
Line voltage and power: 4050 VAC, 340 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.2 dBm
Line voltage and power: 4050 VAC, 340 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +6.1 dBm
Tx4 +6.0 dBm
Line voltage and power: 4040 VAC, 340 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +6.1 dBm
Tx4 +6.0 dBm
Line voltage and power: 4040 VAC, 340 KW
13:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4040 VAC, 340 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4040 VAC, 340 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +6.1 dBm
Tx4 +6.0 dBm
Line voltage and power: 4040 VAC, 340 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4060 VAC, 350 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +6.0 dBm
Tx4 +6.0 dBm
Line voltage and power: 4060 VAC, 350 KW
17:42 Dr3 ON (Imaging)  -6.5dBm
18:00 TX Power sample (-70 dB coupling)
Tx2 +6.1 dBm
Tx4 +6.1 dBm
Dr3 -6.5 dBm
Line voltage and power: 4060 VAC, 360 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +6.2 dBm
Tx4 +6.2 dBm
Dr3 -6.4 dBm
Line voltage and power: 4060 VAC, 360 KW





"	rtadeo
638	12 Dec 23:00 Transmitter Power Measurements	ISR		2015_12 ISR ISCOD	Transmitters		new	2015-12-13T00:03:06-05:00	2015-12-13T00:03:06-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +6.5 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4090 VAC, 350 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +6.5 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4090 VAC, 350 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +6.7 dBm
Tx4 +6.5 dBm
D3 -6.5 dBm
Line voltage and power: 4100 VAC, 360 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +6.7 dBm
Tx4 +6.5 dBm
D3 -6.5 dBm
Line voltage and power: 4100 VAC, 360 KW

"	vquesada
645	13 Dec 07:05 Transmitter Power Measurements	ISR		2015_12 ISR ISCOD	Transmitters		new	2015-12-13T08:07:49-05:00	2015-12-13T08:07:49-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4090 VAC, 350 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4090 VAC, 350 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4090 VAC, 350 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4090 VAC, 350 KW
03:15 Driver 3 OFF
04:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4080 VAC, 350 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4080 VAC, 350 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4080 VAC, 350 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +6.6 dBm
Tx4 +6.4 dBm
D3 -6.5 dBm
Line voltage and power: 4080 VAC, 350 KW"	vquesada
676	05 Ene 17:36 Imaging On	ISR		2016_01_1 ISR+Imaging (ISCOD)	Acquisition system	P Condor	new	2016-01-05T19:18:45-05:00	2016-01-05T19:18:45-05:00	Imaging On but Ch 5 has problem.	pcondor
678	05 Ene 17:49 Tx on	ISR		2016_01_1 ISR+Imaging (ISCOD)	Acquisition system	P Condor	new	2016-01-05T19:21:27-05:00	2016-01-05T19:21:27-05:00	Tx on and all is ok.	pcondor
700	08 Jan 01:00 Turn Off Imaging	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Acquisition system	AValdez	new	2016-01-08T08:09:26-05:00	2016-02-11T12:54:06-05:00		avaldez
703	08 Jan 07:50 Operation Resume	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Acquisition system	AValdez	new	2016-01-08T09:01:15-05:00	2016-02-11T12:56:04-05:00	"Person in Charge: A. Valdez.
Experiment: EW_DRIFT + Imaging
1) 20:00 - 08:00 
2) Operation Hours: 11:50 h
3) Operation incomplete: 10 min
4) Reasons:
-  The computer Ares hung and had to be rebooted"	avaldez
710	09 Ene 02:10 Imaging Off	ISR		2016_01_1 ISR+Imaging (ISCOD)	Acquisition system	P.Condor	new	2016-01-09T03:39:57-05:00	2016-01-09T03:39:57-05:00	Imaging off	pcondor
658	04 Jan 17:12 Antena VSWR	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Antennas	I. Manay	new	2016-01-04T20:48:49-05:00	2016-01-05T12:30:24-05:00	"WUp 1.06
WDn 1.10
NDn 1.02
NUp 1.00
EUp 1.05
EDn 1.05
SDn 1.09
SUp 1.03
"	imanay
734	10 Ene 20:01 End	ISR		2016_01_1 ISR+Imaging (ISCOD)	End experiment	P.Condor	new	2016-01-10T21:18:08-05:00	2016-01-10T21:18:08-05:00	End of experiment.	pcondor
660	04 Jan 19:59 Operation Resume	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	General	I. Manay	new	2016-01-04T21:51:10-05:00	2016-01-04T21:51:10-05:00	"Person in Charge: I. Manay.
Experiment: EW_DRIFT + Imaging
1) 17:10 - 20:00 
2) Operation Hours: 2h 50
3) Operation incomplete: 1h 12 min
4) Reasons:
-Fails of driver of transmitter number 1. The transmitters were turned off for a complete replacement of driver 1."	imanay
662	04 January 22:23 Noise Level	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	General	AValdez	new	2016-01-05T05:41:32-05:00	2016-01-05T05:41:32-05:00	"Noise Level

Ew_Drift

ChA : 21.21   
ChB : 20.04
ChC : 21.40
ChD : 21.17 

Faraday -Signal Chain
Ch0 16.81
Ch1 16.92

Faraday -DP
A 53.9
B 54"	avaldez
667	05 Jan 07:59  am  Operation Resume	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	AValdez	new	2016-01-05T09:03:39-05:00	2016-02-11T12:50:51-05:00	"Person in Charge:Alexamder VAldez.
Experiment: EW_DRIFT + Faraday + Imaging
1) 20:00 - 08:00
2) Operation Hours: 12 h.
3) Operation incomplete: 3h 30 min
4) Reasons:
-Problems with driver 1
-Problems with PA2"	avaldez
674	05 Ene 14:47 Noise levels	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	P Condor	new	2016-01-05T18:22:59-05:00	2016-01-05T18:22:59-05:00	"EW_drifts
A: 21.69 B: 21.19 C:22.83 D:22.48"	pcondor
681	05 Ene 19:31 Noise levels	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	P.Condor	new	2016-01-05T20:47:55-05:00	2016-01-05T20:47:55-05:00	"EW_Drifts
A:21.63 B:20.86 C:21.93 D:21.50
IMAGING
1:19.10 2:20.04 3:17.63 4:19.33 5:19.18 6:18.45 7:20.67 8:21.14"	pcondor
683	05 Ene 20:00 Operation resume	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	P.Condor	new	2016-01-05T21:05:16-05:00	2016-01-05T21:05:16-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift-Faraday-Imaging
1) 08:00 - 20:00
2) Operation Hours: 10h 43 min
3) Operation incomplete: 77 min
4) Reasons:
- Problem with Tx
- To use two Tx for EW_drifts
- To repair Ch 5 of Imaging"	pcondor
690	07 Jan 02:50 Imaging experiment is stopped	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	General	I. Manay	new	2016-01-07T08:14:00-05:00	2016-01-07T08:14:00-05:00		imanay
693	07 Jan 07:59 Operation Resume	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	General	I. Manay	new	2016-01-07T09:06:00-05:00	2016-01-07T09:06:00-05:00	"Person in Charge: I. Manay.
Experiment: EW_DRIFT + Imaging
1) 20:00 - 08:00 
2) Operation Hours: 12h
3) Operation incomplete: 3 min
4) Reasons:
-Fall of transmitters."	imanay
698	07 Jan 19:55 Operation Resume	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	General	F. Montenegro	new	2016-01-07T21:02:24-05:00	2016-01-07T21:02:24-05:00	"Person in Charge: F. MONTENEGRO
Experiment: EW_DRIFT + Imaging
1) 08:00 - 20:00
2) Operation Hours: 12h
3) Operation incomplete: 0 min
4) Reasons:"	fmontenegro
705	08 Jan 19:50 Operation summary	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	General	Karim Kuyeng	new	2016-01-08T21:03:12-05:00	2016-02-18T09:42:56-05:00	"
08:17 EW-Drifts - Noise levels
      A 22.6, B 23.3, C 22.1 D 23.0 

09:24 Ajuste de ATRs

11:12 EW-Drifts - Noise levels
      A 26.0, B 26.4, C 28.4, D 28.4 

12:09 Ajuste de ATRs

14:32 EW-Drifts - Noise levels
      A 21.9, B 21.8, C 22.9, D 22.7 

15:17 Ajuste de ATRs

17:33 Starting Imaging experiment

17:33 EW-Drifts - Noise levels
      A 21.5, B 21.0, C 22.4, D 22.18 

      Imaging - Noise levels
      A 19.3, B 20.1, C 17.68, D 19.6, E 20.2, F 18.6, G 20.6, H 21.0

18:50 Ajuste de ATRs"	kkuyeng
708	08 Ene 20:56 Noise levels	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	P.Condor	new	2016-01-09T03:30:55-05:00	2016-01-09T03:30:55-05:00	"EW_DRIFTS
A:20.98 B:20.49 C:21.72 D:21.31
IMAGING
1: 18.58 2:19.41 3:17.00 4:18.38 5:19.24 6:17.80 7:20.09 8:20.07"	pcondor
709	08 Ene 23:56 Noise levels	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	P.Condor	new	2016-01-09T03:34:21-05:00	2016-01-09T03:34:21-05:00	"EW_DRIFTS
A:22.16 B:21.96 C:23.18 D:22.93
IMAGING
1:20.57 2:21.72 3:19.33 4:20.58 5:21.51 6:20.01 7:22.26 8:22.41"	pcondor
712	09 Ene 04:31 Noise levels	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	P.Condor	new	2016-01-09T08:23:14-05:00	2016-01-09T08:23:14-05:00	"EW_DRIFTS
A:20.31 B:19.71 C:20.95 D:20.59"	pcondor
715	09 Ene 08:00 Operation Resume	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	P.Condor	new	2016-01-09T09:16:13-05:00	2016-01-09T09:16:13-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:
"	pcondor
723	10 Jan  01:15 Imaging Off	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	General	AValdez	new	2016-01-10T08:51:52-05:00	2016-02-11T12:57:32-05:00	"Imaging Off

There was a problem with the data disk.
The computer didn't recognize the disk.
After reset the computer everything works fine."	avaldez
724	10 Jan 08:00 Operation Resume	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	General	AValdez	new	2016-01-10T08:52:17-05:00	2016-02-11T12:55:19-05:00	"Person in Charge: A. Valdez.
Experiment: EW_Drift-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	avaldez
725	10 Ene 10:30 Noise levels	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	P.Condor	new	2016-01-10T20:01:26-05:00	2016-01-10T20:01:26-05:00	"EW_DRIFTS
A:14.47 B:14.66 C:16.17 D:15.22
"	pcondor
726	10 Ene 12:49 Noise levels	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	P.Condor	new	2016-01-10T20:03:11-05:00	2016-01-10T20:03:11-05:00	"EW_DRIFTS
A:23.02 B:23.21 C:24.16 D:23.98"	pcondor
727	10 Ene 16:12  Noise levels	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	P.Condor	new	2016-01-10T20:08:52-05:00	2016-01-10T20:08:52-05:00	"EW_DRIFT
A:21.16 B:20.90 C:22.07 D:21.93"	pcondor
733	10 Ene 20:00 Operation resume	ISR		2016_01_1 ISR+Imaging (ISCOD)	General	P.Condor	new	2016-01-10T21:17:28-05:00	2016-01-10T21:17:28-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift-Faraday-Imaging
1) 08:00 - 20:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
962	18 Feb 14:00 Final Report and Kpi	ISR		2016_01_1 ISR+Imaging (ISCOD)	General		new	2016-02-18T14:42:59-05:00	2016-02-18T14:42:59-05:00	The final report	ryanque
963	18 Feb 14:00 Final Report and Kpi	ISR		2016_01_1 ISR+Imaging (ISCOD)	General		new	2016-02-18T14:43:13-05:00	2016-02-18T14:43:13-05:00	The final report	ryanque
964	18 Feb 14:00 Final Report and Kpi	ISR		2016_01_1 ISR+Imaging (ISCOD)	General		new	2016-02-18T14:43:29-05:00	2016-02-18T14:43:29-05:00	The final report	ryanque
663	04 Jan 23:59 Plots	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Plot	AValdez	new	2016-01-05T05:42:43-05:00	2016-02-11T12:52:33-05:00		avaldez
684	05 Jan 23:59 Plots	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Plot		new	2016-01-06T01:28:27-05:00	2016-02-11T12:48:09-05:00	2016 January, 05 23:59 Plots	abelleza
688	06 Jan 23:59 Plots	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Plot	I. Manay	new	2016-01-07T02:47:31-05:00	2016-01-07T02:47:31-05:00		imanay
694	07 Jan 08:00 Plots	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Plot	F. Montenegro	new	2016-01-07T09:16:57-05:00	2016-01-07T09:16:57-05:00		abelleza
695	07 Jan 17:45 Plots	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Plot	F. Montenegro	new	2016-01-07T19:02:50-05:00	2016-01-07T19:02:50-05:00	07 Jan 17:45 Plots	fmontenegro
699	07 Jan 23:59 Plots	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Plot	AVALDEZ	new	2016-01-08T08:01:05-05:00	2016-02-11T12:56:40-05:00	Plots	avaldez
721	09 Jan  23:59 Plots	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Plot	AValdez	new	2016-01-10T08:40:11-05:00	2016-02-11T18:03:41-05:00		avaldez
675	05 Ene 17:23 Noise levels	ISR		2016_01_1 ISR+Imaging (ISCOD)	Process/Analysis Program	P Condor	new	2016-01-05T19:15:26-05:00	2016-01-05T19:15:26-05:00	"EW-Drifts
A:21.24 B:20.88 C:22.11 D:22.02"	pcondor
682	05 Ene 19:50 Plots	ISR		2016_01_1 ISR+Imaging (ISCOD)	Process/Analysis Program	P.Condor	new	2016-01-05T20:58:17-05:00	2016-01-05T20:58:17-05:00	Plots of rtis spectras etc.	pcondor
707	09 Ene 00:09 Plots	ISR		2016_01_1 ISR+Imaging (ISCOD)	Process/Analysis Program	P.Condor	new	2016-01-09T01:23:53-05:00	2016-01-09T01:23:53-05:00	Plots of rtis and spectras.	pcondor
714	09 Ene 07:40 plots	ISR		2016_01_1 ISR+Imaging (ISCOD)	Process/Analysis Program	P.Condor	new	2016-01-09T08:51:50-05:00	2016-01-09T08:51:50-05:00	Plots of rtis and spectras.	pcondor
728	10 Ene 17:50 We processing online with IDL	ISR		2016_01_1 ISR+Imaging (ISCOD)	Process/Analysis Program	P.Condor	new	2016-01-10T20:10:03-05:00	2016-01-10T20:10:03-05:00	We processing online with IDL 	pcondor
729	10 Ene 18:40 Start Imaging	ISR		2016_01_1 ISR+Imaging (ISCOD)	Process/Analysis Program	P.Condor	new	2016-01-10T20:11:32-05:00	2016-01-10T20:11:32-05:00	Start imaging.	pcondor
731	10 Ene 19:00 Plots	ISR		2016_01_1 ISR+Imaging (ISCOD)	Process/Analysis Program	P.Condor	new	2016-01-10T20:15:42-05:00	2016-01-10T20:15:42-05:00	Figures of noise and spectras	pcondor
665	05 Jan 06:00  am Spark Gaps	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Spark Gaps	AValdez	new	2016-01-05T07:48:24-05:00	2016-02-11T12:50:00-05:00	"04-01-2016
22:45 Spark gaps adjustment
05-01-2016
00:45 Spark gaps adjustment
03:00 Spark gaps adjustment
06:00 Spark gaps adjustment
"	avaldez
679	05 Ene 19:00 Spark gaps adjustment	ISR		2016_01_1 ISR+Imaging (ISCOD)	Spark Gaps	A. Coronado	new	2016-01-05T19:28:08-05:00	2016-01-05T20:51:26-05:00	"08:30 Spark gaps adjustment
14:34 Spark gaps adjustment
17:05 Spark gaps adjustment
19:27 Spark gaps adjustment"	pcondor
686	06 Jan 07:00 Spark gaps adjustment	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Spark Gaps		new	2016-01-06T08:51:54-05:00	2016-02-11T12:54:54-05:00	"05 Jan 21:48 Spark gaps adjustment
05 Jan 23:48 Spark gaps adjustment
06 Jan 01:57 Spark gaps adjustment
06 Jan 03:56 Spark gaps adjustment
06 Jan 06:05 Spark gaps adjustment

adjustment by Walter Rojas."	abelleza
691	07 Jan 07:40 Spark-gaps summary	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Spark Gaps	W. Rojas	new	2016-01-07T08:52:56-05:00	2016-01-07T08:52:56-05:00	"ATR's adjustment:
1) 06 Jan 20:29 spark gaps adjustment.
2) 06 Jan 22:36 spark gaps adjustment.
3) 07 Jan 00:26 spark gaps adjustment.
4) 07 Jan 02:26 spark gaps adjustment.
5) 07 Jan 05:06 spark gaps adjustment.
6) 07 Jan 07:38 spark gaps adjustment."	imanay
697	07 Jan 19:50 Spark gaps Resume	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Spark Gaps	F. Montenegro	new	2016-01-07T21:02:13-05:00	2016-01-07T21:03:06-05:00	" ATR's adjustment:
1) 07 Jan 09:55 spark gaps adjustment.
2) 07 Jan 12:32 spark gaps adjustment.
3) 07 Jan 15:07 spark gaps adjustment.
4) 07 Jan 18:38 spark gaps adjustment.
"	fmontenegro
701	08 Jan 07:00 Spark Gaps adjustment	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Spark Gaps	AValdez	new	2016-01-08T08:09:40-05:00	2016-02-11T12:53:24-05:00	"ATR's adjustment:
1) 07 Jan 21:34 spark gaps adjustment.
2) 08 Jan 00:15 spark gaps adjustment.
3) 08 Jan 03:16 spark gaps adjustment.
4) 08 Jan 06:17 spark gaps adjustment."	avaldez
713	09 Ene 07:00 Spark gaps adjustment	ISR		2016_01_1 ISR+Imaging (ISCOD)	Spark Gaps	A. Coronado	new	2016-01-09T08:39:07-05:00	2016-01-09T08:39:07-05:00	"08-01-2016
21:52 Spark gaps adjustment
09-01-2016
00:54 Spark gaps adjustment
03:53 Spark gaps adjustment
07:19 Spark gaps adjustment"	pcondor
722	10 Jan 07:00 Spark gaps adjustment	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Spark Gaps	AValdez	new	2016-01-10T08:45:18-05:00	2016-02-11T12:57:56-05:00	"10-01-2016
19:42 09 Jan Spark gaps adjustment
22:30 09 Jan Spark gaps adjustment
01:30 10 Jan Spark gaps adjustment
04:00 10 Jan Spark gaps adjustment
06:40 10 Jan Spark gaps adjustment"	avaldez
730	10 Ene 18:05 Spark gaps adjustment	ISR		2016_01_1 ISR+Imaging (ISCOD)	Spark Gaps	J. Lavado	new	2016-01-10T20:13:01-05:00	2016-01-10T20:13:01-05:00	"09:05 Spark gaps adjustment
11:48 Spark gaps adjustment
15:03 Spark gaps adjustment
18:05 Spark gaps adjustment"	pcondor
657	04 Jan 17:10 Experiment Started	ISR		2016_01_1 ISR+Imaging (ISCOD)	Start experiment		new	2016-01-04T16:10:06-05:00	2016-01-05T13:15:50-05:00	"Log Created 14:00
ISR + Imaging Campaign (ISCOD)
Start: Mon Jan 04 2016
End  : Sun Jan 10 2016
L. User: P. Condor"	ryanque
716	09 Ene 19:15 Spark gaps adjustment	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Start experiment	dlume	new	2016-01-09T20:31:40-05:00	2016-01-09T20:31:40-05:00	"09-01-2016
09:25 Spark gaps adjustment
11:46 Spark gaps adjustment
14:25 Spark gaps adjustment
17:25 Spark gaps adjustment"	dlume
718	09 Ene 19:40 Operation Resume	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Start experiment	dlume	new	2016-01-09T20:56:50-05:00	2016-01-09T20:56:50-05:00	"Person in Charge: D. Lume.
Experiment: EW_Drift-Faraday-Imaging
1) 08:00 - 20:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	dlume
659	04 Jan 18:50 Transmitters were down	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Transmitters	I. Manay	new	2016-01-04T21:09:28-05:00	2016-02-11T12:05:49-05:00	"Transmitters were down due to failure Transmitter 2.
Faraday stops, only EW Drift and Imaging."	imanay
661	04 Jan 22:10 Problems with Driver 1 FIxed	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Transmitters	AValdez	new	2016-01-05T05:37:13-05:00	2016-02-11T12:49:05-05:00	"At 7pm There was a problem with Driver1 , we decided turn off Tx's. and replace the driver 1  for driver 3(Imaging experiment).
At 22:10 pm We restart transmition
We continue with experiments: Ew_Drift and Farday. 
The imaging experiment was cancelled.


"	avaldez
664	05 Jan 01:00  Problems with PA 2	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Transmitters	AValdez	new	2016-01-05T05:57:19-05:00	2016-02-11T12:52:02-05:00	"There was a problem with PA2, after check the PA we decided to cancel Faraday Experiment
At 02:20am We restart Ew_Drfit Experiment."	avaldez
666	05 Jan 07:30 Transmitter power measurements	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-05T07:54:24-05:00	2016-01-05T07:54:24-05:00	"04/01/2016
22:00 HV: ON
22:10 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.6 /+5.2 dBm
Tx4 +2.2 dBm
Line voltage and power: 4050 VAC, 350 KW
23:12 Failure source screen PA1

05/01/2016
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx2 +1.6 /+5.2 dBm
Tx4 +2.2 dBm
Line voltage and power: 4050 VAC, 350 KW
00:33 POWER FAILURE PA1 Screen
01:00 POWER FAILURE PA2 Screen
02:20 Start with only PA1. (EW DRIFT)
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4050 VAC, 350 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Line voltage and power: 4050 VAC, 350 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Line voltage and power: 4100 VAC, 350 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4060 VAC, 350 KW





"	rtadeo
669	05 Ene 10:30 Tx off	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters	P Condor	new	2016-01-05T18:13:52-05:00	2016-01-05T18:13:52-05:00	Tx of to enable driver Imaging with of Faraday and put hybrid 3 for have 2 Tx for EW Drifts	pcondor
670	05 Ene 11:45 Transmitter on	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters	P Condor	new	2016-01-05T18:15:14-05:00	2016-01-05T18:15:14-05:00	Tx on.	pcondor
671	05 Ene 14:35 Low power is increased	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters	P Condor	new	2016-01-05T18:18:00-05:00	2016-01-05T18:18:00-05:00	Low power in EW Drifts is increased when was resolved problem in TX.	pcondor
672	05 Ene 14:39 Tx off	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters	P Condor	new	2016-01-05T18:19:59-05:00	2016-01-05T18:19:59-05:00	Tx is off to get the TR-Faraday of South antenna.	pcondor
673	05 Ene 14:46 Tx On	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters	P Condor	new	2016-01-05T18:21:13-05:00	2016-01-05T18:21:13-05:00	Tx on. 7 minute of loss data.	pcondor
677	05 Ene 17:42 Tx off to arrange ch 5-Imaging	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters	P Condor	new	2016-01-05T19:20:38-05:00	2016-01-05T19:20:38-05:00	Tx off to arrange ch 5-Imaging	pcondor
685	06 Jan 07:00 Transmitter Power Measurements	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-06T08:46:34-05:00	2016-01-06T08:46:34-05:00	"05/01/2016
20:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Dr2 -6.6 dBm
Line voltage: 4050 VAC 360Kw
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage: 4050 VAC 360Kw
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage: 4050 VAC 360Kw
22:00 Crowbar HV (variation of the electrical line)
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage: 4100 VAC 350Kw
06/01/2016
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage: 4100 VAC 350Kw
00:20 Drv2 (Imaging OFF)
00:22 Fault water flow sensor
00:59 Failure by disabling source PA1 Screen
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.8 dBm
Dr2 OFF
Line voltage: 4100 VAC 350Kw
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Dr2 OFF
Line voltage: 4100 VAC 350Kw
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.8 dBm
Dr2 OFF
Line voltage: 4100 VAC 355Kw
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.7 dBm
Dr2 OFF
Line voltage: 4080 VAC 350Kw
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Dr2 OFF
Line voltage: 4100 VAC 360Kw
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.8 dBm
Dr2 OFF
Line voltage: 4080 VAC 350Kw
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.8 dBm
Dr2 OFF
Line voltage: 4080 VAC 350Kw






"	rtadeo
687	06 Jan  19:00 Transmitter Power Measurements	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-06T20:17:09-05:00	2016-01-06T20:17:09-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage and power: 4030 VAC, 350 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage and power: 4030 VAC, 350 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage and power: 4030 VAC, 350 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage and power: 4030 VAC, 350 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage and power: 4030 VAC, 350 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage and power: 4030 VAC, 350 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage and power: 4020 VAC, 345 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage and power: 4020 VAC, 345 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4080 VAC, 350 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4080 VAC, 350 KW
17:35 Driver 2 ON -6.6 dBm
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -6.6 dBm
Line voltage and power: 4080 VAC, 350 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2  -6.6 dBm
Line voltage and power: 4080 VAC, 350 KW


"	vquesada
689	07 Jan 02:25 Fall of transmitters	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Transmitters	I. Manay	new	2016-01-07T08:12:56-05:00	2016-01-07T08:12:56-05:00		imanay
692	07 Jan 07:30 Transmitter power measurements	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-07T08:56:58-05:00	2016-07-14T18:41:13-05:00	"06/01/2016
Line voltage: 4050 VAC 360Kw
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage: 4100 VAC 360Kw
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage: 4080 VAC 350Kw
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.4 dBm
Line voltage: 4060 VAC 360Kw
07/01/2016
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Dr2 -6.5 dBm
Line voltage: 4050 VAC 350Kw
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Dr2 -6.4
Line voltage: 4070 VAC 360Kw
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.5
Line voltage: 4050 VAC 360Kw
02:22 Crowbar
02:50 Drv2 (Imaging OFF)
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage: 4030 VAC 350Kw
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage: 4050 VAC 350Kw
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage: 4040 VAC 350Kw
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage: 4050 VAC 350Kw
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage: 4070 VAC 350Kw"	ryaya
696	07 Jan 19:00 Transmitter Power Measurements	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-07T20:17:00-05:00	2016-01-07T20:17:00-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4070 VAC, 350 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4070 VAC, 350 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4070 VAC, 350 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4070 VAC, 350 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4070 VAC, 350 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4070 VAC, 350 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4070 VAC, 350 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4070 VAC, 350 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage and power: 4050 VAC, 350 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4050 VAC, 350 KW
17:30 Driver 2 ON -6.3dBm
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2  -6.5 dBm
Line voltage and power: 4050 VAC, 350 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2  -6.5 dBm
Line voltage and power: 4050 VAC, 350 KW










"	vquesada
702	08 Jan 07:30 Transmitter power measurements	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-08T08:41:52-05:00	2016-01-08T08:41:52-05:00	"07/01/2016
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Dr2 -6.6 dBm
Line voltage: 4050 VAC 360Kw
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage: 4100 VAC 360Kw
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage: 4060 VAC 360Kw
08/01/2016
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage: 4030 VAC 360Kw
01:00 Drv2 (Imaging OFF)
TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage: 4060 VAC 360Kw
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage: 4080 VAC 360Kw
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage: 4080 VAC 360Kw
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage: 4040 VAC 360Kw
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage: 4050 VAC 360Kw
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage: 4080 VAC 360Kw
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage: 4050 VAC 360Kw"	ryaya
704	08 Jan 19:00 Transmitter power measurements	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-08T20:23:35-05:00	2016-01-08T20:23:35-05:00	"08/01/2016
08:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage: 4050 VAC 360Kw
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage: 4050 VAC 360Kw
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.6 dBm
Line voltage: 4020 VAC 340Kw
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.6 dBm
Line voltage: 4020 VAC 340Kw
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.7 dBm
Line voltage: 4025 VAC 340Kw
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.6 dBm
Line voltage: 4025 VAC 340Kw
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.7 dBm
Line voltage: 4050 VAC 325Kw
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage: 4040 VAC 325Kw
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage: 4050 VAC 350Kw
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage: 4050 VAC 350Kw
17:30 ON IMAGING
17:30 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.6 dBm
Dr2 -6.5 dBm
Line voltage: 4020 VAC 325Kw
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.7 dBm
Dr2 -6.5 dBm
Line voltage: 4030 VAC 325Kw
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line voltage: 4030 VAC 330Kw
"	rtadeo
706	08 Jan 23:00 Transmitter Power Measurements	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-09T00:19:23-05:00	2016-01-09T00:19:23-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
D2  -6.4
Line voltage and power: 4020 VAC, 345 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
D2  -6.4
Line voltage and power: 4020 VAC, 345 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2  -6.3
Line voltage and power: 4100 VAC, 350 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2  -6.3
Line voltage and power: 4100 VAC, 350 KW"	vquesada
711	09 Jan 07:00 Transmitter Power Measurements	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-09T08:15:46-05:00	2016-01-09T08:15:46-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -6.3
Line voltage and power: 4090 VAC, 350 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -6.3
Line voltage and power: 4090 VAC, 350 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
D2 -6.3
Line voltage and power: 4050 VAC, 350 KW
02:05 Driver 2 OFF
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage and power: 4050 VAC, 350 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4080 VAC, 350 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4080 VAC, 350 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4050 VAC, 350 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4050 VAC, 350 KW"	vquesada
717	09 Jan 19:00 Transmitter Power Measurements	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-09T20:41:37-05:00	2016-01-09T20:41:37-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4050 VAC, 330 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4050 VAC, 330 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4050 VAC, 330 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4050 VAC, 330 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4050 VAC, 330 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4040 VAC, 325 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage and power: 4040 VAC, 325 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.7 dBm
Line voltage and power: 4040 VAC, 325 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.6 dBm
Line voltage and power: 4040 VAC, 325 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.6 dBm
Line voltage and power: 4040 VAC, 325 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.6 dBm
Line voltage and power: 4025 VAC, 320 KW
18:00 Imaging ON
Dr2 -6.5 dBm
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.4 dBm
Line voltage and power: 4050 VAC, 340 KW
"	rtadeo
719	09 Jan 23:15 Transmitter Power Measurements	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-10T00:29:04-05:00	2016-01-10T00:29:04-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -6.0
Line voltage and power: 4090 VAC, 350 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -6.0
Line voltage and power: 4090 VAC, 350 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -6.0
Line voltage and power: 4100 VAC, 350 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -6.0
Line voltage and power: 4100 VAC, 350 KW"	vquesada
720	10 Jan 07:00 Transmitter Power Measurements	ISR		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-10T08:15:07-05:00	2016-01-10T08:15:07-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
D2 -6.0
Line voltage and power: 4080 VAC, 350 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
D2 -6.0
Line voltage and power: 4080 VAC, 350 KW
01:40 driver 2 OFF
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage and power: 4080 VAC, 350 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line voltage and power: 4080 VAC, 350 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4090 VAC, 350 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4090 VAC, 350 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
Line voltage and power: 4110 VAC, 350 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
Line voltage and power: 4110 VAC, 350 KW"	vquesada
732	10 Jan 19:30 Transmitter power measurements	ISR+Imaging		2016_01_1 ISR+Imaging (ISCOD)	Transmitters		new	2016-01-10T20:52:34-05:00	2016-01-10T20:52:34-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4050 VAC, 350 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4060 VAC, 350 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4060 VAC, 350 KW
11:43 Problem at PA1 screen power supply
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4060 VAC, 350 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4060 VAC, 350 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4100 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.8 dBm
Line voltage and power: 4070 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4080 VAC, 360 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4060 VAC, 360 KW
18:30 Imaging ON
Dr2 -6.5 dBm
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.7 dBm
Dr2 -6.4 dBm
Line voltage and power: 4000 VAC, 340 KW"	ryaya
738	12 Ene 22:07 Noise levels	ISR		2016_01_2 Gyro Synchro	General	P.Condor	new	2016-01-13T07:40:24-05:00	2016-01-13T07:40:24-05:00	A:11.87 B:14.46	pcondor
740	13 Ene 01:15 Noise levels	ISR		2016_01_2 Gyro Synchro	General	P.Condor	new	2016-01-13T07:47:01-05:00	2016-01-13T07:47:01-05:00	A:11.87 B:14.47	pcondor
741	13 Ene 04:18 Noise levels	ISR		2016_01_2 Gyro Synchro	General	P.Condor	new	2016-01-13T07:48:19-05:00	2016-01-13T07:48:19-05:00	A:11.98 B:14.68	pcondor
743	13 Ene 07:06 Noise Levels	ISR		2016_01_2 Gyro Synchro	General	P.Condor	new	2016-01-13T08:50:45-05:00	2016-01-13T08:50:45-05:00	A:12.68 B:15.19	pcondor
744	13 Ene 07:33 Noise Levels	ISR		2016_01_2 Gyro Synchro	General	P.Condor	new	2016-01-13T08:51:32-05:00	2016-01-13T08:51:32-05:00	A:13.41 B:13.75	pcondor
747	13 Ene 08:00 Operation Resume	ISR		2016_01_2 Gyro Synchro	General	P.Condor	new	2016-01-13T09:13:28-05:00	2016-01-13T09:13:28-05:00	"Person in Charge: P. Condor.
Experiment: Gyro Synchro
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
749	13 Jan 19:30 Cuts and falls of the transmitters	ISR		2016_01_2 Gyro Synchro	General	I. Manay	new	2016-01-13T21:01:01-05:00	2016-01-13T21:01:33-05:00	"13 Ene 08:00 60 minutes cut due to change at the pulse configuration.
13 Ene 09:55, 5 minutes fall of transmitters.
13 Ene 11:27, 42 minutes fall of transmitters.
13 Ene 11:55, 2 minutes fall of transmitters.
13 Ene 14:20, 10 minutes cut due to change at the pulse configuration.
13 Ene 15:45, 35 minutes cut due to change at the pulse configuration.
13 Ene 17:42, 1 minutes cut due to change at the pulse configuration.

"	imanay
757	14 Jan 08:00 Operation Resume	ISR		2016_01_2 Gyro Synchro	General	AValdez	new	2016-01-14T08:43:16-05:00	2016-01-14T08:43:16-05:00	"Person in Charge: A. Valdez.
Experiment: Hydrogen Gyro
1) 20:00 - 08:00 
2) Operation Hours: 12h
3) Operation incomplete: 45 min
4) Reasons:
-Fall of transmitters
"	avaldez
753	13 Jan 23:40 Plots	ISR		2016_01_2 Gyro Synchro	Plot	AValdez	new	2016-01-14T07:29:17-05:00	2016-01-14T07:29:17-05:00	"Spectra
Range Cuts
RTI"	avaldez
739	13 Ene 00:00 Figures	ISR		2016_01_2 Gyro Synchro	Process/Analysis Program	P.Condor	new	2016-01-13T07:42:50-05:00	2016-01-13T07:42:50-05:00	Figures of rti and spectra.	pcondor
746	13 Ene 07:50 Figures	ISR		2016_01_2 Gyro Synchro	Process/Analysis Program	P.Condor	new	2016-01-13T08:57:12-05:00	2016-01-13T08:57:12-05:00	Figures of rti and spectra	pcondor
745	13 Ene 07:23 Spark gaps adjustment	ISR		2016_01_2 Gyro Synchro	Spark Gaps	A. Coronado	new	2016-01-13T08:53:56-05:00	2016-01-13T08:53:56-05:00	"12-01
22:35 Spark gaps adjustment
13-01
01:37 Spark gaps adjustment
04:36 Spark gaps adjustment
07:23 Spark gaps adjustment"	pcondor
750	13 Jan 19:40 Spark-gaps summary	ISR		2016_01_2 Gyro Synchro	Spark Gaps	J. Lavado	assigned	2016-01-13T21:05:31-05:00	2016-01-13T21:11:16-05:00	"ATR's adjustment:
1) 13 Jan 08:55 spark gaps adjustment.
2) 13 Jan 12:25 spark gaps adjustment.
3) 13 Jan 14:39 spark gaps adjustment.
4) 13 Jan 16:30 spark gaps adjustment.
5) 13 Jan 18:38 spark gaps adjustment."	J. Lavado
735	11 Jan 13:00 Log created	ISR		2016_01_2 Gyro Synchro	Start experiment	ryanque	new	2016-01-11T14:00:31-05:00	2016-01-11T14:00:31-05:00	"Gyro Sincro Experiment
Start: Monday January 11, 2016
End  : Wednesday January 13 2016
User: E. Kudeki
VIPIR: Off
"	ryanque
736	11 Jan 13:10 Antenna VSWR	ISR		2016_01_2 Gyro Synchro	Start experiment	ryanque	new	2016-01-11T14:02:00-05:00	2016-01-11T14:02:00-05:00	"WUp 1.05
WDn 1.08
NDn 1.01
NUp 1.12
EUp 1.08
EDn 1.07
SDn 1.08
SUp 1.05"	ryanque
751	13 Jan 19:59 Operation Resume	ISR		2016_01_2 Gyro Synchro	Start experiment	I. Manay	new	2016-01-13T21:09:43-05:00	2016-01-13T21:09:43-05:00	"Person in Charge: I. Manay.
Experiment: Hydrogen Gyro
1) 08:00 - 20:00 
2) Operation Hours: 12h
3) Operation incomplete: 155 min
4) Reasons:
-Fall of transmitters
-Cuts for testing of several pulse configurations."	imanay
755	14 Jan 07:40 Spark-gaps summary	ISR		2016_01_2 Gyro Synchro	Start experiment	AValdez	new	2016-01-14T08:06:03-05:00	2016-01-14T08:06:03-05:00	"ATR's adjustment:
1) 13 Jan 21:41 spark gaps adjustment.
2) 14 Jan 00:58 spark gaps adjustment.
3) 14 Jan 04:02 spark gaps adjustment.
4) 14 Jan 06:49 spark gaps adjustment.
"	avaldez
737	10 Jan 23:00 Transmitter power measurements	ISR		2016_01_2 Gyro Synchro	Transmitters		new	2016-01-13T00:19:28-05:00	2016-01-13T00:19:28-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx4 +4.7 dBm
Line voltage and power: 4050 VAC, 340 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW"	vquesada
742	13 Jan 07:00 Transmitter power measurements	ISR		2016_01_2 Gyro Synchro	Transmitters		new	2016-01-13T08:16:39-05:00	2016-01-13T08:16:39-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4020 VAC, 340 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4020 VAC, 340 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4020 VAC, 330 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.5 dBm
Line voltage and power: 4000 VAC, 330 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW"	vquesada
748	13 Jan 19:00 Transmitter power measurements	ISR		2016_01_2 Gyro Synchro	Transmitters		new	2016-01-13T20:46:53-05:00	2016-01-13T20:46:53-05:00	"
08:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
08:30 Change 4ms and pulse code
09:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.7 dBm
Line voltage and power: 4000 VAC, 330 KW
09:50 Fault flow sensor H. P.
10:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.7 dBm
Line voltage and power: 4000 VAC, 330 KW
10:30 failure of the power PA1 Screen
10:45 Fault flow sensor H. P.
11:10 failure of the power PA1 Screen
11:20 It restarts with transmission
11:20 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
11:53 failure of the power PA1 Screen
12:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.7 dBm
Line voltage and power: 4000 VAC, 320 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.7 dBm
Line voltage and power: 4000 VAC, 320 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 320 KW
14:30 the pulse is changed to 3.9ms
15:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 320 KW
15:45 The pulse is changed
16:20 transmission starts
16:20 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 320 KW
16:45 The pulse is changed
17:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 320 KW
17:45 It disables the RF - enabled rf
18:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 320 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 320 KW






 "	rtadeo
752	13 Jan 25:05 Transmitter power measurements	ISR		2016_01_2 Gyro Synchro	Transmitters		new	2016-01-14T00:21:14-05:00	2016-01-14T00:21:14-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 340 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 340 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx4 +4.7 dBm
Line voltage and power: 4020 VAC, 340 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx4 +4.7 dBm
Line voltage and power: 4020 VAC, 340 KW"	vquesada
754	14 Jan 06:30 Cuts and falls of the transmitters	ISR		2016_01_2 Gyro Synchro	Transmitters	AValdez	new	2016-01-14T07:32:18-05:00	2016-01-14T07:32:18-05:00	"14 Jan 00:10, 40 minutes fall of transmitters. Problem with a flow sensor in Tx1
14 Jan 03:15, 5 minutes fall of transmitters.
"	avaldez
756	14 Jan 07:00 Transmitter power measurements	ISR		2016_01_2 Gyro Synchro	Transmitters		new	2016-01-14T08:16:43-05:00	2016-01-14T08:16:43-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx4 +4.7 dBm
Line voltage and power: 4020 VAC, 330 KW
00:08 HP Tx1 flow fault sensor
01:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
03:10 HP Tx1 flow fault sensor
04:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 3950 VAC, 320 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.7 dBm
Tx4 +4.7 dBm
Line voltage and power: 4000 VAC, 330 KW"	vquesada
758	14 Jan 19:00 Transmitter power measurements	ISR		2016_01_2 Gyro Synchro	Transmitters		new	2016-01-14T20:29:11-05:00	2016-01-14T20:29:11-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.6 dBm
Line voltage and power: 4000 VAC, 330 KW
08:08 TX OFF (It changes from experiment)
08:43 Experiment Valley ISR 35us-140us (5%)
08:50 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx4 +5.5 dBm
Line voltage and power: 4200 VAC, 320 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.6 dBm
Line voltage and power: 4000 VAC, 390 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.7 dBm
Line voltage and power: 4200 VAC, 395 KW
11:05 failure by crowbar
11:20 Transmission restarts
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx4 +5.6 dBm
Line voltage and power: 4000 VAC, 390 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx4 +5.6 dBm
Line voltage and power: 4000 VAC, 390 KW
13:50 failure by crowbar
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.7 dBm
Tx4 +5.7 dBm
Line voltage and power: 4000 VAC, 320 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.7 dBm
Line voltage and power: 4000 VAC, 320 KW
16:00 change of HDD
16:12 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.7 dBm
Line voltage and power: 4000 VAC, 325 KW
16:30 crowbar by restarting the PC
16:30 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.5 dBm
Line voltage and power: 4000 VAC, 325 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx4 +5.2 dBm
Line voltage and power: 4000 VAC, 360 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.6 dBm
Line voltage and power: 4000 VAC, 380 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.5 dBm
Line voltage and power: 4000 VAC, 380 KW















"	rtadeo
759	21 Jan 23:00 Transmitter power measurements	ISR		2016_01_2 Gyro Synchro	Transmitters		new	2016-01-22T00:19:53-05:00	2016-01-22T00:19:53-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW"	vquesada
765	21 Ene 20:20 Restart batch in Jars	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system	P.Condor	new	2016-01-22T06:55:29-05:00	2016-01-22T06:55:29-05:00	Restart batch in Jars	pcondor
770	22 Ene 00:44 Reset Pc operaciones	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system	P.Condor	new	2016-01-22T07:30:58-05:00	2016-01-22T07:30:58-05:00	Reset Pc operaciones and restart the acquisition programs.	pcondor
792	22 Ene 17:00 JASMET processing begins	JASMET		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-22T21:29:26-05:00	2016-01-22T21:29:26-05:00		jverastegui
793	22 Ene 18:47 JASMET processing fixed, the header of the processed data has CodeType=17, this seems to be the problem	JASMET		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-22T21:30:04-05:00	2016-01-22T21:55:24-05:00		jverastegui
797	23 Jan  05:10 Change data Path	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system	AVALDEZ	new	2016-01-23T08:10:06-05:00	2016-01-23T08:10:06-05:00	"There was no space in data disk, we change the location folder.
New datapath:
mst_isr_eej_2
The adquisition start at 5:25am."	avaldez
812	24 JAN  12:10 Problems with JARS	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system	AValdez	new	2016-01-24T20:42:56-05:00	2016-01-24T20:42:56-05:00	"12:10 PM Restart batch in Jars
14:20 PM Restart batch in Jars
14:40 PM Restart the computer and batch in jars, change 2 data disks"	AVALDEZ
817	25 Jan 07:00 Acq. re-starts	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system	I. Manay	new	2016-01-25T08:11:25-05:00	2016-01-25T08:11:25-05:00	"Re-starts of JARS:

1) 24 Jan 23:01, 5 minutes without data.
2) 25 Jan 01:48, 2 minutes without data.
3) 25 Jan 02:47, 2 minutes without data.
4) 25 Jan 03:20, 2 minutes without data."	imanay
823	25 Jan 10:25 Acquisition system stopped	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-25T19:52:07-05:00	2016-01-25T19:52:07-05:00	"JARS system had to be reseted.
10:29 System is on"	ryanque
828	25 Jan 17:41 Acquisition restarted	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-25T20:03:39-05:00	2016-01-25T20:03:39-05:00	"17:35 Acquisition system stopped
17:41 Acquisition system restarted"	ryanque
831	25 Jan 19:18 Acquisition restarted	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-25T21:13:16-05:00	2016-01-25T21:13:16-05:00	"19:15 Acquisition stopped
19:18 Acquisition restarted"	ryanque
835	25 Jan 20:50 Acquisition restarted	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-26T07:23:25-05:00	2016-01-26T07:23:25-05:00	"20:50 Acquisition stopped
20:55 Acquisition restarted"	joscanoa
836	25 Jan 22:14 Acquisition restarted	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-26T07:24:53-05:00	2016-03-16T12:37:03-05:00	"22:14 Acquisition stopped
22:19 Acquisition restarted

23:51 Acquisition stopped
23:56 Acquisition restarted"	joscanoa
837	25 Jan 23:51 Plots	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-26T07:27:19-05:00	2016-03-16T12:54:39-05:00	"
"	joscanoa
838	26 Jan 00:12 Acquisition restarted	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-26T07:29:49-05:00	2016-01-26T07:29:49-05:00	"00:12 Acquisition stopped
00:14 Acquisition restarted"	joscanoa
839	26 Jan 00:21 Acquisition restarted	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-26T07:32:07-05:00	2016-01-26T07:32:07-05:00	"00:21 Acquisition stopped
00:25 Acquisition restarted"	joscanoa
840	26 Jan 00:30 Acquisition restarted	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-26T07:33:55-05:00	2016-01-26T07:33:55-05:00	"00:30 Acquisition stopped. 

The HD where the data was being stored was changed.

00:35 Acquisition restarted"	joscanoa
863	28 Jan 20:25 Acquisition system was restarted	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system	I. Manay	new	2016-01-29T06:38:48-05:00	2016-01-29T06:38:48-05:00	Because the data hard disk was full, the data path was changed to another empty disk. The acquisition was stopped during 4 minutes. 	imanay
864	29 Jan 00:09 Restart of the acquisition	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system	I. Manay	new	2016-01-29T06:49:06-05:00	2016-01-29T06:49:06-05:00	Acquisition was manually restarted because JARS system was not able to recover itself. This process took 4 minutes.	imanay
871	29 Jan 10:35 Acquisition restarted	ISR		2016_01_3 MST-ISR-EEJ	Acquisition system		new	2016-01-29T11:55:59-05:00	2016-01-29T11:55:59-05:00		jespinoza
822	25 Jan 09:37 Spark Gap Maintenance	ISR		2016_01_3 MST-ISR-EEJ	Break Experiment		new	2016-01-25T19:49:32-05:00	2016-01-25T19:49:32-05:00	The experiment is turned off to change the Spark Gaps.	ryanque
892	Turno 31-Enero2016  8am - 8pm	ISR		2016_01_3 MST-ISR-EEJ	End experiment		new	2016-01-31T21:29:08-05:00	2016-07-14T18:40:08-05:00	20:04 - Fin de experimento	kkuyeng
763	21 Jan 20:25 Restart of the experiment	ISR		2016_01_3 MST-ISR-EEJ	General	I. Manay	new	2016-01-22T00:51:27-05:00	2016-01-22T01:02:17-05:00	Transmitters were off during 3 minutes, from 20:22 to 20:25. Radar controller was established to follow the rising edge of the PPS.	imanay
764	21 Jan 19:59 Operation Resume	ISR		2016_01_3 MST-ISR-EEJ	General	I. Manay	new	2016-01-22T00:55:21-05:00	2016-01-25T08:58:40-05:00	"Person in Charge: I. Manay.
Experiment: MST-ISR-EEJ
1) 18:10 - 20:00 
2) Operation Hours: 1h 50 minutes
3) Operation incomplete: 18 minutes
4) Reasons:
-Turning off of transmitters for adjustments at the system."	imanay
766	21 Ene 21:08 Noise levels	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-22T07:03:22-05:00	2016-01-22T07:03:22-05:00	"ISR
1: 26.28 2:25.71 3:26.63 4:25.04
MST
1:27.01 2:26.72 3:26.11 4:25.67
EEJ
1:26.62 2:26.44 3:26.29 4:25.16"	pcondor
768	22 Ene 00:15 Noise levels	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-22T07:23:33-05:00	2016-01-22T07:23:33-05:00	"ISR
1:26.29 2:27.24 3:25.04 4:25.70
MST
1:27.10 2:29.10 3:26.15 4:26.31
EEJ
1:25.86 2:27.18 3:25.50 4:25.15"	pcondor
773	22 Ene 04:01 Noise levels	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-22T07:42:01-05:00	2016-01-22T07:42:01-05:00	"ISR
1:25.53 2:26.07 3:24.28 4:25.11
MST
1:26.22 2:27.84 3:25.76 4:25.89
EEJ
1:25.84 2:26.97 3:25.18 4:25.51"	pcondor
774	22 Ene 06:15 Noise levels	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-22T07:48:05-05:00	2016-01-22T07:48:05-05:00	"ISR
1:25.87 2:26.48 3:24.60 4:25.20
MST
1:26.05 2:27.24 3:25.80 4:25.83
EEJ
1:26.03 2:27.25 3:25.42 4:25.61"	pcondor
778	22  Ene 08:00 resume operation	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-22T09:19:23-05:00	2016-01-22T09:19:23-05:00	"Person in Charge: P. Condor.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 11h 53 min
3) Operation incomplete: 07 min
4) Reasons:
_ Problem with Tx"	pcondor
779	22 Ene 06:22 JASMET system went down	JASMET		2016_01_3 MST-ISR-EEJ	General		new	2016-01-22T20:49:37-05:00	2016-01-22T20:49:37-05:00		jverastegui
782	22 Ene 09:40 JASMET system went up but without network connection	JASMET		2016_01_3 MST-ISR-EEJ	General		new	2016-01-22T20:52:24-05:00	2016-01-22T20:52:24-05:00		jverastegui
790	22 Ene 16:36 Energy up on the JASMET cabin	JASMET		2016_01_3 MST-ISR-EEJ	General		new	2016-01-22T21:27:53-05:00	2016-01-22T21:27:53-05:00		jverastegui
794	22 Ene 18:49 Noise levels	ISR		2016_01_3 MST-ISR-EEJ	General		new	2016-01-22T21:31:40-05:00	2016-01-22T21:31:40-05:00	"ISR
25.3
26.05
24.05
24.73

MST
25.35
26.64
25.07
25.21

EEJ
25.62
26.92
25.04
25.04"	jverastegui
800	23 Jan 07:59  Operation Resume	ISR		2016_01_3 MST-ISR-EEJ	General	AVALDEZ	new	2016-01-23T09:01:11-05:00	2016-02-04T10:50:57-05:00	"Person in Charge: A. VALDEZ.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 11h 45 min
3) Operation incomplete: 15 min
4) Reasons:
_ Change data path and mount the disk."	avaldez
806	24 Jan 06:34 Noise levels	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-24T08:22:21-05:00	2016-01-24T08:22:21-05:00	"23-01-16
21:34
ISR
1:25.33 2:24.37 3:24.14 4:25.12 
MST
1:25.84 2:25.32 3:25.47 4:25.79 
EEJ
1:25.41 2:24.49 3:24.90 4:25.15
JASMET
1:39.26 2:39.52 3:40.25 4:40.69 5:40.26
24-01-16
00:37
ISR
1:25.02 2:23.91 3:23.62 4:24.31 
MST
1:25.49 2:24.99 3:25.05 4:25.12 
EEJ
1:25.05 2:24.43 3:24.54 4:24.73
JASMET
1:39.27 2:39.46 3:40.16 4:41.04 5:40.21

03:12
ISR
1:24.76 2:23.38 3:23.39 4:24.18 
MST
1:25.35 2:24.41 3:24.91 4:24.97 
EEJ
1:25.09 2:24.04 3:24.40 4:24.72
JASMET 
1:39.94 2:40.13 3:40.99 4:41.35 5:40.72

06:34
ISR
1:25.93 2:24.85 3:24.49 4:25.26 
MST
1:26.20 2:25.61 3:25.78 4:25.99 
EEJ
1:25.95 2:25.90 3:25.41 4:25.66
JASMET
1:41.52 2:41.89 3:42.42 4:41.82 5:42.49"	pcondor
809	24 Jan 08:00 Resume Operation	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-24T09:15:37-05:00	2016-01-24T09:15:37-05:00	"Person in Charge: P. Condor.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 12h 0 min
3) Operation incomplete: 0 min
4) Reasons:
"	pcondor
814	24 jAN  19:59  Operation Resume	ISR		2016_01_3 MST-ISR-EEJ	General	AValdez	new	2016-01-24T20:55:31-05:00	2016-01-24T20:55:31-05:00	"Person in Charge: A. VALDEZ.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 8h 30 min
3) Operation incomplete: 3h 30 min
4) Reasons:
Problems with jars and source of tx."	AVALDEZ
821	25 Jan 07:59 Operation Resume	ISR		2016_01_3 MST-ISR-EEJ	General	I. Manay	new	2016-01-25T09:04:22-05:00	2016-01-25T09:04:22-05:00	"Person in Charge: I. Manay.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00 
2) Operation Hours: 12h
3) Operation incomplete: 11 minutes
4) Reasons:
-Acquisition restarts."	imanay
824	25 Jan 12:40 TX Failure	ISR		2016_01_3 MST-ISR-EEJ	General		new	2016-01-25T19:54:46-05:00	2016-01-25T19:54:46-05:00	"12:08 Acquisition system stopped.
12:10 Acquisition system restarted
12:36 TX Failure
12:40 TX On"	ryanque
825	25 Jan 14:05 Acquisition system restarted	ISR		2016_01_3 MST-ISR-EEJ	General		new	2016-01-25T19:56:22-05:00	2016-01-25T19:56:22-05:00	Acquisition system restarted	ryanque
829	25 Jan 17:47 Noise mesaurement	ISR		2016_01_3 MST-ISR-EEJ	General		new	2016-01-25T20:11:19-05:00	2016-01-25T20:11:19-05:00	"11:40        CH0   CH1   CH2   CH3  CH4
JASMET 30   43.07 43.54 43.53 44.85 44.48
MST         27.32 27.95 27.18 27.42
ISR         27.32 27.59 26.49 27.12
EEJ         27.26 27.85 27.15 27.21

14:47
JASMET 30   40.80 40.08 41.24 43.82 41.66
MST         25.89 25.47 25.36 25.50
ISR         25.95 24.89 24.57 25.13
EEJ         25.77 25.26 25.24 25.22

17:47
JASMET 30   38.98 38.96 39.51 41.27 39.97
MST         25.30 25.08 24.95 24.72
ISR         25.25 24.59 24.03 24.31
EEJ         25.22 24.89 24.64 24.51"	ryanque
832	25 Jan 19:58 Operation Resume	ISR		2016_01_3 MST-ISR-EEJ	General		new	2016-01-25T21:16:11-05:00	2016-01-25T21:16:11-05:00	"Person in Charge: R. Yanque.
Experiment: MST-ISR-EEJ
1) 08:00 - 20:00 
2) Operation Hours: 12h
3) Operation incomplete: 40 minutes
4) Reasons:
-Spark Gap replacement
-Acquisition restarts.
-TX Failure"	ryanque
844	26 Jan 07:55 Operation Resume	ISR		2016_01_3 MST-ISR-EEJ	General		new	2016-01-26T09:16:32-05:00	2016-01-26T09:16:32-05:00	"Person in Charge: Julio Oscanoa
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 12h
3) Operation incomplete: 52 minutes
4) Reasons:
-Acquisition problems
-TX Failure"	joscanoa
849	27 Jan 06:33 Noise levels	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-27T08:27:52-05:00	2016-01-27T08:27:52-05:00	"26-01-2016
21:12
ISR
1:25.44 2:24.30 3:23.79 4:24.75 
MST
1:25.69 2:25.00 3:25.11 4:25.28 
EEJ
1:25.34 2:24.82 3:24.69 4:25.00 
JASMET
1:39.17 2:39.26 3:39.78 4:41.78 5:40.31 
27-01-2016
00:40
ISR
1:24.75 2:24.09 3:23.66 4:24.11 
MST
1:25.41 2:25.02 3:25.19 4:24.93 
EEJ
1:24.96 2:24.75 3:24.56 4:24.46 
JASMET
1:39.46 2:39.57 3:40.06 4:42.16 5:40.58 
03:17
ISR
1:25.38 2:24.46 3:24.07 4:24.65 
MST
1:25.42 2:25.12 3:25.16 4:25.47 
EEJ
1:25.35 2:24.99 3:24.95 4:25.10 
JASMET
1:40.22 2:40.47 3:40.77 4:42.39 5:41.38 
06:33
ISR
1:26.15 2:25.73 3:25.13 4:25.68 
MST
1:26.38 2:26.37 3:26.20 4:26.09 
EEJ
1:26.30 2:26.24 3:26.09 4:26.05 
JASMET
1:41.96 2:42.46 3:42.50 4:43.39 5:43.24 "	pcondor
852	27 Jan 08:00 Resume Operation	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-27T09:14:18-05:00	2016-01-27T09:14:18-05:00	"Person in Charge: P. Condor.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 12h 0 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
855	27 Jan 07:33 Noise levels	ISR		2016_01_3 MST-ISR-EEJ	General	dlume	new	2016-01-27T20:57:37-05:00	2016-01-27T20:57:37-05:00	"27-01-2016
09:19
ISR
1:28.67 2:28.69 3:27.81 4:28.81 
MST
1:28.73 2:29.07 3:28.76 4:29.20 
EEJ
1:28.82 2:29.17 3:28.85 4:29.21 
JASMET
1:41.20 2:42.18 3:42.31 4:42.42 5:43.12 
13:50
ISR
1:26.15 2:25.12 3:24.26 4:24.98 
MST
1:26.00 2:25.52 3:25.19 4:25.42 
EEJ
1:25.85 2:25.32 3:24.93 4:25.14 
JASMET
1:39.24 2:39.56 3:40.59 4:40.86 5:40.86 
19:01
ISR
1:24.95 2:24.21 3:23.51 4:24.32 
MST
1:25.14 2:24.68 3:24.57 4:24.85 
EEJ
1:25.03 2:24.46 3:24.25 4:24.43 
JASMET
1:38.73 2:39.01 3:39.59 4:41.00 5:41.44 
"	dlume
860	28 Jan 08:00 Resume Operation	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	General		new	2016-01-28T09:17:16-05:00	2016-01-29T01:22:47-05:00	"Person in Charge: M. Urco.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons: - "	murco
861	28 Jan 19:00 Operation Resume	ISR		2016_01_3 MST-ISR-EEJ	General		new	2016-01-28T20:31:10-05:00	2016-03-14T10:08:34-05:00	"Person in Charge: D. Cordova
Experiment: MST-ISR-EEJ
1) 08:00 - 20:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 60 min
4) Reasons: - 
    a) Faillure in Transmiter TX1 that generates  interference in reception, the problem was the capaciter filter in Tx1, the filter was changed an the interference dissapears
    b) Failure in a relay that controls a resistor who limits the current in the 20000V circuit, it was turned off and then turned on, the problem doesnt occurs again"	dcordova
869	29 Jan 07:59 Operation Resume	ISR		2016_01_3 MST-ISR-EEJ	General	I. Manay	new	2016-01-29T08:58:21-05:00	2016-01-29T08:58:21-05:00	"Person in Charge: I. Manay.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00 
2) Operation Hours: 12h
3) Operation incomplete: 8 minutes
4) Reasons:
-Acquisition restarts.
-Change of data disk."	imanay
878	30 Jan  04:00 Change of disks	ISR		2016_01_3 MST-ISR-EEJ	General	AVALDEZ	new	2016-01-30T08:54:20-05:00	2016-03-14T09:42:55-05:00	"The disks were changed due to they were full.
Experiment restarted: 04:45"	avaldez
879	30 Jan  07:59 RESUME OPERATION	ISR		2016_01_3 MST-ISR-EEJ	General	AVALDEZ	new	2016-01-30T08:54:25-05:00	2016-01-30T08:55:59-05:00	"Person in Charge: A. VALDEZ.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 11h 15 min
3) Operation incomplete: 45 min
4) Reasons:
Data disk problems."	avaldez
880	30 Jan 18:08 Noise Levels	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-30T20:18:59-05:00	2016-01-30T20:18:59-05:00	"30-01-2016
09:08
ISR
1:28.55 2:28.74 3:27.87 4:28.88 
MST
1:28.92 2:29.29 3:29.11 4:29.33 
EEJ
1:28.88 2:29.26 3:28.88 4:29.15
JASMET
1:41.75 2:42.33 3:42.75 4:43.71 5:43.21 
12:18
ISR
1:26.33 2:26.58 3:25.18 4:25.86 
MST
1:26.52 2:27.00 3:26.76 4:26.54 
EEJ
1:26.32 2:26.59 3:26.20 4:25.96
JASMET
1:40.81 2:41.29 3:41.89 4:43.14 5:42.44
15:29
ISR
1:25.72 2:25.12 3:24.44 4:25.10 
MST
1:25.73 2:25.37 3:25.42 4:25.61 
EEJ
1:25.60 2:25.19 3:25.11 4:25.20
JASMET
1:39.16 2:39.21 3:40.25 4:42.03 5:40.26
18:08
ISR
1:25.12 2:24.43 3:23.86 4:24.46 
MST
1:25.26 2:24.76 3:24.76 4:24.87 
EEJ
1:25.20 2:24.67 3:24.56 4:24.58
JASMET
1:38.97 2:39.24 3:40.00 4:41.64 5:40.18   "	pcondor
881	30 Jan 17:00 Interference in EEJ from 10 to 14 hours.	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-30T20:22:33-05:00	2016-01-30T20:22:33-05:00	Interference in EEJ from 10 to 14 hours.	pcondor
885	30 Jan 20:00 Resume Operation	ISR		2016_01_3 MST-ISR-EEJ	General	P.Condor	new	2016-01-30T21:13:41-05:00	2016-01-30T21:13:41-05:00	"Person in Charge: P. Condor.
Experiment: MST-ISR-EEJ
1) 08:00 - 20:00
2) Operation Hours: 12h 0 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
890	31 Jan 08:00 Resume Operation	ISR		2016_01_3 MST-ISR-EEJ	General		new	2016-01-31T09:01:17-05:00	2016-01-31T09:01:17-05:00	"Person in Charge: J. Oscanoa.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons: - "	joscanoa
891	Turno 31-Enero2016  8am - 8pm	ISR		2016_01_3 MST-ISR-EEJ	General		new	2016-01-31T21:27:56-05:00	2016-07-14T18:40:40-05:00	"09:01 Ajuste de ATrs
09:45 cambio de ruta en el disco de la PC de adquisicion
11:38 Ajuste de ATrs
15:08 Ajuste de ATrs
17:30 Ajuste de ATrs

"	kkuyeng
1000	16 Mar 12:00 JASMET30 Manual Configuration	ISR		2016_01_3 MST-ISR-EEJ	General		new	2016-03-16T12:25:11-05:00	2016-03-16T12:25:11-05:00		ryanque
787	22 Ene 12:19 Plots	ISR		2016_01_3 MST-ISR-EEJ	Plot		new	2016-01-22T21:21:47-05:00	2016-01-22T21:21:47-05:00		jverastegui
796	22 Jan 23:59 plots of experiments	ISR		2016_01_3 MST-ISR-EEJ	Plot	AValdez	new	2016-01-23T07:56:47-05:00	2016-01-25T20:12:55-05:00		avaldez
815	24 Jan 23:59 Plots of the experiments	ISR		2016_01_3 MST-ISR-EEJ	Plot	I. Manay	new	2016-01-25T04:52:59-05:00	2016-01-25T04:52:59-05:00		imanay
819	25 Jan 07:00 Plots of the experiments	ISR		2016_01_3 MST-ISR-EEJ	Plot	I. Manay	new	2016-01-25T08:15:04-05:00	2016-01-25T08:15:04-05:00		imanay
865	29 Jan 00:10 Plots	ISR		2016_01_3 MST-ISR-EEJ	Plot	I. Manay	new	2016-01-29T08:08:57-05:00	2016-01-29T08:08:57-05:00		imanay
876	29 Jan 23:59 Plots of Experiment	ISR		2016_01_3 MST-ISR-EEJ	Plot	AVALDEZ	new	2016-01-30T08:30:44-05:00	2016-01-30T08:30:44-05:00		avaldez
887	30 Jan 23:59 Plots of Experiment	ISR		2016_01_3 MST-ISR-EEJ	Plot		new	2016-01-31T01:22:18-05:00	2016-01-31T01:22:18-05:00		joscanoa
965	31 Jan 20:00 Plots	ISR		2016_01_3 MST-ISR-EEJ	Plot		new	2016-03-14T09:44:00-05:00	2016-03-14T09:44:00-05:00		ryanque
767	21 Ene 23:59 Plots	ISR		2016_01_3 MST-ISR-EEJ	Process/Analysis Program	P. Condor	new	2016-01-22T07:13:06-05:00	2016-01-22T07:13:06-05:00	Figures of rti and spectra	pcondor
769	22 Ene 00:22 There is not network in PC-OPERACIONES	ISR		2016_01_3 MST-ISR-EEJ	Process/Analysis Program	P.Condor	new	2016-01-22T07:27:50-05:00	2016-01-22T07:27:50-05:00	There is not network in PC-OPERACIONES	pcondor
777	22 Ene 07:50 figures	ISR		2016_01_3 MST-ISR-EEJ	Process/Analysis Program	P. Condor	new	2016-01-22T09:06:15-05:00	2016-01-22T09:06:15-05:00	Figures of rti and spectra	pcondor
788	22 Ene 13:44 Noise levels	ISR		2016_01_3 MST-ISR-EEJ	Process/Analysis Program		new	2016-01-22T21:25:17-05:00	2016-01-22T21:25:17-05:00	"ISR
26.1
27.08
24.95
25.49

MST
26.21
27.68
25.82
26.14

EEJ
25.96
27.5
25.62
25.8"	jverastegui
804	23 Jan 23:59 Figures	ISR		2016_01_3 MST-ISR-EEJ	Process/Analysis Program	P.Condor	new	2016-01-24T02:02:11-05:00	2016-03-16T13:08:18-05:00	Figures of rti and spectra	pcondor
808	24 Jan 07:59 Figures	ISR		2016_01_3 MST-ISR-EEJ	Process/Analysis Program	P.Condor	new	2016-01-24T09:12:12-05:00	2016-01-24T09:12:12-05:00	Figures rtis and spectras	pcondor
847	26 Jan 23:59 Figures	ISR		2016_01_3 MST-ISR-EEJ	Process/Analysis Program	P. Condor	new	2016-01-27T01:24:12-05:00	2016-01-27T01:24:12-05:00	Figures rtis and spectras	pcondor
851	27 Jan 07:50 Figures	ISR		2016_01_3 MST-ISR-EEJ	Process/Analysis Program	P. Condor	new	2016-01-27T09:06:18-05:00	2016-01-27T09:06:18-05:00	Figures rtis and spectras	pcondor
857	27 Jan 23:59 Figures	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Process/Analysis Program		new	2016-01-28T07:56:30-05:00	2016-01-28T07:56:30-05:00	Figures rtis and spectras	murco
762	21 Jan 18:22 Spark-gaps summary	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps	I. Manay	new	2016-01-22T00:45:50-05:00	2016-01-22T01:01:33-05:00	"ATR's adjustment:
1) 21 Jan 18:22 spark gaps adjustment.
"	imanay
775	22 Ene 05:02 Spark gaps adjustment	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps	A. Coronado	new	2016-01-22T07:51:25-05:00	2016-01-22T07:51:25-05:00	"21-01
21:24 Spark gaps adjustment
23:59 Spark gaps adjustment
22-01
02:33 Spark gaps adjustment
05:02 Spark gaps adjustment
"	pcondor
786	22 Ene 11:24 ATR adjustment	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps		new	2016-01-22T21:20:55-05:00	2016-01-22T21:22:08-05:00		jverastegui
789	22 Jan 14:15 ATR adjustment	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps		new	2016-01-22T21:26:31-05:00	2016-01-25T20:15:10-05:00		jverastegui
791	22 Ene 17:06 ATR adjustment	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps		new	2016-01-22T21:28:44-05:00	2016-01-22T21:28:44-05:00		jverastegui
798	23 Jan 06:50 Spark-gaps summary	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps	AVALDEZ	new	2016-01-23T08:13:06-05:00	2016-01-23T08:13:06-05:00	"22 January
21:00 Spark gaps adjustment
23 January
00:04 Spark gaps adjustment
03:05 Spark gaps adjustment
06:04 Spark gaps adjustment"	avaldez
807	24 Jan 06:08 Spark gaps adjustment	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps	W. Rojas	new	2016-01-24T08:25:02-05:00	2016-01-24T08:25:02-05:00	"23-01-16
21:06  Spark gaps adjustment
24-01-16
00:13  Spark gaps adjustment
03:08  Spark gaps adjustment
06:08  Spark gaps adjustment"	pcondor
813	24 JAN  18:03 Spark gaps adjustment	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps	AValdez	new	2016-01-24T20:46:09-05:00	2016-01-24T20:46:09-05:00	"Spark gaps adjustment
09:03 am 
12:02 pm
18:03 pm
"	AValdez
816	25 Jan 06:45 Spark-gaps summary	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps	I. Manay	new	2016-01-25T08:05:51-05:00	2016-01-25T08:05:51-05:00	"ATR's adjustment:
1) 24 Jan 21:10 spark gaps adjustment.
2) 25 Jan 00:27 spark gaps adjustment.
3) 25 Jan 03:37 spark gaps adjustment.
4) 25 Jan 06:34 spark gaps adjustment.
"	imanay
827	25 Jan 17:11 Spark Gap Summary	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps		new	2016-01-25T20:01:49-05:00	2016-01-25T20:01:49-05:00	"10:37 Spark Gap adjustment
13:53 Spark Gap adjustment
17:11 Spark Gap adjustment"	ryanque
843	26 Jan 07:30 Spark-gaps summary	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps		new	2016-01-26T08:50:13-05:00	2016-01-26T08:50:13-05:00	"1) 25 Jan 19:28 spark gaps adjustment.
2) 25 Jan 21:37 spark gaps adjustment.
3) 25 Jan 23:40 spark gaps adjustment.
4) 26 Jan 01:40 spark gaps adjustment.
5) 26 Jan 03:33 spark gaps adjustment.
6) 26 Jan 05:30 spark gaps adjustment.
6) 26 Jan 07:30 spark gaps adjustment."	joscanoa
850	27 Jan 05:40 Spark gaps adjustment	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps	A. Huamani	new	2016-01-27T08:31:26-05:00	2016-01-27T08:31:26-05:00	"26-01-2016
21:30 Spark gaps adjustment
23:30 Spark gaps adjustment
27-01-2016
01:30 Spark gaps adjustment
03:30 Spark gaps adjustment
05:40 Spark gaps adjustment"	pcondor
854	27 Jan 07:29 Spark gaps adjustment	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps	dlume	new	2016-01-27T20:46:36-05:00	2016-01-27T20:46:36-05:00	"27-01-2016
10:05 Spark gaps adjustment
12:33 Spark gaps adjustment
14:40 Spark gaps adjustment
17:03 Spark gaps adjustment"	dlume
858	28 Jan 08:00 Spark gaps adjustment	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Spark Gaps		new	2016-01-28T08:07:06-05:00	2016-03-14T10:09:30-05:00	"27-01-2016
19:40 Spark gaps adjustment
23:05 Spark gaps adjustment

28-01-2016
02:13 Spark gaps adjustment
05:04 Spark gaps adjustment"	murco
867	29 Jan 07:15 Spark-gaps summary	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps	J. Lavado	new	2016-01-29T08:29:28-05:00	2016-01-29T08:29:28-05:00	"ATR's adjustment:
1) 28 Jan 21:10 spark gaps adjustment.
2) 29 Jan 00:10 spark gaps adjustment.
3) 29 Jan 03:08 spark gaps adjustment.
4) 29 Jan 06:10 spark gaps adjustment."	imanay
870	29 Jan 10:00 Spark gaps - tungstens replacement	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps		new	2016-01-29T11:23:22-05:00	2016-03-14T09:56:10-05:00	"Acquisition & processing stopped
System started at 10:30 am"	jespinoza
877	30 Jan  07:20 Spark-gaps summary	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps	AVALDEZ	new	2016-01-30T08:50:36-05:00	2016-01-30T08:50:36-05:00	"29 JAN
21:30PM SPARK GAPS ADJUSTMENT
23:40PM SPARK GAPS ADJUSTMENT
30 JAN
01:40AM SPARK GAPS ADJUSTMENT
03:40AM SPARK GAPS ADJUSTMENT
05:40AM SPARK GAPS ADJUSTMENT
07:30AM SPARK GAPS ADJUSTMENT
"	avaldez
882	30 Jan 18:00 Spark gaps adjustment	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps	W. Rojas	new	2016-01-30T20:25:46-05:00	2016-01-30T20:25:46-05:00	"10:25 Spark gaps adjustment
12:51 Spark gaps adjustment
15:27 Spark gaps adjustment
18:00 Spark gaps adjustment"	pcondor
889	31 Jan 07:15 Spark gaps summary	ISR		2016_01_3 MST-ISR-EEJ	Spark Gaps		new	2016-01-31T08:32:40-05:00	2016-01-31T08:32:40-05:00	"30 Jan
20:22 pm Spark gaps adjustment
22:30 pm Spark gaps adjustment
31 Jan
00:30 am Spark gaps adjustment
02:20 am Spark gaps adjustment
04:30 am Spark gaps adjustment
06:30 am Spark gaps adjustment"	joscanoa
760	21 Jan 18:10 Start of the experiment	ISR		2016_01_3 MST-ISR-EEJ	Start experiment	I. Manay	new	2016-01-22T00:29:49-05:00	2016-01-22T00:59:16-05:00		imanay
780	22 Ene 08:30 220 VAC line was lower than 100 VAC on the JASMET cabin	JASMET		2016_01_3 MST-ISR-EEJ	Start experiment		new	2016-01-22T20:50:59-05:00	2016-01-22T20:50:59-05:00		jverastegui
856	27 Jan 20:00 Resume Operation	ISR		2016_01_3 MST-ISR-EEJ	Start experiment	dlume	new	2016-01-27T21:04:23-05:00	2016-01-27T21:04:23-05:00	"Person in Charge: P. Condor.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 11h 50 min
3) Operation incomplete: 10 min
4) Reasons:
change of hard disk drive"	dlume
761	21 Jan 18:45 Transmitter were on	ISR		2016_01_3 MST-ISR-EEJ	Transmitters	I. Manay	new	2016-01-22T00:42:02-05:00	2016-01-22T01:00:37-05:00	Transmitter were off during 15 minutes for 18:30 to 18:45.	imanay
771	22 Ene 03:15 Problem with Transmitter	ISR		2016_01_3 MST-ISR-EEJ	Transmitters	P.Condor	new	2016-01-22T07:32:31-05:00	2016-01-22T07:32:31-05:00	 Problem with Transmitter	pcondor
772	22 Ene 03:23 Transmitter is on	ISR		2016_01_3 MST-ISR-EEJ	Transmitters	P.Condor	new	2016-01-22T07:33:49-05:00	2016-01-22T07:33:49-05:00	Transmitter is on	pcondor
776	22 Jan 07:00 Transmitter Power Measurements	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-22T08:22:03-05:00	2016-01-22T08:22:03-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
03:12 Crowbar
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW"	vquesada
781	22 Jan 19:30 Transmitter Power Measurements	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-22T20:52:24-05:00	2016-01-22T20:52:24-05:00	"
08:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4050 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4050 VAC, 300 KW
10:00 Electric arc in the filter + 20KV (TX1:OFF)
11:15 filter change +20 KV (TX1:ON)
11:15:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4050 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4050 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW



"	rtadeo
783	22 Ene 10:00 Transmitter was shutdown because of a failure on the power supply	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-22T20:53:51-05:00	2016-01-22T20:53:51-05:00		jverastegui
784	22 Ene 11:00 Transmitter up with half of the maximum power	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-22T20:54:45-05:00	2016-01-22T20:54:45-05:00		jverastegui
785	22 Ene 11:20 Transmitter up at full power	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-22T21:20:19-05:00	2016-01-22T21:20:19-05:00		jverastegui
795	22 Jan 23:00 Transmitter Power Measurements	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-23T00:19:23-05:00	2016-01-23T00:19:23-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4000 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4000 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW"	vquesada
799	23 Jan 07:00 Transmitter Power Measurements	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-23T08:20:38-05:00	2016-01-23T08:20:38-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW"	vquesada
801	23 Jan 19:15 Transmitter Power Measurements	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-23T20:35:19-05:00	2016-01-23T20:35:19-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.3 dBm
Line voltage and power: 4050 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.3 dBm
Line voltage and power: 4050 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.2 dBm
Line voltage and power: 4010 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4010 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW



"	rtadeo
803	23 Jan 23:00 Transmitter Power Measurements	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-24T00:20:38-05:00	2016-01-24T00:20:38-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4030 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4030 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4040 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4040 VAC, 300 KW"	vquesada
805	24 Jan 07:00 Transmitter Power Measurements	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-24T08:20:44-05:00	2016-01-24T08:20:44-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4030 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4030 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4040 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4040 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW"	vquesada
810	24 Jan 14:50 20 KV main power supply problem	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-24T19:34:25-05:00	2016-01-24T19:34:25-05:00	A problem in the main power supply was detected. Failure detection on the start sequence caused by the primary limiting resitor stage. A bypass vacuum relay was broken and this caused an overload in the starting sequence for the HV power supply. The vacuum relay was replaced for a new one and the problem was solved.	ryaya
811	24 Jan 19:25 Transmitter power measurements	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-24T20:39:47-05:00	2016-01-24T20:39:47-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
14:50 Problem at 20KV power supply
18:00 Transmitter restarting
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW"	ryaya
820	25 Jan 07:30 Transmitter power measurements	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-25T09:01:39-05:00	2016-01-25T09:01:39-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4000 VAC, 300 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
01:47 DDS failure
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
02:46 DDS failure
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW

"	rtadeo
826	25 Jan 16:03 TX Failure	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-25T19:59:24-05:00	2016-01-25T19:59:24-05:00	"16:03 TX Failure
16:04 TX On
16:13 Acquisition system restarted
16:13 TX Failure
16:15 TX On
"	ryanque
830	25 Jan 19:30 Transmitter power measurements	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-25T20:59:17-05:00	2016-01-25T20:59:17-05:00	"08:30 Problem at PA 1 screen power supply
09:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
09:35 HV OFF (Switchyard TR adjustment)
10:25 HV ON
10:44 Problem at PA 1 screen power supply
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
11:03 Problem at PA 1 screen power supply
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4030 VAC, 300 KW
12:08 Problem at PA 1 screen power supply
12:30 Problem at PA 1 screen power supply
13:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +4.9 dBm
Line voltage and power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
16:02 Problem at PA 1 screen power supply
16:10 HV OFF - Relay K9 is replaced on the PA 1 control circuit
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4050 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4050 VAC, 300 KW"	ryaya
833	25 Jan 23:20 Transmitter Power Measurements	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-26T00:42:35-05:00	2016-01-26T00:42:35-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW"	vquesada
841	26 Jan 02:40 TX Failure	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-26T07:44:52-05:00	2016-01-26T07:44:52-05:00	"02:40 TX Failure
Source 14 driver's fuse blew up at the 220 input

03:05 TX On"	joscanoa
842	25 Jan 07:05 Transmitter Power Measurements	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-26T08:26:33-05:00	2016-01-26T08:26:33-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
02:40 Blown fuse power source driver plate 1 and 4
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW"	vquesada
845	26 Jan 19:30 Transmitter power measurements	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-26T20:30:00-05:00	2016-01-26T20:30:00-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4030 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4010 VAC, 300 KW"	ryaya
846	26 Jan 23:50 Transmitter Power Measurements	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-27T01:04:36-05:00	2016-01-27T01:04:36-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW"	vquesada
848	27 Jan 07:00 Transmitter Power Measurement	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-27T08:15:39-05:00	2016-01-27T08:15:39-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4020 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4020 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW"	vquesada
853	27 Jan 19:00 Transmitter Power Measurement	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-27T20:44:58-05:00	2016-01-27T20:44:58-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
09:50 crowbar H.V.(20KV)
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +4.9 dBm
Line voltage and power: 4000 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +4.9 dBm
Line voltage and power: 4000 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +4.9 dBm
Line voltage and power: 4000 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx4 +4.8 dBm
Line voltage and power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx4 +4.8 dBm
Line voltage and power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx4 +4.8 dBm
Line voltage and power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +4.8 dBm
Tx4 +4.8 dBm
Line voltage and power: 4000 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4020 VAC, 300 KW




"	rtadeo
859	28 Jan 07:00 Transmitter power measurements	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-28T08:47:29-05:00	2016-01-28T08:47:29-05:00	"27/01/2016

21:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW

28/01/2016

00:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
"	ryaya
862	28 Jan 19:59 Transmitter Power Measurements	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-28T21:16:58-05:00	2016-03-14T10:02:48-05:00	"LT    TX   FIL(V)   POW(dBm)  Tension(V) Consumo(kW) 
08:00  1   16.5     5         4000       300
    4   16.5     5

09:00  1   16.5     5         4000   300
    4   16.5     5

10:00  1   16.5     5         4000   300
    4   16.5     5

11:00  1   16.5     5         4000   300
    4   16.5     5

12:16 HV OFF. Debido a la inerferencia que se obseva en los graficos de espectro, se revisa TX1, tablero de conexion +B, posible arco en filtron, se desconecta este dispositivo y tambien se cambia filtro de condensadores +B (se esta usando ahora su propia unidad original reparada, enves de la unidad que tenia prestada del TX2). Sin embargo, se concluye que la falla no parece ser del fitro de condensadores (se probo la unidad TX2 con la fuente de test, y esta bien).

13:05 Falla fuente +B, contactor de vacio en resistencia limitadora del circuito primario. Con el reinicio de la secuencia de encendido se logro buena conexion en esta oportunidad.

13:20  1   16.5     5         4000   300
    4   16.5     5
  
14:00  1   16.5     5         4000   300
    4   16.5     5

15:00  1   16.5     5         4000   300
    4   16.5     5

16:00  1   16.5     5         4000   300
    4   16.5     5

17:00  1   16.5     5         4000   300
    4   16.5     5

18:00  1   16.5     5         4000   300
    4   16.5     5

19:00  1   16.5     5         4000   300
    4   16.5     5

20:00  1   16.5     5         4000   300
    4   16.5     5"	ocastillo
868	29 Jan 07:30 Transmitter power measurements	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-29T08:42:36-05:00	2016-01-29T08:42:36-05:00	"28/01/2016
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.2 dBm
Line voltage and power: 4020 VAC, 300 KW
29/01/2016
00:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.2 dBm
Line voltage and power: 4030 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.2 dBm
Line voltage and power: 4030 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.1 dBm
Line voltage and power: 4000 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx4 +4.9 dBm
Line voltage and power: 3980 VAC, 300 KW"	ryaya
872	29 Jan 19:00 Transmitter power measurements	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-29T20:32:27-05:00	2016-01-29T20:32:27-05:00	"
29/01/2016
08:00 TX Power sample (-70 dB coupling)
Tx1 +4.9 dBm
Tx4 +4.9 dBm
Line voltage and power: 3980 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
10:06 Spark gap changes
10:45 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
"	rtadeo
873	29 Jan 23:00 Transmitter Power Measurement	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-30T00:15:18-05:00	2016-01-30T00:15:18-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 Kw"	vquesada
874	30 Jan 07:05 Transmitter Power Measurement	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-30T08:22:42-05:00	2016-01-30T08:22:42-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.3 dBm
Tx4 +5.2 dBm
Line voltage and power: 4050 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +4.9 dBm
Line voltage and power: 4000 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +4.9 dBm
Line voltage and power: 4000 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.1 dBm
Line voltage and power: 4050 VAC, 300 KW"	vquesada
883	30 Jan 19:30 Transmitter Power Measurement	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-30T20:46:38-05:00	2016-01-30T20:46:38-05:00	"
08:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.1 dBm
Line voltage and power: 4010 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +5.1 dBm
Line voltage and power: 4010 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
"	rtadeo
886	30 Jan 23:00 Transmitter Power Measurement	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-31T00:18:44-05:00	2016-01-31T00:18:44-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4030 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4030 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4040 VAC, 300 KW
2:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4040 VAC, 300 KW"	vquesada
888	31 Jan 07:00 Transmitter Power Measurement	ISR	JRO Staff	2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-31T08:16:38-05:00	2016-01-31T08:16:38-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +4.9 dBm
Line voltage and power: 4000 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +4.9 dBm
Line voltage and power: 4000 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +4.9 dBm
Line voltage and power: 4000 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +4.9 dBm
Line voltage and power: 4000 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4040 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4040 VAC, 300 KW
"	vquesada
893	31 Jan 20:00 Transmitter Power Measurement	ISR		2016_01_3 MST-ISR-EEJ	Transmitters		new	2016-01-31T21:33:45-05:00	2016-01-31T21:33:45-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4020 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +4.9 dBm
Line voltage and power: 4020 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +4.9 dBm
Line voltage and power: 4020 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.1 dBm
Tx4 +4.9 dBm
Line voltage and power: 4010 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +4.9 dBm
Line voltage and power: 4010 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +4.9 dBm
Line voltage and power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.0 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4000 VAC, 300 KW
20:00 OFF TX
"	rtadeo
905	06 Feb 03:00 Imaging off	ISR		2016_02_1 ISCOD Gravity Waves	Acquisition system	P.Condor	new	2016-02-06T06:54:10-05:00	2016-02-06T06:54:10-05:00	Imaging off	pcondor
921	07 Feb 08:03 Restart EW_Drifts	ISR		2016_02_1 ISCOD Gravity Waves	Acquisition system	P.Condor	new	2016-02-07T18:58:22-05:00	2016-02-07T18:58:22-05:00	 Restart EW_Drifts because Pc ARES was working	pcondor
924	07 Feb 17:45 Imaging is on	ISR		2016_02_1 ISCOD Gravity Waves	Acquisition system	P.Condor	new	2016-02-07T19:04:30-05:00	2016-02-07T19:04:30-05:00	Imaging is on	pcondor
948	10 Feb 01:07 Imaging Off	ISR		2016_02_1 ISCOD Gravity Waves	Acquisition system	P.Condor	new	2016-02-10T07:09:03-05:00	2016-02-10T07:09:03-05:00	 Imaging Off	pcondor
895	04 Feb 17:40 Antenna VSWR	ISR		2016_02_1 ISCOD Gravity Waves	Antennas		new	2016-02-04T17:43:03-05:00	2016-02-04T17:43:03-05:00	"WU 1.06
WD 1.09
ND 1.01
NU 1.14
EU 1.02
ED 1.08
SD 1.09
SU 1.04"	ryanque
913	06 Feb 18:30 Spark Gap Adjustment	ISR		2016_02_1 ISCOD Gravity Waves	Antennas		new	2016-02-06T19:45:35-05:00	2016-02-06T19:45:35-05:00	"08:45 Spark Gap Adjustment

10:38 Spark Gap Adjustment

12:19 Spark Gap Adjustment

14:19 Spark Gap Adjustment

16:26 Spark Gap Adjustment

18:30 Spark Gap Adjustment"	ryanque
958	10 Feb 19:50 Operation Resume	ISR		2016_02_1 ISCOD Gravity Waves	End experiment		new	2016-02-10T20:04:13-05:00	2016-02-10T20:04:13-05:00	"Person in Charge: R. Yanque
Experiment: EW_drifts+Imaging
1) 08:00 - 19:40
2) Operation Hours: 11h 40 min
3) Operation incomplete: 00 min
4) Reasons:"	ryanque
898	05 Feb 18:43 Noise Levels ISR + Imaging	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	General		new	2016-02-05T18:48:30-05:00	2016-02-10T18:40:35-05:00	"ISR (EWDrift)
A: 20.6
B: 21.28
C: 21.78
D: 21.3

Imaging: 
ch0: 17.58
ch1: 16.78
ch2: 15.86
ch3: 18.4
ch4: 21.08
ch5: 17.39
ch6: 19.79
ch7: 19.23
"	kkuyeng
904	06 Feb 05:12 Noise levels	ISR		2016_02_1 ISCOD Gravity Waves	General	P.Condor	new	2016-02-06T06:50:44-05:00	2016-02-06T06:50:44-05:00	"05-02-2016
20:36
EW_DRIFTS
1:21.01 2:21.74 3:22.31 4:21.81
IMAGING
1:18.20 2:17.35 3:16.68 4:19.00 5:21.75 6:18.07 7:20.70 8:20.21
23:32
EW_DRIFTS
1:21.20 2:22.05 3:22.26 4:21.95
IMAGING
1:18.80 2:17.82 3:17.13 4:19.30 5:22.20 6:18.50 7:21.08 8:20.53
6-02-2016  
02:18
EW_DRIFTS
1:21.09 2:21.78 3:22.37 4:21.86
IMAGING
1:18.52 2:17.62 3:16.81 4:18.99 5:21.87 6:18.18 7:20.83 8:20.42
05:12
EW_DRIFTS
1:21.60 2:22.55 3:22.87 4:22.43
"	pcondor
909	06 Feb 08:00 Operation Resume	ISR		2016_02_1 ISCOD Gravity Waves	General	P.Condor	new	2016-02-06T08:00:03-05:00	2016-02-06T19:30:08-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
915	06 Feb 19:55 Operation Resume	ISR		2016_02_1 ISCOD Gravity Waves	General		new	2016-02-06T19:47:21-05:00	2016-02-06T19:47:21-05:00	"Person in Charge: R. Yanque.
Experiment: EW_drifts+Imaging
1) 20:00 - 08:00
2) Operation Hours: 11h 58 min
3) Operation incomplete: 02 min
4) Reasons: Transmitter Failure"	ryanque
920	07 Feb 07:55 Operation Resume	ISR		2016_02_1 ISCOD Gravity Waves	General	AVALDEZ	new	2016-02-07T07:19:32-05:00	2016-02-07T07:19:32-05:00	"Person in Charge: A. Valdez.
Experiment: EW_drifts+Imaging
1) 20:00 - 08:00
2) Operation Hours: 11h 59 min
3) Operation incomplete: 01 min
4) Reasons: Acquisition System Failure"	avaldez
926	07 Feb 18:30 Noise levels	ISR		2016_02_1 ISCOD Gravity Waves	General	P.Condor	new	2016-02-07T19:26:31-05:00	2016-02-07T19:26:31-05:00	"07-02-2016
09:13
EW_Drifts
1:27.32 2:28.83 3:28.33 4:28.44 
12:20
EW_Drifts
1:23.00 2:23.50 3:24.03 4:23.80 
15:06
EW_Drifts
1:22.14 2:22.42 3:22.59 4:22.19 
18:50
EW_Drifts
1:21.77 2:21.84 3:21.96 4:21.59 
IMAGING
1:17.84 2:17.05 3:16.25 4:18.46 5:21.21 6:17.39 7:20.07 8:19.43

"	pcondor
929	07 Feb 20:00 Operation resume	ISR		2016_02_1 ISCOD Gravity Waves	General	P.Condor	new	2016-02-07T19:57:15-05:00	2016-02-07T19:57:15-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 38 min
3) Operation incomplete: 22 min
4) Reasons:
_ Problem with transmitter
_ Problem with pc Ares."	pcondor
932	08 Feb 07:10 Imaging experiment was stopped	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	General	I. Manay	new	2016-02-08T07:25:55-05:00	2016-02-08T07:25:55-05:00	"Data for the Imaging experiment was saved twice:
1) From 18:45 07/02 to 02:20 08/02, 
2) From 02:58 08/02 to 07:10 08/02."	imanay
934	08 Feb 07:59 Operation Resume	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	General	I. Manay	new	2016-02-08T07:49:48-05:00	2016-02-08T07:49:48-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 20:00 - 08:00 
2) Operation Hours: 12h
3) Operation incomplete: 0 minutes
4) Reasons:
-None."	imanay
938	08 Feb 19:55 Noise levels	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	General	fmontenegro	new	2016-02-08T20:03:32-05:00	2016-02-08T20:03:32-05:00	"08-02-2016
08:00
EW_Drifts
1:24.28 2:24.72 3:24.89 4:25.43 
11:00
EW_Drifts
1:23.42 2:23.20 3:23.87 4:22.96 
14:04
EW_Drifts
1:22.61 2:22.72 3:22.84 4:22.38
17:03
EW_Drifts
1:22.19 2:22.34 3:22.89 4:22.95 
20:00
EW_Drifts
1:21.92 2:22.01 3:22.05 4:21.51 
IMAGING
1:17.53 2:17.70 3:17.81 4:18.16 5:20.36 6:17.45 7:18.96 8:19.55"	fmontenegro
941	08 Feb 08:05 Operation Resume	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	General	fmontenegro	new	2016-02-08T20:13:45-05:00	2016-02-08T20:13:45-05:00	"Person in Charge: F. Montenegro.
Experiment: ISR + Imaging
1) 08:00 - 20:00 
2) Operation Hours: 12h
3) Operation incomplete: 45 minutes
4) Reasons:
- The transmitter is turned off to check the noise generated by a meter TX4 forming an arc.
- Besides internal and external chisperos of ATRs they were changed."	fmontenegro
945	09 Feb 07:30 Noise levels	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	General	dlume	new	2016-02-09T07:38:02-05:00	2016-02-09T07:38:02-05:00	"08-02-2016
23:59
EW_Drifts
1:21.76 2:21.71 3:22.23 4:21.56 
Imaging
1:17.52 2:18.07 3:18.23 4:18.37
5:20.65 6:17.69 7:19.32 8:19:91

09-02-2016
02:00
EW_Drifts
1:21.85 2:21.85 3:22.00 4:21.45 
05:00
EW_Drifts
1:22.51 2:22.82 3:22.75 4:22.18
07:30
EW_Drifts
1:23.65 2:24.39 3:24.08 4:23.48 

"	dlume
950	10 Feb 05:52 Noise levels	ISR		2016_02_1 ISCOD Gravity Waves	General	P.Condor	new	2016-02-10T07:24:42-05:00	2016-02-10T07:24:42-05:00	"Noise levels
09 - 02 - 2016
20:19
EW DRIFTS
1:21.66 2:21.27 3:21.87 4:21.30 
IMAGING
1:16.73 2:16.88 3:16.87 4:17.66 5:19.30 6:17.40 7:19.49 8:18.85
23:17
EW DRIFTS
1:21.72 2:21.77 3:21.29 4:21.23 
IMAGING
1:16.34 2:16.45 3:16.29 4:17.33 5:18.86 6:17.31 7:19.34 8:18.56
10 - 02 - 2016
02:42
EW DRIFTS
1:21.71 2:21.89 3:21.98 4:21.39 
05:52
EW DRIFTS
1:21.73 2:20.92 3:22.03 4:21.24 "	pcondor
953	10 Feb 08:00 Operation resume	ISR		2016_02_1 ISCOD Gravity Waves	General	P.Condor	new	2016-02-10T08:00:13-05:00	2016-02-10T08:00:13-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
955	10 Feb 17:32 Imaging On	ISR		2016_02_1 ISCOD Gravity Waves	General		new	2016-02-10T18:45:34-05:00	2016-02-10T18:45:34-05:00	Imaging Started	ryanque
899	05 Feb 19:40 VIPER (Ionosonde) and Digisonde (and synchronization)	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Other Instruments		new	2016-02-05T18:58:55-05:00	2016-02-10T18:41:43-05:00	"VIPER configuration
- ionograms every 5 minutes (3, 8, 13, 18, ...), so it won't interfere with digisonde pulses.
- IPP = 3000km (ISR + Imaging is synchronized with PPS)

Digisonde
-ionogram every 5 min (0,5,10,15,...)
- its tx pulse is seen at the top of the 1000km of the ISR + Imaging experiment.

*ISR+Imaging
- syncrhonized with PPS, then must restart Digisonde clock (10MHz) to put its tx pulse as close as the PPS (shown on osciloscope). Right now it is ok, but in case of a blackout this needs to be done."	kkuyeng
930	07 Feb 23:59 Plots	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Plot	I. Manay	new	2016-02-08T02:34:18-05:00	2016-02-08T02:34:18-05:00		imanay
940	08 Feb 20:02 Figures	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Plot	fmontenegro	new	2016-02-08T20:07:56-05:00	2016-02-10T18:31:40-05:00	Figures of RTIs and Spectra	fmontenegro
942	08 Feb 23:59 Figures	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Plot	dlume	new	2016-02-09T06:57:20-05:00	2016-02-10T18:39:05-05:00		dlume
903	06 Feb 00:45 Figures	ISR		2016_02_1 ISCOD Gravity Waves	Process/Analysis Program	P.Condor	new	2016-02-06T00:47:55-05:00	2016-02-06T00:47:55-05:00	Figures of rti and spectras.	pcondor
908	06 Feb 07:50 Figures	ISR		2016_02_1 ISCOD Gravity Waves	Process/Analysis Program	P.Condor	new	2016-02-06T07:59:36-05:00	2016-02-06T07:59:36-05:00	Figures rtis and spectras	pcondor
918	06 Feb 23:59 Figures	ISR		2016_02_1 ISCOD Gravity Waves	Process/Analysis Program	AVALDEZ	new	2016-02-07T07:13:52-05:00	2016-02-07T07:16:01-05:00	Plots	avaldez
928	07 Feb 19:50  Figures	ISR		2016_02_1 ISCOD Gravity Waves	Process/Analysis Program	P.Condor	new	2016-02-07T19:53:03-05:00	2016-02-07T19:53:03-05:00	Figures of rti and spectras	pcondor
936	08 Feb 11:09 Figures	ISR		2016_02_1 ISCOD Gravity Waves	Process/Analysis Program	fmontenegro	new	2016-02-08T11:14:22-05:00	2016-02-08T11:14:22-05:00	Figures RTIs and Spectra	fmontenegro
947	10 Feb 00:20 Figures	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Process/Analysis Program	P.Condor	new	2016-02-10T00:26:25-05:00	2016-02-10T00:26:25-05:00	Figures of rtis and spectras	pcondor
952	10 Feb 07:50 Figures	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Process/Analysis Program	P.Condor	new	2016-02-10T07:55:34-05:00	2016-02-10T07:55:34-05:00	Figures rtis and spectras.	pcondor
910	06 Feb 11:40 Interchang pre-amplifier	ISR		2016_02_1 ISCOD Gravity Waves	Reception		new	2016-02-06T19:33:31-05:00	2016-02-06T19:33:31-05:00	"Interchange Pre-amplifier A with B
Noise 
Ch A 22.8
Ch B 23.66
Ch C 23.83
Ch D 23.19"	ryanque
911	06 Feb 17:40 Imaging Starts	ISR		2016_02_1 ISCOD Gravity Waves	Reception		new	2016-02-06T19:36:17-05:00	2016-02-06T19:36:17-05:00	"Imaging Starts
ChA 21.83
ChB 22.02
ChC 21.98
ChD 21.48
Imaging
Ch0 17.51       Ch4 20.00
Ch1 16.56       Ch5 17.55
Ch2 16.16       Ch6 19.00
Ch3 17.00       Ch7 19.55
"	ryanque
912	06 Feb 14:40 Noise Measurements	ISR		2016_02_1 ISCOD Gravity Waves	Reception		new	2016-02-06T19:39:36-05:00	2016-02-06T19:39:36-05:00	"09:10 
ChA  25.67     ChC  27.65
ChB  27.41     ChD  27.37
11:10
ChA  22.11     ChC  23.77
ChB  23.25     ChD  23.29
14:40
ChA  22.06     ChC  22.49
ChB  22.39     ChD  22.14"	ryanque
956	10 Feb 17:40 Noise Levels	ISR		2016_02_1 ISCOD Gravity Waves	Reception		new	2016-02-10T18:50:55-05:00	2016-02-10T18:50:55-05:00	"08:50
ChA  26.4             ChB   26.8
ChC  26.23            ChD   26.75
11:53
ChA  22.74            ChB   22.34
ChC  22.61            ChD   22.42
14:50
ChA  22.40            ChB   22.43
ChC  22.84            ChD   22.15
17:40
ChA  21.91            ChB   22.84
ChC  22.43            ChD   22.15
Imagenes
Ch0  17.14    Ch1  17.77   Ch2  17.79
Ch3  18.31    Ch4  20.28   Ch5  17.32
Ch6  19.13    Ch7  19.45"	ryanque
901	05 Feb 2016 - Spark Gaps summary	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Spark Gaps		new	2016-02-05T19:48:59-05:00	2016-02-05T19:48:59-05:00	"07:59 Ajuste de ATrs
10:32 Ajuste de ATrs
12:47 Ajuste de ATrs
15:28 Ajuste de ATrs
17:35 Ajuste de ATrs
19:46 Ajuste de ATrs"	kkuyeng
906	06 Feb 06:25 Spark Gaps adjustment	ISR		2016_02_1 ISCOD Gravity Waves	Spark Gaps	A. Huamani	new	2016-02-06T06:58:18-05:00	2016-02-06T06:58:18-05:00	"05-02-2016
22:20 Spark Gaps adjustment
06-02-2016
00:40 Spark Gaps adjustment
02:40 Spark Gaps adjustment
04:35 Spark Gaps adjustment
06:25 Spark Gaps adjustment"	pcondor
919	07 Feb 07:20 Spark-gaps summary	ISR		2016_02_1 ISCOD Gravity Waves	Spark Gaps	AVALDEZ	new	2016-02-07T07:17:50-05:00	2016-02-07T07:17:50-05:00	"20:36 Spark Gap Adjustment
22:35 Spark Gap Adjustment
00:40 Spark Gap Adjustment
02:40 Spark Gap Adjustment
04:40 Spark Gap Adjustment
06:30 Spark Gap Adjustment"	avaldez
927	07 Feb 19:05 Spark gaps adjustment	ISR		2016_02_1 ISCOD Gravity Waves	Spark Gaps	J. Lavado	new	2016-02-07T19:30:10-05:00	2016-02-07T19:30:10-05:00	"08:30 Spark gaps adjustment
11:07 Spark gaps adjustment
13:44 Spark gaps adjustment
16:45 Spark gaps adjustment
19:05 Spark gaps adjustment"	pcondor
933	08 Feb 07:40 Spark-gaps summary	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Spark Gaps	W. Rojas	new	2016-02-08T07:49:41-05:00	2016-02-08T07:55:42-05:00	"ATR's adjustment:
1) 07 Feb 21:30 spark gaps adjustment.
2) 08 Feb 00:18 spark gaps adjustment.
3) 08 Feb 02:31 spark gaps adjustment.
4) 08 Feb 05:16 spark gaps adjustment.
5) 08 Feb 07:51 spark gaps adjustment."	imanay
939	08 Feb 19:55 Spark gaps adjustment	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Spark Gaps	fmontenegro	new	2016-02-08T20:05:24-05:00	2016-02-08T20:05:24-05:00	"11:00 Spark gaps adjustment
13:40 Spark gaps adjustment
15:30 Spark gaps adjustment
17:45 Spark gaps adjustment
19:30 Spark gaps adjustment
"	fmontenegro
943	09 Feb 07:11 Spark gaps summary	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Spark Gaps	dlume	new	2016-02-09T07:17:54-05:00	2016-02-09T07:17:54-05:00	"ATR's adjustment:
1) 08 Feb 22:10 spark gaps adjustment.
2) 09 Feb 01:08 spark gaps adjustment.
3) 09 Feb 04:11 spark gaps adjustment.
4) 09 Feb 06:51 spark gaps adjustment.
"	dlume
951	10 Feb 05:50 Spark gaps adjustment	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Spark Gaps	A. Coronado	new	2016-02-10T07:29:31-05:00	2016-02-10T07:29:31-05:00	"09-2-2016
21:03 Spark gaps adjustment
10-2-2016
00:05 Spark gaps adjustment
03:04 Spark gaps adjustment
05:50 Spark gaps adjustment"	pcondor
954	10 Feb 17:30 Spark Gap Adjustments	ISR		2016_02_1 ISCOD Gravity Waves	Spark Gaps		new	2016-02-10T18:44:21-05:00	2016-02-10T18:44:21-05:00	"09:05 Spark Gap Adjustment
11:52 Spark Gap Adjustment
14:45 Spark Gap Adjustment
17:30 Spark Gap Adjustment"	ryanque
894	04 Feb 10:50 Log Created	ISR		2016_02_1 ISCOD Gravity Waves	Start experiment		new	2016-02-04T10:55:37-05:00	2016-02-04T10:55:37-05:00	"Campaign 
ISCOD Gravity Waves
From: 05 Feb 07:30
To:   10 Feb 08:00
Total Days: 06"	ryanque
896	05 Feb 07.36 Start Experiment	ISR		2016_02_1 ISCOD Gravity Waves	Start experiment		new	2016-02-05T18:37:33-05:00	2016-02-06T19:31:19-05:00	07:36 Inicio de experimento ISR (EWDrift) + Imaging	kkuyeng
897	05 Feb 18:00 Imaging experiment	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Start experiment		new	2016-02-05T18:43:24-05:00	2016-02-10T18:41:07-05:00	18:00 Start imaging experiment	kkuyeng
900	05 Feb 19:30 Transmitter Power Measurement	ISR		2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-05T19:40:35-05:00	2016-02-05T19:40:35-05:00	"transmission start
07:15 LV ON
07:20 HV ON
07:30 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.8 dBm
Line voltage and power: 4000 VAC, 350 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.8 dBm
Line voltage and power: 4000 VAC, 350 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.6 dBm
Line voltage and power: 4000 VAC, 350 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 +6.7 dBm
Line voltage and power: 4000 VAC, 350 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Line voltage and power: 4010 VAC, 360 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Line voltage and power: 4010 VAC, 360 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Line voltage and power: 4010 VAC, 360 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Line voltage and power: 4010 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Line voltage and power: 4010 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Line voltage and power: 4010 VAC, 360 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -7.5 dBm
Line voltage and power: 4000 VAC, 350 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
Dr2 -6.6 dBm
Line voltage and power: 4050 VAC, 350 KW



















"	rtadeo
902	05 Feb 23:05 Transmitter Power Measurement	ISR	JRO Staff	2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-05T23:07:23-05:00	2016-02-05T23:07:23-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2  -5.5 dBm
Line voltage and power: 4060 VAC, 360 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2  -5.5 dBm
Line voltage and power: 4060 VAC, 360 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.8 dBm
D2  -7.5 dBm
Line voltage and power: 4060 VAC, 360 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.8 dBm
D2  -7.5 dBm
Line voltage and power: 4060 VAC, 360 KW"	vquesada
907	06 Feb 07:00 Transmitter Power Measurement	ISR	JRO Staff	2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-06T07:03:59-05:00	2016-02-06T07:03:59-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -7.4 dBm
Line voltage and power: 4050 VAC, 360 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -7.4 dBm
Line voltage and power: 4040 VAC, 360 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -7.4 dBm
Line voltage and power: 4040 VAC, 360 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -7.4 dBm
Line voltage and power: 4040 VAC, 360 KW
03:04 Imaging  Driver 2 OFF
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4040 VAC, 360 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2 -7.4 dBmLine voltage and power: 4040 VAC, 360 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
Line voltage and power: 4050 VAC, 360 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
Line voltage and power: 4050 VAC, 360 KW"	vquesada
914	06 Feb 19:30 Transmitter power measurements	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-06T19:47:02-05:00	2016-02-06T19:47:02-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.7 dBm
Line voltage and power: 4010 VAC, 360 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4000 VAC, 360 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 3970 VAC, 360 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4030 VAC, 360 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4010 VAC, 360 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4010 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4000 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 3950 VAC, 360 KW
17:48 D2 ON -6.4dBm
18:00 CROWBAR Failure at the 20KV power supply
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.4 dBm
Line voltage and power: 4000 VAC, 360 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.4 dBm
Line voltage and power: 4070 VAC, 350 KW-
"	ryaya
916	06 Feb 23:00 Transmitter Power Measurements	ISR	JRO Staff	2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-06T23:03:05-05:00	2016-02-06T23:03:05-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2  -6.5
Line Voltage and Power: 4080 VAC, 360 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2  -6.5
Line Voltage and Power: 4080 VAC, 360 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2  -6.5
Line Voltage and Power: 4050 VAC, 360 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
D2  -6.5
Line Voltage and Power: 4050 VAC, 360 KW"	vquesada
917	07 Feb 07:00 Transmitter Power Measurements	ISR	JRO Staff	2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-07T07:05:36-05:00	2016-02-07T07:05:36-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
D2 -6.5
Line Voltage and Power: 4080 VAC, 360 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
D2 -6.5
Line Voltage and Power: 4080 VAC, 360 KW
01:25 Imaging Driver 2 OFF
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
Line Voltage and Power: 4080 VAC, 360 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
Line Voltage and Power: 4080 VAC, 360 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW



"	vquesada
922	07 Feb 12:03 Tx  Off	ISR		2016_02_1 ISCOD Gravity Waves	Transmitters	P.Condor	new	2016-02-07T19:01:06-05:00	2016-02-07T19:01:06-05:00	Transmitter had a problem	pcondor
923	07 Feb 12:15 Tx On	ISR		2016_02_1 ISCOD Gravity Waves	Transmitters	P.Condor	new	2016-02-07T19:03:13-05:00	2016-02-07T19:03:13-05:00	Transmitter is working	pcondor
925	07 Feb 19:15 Transmitter power measurements	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-07T19:20:57-05:00	2016-02-07T19:20:57-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4080 VAC, 360 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4090 VAC, 360 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4020 VAC, 360 KW
11:58 Problem at Driver 1 and 2 10KV Plate power supply, fuse is replaced.
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4020 VAC, 360 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4050 VAC, 360 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4080 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line voltage and power: 4040 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.7 dBm
Line voltage and power: 4040 VAC, 360 KW
17:45 D2 ON -6.4dBm
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Dr2 -6.4 dBm
Line voltage and power: 4040 VAC, 360 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Dr2 -6.3 dBm
Line voltage and power: 4080 VAC, 360 KW"	ryaya
931	08 Feb 07:10 Transmitter power measurements	ISR		2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-08T07:20:38-05:00	2016-02-08T07:20:38-05:00	"07/02/2016
20:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.3 dBm
Line voltage and power: 4000 VAC, 360 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.3 dBm
Line voltage and power: 4000 VAC, 360 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.3 dBm
Line voltage and power: 4000 VAC, 360 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +7.0 dBm
Dr2 -6.3 dBm
Line voltage and power: 4050 VAC, 360 KW
08/02/2016
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +7.0 dBm
Dr2 -6.3 dBm
Line voltage and power: 4050 VAC, 360 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Dr2 -6.3 dBm
Line voltage and power: 4050 VAC, 360 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Dr2 -6.3 dBm
Line voltage and power: 4050 VAC, 360 KW
02:20 imaging OFF
02:55 Imaging ON  -6.5 dBm
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +7.0 dBm
Dr2 -6.5 dBm
Line voltage and power: 4090 VAC, 360 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +7.0 dBm
Dr2 -6.5 dBm
Line voltage and power: 4090 VAC, 360 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +7.0 dBm
Dr2 -6.5 dBm
Line voltage and power: 4090 VAC, 360 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +7.0 dBm
Dr2 -6.5 dBm
Line voltage and power: 4090 VAC, 360 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +7.0 dBm
Dr2 -6.5 dBm
Line voltage and power: 4090 VAC, 360 KW
07:13 Imaging OFF
"	rtadeo
935	08 Feb 10:50 Transmitter On	ISR		2016_02_1 ISCOD Gravity Waves	Transmitters	fmontenegro	new	2016-02-08T11:03:18-05:00	2016-02-08T11:03:18-05:00	Transmitter On. All ok there is not noise	fmontenegro
937	08 Feb 19:10 Transmitter Power Measurements	ISR	JRO Staff	2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-08T19:13:34-05:00	2016-02-08T19:13:34-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Line Voltage and Power: 4080 VAC, 360 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Line Voltage and Power: 4080 VAC, 360 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +7.0 dBm
Line Voltage and Power: 4080 VAC, 360 KW
10:08 RF and HV OFF
Ammeter HV TX4 Failure 
10:50 HV and RF ON
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.0¿8 dBm
Line Voltage and Power: 4020 VAC, 360 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx4 +7.0 dBm
Line Voltage and Power: 4090 VAC, 360 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4080 VAC, 360 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4070 VAC, 360 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +7.0 dBm
Line Voltage and Power: 4020 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
Line Voltage and Power: 4020 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.7 dBm
Line Voltage and Power: 4020 VAC, 360 KW
17:34 Imaging D2 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx4 +7.0 dBm
D2 -6.5 dBm
Line Voltage and Power: 4080 VAC, 370 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx4 +7.0 dBm
D2 -6.5 dBm
Line Voltage and Power: 4080 VAC, 370 KW



"	vquesada
944	09 Feb 07:30 Transmitter Power Measurements	ISR		2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-09T07:22:37-05:00	2016-02-09T07:22:37-05:00	"
20:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx4 +7.0 dBm
Dr2 -6.6 dBm
Line Voltage and Power: 4060 VAC, 360 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +7.0 dBm
Dr2 -6.6 dBm
Line Voltage and Power: 4000 VAC, 360 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +7.0 dBm
Dr2 -6.5 dBm
Line Voltage and Power: 4000 VAC, 360 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx4 +7.0 dBm
Dr2 -6.5 dBm
Line Voltage and Power: 4050 VAC, 360 KW
09/02/2016
00:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx4 +7.0 dBm
Dr2 -6.5 dBm
Line Voltage and Power: 4050 VAC, 360 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx4 +7.0 dBm
Dr2 -6.5 dBm
Line Voltage and Power: 4050 VAC, 360 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Tx4 +7.0 dBm
Dr2 -6.5 dBm
Line Voltage and Power: 4050 VAC, 360 KW
02:00 Imaging OFF
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
"	rtadeo
946	09 Feb 19:00 Transmitter Power Measurements	ISR	JRO Staff	2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-09T19:05:58-05:00	2016-02-09T19:05:58-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
Line Voltage and Power: 4050 VAC, 360 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
Line Voltage and Power: 4050 VAC, 360 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
10:08 RF and HV OFF
Ammeter HV TX4 Failure 
10:50 HV and RF ON
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx4 +6.9 dBm
Line Voltage and Power: 4050 VAC, 360 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.9 dBm
Line Voltage and Power: 4050 VAC, 360 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +7.0 dBm
Line Voltage and Power: 4050 VAC, 360 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +7.0 dBm
Line Voltage and Power: 4050 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +7.0 dBm
Line Voltage and Power: 4050 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +6.9 dBm
Line Voltage and Power: 4050 VAC, 360 KW
17:30 Imaging D2 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +7.0 dBm
D2 -6.3 dBm
Line Voltage and Power: 4050 VAC, 370 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Tx4 +7.0 dBm
D2 -6.3 dBm
Line Voltage and Power: 4050 VAC, 370 KW"	vquesada
949	10 Feb 07:20 Transmitter power measurements	ISR+Imaging		2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-10T07:16:15-05:00	2016-02-10T07:16:15-05:00	"09/02/2016
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.1 dBm
Line Voltage and Power: 4090 VAC, 370 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.1 dBm
Line Voltage and Power: 4050 VAC, 360 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.1 dBm
Line Voltage and Power: 4100 VAC, 370 KW
10/02/2016
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.0 dBm
Line Voltage and Power: 4080 VAC, 360 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Dr2 -6.0 dBm
Line Voltage and Power: 4030 VAC, 360 KW
01:07 D2 OFF
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4020 VAC, 360 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4030 VAC, 360 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4000 VAC, 360 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4000 VAC, 360 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4040 VAC, 360 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.7 dBm
Line Voltage and Power: 4080 VAC, 360 KW"	ryaya
957	10 Feb 19:00 Transmitter power measurements	ISR		2016_02_1 ISCOD Gravity Waves	Transmitters		new	2016-02-10T19:41:02-05:00	2016-02-10T19:41:02-05:00	"
10/02/2016
08:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 350 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line Voltage and Power: 4000 VAC, 350 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Tx4 +6.7 dBm
Line Voltage and Power: 4000 VAC, 350 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4080 VAC, 360 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4080 VAC, 360 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4080 VAC, 360 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4080 VAC, 360 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 350 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4050 VAC, 350 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.8 dBm
Line Voltage and Power: 4090 VAC, 350 KW
17:32 Imaging ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line Voltage and Power: 4100 VAC, 350 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.8 dBm
Dr2 -6.5 dBm
Line Voltage and Power: 4100 VAC, 360 KW
19:35 TX OFF





"	rtadeo
960	15 Feb 12:00 Antenna VSWR	ISR		2016_02_2 Tests Dave Hysell	Antennas		new	2016-02-16T12:12:05-05:00	2016-02-16T12:12:05-05:00	"WUp 1.05
WDn 1.11
NDn 1.09
NUp 1.01
EUp 1.05
EDn 1.01
SDn 1.04
SUp 1.03"	ryanque
961	16 Feb 10:30 Antenna VSWR	ISR		2016_02_2 Tests Dave Hysell	Antennas		new	2016-02-16T12:16:00-05:00	2016-02-16T12:16:00-05:00	"WUp 1.02
WDn 1.06
NDn 1.05
NUp 1.13
EUp 1.04
EDn 1.03
SDn 1.05
SUp 1.07"	ryanque
959	15 Feb 10:00 Test starts	ISR		2016_02_2 Tests Dave Hysell	Start experiment		new	2016-02-16T10:35:09-05:00	2016-02-16T10:35:09-05:00	"15 Feb
Long Pulse Faraday
3 different long pulses 1ms, 2ms and 4 ms
Antena On-Axis

16 Feb
Bryounce
Altenating Code
Antena 6 Degree (1960)

17 Feb
Magnetopause"	ryanque
968	14 Mar 18:30 ew_drift and Imaging experiments started	ISR+Imaging		2016_03 ISCOD Meridian Circle	Acquisition system	I. Manay	new	2016-03-14T19:26:19-05:00	2016-03-14T19:26:19-05:00	System was run with the configuration of february due to interferences between ew_drift and imaging systems. New configuration have to be improved.	imanay
970	14 Mar 19:51 Re-start of ew_drift experiment	ISR+Imaging		2016_03 ISCOD Meridian Circle	Acquisition system	I. Manay	new	2016-03-14T20:10:18-05:00	2016-03-14T20:10:18-05:00	Ew_drift experiment was restarted due to hung up of Ares PC.	imanay
982	15 Mar 14:28 Acquisition stopped	ISR		2016_03 ISCOD Meridian Circle	Acquisition system		new	2016-03-15T19:45:09-05:00	2016-03-15T19:45:09-05:00	"The acquisition stopped due to the PC stopped.
It was restarted at 14:42"	ryanque
983	15 Mar 16:19 Acquisition stopped	ISR		2016_03 ISCOD Meridian Circle	Acquisition system		new	2016-03-15T19:46:35-05:00	2016-03-15T19:46:35-05:00	"Acquisition stopped due to PC stopped.
It restarted at 16:51"	ryanque
995	16 Mar 01:36 Imaging off	ISR		2016_03 ISCOD Meridian Circle	Acquisition system	P.Condor	new	2016-03-16T07:12:10-05:00	2016-03-16T07:12:10-05:00	Imaging off.	pcondor
1001	16 Mar 17:35 Imaging Starts	ISR		2016_03 ISCOD Meridian Circle	Acquisition system	fmontenegro	new	2016-03-16T17:55:06-05:00	2016-03-16T17:55:06-05:00		fmontenegro
967	14 Mar 11:30 Antenna VSWR	ISR		2016_03 ISCOD Meridian Circle	Antennas		new	2016-03-14T11:45:12-05:00	2016-03-14T11:45:12-05:00	"Antenna VSWR
WUp 1.07
WDn 1.08
EUp 1.05
EDn 1.07
Hysell       1.11
Mattress Far 1.07

Not used
NDn 1.01
NUp 1.14
SDn 1.08
SUp 1.05"	ryanque
986	15 Mar 17:52 Experiment stopped	ISR		2016_03 ISCOD Meridian Circle	Break Experiment		new	2016-03-15T19:50:53-05:00	2016-03-15T19:50:53-05:00	"The experiment was stopped to repair the Channel B of Imaging.
The TR of Channel B of Imaging is not working, it has been replaced with a Backup.
18:30 Experiment on"	ryanque
971	14 Mar 19:59 Operation Resume	ISR+Imaging		2016_03 ISCOD Meridian Circle	General	I. Manay	new	2016-03-14T20:14:33-05:00	2016-03-14T20:14:33-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 18:30 - 20:00 
2) Operation Hours: 1h 30 minutes
3) Operation incomplete: 18 minutes
4) Reasons:
-Re-start of Ares PC.
-Field amplifier change."	imanay
979	15 Mar  07:59 OPERATION RESUME	ISR+Imaging		2016_03 ISCOD Meridian Circle	General	AVALDEZ	new	2016-03-15T08:17:28-05:00	2016-03-15T09:14:19-05:00	"Person in Charge: A. Valdez.
Experiment: EW_drifts+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 2 hours
4) Reasons:
*********************
14 March Tx failure
*********************
21:08-21:16 8min  
21:37-21:39 2min
22:56-23:39 45min
Total: 55 min 
*********************
15 March Tx failure
*********************
00:27-01:14 47 min
01:15-01:22  7 min
01:57-02:05  8 min
Total: 1 hour 2 min
********************
Imaging
********************
02:34 Turn off 
03:55 Turn on  
07:30 Turn off

"	avaldez
985	15 Mar 17:36 Imaging on	ISR		2016_03 ISCOD Meridian Circle	General		new	2016-03-15T19:48:03-05:00	2016-03-15T19:48:03-05:00	Imaging started with Channel B with lower noise 7 dB, less than the other channels.	ryanque
988	15 Mar 19:00 Noise Levels	ISR		2016_03 ISCOD Meridian Circle	General		new	2016-03-15T19:59:13-05:00	2016-03-15T19:59:13-05:00	"13:00 ChA 21.30    ChB  21.97
      ChC 22.83    ChD  22.44
16:29 ChA 21.74    ChB  20.98
      ChC 21.78    ChD  21.50
19:00 ChA 23.07    ChB  22.16
      ChC 23.17    ChD  22.94
Imaging  ChA  20.08   ChD  20.64    ChG  20.67
         ChB  20.17   ChE  22.07    ChH  22.42
         ChC  21.20   ChF  21.03"	ryanque
990	15 Mar 19:55 Operation Resume	ISR		2016_03 ISCOD Meridian Circle	General		new	2016-03-15T20:07:01-05:00	2016-03-15T20:07:01-05:00	"Person in Charge: R. Yanque
Experiment: EW_drifts+Imaging
1) 08:00 - 20:00
2) Operation Hours: 10:20h 
3) Operation incomplete: 01:40 hour
4) Reasons:
*
Tx failure
11:42-11:58 16min
Reset Acquisition System
14:28-14:42 14min
16:19-16:51 32min
Repair Channel B Imaging
17:52-18:30 38min
Total: 55 min "	ryanque
997	16 Mar 06:08 Noise levels	ISR		2016_03 ISCOD Meridian Circle	General	P.Condor	new	2016-03-16T07:36:25-05:00	2016-03-16T07:36:25-05:00	"15-03-2016
21:05
EW-DRIFTS
A:22.49 B:21.10 C:22.22 D:21.79 
IMAGING
1:19.13 2:19.35 3:20.12 4:19.81 5:20.93 6:20.32 7:19.79 8:21.63 
16-03-2016
00:12
EW-DRIFTS
A:22.45 B:21.21 C:22.51 D:22.03 
IMAGING
1:19.48 2:19.49 3:20.52 4:19.40 5:21.38 6:20.30 7:20.18 8:21.70
03:09
EW-DRIFTS
A:23.32 B:22.20 C:23.37 D:22.88
06:08
EW-DRIFTS
A:26.14 B:25.39 C:26.73 D:26.43 
 

 
"	pcondor
999	16 Mar 08:00 Operation resume	ISR		2016_03 ISCOD Meridian Circle	General	P.Condor	new	2016-03-16T08:05:38-05:00	2016-03-16T08:05:38-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Imaging
1) 20:00 - 08:00
2) Operation Hours: 11h 46 min
3) Operation incomplete: 14 min
4) Reasons:
 _ Problem with transmitter"	pcondor
1004	16 Mar 19:36 Noise levels	ISR+Imaging		2016_03 ISCOD Meridian Circle	General	fmontenegro	new	2016-03-16T19:49:54-05:00	2016-03-16T19:49:54-05:00	"16-03-2016
09:11
EW-DRIFTS
A:23.47 B:22.38 C:23.75 D:23.35 
12:18
EW-DRIFTS
A:22.60 B:21.56 C:22.78 D:22.46 
15:08
EW-DRIFTS
A:22.36 B:21.03 C:22.31 D:21.93
18:08
EW-DRIFTS
A:22.62 B:21.34 C:22.76 D:22.62
IMAGING
1:19.20 2:19.01 3:20.12 4:19.80 5:21.19 6:20.15 7:19.92 8:21.68
"	fmontenegro
1006	16 Mar 19:52 Operation Resume	ISR		2016_03 ISCOD Meridian Circle	General	fmontenegro	new	2016-03-16T20:06:52-05:00	2016-03-16T20:06:52-05:00	"Person in Charge: F. Montenegro.
Experiment: EW_drifts+Imaging
1) 08:00 - 20:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	fmontenegro
1012	17 Mar 19:59 Operation Resume	ISR+Imaging		2016_03 ISCOD Meridian Circle	General		new	2016-03-17T19:53:06-05:00	2016-03-17T19:53:06-05:00	"08:00 - A weird echo appears between 4:00 and 5:00 descending from 800Kms to 600kms
12:10 - The acquisition PC hanged, everything was started normally after ten minutes
17:05 - The acquisition PC hanged, everything was started normally after ten minutes"	jverastegui
1018	18 Mar 07:59 Operation Resume	ISR+Imaging		2016_03 ISCOD Meridian Circle	General	AValdez	new	2016-03-18T08:03:12-05:00	2016-03-18T08:03:12-05:00	"Person in Charge: A. VALDEZ.
Experiment: EW_drifts+Imaging
1) 20:00 - 08:00
2) Operation Hours: 11h 30 min
3) Operation incomplete: 30 min
4) Reasons:
17 MARCH
20:26 PM Reset Acquisition System
20:41 PM Reset Acquisition System
23:54 PM Reset Acquisition System
18 MARCH
03: 00 AM Reset Acquisition System
04: 51 AM Reset Acquisition System
"	avaldez
989	15 Mar 19:25 Spread F Starts	ISR		2016_03 ISCOD Meridian Circle	Physical Phenomena		new	2016-03-15T20:00:08-05:00	2016-03-15T20:00:08-05:00		ryanque
1007	16 Mar 23:59 Plots	ISR+Imaging		2016_03 ISCOD Meridian Circle	Plot	abelleza	assigned	2016-03-17T00:57:43-05:00	2016-03-17T01:05:11-05:00	16 Mar 23:59 Plots	abelleza
1015	17 Mar 23:59 FIGURES	ISR+Imaging		2016_03 ISCOD Meridian Circle	Plot		new	2016-03-18T06:26:51-05:00	2016-03-18T06:26:51-05:00		avaldez
976	14 Mar 23:59 FIgures	ISR+Imaging		2016_03 ISCOD Meridian Circle	Process/Analysis Program	AVALDEZ	new	2016-03-15T08:01:11-05:00	2016-03-15T09:02:23-05:00		avaldez
991	16 Mar 00:10 Figures	ISR		2016_03 ISCOD Meridian Circle	Process/Analysis Program	P.Condor	new	2016-03-16T00:28:21-05:00	2016-03-16T00:28:21-05:00	Figures of rtis and spectras.	pcondor
998	16 Mar 07:55 Figures	ISR		2016_03 ISCOD Meridian Circle	Process/Analysis Program	P.Condor	new	2016-03-16T07:53:16-05:00	2016-03-16T07:53:16-05:00	Figures of rtis and spectras.	pcondor
1005	16 Mar 19:38 Figures	ISR+Imaging		2016_03 ISCOD Meridian Circle	Process/Analysis Program	fmontenegro	new	2016-03-16T19:53:02-05:00	2016-03-16T20:08:07-05:00	Figures of rtis and spectras.	fmontenegro
969	14 Mar 19:00 Experiments were re-established	ISR+Imaging		2016_03 ISCOD Meridian Circle	Reception	I. Manay	new	2016-03-14T19:35:42-05:00	2016-03-14T19:35:42-05:00	The B field amplifier of the Imaging experiment was changed due to fall of its noise level. Experiment was interrupted for 15 minutes: 18:45 to 19:00.	imanay
977	15 Mar 07:50 SPARK GAPS ADJUSTMENT	ISR+Imaging		2016_03 ISCOD Meridian Circle	Spark Gaps	AVALDEZ	new	2016-03-15T08:04:58-05:00	2016-03-15T09:06:48-05:00	"14-03-2016
21:00 Spark gaps adjustment

15-03-2016
00:10 Spark gaps adjustment
03:34 Spark gaps adjustment
05:58 Spark gaps adjustment"	avaldez
987	15 Mar 17:35 Spark Gap Adjustments	ISR		2016_03 ISCOD Meridian Circle	Spark Gaps		new	2016-03-15T19:53:47-05:00	2016-03-15T19:53:47-05:00	"08:42 Spark Gap Adjustment
10:42 Spark Gap Adjustment
12:00 Spark Gap Adjustment
14:47 Spark Gap Adjustment
17:35 Spark Gap Adjustment"	ryanque
994	16 Mar 06:32 Spark gaps adjustment	ISR		2016_03 ISCOD Meridian Circle	Spark Gaps	A. Coronado	new	2016-03-16T07:10:19-05:00	2016-03-16T07:10:19-05:00	"15 -03-2016
20:20 Spark gaps adjustment
22:57 Spark gaps adjustment
16-03-2016
01:33 Spark gaps adjustment
04:03 Spark gaps adjustment
06:32 Spark gaps adjustment"	pcondor
1003	16 Mar 19:32 Spark gaps adjustment	ISR		2016_03 ISCOD Meridian Circle	Spark Gaps	fmontenegro	new	2016-03-16T19:47:00-05:00	2016-03-16T19:47:00-05:00	"16-03-2016
09:15 Spark gaps adjustment
11:38 Spark gaps adjustment
13:40 Spark gaps adjustment
15:40 Spark gaps adjustment
17:40 Spark gaps adjustment
19:25 Spark gaps adjustment"	fmontenegro
1008	17 Mar 01:47 upto 02:05 Spark Gaps Change	ISR		2016_03 ISCOD Meridian Circle	Spark Gaps	abelleza	new	2016-03-17T02:23:55-05:00	2016-03-17T02:26:45-05:00	"17 Mar 01:47 Spark Gaps Change (Spent device at ATR4) TX OFF

17 Mar 02:05 Spark Gaps OK TX ON

By Tec. Walter Rojas"	abelleza
1010	16 Mar 07:48 Spark gaps adjustment	ISR		2016_03 ISCOD Meridian Circle	Spark Gaps	abelleza	new	2016-03-17T07:53:03-05:00	2016-03-17T08:03:47-05:00	"16-03-2016
21:45 Spark gaps adjustment
23:50 Spark gaps adjustment
17-03-2016
01:47 Spark gaps Change ATR4 -upto 05:05
04:05 Spark gaps adjustment
05:52 Spark gaps adjustment

by Tec. Walter Rojas"	abelleza
1013	17 Mar 07:50 SPARK GAPS ADJUSTMENT	ISR+Imaging		2016_03 ISCOD Meridian Circle	Spark Gaps		new	2016-03-17T19:55:06-05:00	2016-03-17T19:55:06-05:00	"11:05 Spark gaps adjustment
14:48 Spark gaps adjustment
17:35 Spark gaps adjustment"	jverastegui
1017	18 Mar 07:48 Spark gaps adjustment	ISR		2016_03 ISCOD Meridian Circle	Spark Gaps	AValdez	new	2016-03-18T07:31:41-05:00	2016-03-18T07:31:41-05:00	"17-03-2016
20:26 Spark gaps adjustment
23:25 Spark gaps adjustment
18-03-2016
02:40 Spark gaps adjustment
04:30 Spark gaps adjustment
07:15 Spark gaps adjustment

by Tec. Americo Huamani"	avaldez
966	14 Mar 10:00 ISCOD Log Created	ISR		2016_03 ISCOD Meridian Circle	Start experiment		new	2016-03-14T10:13:33-05:00	2016-03-14T10:13:33-05:00	"ISCOD MEridian Circle
EW Drift - Imaging
L. User: Percy Condor
Start: ASAP  14 March 2016
End:   20:00 19 March 2016"	ryanque
972	15 Mar 00:05 Transmitter Power Measurements	ISR	JRO Staff	2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-15T00:18:52-05:00	2016-03-15T00:18:52-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.6 dBm
D3 - 6.9 dBm
Line voltage and power: 4080 VAC, 370 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.6 dBm
D3 - 6.9 dBm
Line voltage and power: 4080 VAC, 370 KW
21:10 Bias Power Failure Tx4
21:36 Screen Power Failure TX1
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.6 dBm
D3 - 6.9 dBm
Line voltage and power: 4080 VAC, 370 KW
22:25 Rectifier diodes fails source screen TX 4
23:45 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.6 dBm
D3 - 6.8 dBm
Line voltage and power: 4080 VAC, 370 KW"	vquesada
973	15 Mar 07:00 Transmitter Power Measurements	ISR		2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-15T07:13:11-05:00	2016-03-15T07:13:11-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.6 dBm
D3 - 6.8 dBm
Line voltage and power: 4070 VAC, 370 KW
00:12 Crowbar
00:28 shorting sparkgap Screen Power TX1
01:10 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.6 dBm
D3 - 6.9 dBm
Line voltage and power: 4080 VAC, 370 KW
01:55 Crowbar.
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
D3 - 6.8 dBm
Line voltage and power: 4080 VAC, 370 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
D3 - 6.8 dBm
Line voltage and power: 4080 VAC, 370 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
D3 - 6.8 dBm
Line voltage and power: 4080 VAC, 370 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
D3 - 6.8 dBm
Line voltage and power: 4080 VAC, 370 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
D3 - 6.7 dBm
Line voltage and power: 4080 VAC, 370 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
D3 - 6.7 dBm
Line voltage and power: 4080 VAC, 370 KW





"	vquesada
980	15 Mar 11:42 Transmitter Failure	ISR		2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-15T19:41:43-05:00	2016-03-15T19:41:43-05:00	The transmitter was on at 11:58	ryanque
981	15 Mar 12:58 Lower Power	ISR		2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-15T19:43:42-05:00	2016-03-15T19:43:42-05:00	"Due to failure in Driver.
It was fixed at 13:06"	ryanque
984	15 Mar 19:30 Transmitter power measurement	ISR+Imaging		2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-15T19:47:13-05:00	2016-03-15T19:47:13-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
Line Voltage and Power: 4080 VAC, 370 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.3 dBm
Line Voltage and Power: 4000 VAC, 360 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.3 dBm
Line Voltage and Power: 4050 VAC, 360 KW
11:30 CROWBAR Problem detected at Driver 4 control circuit
12:43 Problem at Driver 1 screen power supply
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line Voltage and Power: 4030 VAC, 360 KW
14:10 Problem at Driver 1 screen power supply
15:10 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.5 dBm
Line Voltage and Power: 4080 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line Voltage and Power: 4020 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line Voltage and Power: 4030 VAC, 360 KW
17:30 Driver 2 ON Imaging
17:50 RF OFF (Problem at Rx system)
18:30 RF ON
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4060 VAC, 360 KW"	ryaya
992	15 Mar 20:50 Problem with transmitter	ISR		2016_03 ISCOD Meridian Circle	Transmitters	P.Condor	new	2016-03-16T07:01:00-05:00	2016-03-16T07:01:00-05:00	Problem with transmitter	pcondor
993	15 Mar 21:04 Transmitter is On	ISR		2016_03 ISCOD Meridian Circle	Transmitters	P.Condor	new	2016-03-16T07:04:08-05:00	2016-03-16T07:04:08-05:00	Transmitter is On	pcondor
996	16 Mar 07:00 Transmitter power measurement	ISR		2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-16T07:21:22-05:00	2016-03-16T07:21:22-05:00	"15/03/2016
20:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
20:50 FAILURE Screen Driver 1
21:05 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4100 VAC, 360 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4100 VAC, 360 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4080 VAC, 360 KW
16/03/2016
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.5 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4080 VAC, 360 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4080 VAC, 360 KW
01:30 OFF Imaging
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx4 +6.3 dBm
Dr2 OFF
Line Voltage and Power: 4050 VAC, 360 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx4 +6.3 dBm
Dr2 OFF
Line Voltage and Power: 4050 VAC, 360 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.3 dBm
Dr2 OFF
Line Voltage and Power: 4080 VAC, 360 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 OFF
Line Voltage and Power: 4100 VAC, 360 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.3 dBm
Dr2 OFF
Line Voltage and Power: 4080 VAC, 360 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 OFF
Line Voltage and Power: 4040 VAC, 340 KW




"	rtadeo
1002	16 Mar 19:00 Transmitter Power Measurements	ISR	JRO Staff	2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-16T19:16:22-05:00	2016-03-16T19:16:22-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4100 VAC, 360 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4080 VAC, 360 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4100 VAC, 360 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
17:40 Driver 2 ON Imaging
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
D2 - 6.9 dBm
Line voltage and power: 4050 VAC, 360 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
D2 - 6.9 dBm
Line voltage and power: 4050 VAC, 360 KW

"	vquesada
1009	17 Mar 07:30 Transmitter power measurements	ISR+Imaging		2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-17T07:42:46-05:00	2016-03-17T07:42:46-05:00	"16/03/2016
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4060 VAC, 360 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4060 VAC, 360 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4050 VAC, 360 KW
17/03/2016
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4090 VAC, 360 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4100 VAC, 360 KW
01:05 OFF Imaging
01:47 HV OFF Spark gap replacement at switch yard
02:05 HV ON
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
Dr2 OFF
Line Voltage and Power: 4060 VAC, 360 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 OFF
Line Voltage and Power: 4060 VAC, 360 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 OFF
Line Voltage and Power: 4060 VAC, 360 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 OFF
Line Voltage and Power: 4050 VAC, 360 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 OFF
Line Voltage and Power: 4030 VAC, 360 KW"	ryaya
1011	17 Mar 19:10 Transmitter power measurements	ISR+Imaging		2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-17T19:25:47-05:00	2016-03-17T19:25:47-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line Voltage and Power: 4030 VAC, 360 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
Line Voltage and Power: 4050 VAC, 360 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line Voltage and Power: 4050 VAC, 360 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx4 +6.4 dBm
Line Voltage and Power: 4000 VAC, 350 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
Line Voltage and Power: 4000 VAC, 350 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line Voltage and Power: 4000 VAC, 350 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line Voltage and Power: 4050 VAC, 350 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
Line Voltage and Power: 4050 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
Line Voltage and Power: 4050 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line Voltage and Power: 4050 VAC, 360 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 -6.7 dBm
Line Voltage and Power: 4050 VAC, 360 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Dr2 -6.7 dBm
Line Voltage and Power: 4050 VAC, 360 KW
"	rtadeo
1014	17 Mar 23:00 Transmitter Power Measurements	ISR	JRO Staff	2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-17T23:14:15-05:00	2016-03-17T23:14:15-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
D2 - 6.7 dBm
Line voltage and power: 4060 VAC, 360 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
D2 - 6.6 dBm
Line voltage and power: 4080 VAC, 360 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
D2 - 6.6 dBm
Line voltage and power: 4080 VAC, 360 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
D2 - 6.6 dBm
Line voltage and power: 4080 VAC, 360 KW"	vquesada
1016	18 Mar 07:00 Transmitter Power Measurements	ISR	JRO Staff	2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-18T07:15:14-05:00	2016-03-18T07:15:14-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
D2 - 6.6 dBm
Line voltage and power: 4080 VAC, 360 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
D2 - 6.6 dBm
Line voltage and power: 4080 VAC, 360 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
D2 - 6.6 dBm
Line voltage and power: 4080 VAC, 360 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
D2 - 6.6 dBm
Line voltage and power: 4080 VAC, 360 KW
03:02 Driver 2 OFF
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
D2 - 6.6 dBm
Line voltage and power: 4080 VAC, 360 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
D2 - 6.6 dBm
Line voltage and power: 4080 VAC, 360 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
D2 - 6.6 dBm
Line voltage and power: 4080 VAC, 360 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
D2 - 6.6 dBm
Line voltage and power: 4080 VAC, 360 KW
"	vquesada
1019	18 Mar 17:00 Transmitter Power Measurements	ISR		2016_03 ISCOD Meridian Circle	Transmitters		new	2016-03-18T17:42:48-05:00	2016-03-18T17:42:48-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4080 VAC, 360 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4 +6.4 dBm
Line voltage and power: 4080 VAC, 360 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.5 dBm
Line voltage and power: 4080 VAC, 360 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
Line voltage and power: 4080 VAC, 360 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.4 dBm
Line voltage and power: 4050 VAC, 360 KW
17:20 off TX"	rtadeo
1038	20 Apr 15:30 Acquisition started	ISR		2016_04_1 LP Farday - Hysell	Acquisition system	I. Manay	new	2016-04-20T18:35:55-05:00	2016-04-20T18:35:55-05:00	Acquisition system was started.	imanay
1021	18 Apr 11:40 Antenna VSWR	ISR		2016_04_1 LP Farday - Hysell	Antennas		new	2016-04-18T12:09:35-05:00	2016-04-18T12:09:35-05:00	"Wup 1.05
Wdn 1.03
Ndn 1.09
Nup 1.07
Eup 1.04
Edn 1.06
Sdn 1.09
Sup 1.05"	ryanque
1037	20 Apr 11:51 Antenna VSWR	ISR		2016_04_1 LP Farday - Hysell	Antennas		new	2016-04-20T12:21:12-05:00	2016-04-20T12:21:12-05:00	"WUp 1.10
WDn 1.05
NDn 1.02
NUp 1.07
EUp 1.05
EDn 1.06
SDn 1.08
SUp 1.09"	ryanque
1043	21 Apr 05:30 Noise in Channel B	ISR		2016_04_1 LP Farday - Hysell	Antennas		new	2016-04-21T13:11:09-05:00	2016-04-21T13:11:41-05:00	"Noise in Channel B was detected.
The hybrids were changed
After changing RG-17 cables and putting it back it all comes to normal.
06:53 There is no interference

TR Connectors should be changed."	ryanque
1035	19 Apr 16:30 End of campaign	ISR		2016_04_1 LP Farday - Hysell	End experiment		new	2016-04-20T09:31:18-05:00	2016-04-20T09:31:18-05:00	Due to 24 hours of data has been obtained the campaign has ended.	ryanque
1024	18 Apr 19:59 Operation Resume	ISR		2016_04_1 LP Farday - Hysell	General	I. Manay	new	2016-04-18T20:27:11-05:00	2016-04-18T20:27:11-05:00	"Person in Charge: I. Manay.
Experiment: LP_Faraday
1) 16:00 - 20:00 
2) Operation Hours: 4h
3) Operation incomplete: 0
4) Reasons:
None"	imanay
1028	19 Abr 07:22 Noise levels	ISR		2016_04_1 LP Farday - Hysell	General	P.Condor	new	2016-04-19T07:59:24-05:00	2016-04-19T07:59:24-05:00	"18 Abr 
21:34
1:10.04 2:9.85 
1:10.12 2:9.91
1:9.96 2:9.88
19 Abr
01:16
1:11.39 2:11.48 
1:11.50 2:11.48
1:11.33 2:11.40
04:08
1:14.35 2:14.64 
1:14.39 2:14.68
1:14.28 2:14.67
07:22
1:11.08 2:11.23 
1:11.05 2:11.12
1:11.11 2:11.48
"	pcondor
1030	19 Abr 07:50 Figures	ISR		2016_04_1 LP Farday - Hysell	General	P.Condor	new	2016-04-19T08:18:31-05:00	2016-04-19T08:18:31-05:00	Figures of rti and spectra	pcondor
1031	19 Abr 08:00 Operation Resume	ISR		2016_04_1 LP Farday - Hysell	General	P.Condor	new	2016-04-19T08:22:11-05:00	2016-04-19T08:22:11-05:00	"Person in Charge: P. Condor.
Experiment: LP-Faraday
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
1034	19 Apr 16:04 Noise Levels	ISR		2016_04_1 LP Farday - Hysell	General		new	2016-04-20T09:30:09-05:00	2016-04-20T09:30:09-05:00	"10:17 
1ms Pulse  Ch A  10.89   Ch B  10.69
2ms Pulse  Ch A  10.69   Ch B  10.69
4ms Pulse  Ch A  10.49   Ch B  10.63
13:20
1ms Pulse  Ch A  10.30   Ch B  10.07
2ms Pulse  Ch A  10.45   Ch B  10.38
4ms Pulse  Ch A  10.35   Ch B  10.46
16:04
1ms Pulse  Ch A  10.25   Ch B  10.13
2ms Pulse  Ch A  10.33   Ch B  10.03
4ms Pulse  Ch A   9.93   Ch B  10.07"	ryanque
1036	20 Apr 11:50 Start Campaign	ISR		2016_04_1 LP Farday - Hysell	General		new	2016-04-20T12:19:54-05:00	2016-04-20T12:19:54-05:00	"Campaign: SBS Stimulated Brillouin Scattering
User: D. Hysell
L. User: M. Milla

Start: April 20, 2016
End:   April 21, 2016"	ryanque
1042	20 Apr 19:59 Operation Resume	ISR		2016_04_1 LP Farday - Hysell	General	I. Manay	new	2016-04-21T10:18:09-05:00	2016-04-21T10:18:09-05:00	"Person in Charge: I. Manay.
Experiment: SBS
1) 15:30 - 20:00 
2) Operation Hours: 4h 30 minutes
3) Operation incomplete: 0
4) Reasons:
None"	imanay
1033	19 Apr 15:00 Interference Channel B	ISR		2016_04_1 LP Farday - Hysell	Physical Phenomena		new	2016-04-20T09:25:27-05:00	2016-04-20T09:25:27-05:00	"There is some interference in Channel B in the 2ms and 1 ms pulse.
It lasts until the end of the campaign"	ryanque
1046	21 Apr 12:00 Figures	ISR		2016_04_1 LP Farday - Hysell	Plot		new	2016-04-21T16:18:33-05:00	2016-04-21T16:18:33-05:00		jverastegui
1026	19 Abr 01:00 Figures	ISR		2016_04_1 LP Farday - Hysell	Process/Analysis Program	P.Condor	new	2016-04-19T01:52:24-05:00	2016-04-19T01:52:24-05:00	Figures of rtis and spectras.	pcondor
1022	18 Apr 16:00 Acquisition started	ISR		2016_04_1 LP Farday - Hysell	Reception	I. Manay	new	2016-04-18T19:32:16-05:00	2016-04-18T19:32:16-05:00	Acquisition of the experiment was started. JARS system was used.	imanay
1047	21 Apr 12:36 Channel B goes 2dBs down	ISR		2016_04_1 LP Farday - Hysell	Reception		new	2016-04-21T16:21:09-05:00	2016-04-21T16:21:09-05:00		jverastegui
1048	21 Apr 13:24 Transmitter turned off because of the channel B power decrease	ISR		2016_04_1 LP Farday - Hysell	Reception		new	2016-04-21T16:22:31-05:00	2016-04-21T16:22:31-05:00		jverastegui
1050	21 Apr 13:49 Channel B went down again	ISR		2016_04_1 LP Farday - Hysell	Reception		new	2016-04-21T16:28:05-05:00	2016-04-21T16:28:05-05:00		jverastegui
1052	21 Apr 13:53 Channel A and B are equivalent	ISR		2016_04_1 LP Farday - Hysell	Reception		new	2016-04-21T16:32:11-05:00	2016-04-21T16:32:11-05:00		jverastegui
1023	18 Apr 19:57 Spark-gaps summary	ISR		2016_04_1 LP Farday - Hysell	Spark Gaps	W. Rojas	new	2016-04-18T20:26:45-05:00	2016-04-18T20:26:45-05:00	"ATR's adjustment:
1) 18 Apr 17:34 spark gaps adjustment.
2) 18 Apr 19:57 spark gaps adjustment."	imanay
1029	19 Abr 07:33 Spark gaps adjustment	ISR		2016_04_1 LP Farday - Hysell	Spark Gaps	J. Lavado	new	2016-04-19T08:04:42-05:00	2016-04-19T08:04:42-05:00	"18 Abr
22:51 Spark gaps adjustment
19 Abr
01:44 Spark gaps adjustment
05:13 Spark gaps adjustment
07:33 Spark gaps adjustment"	pcondor
1032	19 Apr 14:30 Spark Gap	ISR		2016_04_1 LP Farday - Hysell	Spark Gaps		new	2016-04-20T09:23:55-05:00	2016-04-20T09:23:55-05:00	"09:29 Spark Gap adjustment
14:30 Spark Gap adjustment"	ryanque
1040	20 Apr 18:04 Spark Gap	ISR		2016_04_1 LP Farday - Hysell	Spark Gaps	J. Lavado	new	2016-04-20T19:43:51-05:00	2016-04-20T19:43:51-05:00	18:04 Spark Gap adjustment	imanay
1044	21 Apr 07:22 Spark Gap Adjustment	ISR		2016_04_1 LP Farday - Hysell	Spark Gaps		new	2016-04-21T13:13:08-05:00	2016-04-21T13:13:08-05:00	"20:46 Spark Gap adjustment
23:31 Spark Gap adjustment
02:00 Spark Gap adjustment
05:00 Spark Gap adjustment
07:22 Spark Gap adjustment"	ryanque
1045	21 Apr 10:30 Spark gaps adjustment	ISR		2016_04_1 LP Farday - Hysell	Spark Gaps		new	2016-04-21T16:15:43-05:00	2016-04-21T16:16:50-05:00		jverastegui
1051	21 Apr 13:53 Spark gaps adjustment	ISR		2016_04_1 LP Farday - Hysell	Spark Gaps		new	2016-04-21T16:30:23-05:00	2016-04-21T16:30:23-05:00		jverastegui
1020	18 Apr 11:30 Log Created - LP	ISR		2016_04_1 LP Farday - Hysell	Start experiment		new	2016-04-18T12:07:28-05:00	2016-04-18T12:07:28-05:00	"Campaing: LP Faraday
User: D. Hysell

This campaign has two experiments
1) LP Faraday for 24 hours (Mon-Tue)
2) Bryoance for 24 hours ( Wed - Thu)"	ryanque
1053	21 Apr 16:02 Spark Gaps adjustment	ISR		2016_04_1 LP Farday - Hysell	Start experiment		new	2016-04-21T16:33:03-05:00	2016-04-21T16:33:03-05:00		jverastegui
1025	19 Apr 00 :15 Transmitter Power Measurements	ISR	JRO Staff	2016_04_1 LP Farday - Hysell	Transmitters		new	2016-04-19T00:42:45-05:00	2016-04-19T00:42:45-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx4 +6.1 dBm
Line voltage and power: 4050 VAC, 350 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx4 muestra
Line voltage and power: 4080 VAC, 350 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx4 muestra
Line voltage and power: 4080 VAC, 350 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx4 muestra
Line voltage and power: 4050 VAC, 350 KW"	vquesada
1027	19 Apr 07 :05 Transmitter Power Measurements	ISR	JRO Staff	2016_04_1 LP Farday - Hysell	Transmitters		new	2016-04-19T07:32:50-05:00	2016-04-19T07:32:50-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx4 +6.1 dBm (Muestra)
Line voltage and power: 4050 VAC, 350 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx4 muestra
Line voltage and power: 4050 VAC, 350 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx4 muestra
Line voltage and power: 4050 VAC, 350 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx4 muetra
Line voltage and power: 4050 VAC, 350 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx4 muestra
Line voltage and power: 4080 VAC, 350 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx4 muestra
Line voltage and power: 4080 VAC, 350 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx4 muestra
Line voltage and power: 4050 VAC, 350 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.9 dBm
Tx4 muestra
Line voltage and power: 4050 VAC, 350 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx4 +6.2 muestra
Line voltage and power: 4080 VAC, 350 KW"	vquesada
1039	20 Apr 19:05 Transmitter Power Measurements	ISR		2016_04_1 LP Farday - Hysell	Transmitters		new	2016-04-20T19:33:11-05:00	2016-04-20T19:33:11-05:00	"12:15 LV ON
13:40 HV ON 
13:50 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.6 dBm (Muestra)
Line voltage and power: 4050 VAC, 360 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.6 dBm (Muestra)
Line voltage and power: 4050 VAC, 360 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 Muestra
Line voltage and power: 4050 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 Muestra
Line voltage and power: 4050 VAC, 360 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 Muestra
Line voltage and power: 4050 VAC, 360 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 Muestr
Line voltage and power: 4080 VAC, 360 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 Muestr
Line voltage and power: 4080 VAC, 360 KW

"	vquesada
1041	21 Apr 07:35 Transmitter Power Measurements	ISR		2016_04_1 LP Farday - Hysell	Transmitters		new	2016-04-21T08:19:55-05:00	2016-04-21T08:19:55-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 +6.6 dBm (Muestra)
Line voltage and power: 4040 VAC, 360 KW
20:55 Fuse failure in capacitor bank (Explosion)
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4  (Muestra)
Line voltage and power: 4040 VAC, 360 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4  (Muestra)
Line voltage and power: 4040 VAC, 360 KW
22:25 Failure High Pressure Sensor
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4  (Muestra)
Line voltage and power: 4020 VAC, 350 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4  (Muestra)
Line voltage and power: 4020 VAC, 350 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4  (Muestra)
Line voltage and power: 4020 VAC, 350 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4  (Muestra)
Line voltage and power: 4010 VAC, 350 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4  (Muestra)
Line voltage and power: 4010 VAC, 350 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4  (Muestra)
Line voltage and power: 4010 VAC, 360 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4  (Muestra)
Line voltage and power: 4000 VAC, 360 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx4  (Muestra)
Line voltage and power: 4000 VAC, 360 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4  (Muestra)
Line voltage and power: 4000 VAC, 360 KW











"	rtadeo
1049	21 Apr 13:46 Channels power apparently equivalent, transmitter turned on	ISR		2016_04_1 LP Farday - Hysell	Transmitters		new	2016-04-21T16:23:34-05:00	2016-04-21T16:23:34-05:00		jverastegui
1054	21 Apr 16:15 Transmitter Power Measurements	ISR	JRO Staff	2016_04_1 LP Farday - Hysell	Transmitters		new	2016-04-21T16:43:46-05:00	2016-04-21T16:43:46-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 Muestra
Line voltage and power: 4100 VAC, 360 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 Muestra
Line voltage and power: 4020 VAC, 360 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 Muestra
Line voltage and power: 4020 VAC, 360 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 Muestra
Line voltage and power: 4080 VAC, 360 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 Muestra
Line voltage and power: 4100 VAC, 360 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 Muestra
Line voltage and power: 4100 VAC, 360 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx4 Muestra
Line voltage and power: 4100 VAC, 360 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 Muestra
Line voltage and power: 4050 VAC, 360 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx4 Muestra
Line voltage and power: 4050 VAC, 360 KW
16:10  HV OFF
16:25  LV OFF"	vquesada
1064	End of experiment	ISR		2016_04_2_Hydrogen_gyro - Kudeki	End experiment		new	2016-04-26T16:42:47-05:00	2016-04-26T16:42:47-05:00	16:23  Fin de experimento	kkuyeng
1058	25 Apr 19:59 Operation Resume	ISR		2016_04_2_Hydrogen_gyro - Kudeki	General	I. Manay	new	2016-04-25T19:57:31-05:00	2016-04-25T19:57:31-05:00	"Person in Charge: I. Manay.
Experiment: Hydrogen gyro
1) 10:00 - 20:00 
2) Operation Hours: 10h
3) Operation incomplete: 0
4) Reasons:
None"	imanay
1059	25 Apr 23:59 Plots	ISR		2016_04_2_Hydrogen_gyro - Kudeki	Plot	abelleza	assigned	2016-04-26T01:48:41-05:00	2016-04-26T01:50:51-05:00	25 Apr 23:59 Plots	abelleza
1063	plots (26 Abril 2016 - 08:00 - 16:20)	ISR		2016_04_2_Hydrogen_gyro - Kudeki	Plot		new	2016-04-26T16:39:52-05:00	2016-04-26T16:39:52-05:00	Graficos del turno correspondiente desde las 8:00 hasta las 16:20	kkuyeng
1056	25 Apr 18:32 Spark gaps adjustment	ISR		2016_04_2_Hydrogen_gyro - Kudeki	Spark Gaps	W. Rojas	assigned	2016-04-25T19:44:35-05:00	2016-04-25T19:45:42-05:00	"10:55 Spark Gap Adjustment
13:44 Spark Gap Adjustment
16:00 Spark Gap Adjustment
18:32 Spark Gap Adjustment"	W. Rojas
1061	26 Apr 07:30 Spark gaps adjustment	ISR		2016_04_2_Hydrogen_gyro - Kudeki	Spark Gaps	abelleza	new	2016-04-26T07:39:12-05:00	2016-04-26T07:39:12-05:00	"25 Apr 21:00 Spark gaps adjustment
25 Apr 23:43 Spark gaps adjustment
26 Apr 02:18 Spark gaps adjustment
26 Apr 04:44 Spark gaps adjustment
26 Apr 07:30 Spark gaps adjustment

 By Tec. Jose Lavado"	abelleza
1062	Spark gaps adjustment and noise levels	ISR		2016_04_2_Hydrogen_gyro - Kudeki	Spark Gaps		new	2016-04-26T16:38:24-05:00	2016-04-26T16:38:24-05:00	"26 Apr 08:29 noise level A: 15.75 B: 16.85
26 Apr 08:29 se ajustan los conectores de los Trs de las antenas E y S.
26 Apr 08:40 noise level A: 16.6 B: 16.7
26 Apr 10:40 spark gaps adjustment
26 Apr 11:11 noise level A: 16.23 B: 16.54
26 Apr 13:37 spark gaps adjustment
26 Apr 13:39 noise level A: 15.2 B: 15.6
26 Apr 15:17 noise level A: 15.59 B: 15.95

"	kkuyeng
1055	25 Apr 10:00 Experiment started	ISR		2016_04_2_Hydrogen_gyro - Kudeki	Start experiment	I. Manay	new	2016-04-25T19:41:54-05:00	2016-04-25T19:41:54-05:00	The same antenna and switchyard connection of the LP experiment was used. Also JARs as an acquisition system.	imanay
1057	25 Apr 19:30 Transmitter power measurements	ISR		2016_04_2_Hydrogen_gyro - Kudeki	Transmitters		new	2016-04-25T19:48:17-05:00	2016-04-25T19:48:17-05:00	"08:45 HV ON
09:15 Problem at PA 1 Screen power supply
09:30 Problem at PA 4 Screen power supply
10:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.5 dBm
Line voltage and power: 4020 VAC, 330 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.5 dBm
Line voltage and power: 4030 VAC, 320 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.5 dBm
Line voltage and power: 4080 VAC, 330 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.4 dBm
Line voltage and power: 4000 VAC, 320 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.4 dBm
Line voltage and power: 4010 VAC, 330 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.4 dBm
Line voltage and power: 4000 VAC, 320 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.5 dBm
Line voltage and power: 4080 VAC, 330 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.5 dBm
Line voltage and power: 4050 VAC, 330 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.5 dBm
Line voltage and power: 4040 VAC, 330 KW
"	ryaya
1060	26 Apr 07:20 Transmitter power measurements	ISR		2016_04_2_Hydrogen_gyro - Kudeki	Transmitters		new	2016-04-26T07:28:04-05:00	2016-04-26T07:28:04-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.5 dBm
Line voltage and power: 4040 VAC, 340 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.4 dBm
Line voltage and power: 4030 VAC, 340 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.4 dBm
Tx4 +5.4 dBm
Line voltage and power: 4010 VAC, 340 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx4 +5.3 dBm
Line voltage and power: 4000 VAC, 310 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +5.5 dBm
Tx4 +5.5 dBm
Line voltage and power: 4010 VAC, 320 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.5 dBm
Line voltage and power: 4060 VAC, 340 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.4 dBm
Line voltage and power: 4060 VAC, 340 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx4 +5.3 dBm
Line voltage and power: 4040 VAC, 340 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx4 +5.2 dBm
Line voltage and power: 4040 VAC, 340 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx4 +5.2 dBm
Line voltage and power: 4025 VAC, 320 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx4 +5.2 dBm
Line voltage and power: 4025 VAC, 320 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.6 dBm
Tx4 +5.2 dBm
Line voltage and power: 4025 VAC, 320 KW









"	rtadeo
1066	27 Apr 15:15 VSWR Antenna	ISR		2016_04_3 HP Meteors JASMET	Antennas		new	2016-04-27T15:24:43-05:00	2016-04-27T15:24:43-05:00	"WUp 1.07
WDn 1.04
NDn 1.11
NUp 1.08
EUp 1.02
EDn 1.07
SDn 1.11
SUp 1.08"	ryanque
1068	27 Apr 18:22 Beacom	ISR		2016_04_3 HP Meteors JASMET	General	I. Manay	new	2016-04-27T19:20:14-05:00	2016-04-27T19:20:14-05:00	A beacom signal was added to the experiment.	imanay
1073	28 Mar 07:59 Operation Resume	ISR		2016_04_3 HP Meteors JASMET	General		new	2016-04-28T17:07:33-05:00	2016-04-28T17:07:33-05:00	"Person in Charge: J.Oscanoa
Experiment: HP Meteors + JASMET
1) 08:00 - 20:00
2) Operation Hours: 11:55 h
3) Operation incomplete: 5 min
4) Reasons: Channel C was atenuated 2 dB"	joscanoa
1077	29 Abr 05:20 Noise levels	ISR		2016_04_3 HP Meteors JASMET	General	P.Condor	new	2016-04-29T07:47:59-05:00	2016-04-29T07:47:59-05:00	"28 Apr
20:23
MET
1:16.73 2:16.36 3:17.24
MST
1:15.69 2:14.66 3:15.32 4:15.60
JASMET
1:44.31 2:44.59 3:44.25 4:44.32
23:21
MET
1:17.93 2:17.51 3:17.87
MST
1:15.87 2:15.47 3:16.31 4:16.25
JASMET
1:45.75 2:45.92 3:45.80 4:45.81
29 Apr
02:30
MET
1:19.61 2:19.22 3:19.26
MST
1:17.00 2:17.09 3:17.57 4:17.59
JASMET
1:47.58 2:47.45 3:47.51 4:47.54
05:20
MET
1:20.61 2:20.28 3:20.13
MST
1:17.63 2:17.74 3:18.36 4:18.31
JASMET
1:47.25 2:47.08 3:47.09 4:47.49"	pcondor
1079	29 Abr 08:00 Operation resume	ISR		2016_04_3 HP Meteors JASMET	General	P.Condor	new	2016-04-29T08:17:21-05:00	2016-04-29T08:17:21-05:00	"Person in Charge: P. Condor.
Experiment: HP_Meteors JASMET
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
1070	28 Apr 00:00 Figures	ISR		2016_04_3 HP Meteors JASMET	Plot		new	2016-04-28T00:51:40-05:00	2016-04-28T00:51:40-05:00		joscanoa
1074	29 Abr 00:01 Figures	ISR		2016_04_3 HP Meteors JASMET	Process/Analysis Program	P.Condor	new	2016-04-29T02:41:37-05:00	2016-04-29T02:41:37-05:00	Figures of rtis and spectras.	pcondor
1078	29 Abr 08:01 Figures	ISR		2016_04_3 HP Meteors JASMET	Process/Analysis Program	P.Condor	new	2016-04-29T08:08:04-05:00	2016-04-29T08:08:04-05:00	Figures of rtis and spectras	pcondor
1072	28 Apr 07:30 Spark gaps adjustment	ISR		2016_04_3 HP Meteors JASMET	Spark Gaps		new	2016-04-28T07:38:19-05:00	2016-04-28T07:38:19-05:00	"27 Apr 22:41 Spark gaps adjustment
28 Apr 01:28 Spark gaps adjustment
28 Apr 04:18 Spark gaps adjustment
28 Apr 06:56 Spark gaps adjustment
"	joscanoa
1076	29 Abr 05:49 Spark gaps adjustment	ISR		2016_04_3 HP Meteors JASMET	Spark Gaps	W. Rojas	new	2016-04-29T07:38:31-05:00	2016-04-29T07:38:31-05:00	"28 Apr
21:01 Spark gaps adjustment
29 Apr
00:12 Spark gaps adjustment
03:05 Spark gaps adjustment
05:49 Spark gaps adjustment"	pcondor
1065	27 Apr 15:10 Log Created HP Meteors & JASMET	ISR		2016_04_3 HP Meteors JASMET	Start experiment		new	2016-04-27T15:23:13-05:00	2016-04-27T15:23:13-05:00	"User: D. Scipion

Campaign High Power Meteors and JASMET 30 MHz
Start Wed 27 April 2016 
End   Thu 28 April 2016"	ryanque
1067	27 Apr 18:00 Experiment started	ISR		2016_04_3 HP Meteors JASMET	Start experiment	I. Manay	new	2016-04-27T19:18:36-05:00	2016-04-27T19:18:36-05:00	The MST and meteors acquisition was started.	imanay
1069	27 Apr 23:05 Transmitter Power Measurements	ISR	JRO Staff	2016_04_3 HP Meteors JASMET	Transmitters		new	2016-04-27T23:12:17-05:00	2016-04-27T23:12:17-05:00	"17:55 LV ON
17:59 HV ON
18:12 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 -2.9 dBm
Line voltage and power: 4050 VAC, 250 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 -2.8 dBm
Line voltage and power: 4040 VAC, 250 KW
20:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.7 dBm
Line voltage and power: 4060 VAC, 260 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.6 dBm
Line voltage and power: 4050 VAC, 260 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.6 dBm
Line voltage and power: 4050 VAC, 260 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.6 dBm
Line voltage and power: 4050 VAC, 260 KW"	vquesada
1071	28 Apr 07:00 Transmitter Power Measurements	ISR	JRO Staff	2016_04_3 HP Meteors JASMET	Transmitters		new	2016-04-28T07:10:02-05:00	2016-04-28T07:10:02-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.6 dBm
Line voltage and power: 4050 VAC, 260 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.6 dBm
Line voltage and power: 4050 VAC, 250 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 260 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.6 dBm
Line voltage and power: 4050 VAC, 260 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 -2.5 dBm
Line voltage and power: 4080 VAC, 260 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 -2.5 dBm
Line voltage and power: 4080 VAC, 260 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 -2.5 dBm
Line voltage and power: 4070 VAC, 260 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.5 dBm
Line voltage and power: 4070 VAC, 260 KW"	vquesada
1075	29 Apr 07:00 Transmitter Power Measurements	ISR		2016_04_3 HP Meteors JASMET	Transmitters		new	2016-04-29T07:15:58-05:00	2016-04-29T07:15:58-05:00	"18:05 HV ON
19:00 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 -2.7 dBm
Line voltage and power: 4020 VAC, 280 KW
19:15 Screen PA 1 OFF
20:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 -2.6 dBm
Line voltage and power: 4030 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 -2.6 dBm
Line voltage and power: 4020 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 -2.5 dBm
Line voltage and power: 4030 VAC, 290 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 -2.5 dBm
Line voltage and power: 4030 VAC, 290 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 -2.5 dBm
Line voltage and power: 4040 VAC, 290 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 -2.5 dBm
Line voltage and power: 4040 VAC, 290 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 -2.5 dBm
Line voltage and power: 4040 VAC, 290 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 -2.5 dBm
Line voltage and power: 4040 VAC, 290 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 -2.5 dBm
Line voltage and power: 4040 VAC, 290 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 -2.5 dBm
Line voltage and power: 4040 VAC, 290 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 -2.5 dBm
Line voltage and power: 4040 VAC, 290 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 -2.5 dBm
Line voltage and power: 4040 VAC, 290 KW
08:00 TX (OFF)

"	rtadeo
1085	31 May 15:02 Acquisition re-started	ISR		2016_05 LP Faraday Meteor	Acquisition system	I. Manay	new	2016-05-31T19:47:47-05:00	2016-05-31T19:47:47-05:00	Acquisition system was stopped during 10 minutes, from 14:52 to 15:02. 2mS and 1mS transmitter pulses was shifted 48uS. It was corrected and tested.	imanay
1082	31 May 12:40 Antenna VSWR	ISR		2016_05 LP Faraday Meteor	Antennas		new	2016-05-31T14:07:00-05:00	2016-05-31T14:07:00-05:00	"WUp 1.07
WDn 1.06
NDn 1.11
NUp 1.05
EUp 1.05
EDn 1.09
SDn 1.11
SUp 1.10
"	ryanque
1094	02 Jun 11:45 Antenna VSWR	ISR		2016_05 LP Faraday Meteor	Antennas		new	2016-06-02T11:52:48-05:00	2016-06-02T11:52:48-05:00	"Wu 1.00
Wd 1.08
Nd 1.02
Nu 1.05
Eu 1.04
Ed 1.09
Sd 1.03
Su 1.09"	ryanque
1092	01 Jun 15:30 End Experiment	ISR		2016_05 LP Faraday Meteor	End experiment		new	2016-06-01T17:00:43-05:00	2016-06-01T17:00:43-05:00	"15:30 End Experiment 
15:30 Turn OFF DDS for 5 minutes and take data. This is to see if DC in channels is due to DDS"	kkuyeng
1104	03 Jun 08:04 End Experiment	ISR		2016_05 LP Faraday Meteor	End experiment	P.Condor	new	2016-06-03T08:14:41-05:00	2016-06-03T08:14:41-05:00	End Experiment	pcondor
1083	31 May 13:40 Acquisition started	ISR		2016_05 LP Faraday Meteor	General	I. Manay	new	2016-05-31T19:41:22-05:00	2016-05-31T19:41:22-05:00	Noise test and transmitters from 12:40 to 13:40. Acquisition with good data starterd at 13:40	imanay
1086	31 May 19:59 Operation Resume	ISR		2016_05 LP Faraday Meteor	General	I. Manay	new	2016-05-31T20:11:58-05:00	2016-05-31T20:11:58-05:00	"Person in Charge: I. Manay
Experiment: LP_Faraday
1) 13:40 - 20:00
2) Operation Hours: 6:20 h
3) Operation incomplete: 10 min
4) Reasons:
Acquisition system was restarted."	imanay
1090	01 Jun 15:30 Operation Resume	ISR		2016_05 LP Faraday Meteor	General		new	2016-06-01T16:49:17-05:00	2016-06-01T16:49:17-05:00	"Person in Charge: K.Kuyeng
Experiment: LP_Faraday
1) 08:00 - 15:30
2) Operation Hours: 7:25 h
3) Operation incomplete: 5 min
4) Reasons:
Tx failure."	kkuyeng
1099	03 Jun 06:41 Noise levels	ISR		2016_05 LP Faraday Meteor	General	P.Condor	new	2016-06-03T07:10:03-05:00	2016-06-03T07:10:03-05:00	"02 JUN 2016
23:53
MST
1:15.54 2:15.90 3:15.87 4:14.82
MET
1:18.76 2:19.35 3:18.53
JASMET
1:21.23 2:26.64 3:29.22 4:27.76 5:27.15

03 JUN 2016
03:18
MST
1:15.65 2:15.47 3:15.83 4:14.83
MET
1:18.98 2:19.43 3:18.69
JASMET
1:26.40 2:26.29 3:28.82 4:27.34 5:27.18

06:41
MST
1:14.38 2:14.21 3:14.72 4:13.35
MET
1:17.00 2:17.62 3:17.00
JASMET
1:26.74 2:24.36 3:27.41 4:25.29 5:25.15"	pcondor
1103	03 Jun 08:00 Operation resume	ISR		2016_05 LP Faraday Meteor	General	P.Condor	new	2016-06-03T08:14:01-05:00	2016-06-03T08:14:01-05:00	"Person in Charge: P. Condor.
Experiment: LP Faraday Meteor
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
1087	31 May 23:59 Plot	ISR		2016_05 LP Faraday Meteor	Plot	abelleza	new	2016-06-01T00:21:24-05:00	2016-06-01T00:21:24-05:00	Plots	abelleza
1098	03 Jun 00:20 Plots	ISR		2016_05 LP Faraday Meteor	Process/Analysis Program	P.Condor	new	2016-06-03T00:39:44-05:00	2016-06-03T00:39:44-05:00	Figures of rtis and spectras	pcondor
1101	03 Jun 08:02 Plots	ISR		2016_05 LP Faraday Meteor	Process/Analysis Program	P.Condor	new	2016-06-03T08:10:35-05:00	2016-06-03T08:10:35-05:00	Figures of rtis and spectras	pcondor
1084	31 May 18:58 Spark gaps adjustment	ISR		2016_05 LP Faraday Meteor	Spark Gaps	W. Rojas	new	2016-05-31T19:44:49-05:00	2016-05-31T19:44:49-05:00	"15:51 Spark gaps adjustment.
18:58 Spark gaps adjustment."	imanay
1089	01 jun 07:05 Spark gaps adjustment	ISR		2016_05 LP Faraday Meteor	Spark Gaps		new	2016-06-01T07:40:04-05:00	2016-06-01T07:40:04-05:00	"31-05-2016
22:07 Spark gaps adjustment

01-06-2016
01:07 Spark gaps adjustment
04:04 Spark gaps adjustment
07:05 Spark gaps adjustment

by A. Coronado."	abelleza
1091	01 Jun 15:30 Spark gaps adjustment	ISR		2016_05 LP Faraday Meteor	Spark Gaps		new	2016-06-01T16:58:49-05:00	2016-06-01T16:58:49-05:00	"10:17 Spark gaps adjustment.
10:18 se observan picos en el ruido de los canales pero luego vuelve a su normalidad
12:43 Spark gaps adjustment.
"	kkuyeng
1096	02 jun 20:00 Spark gaps adjustment)	ISR		2016_05 LP Faraday Meteor	Spark Gaps		new	2016-06-02T19:59:49-05:00	2016-06-02T19:59:49-05:00	18:56 Spark gap adjustment	kkuyeng
1100	03 Jun 07:02 Spark gaps adjustment	ISR		2016_05 LP Faraday Meteor	Spark Gaps	A. Coronado	new	2016-06-03T07:12:35-05:00	2016-06-03T07:12:35-05:00	"02-06-16
21:49  Spark gaps adjustment.
03-06-16
00:51  Spark gaps adjustment.
04:10  Spark gaps adjustment.
07:00  Spark gaps adjustment."	pcondor
1081	31 May 12:30 Log Created	ISR		2016_05 LP Faraday Meteor	Start experiment		new	2016-05-31T14:04:33-05:00	2016-05-31T14:04:33-05:00	"This log will be for 2 campaigns
- LP Faraday
- Meteor"	ryanque
1093	02 Jun 11:40 Meteor HP Campaign	ISR		2016_05 LP Faraday Meteor	Start experiment		new	2016-06-02T11:51:21-05:00	2016-06-02T11:51:39-05:00	The Meteor HP Campaign will run Thursday 02 to Friday 03 June 2016	ryanque
1095	02 Jun 16:30 Operation Resume)	ISR		2016_05 LP Faraday Meteor	Start experiment		new	2016-06-02T19:58:25-05:00	2016-06-02T19:58:25-05:00	"Person in Charge: K.Kuyeng
Experiment: MST-Meteor
1) 16:30 - 20:00
2) Operation Hours: 3:30 h

Person in Charge: K.Kuyeng
Experiment: Jasmet
1) 16:30 - 20:00
2) Operation Hours: 3:30 h
3) Incidences: remove 3rd Front-End of receiving chain (18:30)

"	kkuyeng
1088	01 Jun. 07:15 Transmitter Power Measurements	ISR		2016_05 LP Faraday Meteor	Transmitters		new	2016-06-01T07:24:58-05:00	2016-06-01T07:24:58-05:00	"31/05/2016

15:00 TX Power sample (-70 dB coupling)
Tx1 +5.2 dBm
Tx4 +5.0 dBm
Line voltage and power: 4050 VAC, 320 KW
16:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.8 dBm
17:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.8 dBm
19:00 TX Power (reference sample)
Tx1 +1.4 dBm
Tx4 -0.6 dBm
20:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -1.0 dBm
21:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.7 dBm
22:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.8 dBm
23:00 TX Power (reference sample)
Tx1 +1.1 dBm
Tx4 -0.8 dBm

01/06/2016
00:00 TX Power (reference sample)
Tx1 +1.3 dBm
Tx4 -0.8 dBm
01:00 TX Power (reference sample)
Tx1 +1.3 dBm
Tx4 -0.8 dBm
02:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.9 dBm
03:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.9 dBm
04:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.9 dBm
05:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.9 dBm
06:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.8 dBm
07:00 TX Power (reference sample)
Tx1 +1.3 dBm
Tx4 -0.7 dBm

"	rtadeo
1097	02 Jun. 23:05 Transmitter Power Measurements	ISR		2016_05 LP Faraday Meteor	Transmitters		new	2016-06-02T23:14:41-05:00	2016-06-02T23:14:41-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 -2.5 dBm
Line voltage and power: 4050 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 -2.4 dBm
Line voltage and power: 4080 VAC, 280 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +4.2 dBm
Tx4 -2.4 dBm
Line voltage and power: 4080 VAC, 280 KW
"	vquesada
1102	03 Jun. 08:05 Transmitter Power Measurements	ISR		2016_05 LP Faraday Meteor	Transmitters		new	2016-06-03T08:11:45-05:00	2016-06-03T08:11:45-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.5 dBm
Line voltage and power: 4080 VAC, 280 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.5 dBm
Line voltage and power: 4080 VAC, 280 KW
01:50 Crowbar
02:00 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 -2.6 dBm
Line voltage and power: 4050 VAC, 280 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 -2.6 dBm
Line voltage and power: 4050 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.5 dBm
Line voltage and power: 4080 VAC, 280 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +4.1 dBm
Tx4 -2.5 dBm
Line voltage and power: 4080 VAC, 280 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 -2.6 dBm
Line voltage and power: 4050 VAC, 280 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.0 dBm
Tx4 -2.6 dBm
Line voltage and power: 4050 VAC, 280 KW
08:00 HV OFF
08:15 LV OFF"	vquesada
1150	01 Jun 15:30 Transmitter power measurements	ISR		2016_05 LP Faraday Meteor	Transmitters		new	2016-07-18T13:21:11-05:00	2016-07-18T13:21:53-05:00	"08:00 CROWBAR
09:00 TX Power sample (-70 dB coupling)
Tx1 +1.2 dBm
Tx4 -0.7 dBm
10:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.8 dBm
11:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.7 dBm
12:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.8 dBm
14:00 TX Power (reference sample)
Tx1 +1.1 dBm
Tx4 -0.8 dBm
15:00 TX Power (reference sample)
Tx1 +1.2 dBm
Tx4 -0.8 dBm
15:30 HV OFF
15:45 LV OFF"	ryaya
1109	13 Jul 21:45 Channel A EW Drift	ISR		2016_07_1 EW Drift + AMISR	Acquisition system		new	2016-07-14T08:05:31-05:00	2016-07-14T08:05:31-05:00	"21:40 Channel A EW Drift drops 1 dB
21:45 Channel A EW Drift automatically recovers 1 dB"	ryanque
1110	14 Jul 01:15 Acquisition Restarted	ISR		2016_07_1 EW Drift + AMISR	Acquisition system		new	2016-07-14T08:19:39-05:00	2016-07-14T08:19:39-05:00	"00:20 PC Ares stopped
00:50 PC Ares restarted
01:15 Acquisition program running"	ryanque
1116	14 Jul 09:17 Acquisition restarted	ISR		2016_07_1 EW Drift + AMISR	Acquisition system		new	2016-07-14T18:45:06-05:00	2016-07-14T18:45:06-05:00	"09:02 Ares PC stopped
09:17 Ares PC restarted"	ryanque
1120	14 Jul 14:46 Hydra acquisition off	ISR		2016_07_1 EW Drift + AMISR	Acquisition system		new	2016-07-14T18:52:51-05:00	2016-07-14T18:52:51-05:00	"13:00 Hydra acquisition with Imaging
14:46 Hydra acquisition stopped"	ryanque
1122	14 Jul 17:00 Imaging On	ISR		2016_07_1 EW Drift + AMISR	Acquisition system		new	2016-07-14T19:02:01-05:00	2016-07-14T19:02:01-05:00	17:00 Imaging On	ryanque
1128	14 Jul 20:15 Restart Pc Ares	ISR		2016_07_1 EW Drift + AMISR	Acquisition system		new	2016-07-15T03:04:32-05:00	2016-07-15T03:04:32-05:00	 Restart Pc Ares because it is not working	pcondor
1130	15 Jul 01:05 Imaging Off	ISR		2016_07_1 EW Drift + AMISR	Acquisition system	P.Condor	new	2016-07-15T03:07:05-05:00	2016-07-15T03:07:05-05:00	Imaging off	pcondor
1134	15 Jul 03:59 Imaging On	ISR		2016_07_1 EW Drift + AMISR	Acquisition system	P.Condor	new	2016-07-15T07:12:20-05:00	2016-07-15T07:12:20-05:00	Imaging on because spread F is appearing	pcondor
1135	15 Jul 06:19 Imaging Off	ISR		2016_07_1 EW Drift + AMISR	Acquisition system	P.Condor	new	2016-07-15T07:13:20-05:00	2016-07-15T07:13:20-05:00	Imaging OFF	pcondor
1140	15 Jul 15:10 JARS for Hydra was stopped	ISR+Imaging		2016_07_1 EW Drift + AMISR	Acquisition system	I. Manay	new	2016-07-15T19:46:00-05:00	2016-07-15T19:46:00-05:00	Imaging experiment was setup without transmitter to acquire hydra pass for calibration  purposes. The acquisition was from 13:22 to 15:10	imanay
1141	15 Jul 18:00 JARS for Imaging experiment	ISR+Imaging		2016_07_1 EW Drift + AMISR	Acquisition system	I. Manay	new	2016-07-15T19:47:50-05:00	2016-07-15T19:47:50-05:00	Imaging experiment was started for spread-F acquisition	imanay
1147	16 jul 07:25 Imaging Acquisition System Off	ISR+Imaging		2016_07_1 EW Drift + AMISR	Acquisition system		new	2016-07-16T07:39:11-05:00	2016-07-16T07:39:11-05:00	16 jul 07:25 Imaging Acquisition System Off	abelleza
1106	11 Jul 10:40 Antenna	ISR		2016_07_1 EW Drift + AMISR	Antennas		new	2016-07-11T10:54:29-05:00	2016-07-11T10:54:29-05:00	"Wup 1.10
Wdn 1.09
Edn 1.02
Eup 1.10

Mod. Hysell  1.08
Antenna Near 1.00"	ryanque
1112	14 Jul 06:00 Imaging turned off	ISR		2016_07_1 EW Drift + AMISR	End experiment		new	2016-07-14T08:26:57-05:00	2016-07-14T08:26:57-05:00	06:00 Imaging turned off	ryanque
1148	16 Jul 08:03 System Off	ISR+Imaging		2016_07_1 EW Drift + AMISR	End experiment		new	2016-07-16T08:15:06-05:00	2016-07-16T08:15:06-05:00	16 Jul 08:03 System Off	abelleza
1174	27 Aug 08:50 Operativity	ISR		2016_07_1 EW Drift + AMISR	End experiment		new	2016-08-27T06:42:30-05:00	2016-08-27T06:42:30-05:00	"The operativity of the experiment is attached.
This campaign had a delay due to failure of Transmitters"	ryanque
1108	13 Jul 20:00 Operation resume	ISR+Imaging		2016_07_1 EW Drift + AMISR	General	I. Manay	new	2016-07-13T23:47:46-05:00	2016-07-13T23:48:22-05:00	"Person in Charge: I. Manay
Experiment: Ew_Drift&Imaging
1) 18:00 - 20:00
2) Operation Hours: 2:00 h
3) Operation incomplete: 0 min
4) Reasons:
None."	imanay
1125	14 Jul 20:00 Operation Resume	ISR		2016_07_1 EW Drift + AMISR	General		new	2016-07-14T20:12:42-05:00	2016-07-14T20:16:10-05:00		ryanque
1131	15 Jul 05:35 Noise Levels	ISR		2016_07_1 EW Drift + AMISR	General	P.Condor	new	2016-07-15T07:05:39-05:00	2016-07-15T07:05:39-05:00	"14 July 2016
20:25
EW DRIFTS
1:24.39 2:24.85 3:24.78 4:24.75
IMAGING
1:18.37 2:17.43 3:17.68 4:18.69 5:18.49 6:19.02 7:17.82 8:17.84
23:35
EW DRIFTS
1:27.70 2:28.01 3:27.89 4:28.24
IMAGING
1:21.95 2:20.86 3:21.00 4:22.11 5:21.84 6:22.58 7:20.70 8:20.83
15 JULY 2016
02:45
EW DRIFTS
1:23.27 2:23.58 3:23.54 4:23.74

05:35
EW DRIFTS
1:22.92 2:23.27 3:23.38 4:23.44
IMAGING
1:16.76 2:15.94 3:16.17 4:17.12 5:16.79 6:17.50 7:16.46 8:16.25"	pcondor
1137	15 Jul 08:00 Operation Resume	ISR		2016_07_1 EW Drift + AMISR	General	P.Condor	new	2016-07-15T08:12:53-05:00	2016-07-15T08:12:53-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+AMISR
1) 20:00 - 08:00
2) Operation Hours: 11h 50 min
3) Operation incomplete: 10 min
4) Reasons:
_ Problem with transmitter
_ Problem with Pc Ares."	pcondor
1143	15 Jul 19:59 Operation resume	ISR+Imaging		2016_07_1 EW Drift + AMISR	General	I. Manay	new	2016-07-15T19:59:17-05:00	2016-07-15T19:59:17-05:00	"Person in Charge: I. Manay
Experiment: Ew_Drift&Imaging
1) 08:00 - 20:00
2) Operation Hours: 12:00 h
3) Operation incomplete: 0 min
4) Reasons:
None."	imanay
1111	14 Jul 05:00 Spread F finished	ISR		2016_07_1 EW Drift + AMISR	Physical Phenomena		new	2016-07-14T08:24:40-05:00	2016-07-14T08:24:40-05:00	"03:00 Spread F started
05:00 Spread F finished"	ryanque
1142	15 Jul 19:45 Plots	ISR+Imaging		2016_07_1 EW Drift + AMISR	Plot	I. Manay	new	2016-07-15T19:53:04-05:00	2016-07-15T19:53:04-05:00		imanay
1144	15 Jul 23:59 Plots	ISR+Imaging		2016_07_1 EW Drift + AMISR	Plot		new	2016-07-16T07:24:19-05:00	2016-07-16T07:24:19-05:00	Plots	abelleza
1149	16 Jul 08:03 Plots	ISR+Imaging		2016_07_1 EW Drift + AMISR	Plot		new	2016-07-16T08:18:00-05:00	2016-07-16T08:18:00-05:00	16 Jul 08:03 Plots	abelleza
1175	13 Jul 23:59 Plots	ISR		2016_07_1 EW Drift + AMISR	Plot		new	2016-09-26T10:06:24-05:00	2016-09-26T10:06:24-05:00		imanay
1118	14 Jul 11:26 Remove Interference off	ISR		2016_07_1 EW Drift + AMISR	Process/Analysis Program		new	2016-07-14T18:48:24-05:00	2016-07-14T18:48:24-05:00	"10:54 Turned on remove interference on the software Signal Chain
11:26 Turned off remove interference on the software Signal Chain"	ryanque
1127	14 Jul 23:59 Figures	ISR		2016_07_1 EW Drift + AMISR	Process/Analysis Program	P.Condor	new	2016-07-15T02:59:12-05:00	2016-07-15T02:59:12-05:00	Figures of rti and spectras	pcondor
1136	15 Jul 07:50 Figures	ISR		2016_07_1 EW Drift + AMISR	Process/Analysis Program	P.Condor	new	2016-07-15T07:56:48-05:00	2016-07-15T07:56:48-05:00	Figures of rtis and spectras	pcondor
1146	16 Jul 03:50 Re-star acquisition	ISR+Imaging		2016_07_1 EW Drift + AMISR	Process/Analysis Program		new	2016-07-16T07:33:12-05:00	2016-07-16T07:33:12-05:00	16 Jul 03:50 Re-star acquisition at PC ARES	abelleza
1113	14 Jul 06:40 Spark Gaps adjustment	ISR		2016_07_1 EW Drift + AMISR	Reception		new	2016-07-14T08:40:21-05:00	2016-07-14T08:40:21-05:00	"13 Jul
20:40 Spark gap adjustment
23:04 Spark gap adjustment
14 Jul
01:35 Spark gap adjustment
04:07 Spark gap adjustment
06:40 Spark gap adjustment"	ryanque
1114	14 Jul 06:45 Noise measure	ISR		2016_07_1 EW Drift + AMISR	Reception		new	2016-07-14T18:37:24-05:00	2016-07-14T18:37:24-05:00	"13 July
23:00  ChA 28.38  ChB 28.95  ChC  29.15  ChD  29.23
14 July
01:30  ChA 23.52  ChB 23.57  ChC  23.82  ChD  23.82
03:26  ChA 22.67  ChB 22.84  ChC  22.83  ChD  22.88
05:15  ChA 22.85  ChB 22.82  ChC  22.73  ChD  22.73
06:45  ChA 22.46  ChB 22.53  ChC  22.49  ChD  22.40


"	ryanque
1117	14 Jul 10:30 Diode proteccion removed	ISR		2016_07_1 EW Drift + AMISR	Reception		new	2016-07-14T18:46:23-05:00	2016-07-14T18:46:23-05:00	10:30 There was an extra set of diode protección which was removed for the EW Drift.	ryanque
1123	14 Jul 18:20 Imaging atenaution	ISR		2016_07_1 EW Drift + AMISR	Reception		new	2016-07-14T19:03:46-05:00	2016-07-14T19:03:46-05:00	"ChA  0    Ch E 2
ChB  0    Ch F 2
ChC  0    Ch G 3
ChD  0    Ch H 0"	ryanque
1132	15 Jul 05:33 Spark gaps adjustment	ISR		2016_07_1 EW Drift + AMISR	Spark Gaps	J. Lavado	new	2016-07-15T07:10:12-05:00	2016-07-15T07:10:12-05:00	"14 07 2016
22:00 Spark gaps adjustment

15 07 2016
00:31 Spark gaps adjustment
02:28 Spark gaps adjustment
05:33 Spark gaps adjustment."	pcondor
1138	15 Jul 19:23 Spark gaps adjustment	ISR+Imaging		2016_07_1 EW Drift + AMISR	Spark Gaps	J. Inostroza	new	2016-07-15T19:41:50-05:00	2016-07-15T19:56:37-05:00	"10:15 Spark gaps adjustment.
12:30 Spark gaps adjustment.
14:55 Spark gaps adjustment.
17:20 Spark gaps adjustment.
19:23 Spark gaps adjustment."	imanay
1145	16 Jul 05:44 Spark gaps adjustment	ISR+Imaging		2016_07_1 EW Drift + AMISR	Spark Gaps		new	2016-07-16T07:30:38-05:00	2016-07-16T07:34:43-05:00	"15 Jul 21:29 Spark gaps adjustment.
15 Jul 23:34 Spark gaps adjustment.
16 Jul 01:51 Spark gaps adjustment.
16 Jul 03:52 Spark gaps adjustment.
16 Jul 05:44 Spark gaps adjustment.

By Walter Rojas."	abelleza
1105	11 Jul 10:30 Start Campaign	ISR		2016_07_1 EW Drift + AMISR	Start experiment		new	2016-07-11T10:53:24-05:00	2016-07-11T10:53:24-05:00	"Start: 11 July 2016
End:   15 July 2016

User: Fabiano Rodriguez

Mode: EW Drift + Imaging and AMISR"	ryanque
1107	13 Jul 18:00 Experiment started	ISR+Imaging		2016_07_1 EW Drift + AMISR	Start experiment	I. Manay	new	2016-07-13T23:43:31-05:00	2016-07-13T23:43:31-05:00	Experiment with good data started at 6:00 PM. Vipir and AMISR systems are also running.	imanay
1115	14 Jul 08:00 Operation resume	ISR		2016_07_1 EW Drift + AMISR	Start experiment		new	2016-07-14T18:38:04-05:00	2016-07-14T18:43:51-05:00	"Person in Charge: A. Belleza
Experiment: Ew_Drift&Imaging
1) 20:00 - 08:00
2) Operation Hours: 11:00 h
3) Operation incomplete: 60 min
4) Reasons: 
Restart of acquisition system"	ryanque
1119	14 Jul 13:20 Transmitter on	ISR		2016_07_1 EW Drift + AMISR	Transmitters		new	2016-07-14T18:49:53-05:00	2016-07-14T18:49:53-05:00	"13:00 Transmitter off for Hydra acquisition
13:20 Transmitter on for Hydra"	ryanque
1121	14 Jul 16:18 EW Drift On	ISR		2016_07_1 EW Drift + AMISR	Transmitters		new	2016-07-14T19:01:05-05:00	2016-07-14T19:01:05-05:00	"16:07 EW Drift Down, Test Driver 2
16:09 EW Drift On
16:14 EW Drift Down, Test Driver 2
16:18 EW Drift On
"	ryanque
1124	14 Jul 19:20 Transmitter power measurements	ISR		2016_07_1 EW Drift + AMISR	Transmitters		new	2016-07-14T19:32:56-05:00	2016-07-14T19:32:56-05:00	"13 July

15:00 LV ON
15:10 HV ON

15:18 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
D2   -12 dBm 
17:50 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
D2   -12 dBm
19:13 Alarm detected at PA 1 screen power supply
20:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2 -11.2 dBm
Line voltage and power: 4060 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2 -11.2 dBm
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -11.2 dBm
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -11.2 dBm
Line voltage and power: 4060 VAC, 310 KW

14 July

00:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -11.2 dBm
Line voltage and power: 4050 VAC, 310 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -11.2 dBm
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -11.2 dBm
Line voltage and power: 4050 VAC, 310 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -11.2 dBm
Line voltage and power: 4050 VAC, 310 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -11.2 dBm
Line voltage and power: 4050 VAC, 310 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -11.2 dBm
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -11.2 dBm
06:20 D2 OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -
Line voltage and power: 4050 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2 -
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
D2 -
Line voltage and power: 4010 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2 -
Line voltage and power: 4080 VAC, 300 KW
13:00 TX OFF
13:20 TX ON
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
D2 -
Line voltage and power: 4000 VAC, 240 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
D2 -
Line voltage and power: 4000 VAC, 260 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2 ON -9.0 dBm
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2  -9.0 dBm
18:00 Alarm at PA 1 screen power supply
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2  -9.0 dBm
Line voltage and power: 4070 VAC, 300 KW










"	ryaya
1126	14 Jul 23:00 Transmitter power measurements	ISR		2016_07_1 EW Drift + AMISR	Transmitters		new	2016-07-14T23:11:34-05:00	2016-07-14T23:11:34-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2  -9.3 dBm
Line voltage and power: 4080 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2  -9.3 dBm
Line voltage and power: 4080 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2  -9.2 dBm
Line voltage and power: 4030 VAC, 310 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2  -9.2 dBm
Line voltage and power: 4030 VAC, 310 KW"	vquesada
1129	14 Jul 23:05 Tx off	ISR		2016_07_1 EW Drift + AMISR	Transmitters	P.Condor	new	2016-07-15T03:05:57-05:00	2016-07-15T03:05:57-05:00	Problem with transmitter	pcondor
1133	15 Jul 07:00 Transmitter power measurements	ISR		2016_07_1 EW Drift + AMISR	Transmitters		new	2016-07-15T07:10:23-05:00	2016-07-15T07:10:23-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
D2  -9.2 dBm
Line voltage and power: 4050 VAC, 310 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
D2  -9.2 dBm
Line voltage and power: 4050 VAC, 310 KW
01:05 Driver 2 OFF 
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Line voltage and power: 4050 VAC, 310 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Line voltage and power: 4050 VAC, 310 KW
04:00 Driver 2 ON
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
D2  -9.2 dBm
Line voltage and power: 4050 VAC, 310 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2  -9.0 dBm
Line voltage and power: 4060 VAC, 310 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2  -9.1 dBm
Line voltage and power: 4020 VAC, 310 KW
06:20 Driver 2 OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2  -9.1 dBm
Line voltage and power: 4020 VAC, 310 Kw"	vquesada
1139	15 Jul 19:30 Transmitter power measurement	ISR		2016_07_1 EW Drift + AMISR	Transmitters		new	2016-07-15T19:43:27-05:00	2016-07-15T19:43:27-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2 -
Line voltage and power: 4090 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2 -
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
D2 -
Line voltage and power: 4000 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2 -
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2 -
Line voltage and power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
D2 -
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2 -
Line voltage and power: 4040 VAC, 260 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2 -
16:53 CROWBAR
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Line voltage and power: 4030 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
D2 ON -9.0 dBm
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
D2 -9.2 dBm
Line voltage and power: 4080 VAC, 300 KW"	ryaya
1155	26 Jul 10:10 Restart EW-Drift batch in ARES	ISR		2016_07_2 ISR School	Acquisition system	P.Condor	new	2016-07-26T19:22:06-05:00	2016-07-26T19:22:06-05:00	Restart ew_drift batch in pc Ares.	pcondor
1152	25 Jul 12:10 Antenna VSWR	ISR		2016_07_2 ISR School	Antennas		new	2016-07-25T12:28:07-05:00	2016-07-25T12:28:07-05:00	"WUp 1.04
WDn 1.05
EUp 1.03
EDn 1.07"	ryanque
1171	17 Aug 11:00 Report	ISR		2016_07_2 ISR School	End experiment		new	2016-08-17T13:14:14-05:00	2016-08-17T13:14:14-05:00	Attached is the report and Operativity	ryanque
1159	26 Jul 07:31 Operation Resume	ISR		2016_07_2 ISR School	General	P.Condor	new	2016-07-26T19:53:18-05:00	2016-07-26T19:53:18-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts
1) 08:30 - 19:30
2) Operation Hours: 11h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
1153	26 Jul 08:12 Digisonde turned off	ISR		2016_07_2 ISR School	Other Instruments	P.Condor	new	2016-07-26T19:18:39-05:00	2016-07-26T19:18:39-05:00	Digisonde is turned off	pcondor
1157	26 Jul 19:32 Figures	ISR		2016_07_2 ISR School	Process/Analysis Program	P.Condor	new	2016-07-26T19:38:53-05:00	2016-07-26T19:38:53-05:00	Figures of rti and spectras.	pcondor
1156	26 Jul 16:35 Spark gaps adjustment	ISR		2016_07_2 ISR School	Spark Gaps	W. Rojas	new	2016-07-26T19:25:21-05:00	2016-07-26T19:25:21-05:00	"10:37 Spark gaps adjustment
12:39 Spark gaps adjustment
14:48 Spark gaps adjustment
16:35 Spark gaps adjustment"	pcondor
1151	25 Jul 10:00 Log Created	ISR		2016_07_2 ISR School	Start experiment		new	2016-07-25T10:10:24-05:00	2016-07-25T10:10:24-05:00	"ISR School
ISR Campaign (EW Drift only)
Tuesday 26 July 09:00 - 19:30 LT
"	ryanque
1154	26 Jul 08:30 Start Experiment	ISR		2016_07_2 ISR School	Start experiment	P.Condor	new	2016-07-26T19:19:43-05:00	2016-07-26T19:19:43-05:00	Start experiment with Transmitter all ok.	pcondor
1158	26 Jul 19:45 Transmitter power measurements	ISR		2016_07_2 ISR School	Transmitters		new	2016-07-26T19:48:53-05:00	2016-07-26T19:48:53-05:00	"07:50 LV ON
08:15 HV ON
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4030 VAC, 240 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Line voltage and power: 4070 VAC, 240 KW
11:10 Failure at PA1 screen power supply
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4050 VAC, 240 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4060 VAC, 240 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.7 dBm
Line voltage and power: 4020 VAC, 240 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4070 VAC, 240 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Line voltage and power: 4070 VAC, 240 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4050 VAC, 240 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4080 VAC, 240 KW
19:30 HV OFF
19:50 LV OFF"	ryaya
1172	17 Aug 17:00 TX Off	ISR		2016_08 PA3 Test	End experiment		new	2016-08-22T14:33:00-05:00	2016-08-22T14:33:00-05:00	The campaign has ended	ryanque
1173	22 Aug 14:30 Report	ISR		2016_08 PA3 Test	End experiment		new	2016-08-22T14:51:58-05:00	2016-08-22T14:51:58-05:00	Attached is the report and the Operativity	ryanque
1162	16 Aug 19:57 Operation Resume	ISR		2016_08 PA3 Test	General		new	2016-08-16T20:11:57-05:00	2016-08-16T20:13:28-05:00	"Person in Charge: R. Yanque
Experiment: PA#3 Test
1) 15:30 - 20:00
2) Operation Hours: 04h 29 min
3) Operation incomplete: 01 min
4) Reasons:
Transmitter fall at 17:20"	ryanque
1163	16 Aug 19:30 Spark Gap	ISR		2016_08 PA3 Test	General		new	2016-08-16T20:14:28-05:00	2016-08-16T20:14:28-05:00	"17:39 Spark Gap
19:30 Spark Gap"	ryanque
1168	17 Ago 05;49 Noise levels	ISR		2016_08 PA3 Test	General	P.Condor	new	2016-08-17T07:30:43-05:00	2016-08-17T07:30:43-05:00	"16 Aug
21:12
0:1.87 1:23.54 2:19.39 3:21.73
17 Aug.
00:02
0:1.90 1:15.21 2:18:22 3:17.02
05:49
0:1.86 1:14.59 2:16.82 3:15.63"	pcondor
1169	17 Ago 08:00 Operation Resume	ISR		2016_08 PA3 Test	General	P.Condor	new	2016-08-17T08:03:41-05:00	2016-08-17T08:03:41-05:00	"Person in Charge: P. Condor.
Experiment: PA3 Test
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
1165	17 Ago 00:05 Figures	ISR		2016_08 PA3 Test	Process/Analysis Program	P.Condor	new	2016-08-17T06:21:51-05:00	2016-08-17T06:21:51-05:00	Figures of rti and spectra	pcondor
1170	17 Ago 17:00 Figures	ISR		2016_08 PA3 Test	Process/Analysis Program	P.Condor	new	2016-08-17T08:08:37-05:00	2016-08-18T11:48:32-05:00	Figures of spectra and rti	pcondor
1167	17 Ago 06:20 Spark gaps adjustment	ISR		2016_08 PA3 Test	Spark Gaps	J. Lavado	new	2016-08-17T07:26:44-05:00	2016-08-17T07:26:44-05:00	"16 Aug
21:33 Spark gaps adjustment
23:41 Spark gaps adjustment
17 Aug.
02:07 Spark gaps adjustment
04:02 Spark gaps adjustment
06:20 Spark gaps adjustment"	pcondor
1160	16 Aug 14:00 Log Created	ISR		2016_08 PA3 Test	Start experiment		new	2016-08-16T19:03:09-05:00	2016-08-16T19:03:42-05:00	"Mode EW Drift with JULIA Antena
To test the PA#3 a campaign has been scheduled
Starts: Tuesady August 16 2016
Ends:   Thursday August 18 2016"	ryanque
1161	16 Aug 15:20 Start Experiment	ISR		2016_08 PA3 Test	Start experiment		new	2016-08-16T19:04:22-05:00	2016-08-16T19:04:56-05:00	The campaign has started	ryanque
1164	16 Aug 23:00 Transmitter Power Measurements	ISR		2016_08 PA3 Test	Transmitters		new	2016-08-16T23:17:55-05:00	2016-08-17T13:04:19-05:00	"08:20 LV Tx3 FIL ON
14:00 HV ON
15:22 TX Power sample (-70 dB coupling)
Tx3 +5.8 dBm
Line voltage and power: 4000 VAC, 300 KW
15:50 TX Power sample (-70 dB coupling)
Tx3 +5.8 dBm
Line voltage and power: 4000 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx3 +6.6 dBm
Line voltage and power: 4050 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
Tx3 +6.7 dBm
Line voltage and power: 4010 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx3 +6.8 dBm
Line voltage and power: 4000 VAC, 300 KW
20:00 TX Power sample (-70 dB coupling)
Tx3 +6.8 dBm
Line voltage and power: 4000 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx3 +6.7 dBm
Line voltage and power: 4000 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx3 +6.7 dBm
Line voltage and power: 4000 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx3 +6.7 dBm
Line voltage and power: 4000 VAC, 300 KW"	vquesada
1166	16 Jul 07:00 Transmitter Power Measurement7	ISR		2016_08 PA3 Test	Transmitters		new	2016-08-17T07:17:14-05:00	2016-08-17T07:17:14-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx3 +6.7 dBm
Line voltage and power: 4000 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx3 +6.7 dBm
Line voltage and power: 4000 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx3 +6.7 dBm
Line voltage and power: 4000 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx3 +6.6 dBm
Line voltage and power: 4000 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx3 +6.6 dBm
Line voltage and power: 4000 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx3 +6.7 dBm
Line voltage and power: 4000 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx3 +6.7 dBm
Line voltage and power: 4000 VAC, 300 KW
07:00 TX Power sample (-70 dB coupling)
Tx3 +6.7 dBm
Line voltage and power: 4000 VAC, 300 KW"	vquesada
1178	29 Sep 11:00 Bad spectra	ISR		2016_09 ISCOD Storm EW Drift	Acquisition system		new	2016-09-29T15:38:34-05:00	2016-10-03T10:35:07-05:00	"Bad spectra in coherence for problem in pc Ares 

The Proctime0 should be less than 200.
If its higher than 1000, it is problem with running applications or virus."	pcondor
1190	30 Set 11:38 Restart Acquisition in ARES	ISR		2016_09 ISCOD Storm EW Drift	Acquisition system	P.Condor	new	2016-09-30T19:27:10-05:00	2016-10-03T11:05:39-05:00	We canceled program in ARES that it is saturating the CPU.	pcondor
1177	28 Sep 18:00 Antenna VSWR	ISR		2016_09 ISCOD Storm EW Drift	Antennas		new	2016-09-29T15:08:53-05:00	2016-09-29T15:08:53-05:00	"WUp 1.02
WDn 1.04
EUp 1.09
EDn 1.03"	ryanque
1202	19 Oct 09:00 Report Campaign	ISR		2016_09 ISCOD Storm EW Drift	End experiment		new	2016-10-19T09:52:00-05:00	2016-10-19T09:52:00-05:00	"The productivity of the Campaign is attached
The Report of the Campaign is attached

The interference in the 1 MHz band was due to JRO´s 50 MHz Beacon, this has been corrected."	ryanque
1182	29 Sep 19:59 Operation resume	ISR		2016_09 ISCOD Storm EW Drift	General	I. Manay	new	2016-09-29T23:00:44-05:00	2016-10-03T11:12:47-05:00	"Person in Charge: I. Manay
Experiment: Ew_Drift
1) 10:00 - 20:00
2) Operation Hours: 09:30 h
3) Operation incomplete: 30 min
4) Reasons:
30 minutes black out."	imanay
1183	29 Sep 19:30 Black out	ISR		2016_09 ISCOD Storm EW Drift	General	I. Manay	new	2016-09-29T23:01:01-05:00	2016-09-29T23:01:01-05:00	The radar system was off from 19:20 to 19:45 due to a five minutes black out. Acquisition and transmitter systems were restablished.	imanay
1186	30 Sep 07:50 Operation resume	ISR		2016_09 ISCOD Storm EW Drift	General	avaldez	new	2016-09-30T06:33:14-05:00	2016-09-30T06:33:14-05:00	"Person in Charge: A. Valdez
Experiment: Ew_Drift
1) 20:00 - 08:00
2) Operation Hours: 11:50 h
3) Operation incomplete: 10 min
4) Reasons:
10 minutes Energy cut"	avaldez
1196	30 Set 20:00 Operation Resume	ISR		2016_09 ISCOD Storm EW Drift	General	P.Condor	new	2016-09-30T20:02:13-05:00	2016-09-30T20:02:13-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift
1) 08:00 - 20:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
1180	29 Sep 19:00 Interference during the experiment	ISR		2016_09 ISCOD Storm EW Drift	Plot	I. Manay	new	2016-09-29T22:58:04-05:00	2016-09-29T22:58:04-05:00	A fixed interference was observed. See the attachement.	imanay
1187	30  Sep 00:01 Plots	ISR		2016_09 ISCOD Storm EW Drift	Plot		new	2016-09-30T06:34:51-05:00	2016-09-30T06:34:51-05:00		avaldez
1198	30 Set 23:59 Plots	ISR		2016_09 ISCOD Storm EW Drift	Plot	abelleza	new	2016-10-01T06:58:57-05:00	2016-10-01T06:58:57-05:00	30 Set 23:59 Plots	abelleza
1201	01 Oct 08:04 Plots	ISR		2016_09 ISCOD Storm EW Drift	Plot		new	2016-10-01T08:15:12-05:00	2016-10-01T08:15:12-05:00		abelleza
1189	30 Set 11:30 Interchange of Channels	ISR		2016_09 ISCOD Storm EW Drift	Process/Analysis Program	P.Condor	new	2016-09-30T19:24:22-05:00	2016-09-30T19:24:22-05:00	Interchange channels in program IDL: 0,1->3,4.	pcondor
1191	30 Set 11:40 Finish processing of drifts with the interchange of channels.	ISR		2016_09 ISCOD Storm EW Drift	Process/Analysis Program	P.Condor	new	2016-09-30T19:28:32-05:00	2016-09-30T19:28:32-05:00	Finish processing of drifts with the interchange of channels. Drifts now are ok.	pcondor
1192	30 Set 19:02 Noise levels	ISR		2016_09 ISCOD Storm EW Drift	Process/Analysis Program	P.Condor	new	2016-09-30T19:37:02-05:00	2016-09-30T19:37:02-05:00	"EW Drifts
10:00
A:22.05 B:22.52 C:21.72 D:21.79
13:50
A:22.75 B:22.90 C:23.04 D:24.02
17:27
A:26.91 B:27.33 C:27.17 D:28.89
19:02
A:25.05 B:25.45 C:25.07 D:26.36"	pcondor
1195	30 Set 19:50 Figures	ISR		2016_09 ISCOD Storm EW Drift	Process/Analysis Program	P.Condor	new	2016-09-30T19:55:45-05:00	2016-09-30T19:55:45-05:00	Figures of rti,spectras and results	pcondor
1179	29 Sep 15:40 Test with JARS	ISR		2016_09 ISCOD Storm EW Drift	Reception	I. Manay	new	2016-09-29T22:57:28-05:00	2016-09-29T22:57:28-05:00	Four splitters were used to connect reception lines to the JARS system.	imanay
1181	29 Sep 19:20 Spark gaps adjustment	ISR		2016_09 ISCOD Storm EW Drift	Spark Gaps	A. Coronado	new	2016-09-29T22:59:26-05:00	2016-09-29T23:02:35-05:00	"12:03 Spark gaps adjustment.
14:26 Spark gaps adjustment.
17:05 Spark gaps adjustment.
19:20 Spark gaps adjustment."	imanay
1185	30  Sep 07:50 Spark gaps adjustment	ISR		2016_09 ISCOD Storm EW Drift	Spark Gaps	avaldez	new	2016-09-30T06:27:42-05:00	2016-09-30T06:27:42-05:00	"22:06 Spark gaps adjustment.
00:12 Spark gaps adjustment.
02:30 Spark gaps adjustment.
05:01 Spark gaps adjustment.
07:31 Spark gaps adjustment
    "	avaldez
1193	30 Set 17:45 Spark gaps adjustment	ISR		2016_09 ISCOD Storm EW Drift	Spark Gaps	A. Coronado	new	2016-09-30T19:38:49-05:00	2016-09-30T19:38:49-05:00	"09:58 Spark gaps adjustment
12:28 Spark gaps adjustment
15:00 Spark gaps adjustment
17:45 Spark gaps adjustment"	pcondor
1199	01 Oct 06:30 Spark gaps adjustment	ISR		2016_09 ISCOD Storm EW Drift	Spark Gaps		new	2016-10-01T07:08:03-05:00	2016-10-01T07:08:03-05:00	"01 Set - Spark gaps adjustment:
20:30 Spark gaps adjustment
22:55 Spark gaps adjustment

01 Oct - Spark gaps adjustment:
01:30 Spark gaps adjustment
03:57 Spark gaps adjustment
06:30 Spark gaps adjustment

By Jose Lavado."	abelleza
1176	28 Sep 17:00 Log Created	ISR		2016_09 ISCOD Storm EW Drift	Start experiment		new	2016-09-29T15:05:17-05:00	2016-09-29T15:05:17-05:00	"The log was created for this ISCOD Storm Campaign
Start: Sep 29 08:00
End:   Oct 01 08:00
Mode: EW Drift
"	ryanque
1184	29 Set 23:20 Transmitter Power Measurements	ISR		2016_09 ISCOD Storm EW Drift	Transmitters		new	2016-09-29T23:29:19-05:00	2016-10-03T10:56:46-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4100 VAC, 260 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW"	vquesada
1188	30 Sep 07:00 Transmitter Power Measurements	ISR		2016_09 ISCOD Storm EW Drift	Transmitters		new	2016-09-30T07:09:43-05:00	2016-09-30T07:09:43-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
05:45 Blackout
05:50 LV  ON
05:55 HV  ON
06:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW

"	vquesada
1194	30 Sep 19:10 Transmitter power measurements	ISR		2016_09 ISCOD Storm EW Drift	Transmitters		new	2016-09-30T19:50:04-05:00	2016-09-30T19:50:04-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Line voltage and power: 4060 VAC, 260 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4050 VAC, 260 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Line voltage and power: 4080 VAC, 260 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4060 VAC, 260 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.9 dBm
Line voltage and power: 4090 VAC, 260 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4050 VAC, 260 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4050 VAC, 260 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4040 VAC, 260 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.8 dBm
Line voltage and power: 4050 VAC, 260 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW"	ryaya
1197	30 Sep 23:08 Transmitter Power Measurements	ISR		2016_09 ISCOD Storm EW Drift	Transmitters		new	2016-09-30T23:16:33-05:00	2016-09-30T23:16:33-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW"	vquesada
1200	01 Oct 08:00 Transmitter Power Measurements	ISR		2016_09 ISCOD Storm EW Drift	Transmitters		new	2016-10-01T08:11:33-05:00	2016-10-01T08:11:33-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +7.0 dBm
Line voltage and power: 4100 VAC, 260 KW
08:00  HV OFF
08:10  LV OFF"	vquesada
1204	25 Oct 11:10 Antenna VSWR	ISR		2016_10 LP Faraday	Antennas		new	2016-10-25T17:24:06-05:00	2016-10-25T17:24:06-05:00	"WUp 1.05
WDn 1.04
NDn 1.07
NUp 1.08
EUp 1.03
EDn 1.08
SDn 1.09
SUp 1.08"	ryanque
1220	27 Oct 19:42 Spark Gap Adjustment	ISR		2016_10 LP Faraday	Antennas		new	2016-10-27T20:03:47-05:00	2016-10-27T20:03:47-05:00	"10:14 Spark Gap Adjustment
13:04 Spark Gap Adjustment
16:10 Spark Gap Adjustment
18:58 Spark Gap Adjustment"	ryanque
1207	26 Oct 15:00 Break at the experiment	ISR		2016_10 LP Faraday	Break Experiment	I. Manay	new	2016-10-26T19:33:46-05:00	2016-10-26T19:33:46-05:00	Power of the two transmitters were measure, then the experiment was stopped to renew sparkgaps.	imanay
1208	26 Oct 16:15 Experiment was re-established	ISR		2016_10 LP Faraday	General	I. Manay	new	2016-10-26T19:36:46-05:00	2016-10-26T19:36:46-05:00	After they finished the switchyard job, the experiment was re-established.	imanay
1211	26 Oct 19:59 Operation Resume	ISR		2016_10 LP Faraday	General	I. Manay	new	2016-10-26T20:12:43-05:00	2016-10-26T20:12:43-05:00	"Person in Charge: I. Manay.
Experiment: EW_Drift
1) 07:30 - 20:00
2) Operation Hours: 11h 15 min
3) Operation incomplete: 1h 15 min
4) Reasons:
spark-gaps re-new."	imanay
1214	27 Oct 07:06 Noise levels	ISR		2016_10 LP Faraday	General	P.Condor	new	2016-10-27T07:48:56-05:00	2016-10-27T07:48:56-05:00	"26 Oct
22:10
1:12.81 2:13.13 1:12.84 2:13.05 1:12.80 2:13.03 
27 Oct
01:23
1:14.07 2:11.58 1:14.11 2:11.61 1:13.91 2:11.64
04:45
1:13.53 2:14.00 1:13.54 2:13.96 1:13.52 2:13.93
07:06
1:11.78 2:12.08 1:11.79 2:12.07 1:11.84 2:12.10"	pcondor
1216	27 Oct 07:50 Operation Resume	ISR		2016_10 LP Faraday	General	P.Condor	new	2016-10-27T08:05:19-05:00	2016-10-27T08:05:19-05:00	"Person in Charge: P. Condor.
Experiment: EW_Drift
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
1219	27 Oct 19:38 Noise Levels	ISR		2016_10 LP Faraday	General		new	2016-10-27T20:01:51-05:00	2016-10-27T20:37:18-05:00	"10:00
Ch1  11.8   11.64  11.55  11.41
Ch2  12.14  12.20  12.15  12.07

13:10
Ch1  11.76  11.58  11.47  11.35
Ch2  12.12  12.08  12.09  12.03

16:31
Ch1  17.88  17.79  17.76  17.64
Ch2  18.48  18.46  18.46  18.28

19:30
Ch1  13.40  13.46  13.44  13.28  
Ch2  13.66  13.54  13.56  13.48"	ryanque
1223	27 Oct 19:57 Operation Resume	ISR		2016_10 LP Faraday	General		new	2016-10-27T20:20:01-05:00	2016-10-27T20:20:01-05:00	"Person in Charge: R. Yanque.
Experiment: EW_Drift
1) 08:00 - 19:40
2) Operation Hours: 11h 24 min
3) Operation incomplete: 16 min
4) Reasons:
HV Interfernce in transmitter 4"	ryanque
1224	02 Nov 11:00 Final Report and Operativity	ISR		2016_10 LP Faraday	General		new	2016-11-02T11:22:45-05:00	2016-11-02T11:22:45-05:00		ryanque
1221	27 Oct 19:44 Plots	ISR		2016_10 LP Faraday	Plot		new	2016-10-27T20:05:41-05:00	2016-10-27T20:05:41-05:00		ryanque
1212	26 Oct 24:00 Figures	ISR		2016_10 LP Faraday	Process/Analysis Program	P.Condor	new	2016-10-27T07:13:59-05:00	2016-10-27T07:13:59-05:00	Figures of rtis, spectra and noises	pcondor
1206	26 Oct 07:30 Adjustment of reception line	ISR		2016_10 LP Faraday	Reception	I. Manay	new	2016-10-26T19:30:25-05:00	2016-10-26T19:30:25-05:00	1dB attenuation was applied to the A channel.	imanay
1210	26 Oct 19:00 Spark gaps adjustment history	ISR		2016_10 LP Faraday	Spark Gaps	J. Lavado	new	2016-10-26T20:12:03-05:00	2016-10-26T20:12:03-05:00	"07:25 Spark gaps adjustment.
10:17 Spark gaps adjustment.
13:40 Spark gaps adjustment.
16:30 Spark gaps adjustment.
19:00 Spark gaps adjustment."	imanay
1215	27 Oct 07:14 Spark gaps adjustment	ISR		2016_10 LP Faraday	Spark Gaps	W. Rojas	new	2016-10-27T07:51:13-05:00	2016-10-27T07:51:13-05:00	"26 Oct
22:09 Spark gaps adjustment
27 Oct
00:59 Spark gaps adjustment
03:59 Spark gaps adjustment
07:14 Spark gaps adjustment"	pcondor
1203	25 Oct 11:00 Log Created	ISR		2016_10 LP Faraday	Start experiment	ryanque	new	2016-10-25T17:22:38-05:00	2016-10-25T17:22:38-05:00	"LP Campaign
Oct 26-27 2016
LP Faraday Mode"	ryanque
1205	26 Oct 07:30 Start of the experiment	ISR		2016_10 LP Faraday	Start experiment	I. Manay	new	2016-10-26T19:27:13-05:00	2016-10-26T19:27:13-05:00		imanay
1209	26 Oct 19:30 Transmitter Power Measurements	ISR		2016_10 LP Faraday	Transmitters		new	2016-10-26T19:50:06-05:00	2016-10-26T19:50:06-05:00	"26/10/2016
06:40 LV ON
06:50 HV ON
07:00 Rf ON
07:25 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.0 dBm
Line voltage and power: 4090 VAC, 340 KW
09:20 source fails Screen PA1
10:08 source fails Screen PA1
15:00 TX Power sample (-70 dB coupling)
Tx1 INC:+5.8 dBm/REF:-15.5 dBm
Tx4 INC:+5.8 dBm/REF:-11.7 dBm
Line voltage and power: 4090 VAC, 340 KW
15:00 Rf:OFF Spark gap change transmission lines
16:06 Rf:ON
16:41 source fails Screen PA1


"	rtadeo
1213	27 Oct 07:00 Transmitter Power Measurements	ISR		2016_10 LP Faraday	Transmitters		new	2016-10-27T07:21:14-05:00	2016-10-27T07:21:14-05:00	"26 Oct Transmitter Power Measurements

20:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW

27 Oct Transmitter Power Measurements

00:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +5.8 dBm
Tx4 +5.8 dBm
Line voltage and power: 4080 VAC, 350 KW

"	vquesada
1217	27 Oct 08:00 Interference in Faraday Channel	ISR		2016_10 LP Faraday	Transmitters		new	2016-10-27T16:51:38-05:00	2016-10-27T16:51:38-05:00	"A strange interference in Faraday Channel has appeared.
08:20 TX Off
There was an interference in the meter of HV of TX 4
08:36 TX On"	ryanque
1218	26 Oct 10:00 Transmitter initial values	ISR		2016_10 LP Faraday	Transmitters		new	2016-10-27T17:00:33-05:00	2016-10-27T17:00:33-05:00	"Transmitters initial operational measurements
(All values related to the maximum duty cycle: 4%) 

PA 1
P.Inc: +5.8 dBm (-70 dB coupling)
P.Ref: -15.3 dBm (-70 dB coupling)
V.Plate: 20 KV
I.plate: 3.5 A
V.Bias: -460 VDC
I.Bias: 65 mA
V.Screen: 900 VDC
I.Screen: 10 mA
V.Fil: 16.5 VDC
I.VACION: 0.12 uA

PA 4
P.Inc: +5.8 dBm (-70 dB coupling)
P.Ref: -11.7 dBm (-70 dB coupling)
V.Plate: 20 KV
I.plate: 3.6 A
V.Bias: -460 VDC
I.Bias: 40 mA
V.Screen: 900 VDC
I.Screen: 22 mA
V.Fil: 16.5 VDC
I.VACION: 0.05 uA

"	ryaya
1222	27 Oct 19:55 Transmitter report	ISR		2016_10 LP Faraday	Transmitters		new	2016-10-27T20:12:48-05:00	2016-10-27T20:12:48-05:00	"08:20 HV OFF, isolation problem on PA 4 +B local current meter. Meter is producing arcing.
08:35 Problem fixed, transmitter restart operation.
From 08:35 to 19:45 Transmitter was stable at the same output power:

TX 1: +5.8 dBm (-70 dB coupling)
TX 4: +5.8 dBm (-70 dB coupling)
"	ryaya
1250	29 Nov 21:09  Pc ARES had hanged up	ISR		2016_11 ISR + Imaging (ISCOD)	Acquisition system	avaldez	new	2016-11-29T21:28:46-05:00	2016-11-29T21:28:46-05:00	Pc ARES had hanged up and acquisition restart	avaldez
1252	30 Nov 09:43 Restart pc ARES	ISR		2016_11 ISR + Imaging (ISCOD)	Acquisition system	P.Condor	new	2016-11-29T21:39:39-05:00	2016-11-29T21:39:39-05:00	Restart pc ARES because it was not working and restart acquisition of EWDRIFT	pcondor
1255	30 Nov 18:02 Starting Imaging	ISR		2016_11 ISR + Imaging (ISCOD)	Acquisition system	P.Condor	new	2016-11-30T01:37:43-05:00	2016-11-30T01:37:43-05:00	Starting Imaging	pcondor
1257	30 Nov 19:10 Imaging off	ISR		2016_11 ISR + Imaging (ISCOD)	Acquisition system	P.Condor	new	2016-11-30T02:26:28-05:00	2016-11-30T02:26:28-05:00	Imaging off because disk is full in JARS	pcondor
1265	01 Dec 06:00 Restart of PC ARES	ISR		2016_11 ISR + Imaging (ISCOD)	Acquisition system	I. Manay	new	2016-11-30T14:49:18-05:00	2016-11-30T14:49:18-05:00	ARES was restarted due it hung. The acquisition of the ew_drifts experiment was stopped during 10 minutes: From 5:50 to 6:00 AM.	imanay
1274	02 Dec 06:17 Imaging is off	ISR		2016_11 ISR + Imaging (ISCOD)	Acquisition system	P.Condor	new	2016-12-01T13:57:51-05:00	2016-12-01T13:57:51-05:00	Imaging is off	pcondor
1276	02 Dec 06:22 Restart Faraday because was desynchronized	ISR		2016_11 ISR + Imaging (ISCOD)	Acquisition system	P.Condor	new	2016-12-01T14:01:57-05:00	2016-12-01T14:01:57-05:00	Restart Faraday because was desynchronized	pcondor
1288	02 Dec 11:11 Restart Faraday	ISR		2016_11 ISR + Imaging (ISCOD)	Acquisition system	J.Espinoza	new	2016-12-05T17:19:56-05:00	2016-12-05T17:19:56-05:00	"Restart Faraday because it was desynchronized.
"	pcondor
1289	02 Dec 17:25 Start Imaging	ISR		2016_11 ISR + Imaging (ISCOD)	Acquisition system	J.Espinoza	new	2016-12-05T17:31:34-05:00	2016-12-05T17:31:34-05:00	Imaging is ON.	pcondor
1290	02 Dec 16:00 Restart Faraday	ISR		2016_11 ISR + Imaging (ISCOD)	Acquisition system	J.Espinoza	new	2016-12-05T17:40:46-05:00	2016-12-05T17:40:46-05:00	Restart Faraday because it was desynchronized. 	pcondor
1226	28 Nov 15:00 Antenna VSWR	ISR		2016_11 ISR + Imaging (ISCOD)	Antennas		new	2016-11-27T23:42:51-05:00	2016-11-27T23:42:51-05:00	"WUp 1.01
WDn 1.02
NDn 1.09
NUp 1.09
EUp 1.01
EDn 1.03
SDn 1.07
SUp 1.04"	ryanque
1285	03 Dec 06:12 Imaging is off	ISR		2016_11 ISR + Imaging (ISCOD)	End experiment	abelleza	new	2016-12-02T13:15:30-05:00	2016-12-02T13:15:30-05:00	 03 Dec 06:12 Imaging is off	abelleza
1334	23 Jan 14:00 Final Report and Operativity	ISR		2016_11 ISR + Imaging (ISCOD)	End experiment		new	2017-01-22T22:59:21-05:00	2017-01-22T22:59:21-05:00		ryanque
1236	28 Nov 19:59 Operation Resume	ISR		2016_11 ISR + Imaging (ISCOD)	General	I. Manay	new	2016-11-29T00:48:32-05:00	2016-11-29T00:48:32-05:00	"Person in Charge: I. Manay.
Experiment: EW_Drift_Faraday_Imaging
1) 18:00 - 20:00
2) Operation Hours: 2h
3) Operation incomplete: 0
4) Reasons:
None"	imanay
1238	29 Nov 08:12 Channel B EW Drift	ISR		2016_11 ISR + Imaging (ISCOD)	General		new	2016-11-29T02:47:17-05:00	2016-11-29T02:47:17-05:00	"Channel B has 1 dB more gain.
There is an interference and less signal in Channel B"	ryanque
1239	29 Nov 10:03 VIPIR is turned off	ISR		2016_11 ISR + Imaging (ISCOD)	General		new	2016-11-29T02:47:46-05:00	2016-11-29T02:48:43-05:00		ryanque
1243	29 Nov 15:33 EW Drift	ISR		2016_11 ISR + Imaging (ISCOD)	General		new	2016-11-29T02:53:48-05:00	2016-11-29T02:53:48-05:00	"The pulse of EW Drift are 128 Random Barker 3
Set 263
Started at 14:46
The program has been changed"	ryanque
1247	29 Nov 19:44 Operation Resume	ISR		2016_11 ISR + Imaging (ISCOD)	General		new	2016-11-29T02:57:23-05:00	2016-11-30T22:46:29-05:00		ryanque
1256	30 Nov 19:03 Noise levels	ISR		2016_11 ISR + Imaging (ISCOD)	General	P.Condor	new	2016-11-30T02:24:38-05:00	2016-11-30T02:24:38-05:00	"08:48
EW_DRIFTS
A:22.47 B:23.44 C:21.87 D:21.89 
FARADAY
A:54.3 B:54.7
11:30
EW_DRIFTS
A:23.42 B:24.42 C:22.75 D:22.73 
FARADAY
A:55.2 B:55.8
17:00
EW_DRIFTS
A:22.89 B:23.81 C:22.29 D:22.08 
FARADAY
A:54.8 B:54.9
19:03
EW_DRIFTS
A:22.19 B:23.00 C:21.91 D:21.28 
FARADAY
A:54.9 B:55.1
IMAGING
1:19.27 2:17.93 3:17.97 4:19.77 5:18.45 6:18.3 7:19.92 8:21.89
"	pcondor
1260	30 Nov 19:59 Operation Resume	ISR		2016_11 ISR + Imaging (ISCOD)	General	P.Condor	new	2016-11-30T03:03:34-05:00	2016-11-30T03:03:34-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Faraday+Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 55 min
3) Operation incomplete: 5 min
4) Reasons:
_ Problem with Pc Ares."	pcondor
1264	01 Dec 05:15 Imaging experiment on / off	ISR		2016_11 ISR + Imaging (ISCOD)	General	I. Manay	new	2016-11-30T14:44:39-05:00	2016-11-30T14:44:39-05:00	"Next the sequence of starts and stops of the Imaging experiment:
00:48 Imaging was stopped.
01:53 Imaging was started.
05:15 Imaging was stopped.
"	imanay
1267	01 Dec 07:59 Operation Resume	ISR		2016_11 ISR + Imaging (ISCOD)	General	I. Manay	new	2016-11-30T14:54:24-05:00	2016-11-30T14:54:24-05:00	"Person in Charge: I. Manay.
Experiment: EW_Drift_Faraday_Imaging
1) 20:00 - 08:00
2) Operation Hours: 11h 40 minutes
3) Operation incomplete: 20
4) Reasons:
-Transmitters were off during 10 minutes from 20:00 to 20:10
-Acquisition restart from 5:50 to 6:00"	imanay
1272	01 Dec 20:00 Operation Resume	ISR+Imaging		2016_11 ISR + Imaging (ISCOD)	General		new	2016-12-01T02:48:11-05:00	2016-12-01T02:54:58-05:00	"Person in Charge: K.Kuyeng
Experiment: EW_Drift_Faraday_Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 20 minutes (EWDrift)
3) Operation incomplete: 40
4) Reasons:
Acquisition PC of EW Drift hung at 16:16
It was restarted at 16:53

NOTE:
At 19:50: In EWDrift acquisition PC, it has being stopped a background process that was consuming 98% of PC resources from time to time, making the acquisition program loss data."	kkuyeng
1277	02 Dec 06:19 Noise levels	ISR		2016_11 ISR + Imaging (ISCOD)	General	P.Condor	new	2016-12-01T14:18:42-05:00	2016-12-01T14:18:42-05:00	"01-12-2016
21:15
EW_DRIFTS
A:22.00 B:22.73 C:21.85 D:21.00
FARADAY
A:55.4 B:54.7
IMAGING
1:19.06 2:17.66 3:17.66 4:19.27 5:18.61 6:18.12 7:19.99 8:21.79
02-12-2016
00:42
EW_DRIFTS
A:21.55 B:22.22 C:21.43 D:20.92
FARADAY
A:54.2 B:54.6
IMAGING
1:18.30 2:16.99 3:17.01 4:18.78 5:18.07 6:17.58 7:19.96 8:21.37
03:06
EW_DRIFTS
A:22.21 B:22.93 C:22.01 D:21.44
FARADAY
A:54.8 B:55.3
IMAGING
1:19.56 2:18.24 3:18.17 4:19.96 5:19.25 6:18.78 7:21.14 8:22.39
06:19
EW_DRIFTS
A:21.35 B:22.12 C:21.04 D:20.83
FARADAY
A:53.3 B:53.5
"	pcondor
1280	02 Dec 08:00 Operation Resume	ISR		2016_11 ISR + Imaging (ISCOD)	General	P.Condor	new	2016-12-01T14:59:03-05:00	2016-12-01T14:59:03-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Faraday+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
1291	02 Dec 20:00 Operation Resume	ISR		2016_11 ISR + Imaging (ISCOD)	General	J.Espinoza	new	2016-12-05T17:47:02-05:00	2016-12-05T17:47:02-05:00	"Person in Charge: J. Espinoza.
Experiment: EW_drifts+Faraday+Imaging
1) 08:00 - 20:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
1294	03 Dec 08:01 Operation Resume	ISR		2016_11 ISR + Imaging (ISCOD)	General	A. Belleza	new	2016-12-05T18:05:14-05:00	2016-12-05T18:05:14-05:00	"Person in Charge: A. Belleza.
Experiment: EW_drifts+Faraday+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
1241	29 Nov 12:20 Digisonde off	ISR		2016_11 ISR + Imaging (ISCOD)	Other Instruments		new	2016-11-29T02:51:05-05:00	2016-11-29T02:51:05-05:00	Due to interference Digisonde is turned off	ryanque
1244	29 Nov 16:05 VIPIR on	ISR		2016_11 ISR + Imaging (ISCOD)	Other Instruments		new	2016-11-29T02:54:50-05:00	2016-11-29T02:54:50-05:00	"15:40 Digisonde on
16:05 Vipir on"	ryanque
1229	28 Nov 23:59 Plots	ISR+Imaging		2016_11 ISR + Imaging (ISCOD)	Plot		new	2016-11-28T07:13:59-05:00	2016-11-28T07:13:59-05:00	 28 Nov 23:59 Plots 	abelleza
1249	29 Nov 23:59 Plots	ISR	Others	2016_11 ISR + Imaging (ISCOD)	Plot		new	2016-11-29T15:10:17-05:00	2016-11-29T15:17:03-05:00	29 Nov 23:59 Plots	avaldez
1261	30 Nov 23:55 Plots of the day	ISR		2016_11 ISR + Imaging (ISCOD)	Plot	I. Manay	new	2016-11-30T10:50:15-05:00	2016-11-30T10:50:15-05:00		imanay
1271	01 Dec 19:39 Plots of the day	ISR+Imaging		2016_11 ISR + Imaging (ISCOD)	Plot		new	2016-12-01T02:38:20-05:00	2016-12-01T02:38:20-05:00		kkuyeng
1283	02 Dic 23:59 Plots	ISR+Imaging		2016_11 ISR + Imaging (ISCOD)	Plot		new	2016-12-02T12:58:15-05:00	2016-12-02T12:58:15-05:00	"02 Dic 23:59 Plots 

"	abelleza
1284	02 Dic 23:59 Plots	ISR+Imaging		2016_11 ISR + Imaging (ISCOD)	Plot	abelleza	new	2016-12-02T13:02:49-05:00	2016-12-02T13:02:49-05:00	    02 Dic 23:59 Plots 	abelleza
1253	30 Nov 11:35 Now is running new programs in Faraday	ISR		2016_11 ISR + Imaging (ISCOD)	Process/Analysis Program	P.Condor	new	2016-11-29T21:43:32-05:00	2016-11-29T21:43:32-05:00	"Now is running new programs in Faraday:
reader-DP-2016
fitter-DP-2016
Also the figures now are showed in the web."	pcondor
1259	30 Nov 20:00 Figures	ISR		2016_11 ISR + Imaging (ISCOD)	Process/Analysis Program	P. Condor	new	2016-11-30T03:03:15-05:00	2016-11-30T03:03:15-05:00	figures of rti and spectra	pcondor
1273	02 Dec 00:10 Figures	ISR		2016_11 ISR + Imaging (ISCOD)	Process/Analysis Program	P. Condor	new	2016-12-01T07:48:41-05:00	2016-12-01T07:48:41-05:00	Figures of rti, spectra and parameters.	pcondor
1279	02 Dec 07:55 Figures	ISR		2016_11 ISR + Imaging (ISCOD)	Process/Analysis Program	P. Condor	new	2016-12-01T14:54:45-05:00	2016-12-01T14:54:45-05:00	Figures of rti, spectra and parameters.	pcondor
1293	03 Dec 08:10 Figures	ISR		2016_11 ISR + Imaging (ISCOD)	Process/Analysis Program	A. Belleza	new	2016-12-05T17:56:41-05:00	2016-12-05T17:56:41-05:00	Rtis, spectras and parameters.	pcondor
1234	28 Nov 19:00 Vipir system was stopped	ISR		2016_11 ISR + Imaging (ISCOD)	Reception	I. Manay	new	2016-11-29T00:34:00-05:00	2016-11-29T00:48:24-05:00	An interference was observed at the B channel of the ew_drift experiment: See attached file. This interference was also observed at the A, B, C and D channels of the Imaging experiment. This interference showed up every five minutes and it disapeared when the vipir system was stopped.	imanay
1246	29 Nov 19:44 Noise	ISR		2016_11 ISR + Imaging (ISCOD)	Reception		new	2016-11-29T02:56:32-05:00	2016-11-30T22:41:35-05:00	"15:37 EW  A 23.49  B 24.37 
          C 22.59  D 22.47
      Faraday
          A 55.6   B 56.0

17:45 EW  A 22.35  B 23.10
          C 22.01  D 21.46
      Faraday 
          A 54.4   B 54.8
      Imaging
          0 18.79  1 17.35  2 17.71
          3 19.70  4 17.75  5 18.05
          6 19.85  7 21.97

19:44 EW  A 22.21  B 22.93
          C 21.89  D 21.46
      Faraday 
          A 54.5   B 54.9
      Imaging
          0 19.13  1 17.75  2 17.88
          3 19.66  4 18.14  5 18.17
          6 19.97  7 21.98
"	ryanque
1266	01 Dec 05 :20 Noise history	ISR		2016_11 ISR + Imaging (ISCOD)	Reception	I. Manay	new	2016-11-30T14:50:44-05:00	2016-11-30T14:50:44-05:00		imanay
1232	29 Nov 07:35 Spark gaps adjustment	ISR+Imaging		2016_11 ISR + Imaging (ISCOD)	Spark Gaps		new	2016-11-28T14:33:18-05:00	2016-11-28T14:33:18-05:00	"28 Nov
20:30 Spark gaps adjustment
22:30 Spark gaps adjustment

29 Nov
01:00 Spark gaps adjustment
03:40 Spark gaps adjustment
06:40 Spark gaps adjustment

By Americo Huamani."	abelleza
1235	28 Nov 19:00 Spark gaps adjustment history	ISR		2016_11 ISR + Imaging (ISCOD)	Spark Gaps	W. Rojas	new	2016-11-29T00:42:22-05:00	2016-11-29T00:42:22-05:00	18:00 Spark gaps adjustment	imanay
1245	29 Nov 18:55 Spark Gap adjustments	ISR		2016_11 ISR + Imaging (ISCOD)	Spark Gaps		new	2016-11-29T02:56:01-05:00	2016-11-29T02:56:01-05:00	"16:00 Spark Gap adjustment
18:55 Spark Gap adjustment"	ryanque
1251	30 Nov 06:00 Spark gaps adjustment	ISR		2016_11 ISR + Imaging (ISCOD)	Spark Gaps	A Huamani	new	2016-11-29T21:32:33-05:00	2016-11-29T21:32:33-05:00	"29 -11-16
22:00 Spark gaps adjustment
01:00 Spark gaps adjustment
03:00 Spark gaps adjustment
06:00 Spark gaps adjustment"	avaldez
1254	30 Nov 18:07 Spark gaps adjustment	ISR		2016_11 ISR + Imaging (ISCOD)	Spark Gaps	A. Coronado	new	2016-11-30T01:35:26-05:00	2016-11-30T01:35:26-05:00	"09:00 Spark gaps adjustment
12:06 Spark gaps adjustment
15:14 Spark gaps adjustment
18:07 Spark gaps adjustment"	pcondor
1263	01 Dec 06:18 Spark gaps adjustment history	ISR		2016_11 ISR + Imaging (ISCOD)	Spark Gaps	J. Lavado	new	2016-11-30T14:40:15-05:00	2016-11-30T14:40:15-05:00	"30 Nov 21:10 Spark gaps adjustment
01 Dec 00:15 Spark gaps adjustment
01 Dec 03:18 Spark gaps adjustment
01 Dec 06:18 Spark gaps adjustment"	imanay
1270	01 Dec 20:00 Spark gaps adjustment history	ISR+Imaging		2016_11 ISR + Imaging (ISCOD)	Spark Gaps		new	2016-12-01T02:35:45-05:00	2016-12-01T02:35:45-05:00	"01 Dec 09:24 Spark gaps adjustment
01 Dec 12:14 Spark gaps adjustment
01 Dec 15:15 Spark gaps adjustment
01 Dec 18:09 Spark gaps adjustment
"	kkuyeng
1278	02 Dec 06:03 Spark gaps adjustment	ISR		2016_11 ISR + Imaging (ISCOD)	Spark Gaps	W. Rojas	new	2016-12-01T14:24:18-05:00	2016-12-01T14:24:18-05:00	"01-12-2016
21:08 Spark gaps adjustment
02-12-2016
00:06 Spark gaps adjustment
03:09 Spark gaps adjustment
06:03 Spark gaps adjustment"	pcondor
1286	03 Dec 06:21 Spark gaps adjustment	ISR		2016_11 ISR + Imaging (ISCOD)	Spark Gaps	abelleza	new	2016-12-02T13:19:42-05:00	2016-12-02T13:19:42-05:00	"
02 Dec
21:34 Spark gaps adjustment
23:53 Spark gaps adjustment

03 Dec
03:03 Spark gaps adjustment
05:55 Spark gaps adjustment

By Walter Rojas."	abelleza
1292	02 Dec 18:33 Spark gaps adjustment	ISR		2016_11 ISR + Imaging (ISCOD)	Spark Gaps	J.Espinoza	new	2016-12-05T17:49:52-05:00	2016-12-05T17:49:52-05:00	"09:30 Spark gaps adjustment
12:18 Spark gaps adjustment
15:40 Spark gaps adjustment
18:33 Spark gaps adjustment"	pcondor
1225	28 Nov 10:00 Log Created Nov 2016 Campaign	ISR		2016_11 ISR + Imaging (ISCOD)	Start experiment		new	2016-11-27T22:58:00-05:00	2016-11-27T22:58:00-05:00	"This Campaign
- EW Drift + Faraday + Imaging
ISCOD World Day
Starts: Mon Nov 28 2016
Ends:   Sat Dec 02 2016"	ryanque
1233	28 Nov 17:50 Start of the experiment	ISR		2016_11 ISR + Imaging (ISCOD)	Start experiment	I. Manay	new	2016-11-29T00:31:11-05:00	2016-11-29T00:31:11-05:00	"Faraday started ok.
EW_drift started with weak signal at A and B channel, the ones that are pointing to the east direction."	imanay
1269	01 Dec 17:48 Starting Imaging	ISR+Imaging		2016_11 ISR + Imaging (ISCOD)	Start experiment		new	2016-12-01T02:04:50-05:00	2016-12-01T02:04:50-05:00	Start of Imaging experiment	kkuyeng
1227	28 Nov 19:30 Transmitter power measurement	ISR+Imaging		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-11-28T02:42:31-05:00	2016-11-28T02:42:31-05:00	"17:20 ON LV
17:30 ON HV
17:30 TX Power sample (-70 dB coupling)
TX1 +2.0 dBm / +5.1 dBm
TX3 +2.2 dBm
Tx4 +6.1 dBm
Dr2 -7.3 dBm
Voltage line and power: 4090 VAC, 300 KW
18:00 TX Power sample (-70 dB coupling)
TX1 +2.1 dBm
TX3 +2.3 dBm
Tx4 +6.2 dBm
Dr2 -7.3 dBm
Voltage line and power: 4090 VAC, 300 KW
18:54 Crowbar circuit failure
19:00 TX Power sample (-70 dB coupling)
TX1 +2.1 dBm
TX3 +2.3 dBm
Tx4 +6.0 dBm
Dr2 -7.3 dBm
Voltage line and power: 4090 VAC, 300 KW
20:00 TX Power sample (-70 dB coupling)
TX1 +2.0 dBm
TX3 +2.1 dBm
Tx4 +5.9 dBm
Dr2 -7.3 dBm
Voltage line and power: 4050 VAC, 290 KW







"	rtadeo
1228	28 Nov 23:00 Transmitter Power Measurement	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-11-28T05:59:15-05:00	2016-11-28T05:59:15-05:00	"20:00 TX Power Sample (-70 dB coupling)
TX1 +2.0 dBm
TX3 +2.2 dBm
Tx4 +6.0 dBm
D2 -7.3 dBm
Voltage line and power: 4020 VAC, 310 KW
21:00 TX Power Sample (-70 dB coupling)
TX1 +2.0 dBm
TX3 +2.2 dBm
Tx4 +6.0 dBm
D2 -7.3 dBm
Voltage line and power: 4020 VAC, 310 KW
22:00 TX Power Sample (-70 dB coupling)
TX1 +2.0 dBm
TX3 +2.2 dBm
Tx4 +6.0 dBm
D2 -7.2 dBm
Voltage line and power: 4050 VAC, 320 KW
23:00 TX Power Sample (-70 dB coupling)
TX1 +2.0 dBm
TX3 +2.2 dBm
Tx4 +6.0 dBm
D2 -7.2 dBm
Voltage line and power: 4050 VAC, 320 KW"	vquesada
1230	29 Nov 03:40 Fail TX3	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-11-28T10:46:25-05:00	2016-11-28T10:46:25-05:00	"02:40 Fail meter relay sourse screen Tx3
03:30 HV ON Txs OK"	vquesada
1231	29 Nov 07:00 Transmitter Power Measurements	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-11-28T13:59:12-05:00	2016-11-28T13:59:12-05:00	"00:00 TX Power Sample (-70 dB coupling)
TX1 +1.9 dBm
TX3 +2.1 dBm
Tx4 +5.9 dBm
D2 -7.2 dBm
Voltage line and power: 4020 VAC, 310 KW
00:42 Driver 2 OFF
01:00 TX Power Sample (-70 dB coupling)
TX1 +2.0,5.5 dBm
TX3 +2.4 dBm
Tx4 +6.0 dBm
Voltage line and power: 4080 VAC, 320 KW
02:00 TX Power Sample (-70 dB coupling)
TX1 +2.0,5.5 dBm
TX3 +2.4 dBm
Tx4 +6.0 dBm
Voltage line and power: 4080 VAC, 320 KW
02:40 Fail meter relay sourse screen Tx3
03:30 HV ON Txs OK
03:30 TX Power Sample (-70 dB coupling)
TX1 +2.2,5.5 dBm
TX3 +2.5 dBm
Tx4 +6.1 dBm
Voltage line and power: 4080 VAC, 310 KW
04:00 TX Power Sample (-70 dB coupling)
TX1 +2.2,5.5 dBm
TX3 +2.5 dBm
Tx4 +6.1 dBm
Voltage line and power: 4080 VAC, 310 KW
05:00 TX Power Sample (-70 dB coupling)
TX1 +2.3,5.5 dBm
TX3 +2.6 dBm
Tx4 +6.4 dBm
Voltage line and power: 4090 VAC, 320 KW
06:00 TX Power Sample (-70 dB coupling)
TX1 +2.3,5.5 dBm
TX3 +2.6 dBm
Tx4 +6.4 dBm
Voltage line and power: 4090 VAC, 320 KW
07:00 TX Power Sample (-70 dB coupling)
TX1 +2.2,5.5 dBm
TX3 +2.5 dBm
Tx4 +6.3 dBm
Voltage line and power: 4050 VAC, 310 KW"	vquesada
1237	29 Nov 19:30 Transmitter power measurements	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-11-29T02:46:20-05:00	2016-11-30T01:14:12-05:00	"09:00 TX Power Sample (-70 dB coupling)
TX1 +2.0/+5.4 dBm
TX3 +2.4 dBm
Tx4 +6.1 dBm
Voltage line and power: 4010 VAC, 310 KW
09:50 HV OFF (Adquisition revision)
12:30 HV ON (TX 1 and TX4 swapped)
13:30 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +1.9 dBm
Tx4 +1.8/+5.2 dBm
Voltage line and power: 3980 VAC, 310 KW
14:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +1.9 dBm
Tx4 +1.9,5.4 dBm
Voltage line and power: 4050 VAC, 310 KW
RF OFF (Adquisition requirement)
14:40 RF ON
15:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.0 dBm
Tx4 +1.9/+5.4 dBm
Voltage line and power: 4010 VAC, 310 KW
16:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.1 dBm
Tx4 +1.9/+5.4 dBm
Voltage line and power: 4030 VAC, 310 KW
17:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.0 dBm
Tx4 +1.8/+5.3 dBm
Voltage line and power: 4010 VAC, 310 KW
17:45 D2 ON "" Imaging""
18:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.1 dBm
Tx4 +1.9 dBm
D2  -7.4 dBm
Voltage line and power: 4020 VAC, 310 KW
19:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.4 dBm
Tx4 +2.1 dBm
D2  -7.4 dBm
Voltage line and power: 4080 VAC, 310 KW"	ryaya
1240	29 Nov 10:45 Transmitter on	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-11-29T02:50:06-05:00	2016-11-29T02:50:06-05:00	"10:15 Transmitter off
10:45 Transmitter on"	ryanque
1242	29 Nov 12:45 Transmitter on	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-11-29T02:52:14-05:00	2016-11-29T02:52:14-05:00	"12:00 Transmitter off
The cables of Imaging were not right
12:45 Transmitter on"	ryanque
1248	29 Nov 23:00 Transmitter Power Measurements	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-11-29T05:59:54-05:00	2016-11-29T05:59:54-05:00	"20:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.4 dBm
Tx4 +2.0 dBm
D2 -7.3 dBm
Voltage Line and Power: 4070 VAC, 310 KW
21:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.4 dBm
Tx4 +2.0 dBm
D2 -7.3 dBm
Voltage Line and Power: 4070 VAC, 310 KW
22:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.4 dBm
Tx4 +2.0 dBm
D2 -7.3 dBm
Voltage Line and Power: 4070 VAC, 310 KW
22:58 Crowbar
23:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.4 dBm
Tx4 +2.0 dBm
D2 -7.3 dBm
Voltage Line and Power: 4070 VAC, 310 KW"	vquesada
1258	30 Nov 19:30 Transmitter power measurements	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-11-30T02:30:45-05:00	2016-11-30T02:30:45-05:00	"00:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.4 dBm
Tx4 +2.0 dBm
D2 -7.4 dBm
Voltage Line and Power: 4080 VAC, 310 KW
00:45 Problem at PA1 and PA4, interlock control alarm, transmitters should be restarted.
01:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.4 dBm
Tx4 +2.0 dBm
D2 -7.4 dBm
02:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +1.9 dBm
D2 -7.3 dBm
Voltage Line and Power: 4040 VAC, 300 KW
03:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +1.9 dBm
D2 -7.3 dBm
03:58 D2 OFF
04:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.3 dBm
Tx4 +2.0/+5.4 dBm
Voltage Line and Power: 4080 VAC, 310 KW
05:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.2 dBm
Tx4 +2.0/+5.4 dBm
06:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.3 dBm
Tx4 +2.0/+5.4 dBm
Voltage Line and Power: 4050 VAC, 310 KW
07:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.3 dBm
Tx4 +2.0/+5.4 dBm
09:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.1 dBm
Tx4 +1.9/+5.3 dBm
Voltage Line and Power: 4000 VAC, 310 KW
10:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.0 dBm
Tx4 +1.8/+5.2 dBm
Voltage Line and Power: 4000 VAC, 310 KW
11:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.0 dBm
Tx4 +2.0/+5.4 dBm
Voltage Line and Power: 4030 VAC, 310 KW
12:15 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.0 dBm
Tx4 +2.0/+5.4 dBm
Voltage Line and Power: 4050 VAC, 310 KW
13:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.1 dBm
Tx4 +2.0/+5.5 dBm
Voltage Line and Power: 4050 VAC, 310 KW
14:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.0 dBm
Tx4 +1.9/+5.4 dBm
Voltage Line and Power: 4000 VAC, 310 KW
15:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.0 dBm
Tx4 +2.0/+5.4 dBm
Voltage Line and Power: 4060 VAC, 310 KW
16:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.0 dBm
Tx4 +2.0/+5.4 dBm
Voltage Line and Power: 4000 VAC, 310 KW
17:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.0 dBm
Tx4 +1.9/+5.4 dBm
Voltage Line and Power: 3980 VAC, 310 KW
18:00 D2 ON Imaging
18:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.1 dBm
D2  -7.4 dBm
Voltage Line and Power: 4080 VAC, 310 KW
19:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.3 dBm
Tx4 +2. dBm
D2  -7.5 dBm
Voltage Line and Power: 4080 VAC, 310 KW"	ryaya
1262	01 Dec 07:30 Transmitter power measurements	ISR+Imaging		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-11-30T14:05:57-05:00	2016-11-30T14:05:57-05:00	"
20:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.3 dBm
Tx4 +2.0 dBm
D2  -7.4 dBm
Voltage Line and Power: 4080 VAC, 310 KW
20:10 Crowbar failure
21:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.2 dBm
Tx4 +1.8 dBm
D2  -7.6 dBm
Voltage Line and Power: 4060 VAC, 300 KW
22:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.2 dBm
Tx4 +2.0 dBm
D2  -7.5 dBm
Voltage Line and Power: 4060 VAC, 300 KW
23:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.2 dBm
Tx4 +1.9 dBm
D2  -7.5 dBm
Voltage Line and Power: 4080 VAC, 300 KW
01/12/2016
00:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.2 dBm
Tx4 +1.9 dBm
D2  -7.5 dBm
Voltage Line and Power: 4080 VAC, 300 KW
00:50 Imaging OFF
01:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.2 dBm
Tx4 +1.9/+5.2dBm
Voltage Line and Power: 4070 VAC, 300 KW
01:50 Imaging ON (-7.3dBm)
02:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +1.9 dBm
D2  -7.4 dBm
Voltage Line and Power: 4050 VAC, 300 KW
03:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +1.9 dBm
D2  -7.4 dBm
Voltage Line and Power: 4050 VAC, 300 KW
04:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.0 dBm
D2  -7.3 dBm
Voltage Line and Power: 4050 VAC, 300 KW
05:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +2.0 dBm
D2  -7.2 dBm
Voltage Line and Power: 4080 VAC, 300 KW
05:15 Imaging OFF
TX4 +2.0/+5.2dBm
06:00 RF OFF Acquisition Failure
06:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +5.3/+2.1 dBm
Voltage Line and Power: 4080 VAC, 310 KW
07:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +5.3/+2.1 dBm
Voltage Line and Power: 4080 VAC, 310 KW
"	rtadeo
1268	01 Dec 19:00 Transmitter Power Measurements	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-12-01T02:00:00-05:00	2016-12-01T02:00:00-05:00	"08:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +2.1,5.4 dBm
Voltage Line and Power: 4090 VAC, 310 KW
09:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.2 dBm
Tx4 +1.9,5.3 dBm
Voltage Line and Power: 4050 VAC, 310 KW
10:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.2 dBm
Tx4 +1.9,5.3 dBm
Voltage Line and Power: 4050 VAC, 310 KW
11:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.2 dBm
Tx4 +1.9,5.3 dBm
Voltage Line and Power: 4050 VAC, 310 KW
12:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.2 dBm
Tx4 +2.0,5.4 dBm
Voltage Line and Power: 4080 VAC, 310 KW
13:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.2 dBm
Tx4 +2.0,5.4 dBm
Voltage Line and Power: 4080 VAC, 310 KW
14:00 TX Power Sample (-70 dB coupling)
TX1 +6.3 dBm
TX3 +2.1 dBm
Tx4 +1.9,5.3 dBm
Voltage Line and Power: 4010 VAC, 310 KW
15:00 TX Power Sample (-70 dB coupling)
TX1 +6.3 dBm
TX3 +2.1 dBm
Tx4 +1.9,5.3 dBm
Voltage Line and Power: 4010 VAC, 310 KW
16:00 TX Power Sample (-70 dB coupling)
TX1 +6.3 dBm
TX3 +2.1 dBm
Tx4 +1.9,5.3 dBm
Voltage Line and Power: 4030 VAC, 310 KW
17:00 TX Power Sample (-70 dB coupling)
TX1 +6.3 dBm
TX3 +2.1 dBm
Tx4 +1.9,5.3 dBm
Voltage Line and Power: 4030 VAC, 310 KW
17:45 driver2 ON
18:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +1.9 dBm
Tx4 +2.1 dBm
D2 -7.4  dBm
Voltage Line and Power: 4030 VAC, 310 KW
19:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +1.9 dBm
Tx4 +2.1 dBm
D2 -7.5  dBm
Voltage Line and Power: 4030 VAC, 310 KW








"	vquesada
1275	02 Dec 07:00 Transmitter Power Measurements	ISR+Imaging		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-12-01T14:00:41-05:00	2016-12-01T14:00:41-05:00	"
20:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.0 dBm
Tx4 +1.9 dBm
Dr2 -7.4 dBm
Voltage Line and Power: 4030 VAC, 310 KW
21:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.2 dBm
Tx4 +1.9 dBm
Dr2 -7.4 dBm
Voltage Line and Power: 4050 VAC, 300 KW
22:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.1 dBm
Tx4 +1.8 dBm
Dr2 -7.3 dBm
Voltage Line and Power: 4040 VAC, 300 KW
23:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.1 dBm
Tx4 +1.8 dBm
Dr2 -7.3 dBm
Voltage Line and Power: 4040 VAC, 300 KW
00:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.1 dBm
Tx4 +1.8 dBm
Dr2 -7.3 dBm
Voltage Line and Power: 4040 VAC, 300 KW
01:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.1 dBm
Tx4 +1.8 dBm
Dr2 -7.3 dBm
Voltage Line and Power: 4040 VAC, 300 KW
02:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.1 dBm
Tx4 +1.8 dBm
Dr2 -7.3 dBm
Voltage Line and Power: 4040 VAC, 300 KW
03:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.1 dBm
Tx4 +1.8 dBm
Dr2 -7.3 dBm
Voltage Line and Power: 4040 VAC, 300 KW
04:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.1 dBm
Tx4 +1.8 dBm
Dr2 -7.3 dBm
Voltage Line and Power: 4040 VAC, 300 KW
05:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +2.0 dBm
Dr2 -7.1 dBm
Voltage Line and Power: 4060 VAC, 300 KW
06:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +2.0 dBm
Dr2 -7.1 dBm
Voltage Line and Power: 4060 VAC, 300 KW
06:15 IMAGING OFF
07:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +1.9 dBm/+5.3 dBm
Voltage Line and Power: 4060 VAC, 300 KW
"	rtadeo
1281	02 Dic 19:30 Transmitter power measurements	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-12-02T02:30:33-05:00	2016-12-05T15:30:37-05:00	"09:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.1/+5.4 dBm
Voltage Line and Power: 4050 VAC, 310 KW
10:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.1/+5.5 dBm
Voltage Line and Power: 4080 VAC, 310 KW
11:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.0 dBm
Tx4 +1.9/+5.4 dBm
Voltage Line and Power: 4020 VAC, 310 KW
12:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.1/+5.5 dBm
Voltage Line and Power: 4080 VAC, 310 KW
14:00 TX Power Sample (-70 dB coupling)
TX1 +6.3 dBm
TX3 +2.0 dBm
Tx4 +1.9/+5.3 dBm
Voltage Line and Power: 4000 VAC, 310 KW
15:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.0/+5.5 dBm
Voltage Line and Power: 4060 VAC, 310 KW
16:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.0 dBm
Tx4 +1.9/+5.3 dBm
Voltage Line and Power: 4000 VAC, 310 KW
17:00 TX Power Sample (-70 dB coupling)
TX1 +6.3 dBm
TX3 +2.1 dBm
Tx4 +1.9/+5.3 dBm
Voltage Line and Power: 4000 VAC, 310 KW
17:30 D2 ON Imaging
18:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.1 dBm
Tx4 +1.9 dBm
D2  -7.4 dBm
Voltage Line and Power: 4050 VAC, 310 KW
19:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.1 dBm
Tx4 +2.0 dBm
D2  -7.4 dBm
Voltage Line and Power: 4060 VAC, 310 KW
"	ryaya
1282	02 Dec 23:00 Transmitter Power Measurements	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-12-02T06:03:39-05:00	2016-12-02T06:03:39-05:00	"20:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.1 dBm
Tx4 +2.2 dBm
D2 -7.4 dBm
Voltage Line and Power: 4060 VAC, 310 KW
21:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.0 dBm
D2 -7.5 dBm
Voltage Line and Power: 4030 VAC, 300 KW
22:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.1 dBm
Tx4 +2.0 dBm
D2 -7.5 dBm
Voltage Line and Power: 4070 VAC, 310 KW
23:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.0 dBm
D2 -7.5 dBm
Voltage Line and Power: 4060 VAC, 310 KW
"	vquesada
1287	03 Dec 08:00 Transmitter Power Measurements	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-12-02T15:07:19-05:00	2016-12-02T15:07:19-05:00	"00:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.0 dBm
D2  -7.5 dBm
Voltage Line and Power: 4060 VAC, 310 KW
01:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.0 dBm
D2  -7.5 dBm
Voltage Line and Power: 4050 VAC, 310 KW
02:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.0 dBm
D2  -7.5 dBm
Voltage Line and Power: 4050 VAC, 310 KW
03:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.0 dBm
D2  -7.5 dBm
Voltage Line and Power: 4050 VAC, 310 KW
04:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.1 dBm
Tx4 +2.0 dBm
D2  -7.5 dBm
Voltage Line and Power: 4050 VAC, 310 KW
05:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.1 dBm
Tx4 +2.0 dBm
D2  -7.5 dBm
Voltage Line and Power: 4050 VAC, 310 KW
06:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.1 dBm
Tx4 +2.0 dBm
D2  -7.5 dBm
Voltage Line and Power: 4050 VAC, 310 KW
06:10 Driver OFF Imaging 
07:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +2.1,5.5 dBm
Voltage Line and Power: 4080 VAC, 310 KW
08:00 HV  OFF
08:10 LV  OFF

"	vquesada
1295	06 Dec 12:00 Transmitters operative parameters	ISR		2016_11 ISR + Imaging (ISCOD)	Transmitters		new	2016-12-05T18:10:19-05:00	2016-12-05T18:10:19-05:00	"Date	01/12/2016		
TX	1	  3	      4
Exp. EW. Drift	Faraday	Faraday + EW Drift
			
DRIVER			
V.fil (VAC)	14.1	13.8	14.8
V. Plate (KV)	9.4	9.4	9.4
I. Plate (mA)	450	300	300
V. Bias (V)	-350	-320	-345
I. Bias (mA)	45	15	65
V. Screen (V)	700	700	750
I. Screen (mA)	17.5	7.5	80
I. Cathode (mA)	250	200	500
P. Inc (KWp)	58	74.8	48
P. Ref (KWp)	1.07	3	1.8
			
PA			
V.fil (VAC)	16.5	16.5	16.5
V. Plate (KV)	20	20	20
I. Plate (mA)	-	-	-
V. Bias (V)	-450	-440	-460
I. Bias (mA)	75	20	70
V. Screen (V)	900	900	900
I. Screen (mA)	-	20	70
P. Inc (KWp)	916.3	1132	695
P. Ref (KWp)	3.9	2.9	12.9
"	ryaya
1307	03 Jan 10:10 Ares PC restarted	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Acquisition system		new	2017-01-03T02:32:59-05:00	2017-01-03T02:32:59-05:00		jverastegui
1311	03 Jan 17:29 Imaging acquisition system and processing software started	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Acquisition system		new	2017-01-03T02:43:40-05:00	2017-01-03T02:43:40-05:00		jverastegui
1297	02 Jan 13:50 Antenna VSWR	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Antennas	W. Rojas	new	2017-01-01T20:58:07-05:00	2017-01-01T20:58:07-05:00	"WUp 1.01
WDn 1.08
NDn 1.07
NUp 1.08
EUp 1.03
EDn 1.06
SDn 1.08
SUp 1.03"	pcondor
1335	23 Jan 14:10 Final Report and Operativity	ISR		2017_01 ISR + Imaging (ISCOD)	End experiment		new	2017-01-22T23:07:06-05:00	2017-01-22T23:07:06-05:00		ryanque
1321	04 Jan 07:59 Operation Resume	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	General	AVALDEZ	new	2017-01-04T01:31:41-05:00	2017-01-04T01:31:41-05:00	"Person in Charge: A. VALDEZ.
Experiment: EW_drifts+Faraday+Imaging
1) 20:00 - 08:00
2) Operation Hours: 11h 45 min
3) Operation incomplete: 15 min
4) Reasons:
   -PC- Faraday Acquisition restart from 02:30 to 02:38.
   -PC- Faraday Acquisition restart from 02:57 to 03:03.

   
"	AVALDEZ
1323	04 Jan 20:00 Operation Resume	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	General		new	2017-01-04T02:39:17-05:00	2017-01-04T02:39:17-05:00	"Person in Charge: K.Kuyeng
Experiment: EW_drifts+Faraday+Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 55 min
3) Operation incomplete: 5 min
4) Reasons:
-PC- Faraday Acquisition restarted at 13:27 (synchronization problems).
"	kkuyeng
1327	04 Jan 23:59 Figures	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	General	P. Condor	new	2017-01-04T12:04:41-05:00	2017-01-04T12:04:41-05:00	Figures of rtis, spectras and parameters.	pcondor
1328	05 Jan 05:05 Noise levels	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	General	P.Condor	new	2017-01-04T14:22:55-05:00	2017-01-04T14:22:55-05:00	"04-01-2017
20:28
EW DRIFTS
A:22.61 B:22.04 C:23.35 D:23.37 
FARADAY
A:56.3 B:55.0 
IMAGING
1:18.14 2:16.47 3:16.35 4:19.33 5:17.18 6:17.20 7:19.29 8:20.58
23:43
EW DRIFTS
A:23.58 B:23.24 C:24.44 D:23.83 
FARADAY
A:56.6 B:56.2 
IMAGING
1:19.89 2:18.25 3:18.18 4:21.24 5:18.78 6:18.90 7:20.89 8:22.36
05-01-2017
02:40
EW DRIFTS
A:22.89 B:22.88 C:23.46 D:22.45 
FARADAY
A:56.0 B:55.1 
IMAGING
1:18.85 2:17.24 3:17.23 4:20.37 5:18.04 6:18.15 7:20.15 8:21.06
05:05
EW DRIFTS
A:23.15 B:22.83 C:24.22 D:23.28 
FARADAY
A:56.1 B:55.5 
IMAGING
1:19.23 2:17.58 3:17.69 4:20.54 5:18.27 6:18.33 7:20.50 8:21.75    
"	pcondor
1330	05 Jan 07:55 Figures	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	General	P. Condor	new	2017-01-04T15:01:55-05:00	2017-01-04T15:01:55-05:00	Figures of rti, spectra and parqameters.	pcondor
1331	05 Jan 08:00 Operation Resume	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	General	P.Condor	new	2017-01-04T15:06:19-05:00	2017-01-04T15:06:19-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Faraday+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
1308	03 Jan 11:45 ABS control system turned off	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Other Instruments		new	2017-01-03T02:34:24-05:00	2017-01-03T02:34:24-05:00		jverastegui
1302	02 Jan 20:10 Graphics	ISR		2017_01 ISR + Imaging (ISCOD)	Plot	kkuyeng	new	2017-01-02T02:54:57-05:00	2017-01-22T16:09:58-05:00	Se adjuntan los gráficos hasta el momento	kkuyeng
1303	02 Jan 23:59 Plots	ISR		2017_01 ISR + Imaging (ISCOD)	Plot	abelleza	new	2017-01-02T07:23:48-05:00	2017-01-22T16:14:47-05:00	02 Jan 2017 - 23:59 Plots	abelleza
1314	03 Jan 19:50 Plots	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Plot		new	2017-01-03T02:59:33-05:00	2017-01-03T02:59:33-05:00		jverastegui
1317	03 Jan 23:59 Plots	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Plot	AVALDEZ	new	2017-01-03T10:21:34-05:00	2017-01-03T10:21:34-05:00		A. VALDEZ
1310	03 Jan 16:41 Faraday processing software restarted	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Process/Analysis Program		new	2017-01-03T02:42:27-05:00	2017-01-03T02:42:27-05:00		jverastegui
1300	02 Jan 17:23 Nivel de ruido de los canales	ISR		2017_01 ISR + Imaging (ISCOD)	Reception	kkuyeng	new	2017-01-02T02:10:30-05:00	2017-01-22T16:10:58-05:00	"Niveles de ruido de los canales
EW Drift
A 22.8
B 22.8
C 24.21
D 22.9

Faraday:
A 55.8
B 55.2

Imagenes:
A 18.41
B 16.6
C 16.9
D 19.9
E 17.3
F 17.8
G 19.4
H 20.8"	kkuyeng
1309	03 Jan 15:04 noise floor got a little higher after the spark gaps adjustment	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Reception		new	2017-01-03T02:40:51-05:00	2017-01-03T02:40:51-05:00		jverastegui
1312	03 Jan 17:40 noise floor got a little higher after the spark gaps adjustment	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Reception		new	2017-01-03T02:44:36-05:00	2017-01-03T02:44:36-05:00		jverastegui
1313	03 Jan 19:32 noise floor a little higher on Faraday's channel A due to spark gaps adjustment	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Reception		new	2017-01-03T02:45:56-05:00	2017-01-22T16:13:42-05:00		jverastegui
1305	03 Jan 07:41 Spark gaps adjustment	ISR		2017_01 ISR + Imaging (ISCOD)	Spark Gaps	abelleza	new	2017-01-02T14:49:02-05:00	2017-01-02T14:49:02-05:00	"02 Jan
22:36 Spark gaps adjustment

03 Jan
01:08 Spark gaps adjustment
03:32 Spark gaps adjustment
06:01 Spark gaps adjustment

By Americo Coronado."	abelleza
1306	03 Jan 19:30 Spark gaps adjustment history	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Spark Gaps	J. Lavado	new	2017-01-03T02:30:15-05:00	2017-01-03T02:39:39-05:00	"03 Jan 08:50 Spark gaps adjustment
03 Jan 11:40 Spark gaps adjustment
03 Jan 15:03 Spark gaps adjustment
03 Jan 17:38 Spark gaps adjustment"	jverastegui
1319	04 Jan 07:40 Spark Gaps Adjustment	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Spark Gaps	AVALDEZ	new	2017-01-03T14:42:35-05:00	2017-01-03T14:42:35-05:00	"22:05 Spark gaps adjustment
00:35 Spark gaps adjustment
03:03 Spark gaps adjustment
05:30 Spark gaps adjustment"	AVALDEZ
1320	04 Jan 07:40 Spark Gaps Adjustment	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Spark Gaps	AVALDEZ	new	2017-01-03T14:42:44-05:00	2017-01-03T14:42:44-05:00	"22:05 Spark gaps adjustment
00:35 Spark gaps adjustment
03:03 Spark gaps adjustment
05:30 Spark gaps adjustment"	AVALDEZ
1324	04 Jan 20:00 Spark Gap Adjustment Resume	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Spark Gaps		new	2017-01-04T02:39:46-05:00	2017-01-04T02:39:46-05:00	"08:06 Spark gaps adjustment
10:37 Spark gaps adjustment
13:16 Spark gaps adjustment
15:46 Spark gaps adjustment
18:39 Spark gaps adjustment"	kkuyeng
1329	05 Jan 06:00 Spark gaps adjustment	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Spark Gaps	W. Rojas	new	2017-01-04T14:25:17-05:00	2017-01-04T14:25:17-05:00	"04-01-2017
20:56 Spark gaps adjustment
24:00 Spark gaps adjustment
05-01-2017
02:58 Spark gaps adjustment
06:00 Spark gaps adjustment"	pcondor
1296	26 Dec 11:00 Log Created January 2017 ISCOD Campaign	ISR		2017_01 ISR + Imaging (ISCOD)	Start experiment		new	2016-12-25T19:48:48-05:00	2016-12-25T19:48:48-05:00	"The log for the 
ISCOD Flow Channel Campaign
02 - 04 January 2017
Mode: ISR + Imaging"	ryanque
1298	02 Jan 15:23 Inicio de experimento EW-Drift + Faraday	ISR		2017_01 ISR + Imaging (ISCOD)	Start experiment	kkuyeng	new	2017-01-02T02:04:23-05:00	2017-01-22T16:12:41-05:00	"15:23 Se inicia experimentos con buenos datos en EW-Drift y Faraday

Atenuaciones:
EW-Drift +Faraday
A 2dB
B 0
C 0
D 0
E 1 (4 preamps)
F 5 (4 preamps)

Imaging
A 0
B 1 
C 0
D 2
E 1
F 4
G 3
H 0"	kkuyeng
1299	02 Jan 17:15 Inicio modo Imágenes	ISR		2017_01 ISR + Imaging (ISCOD)	Start experiment	kkuyeng	new	2017-01-02T02:06:36-05:00	2017-01-22T16:11:35-05:00	"17:15 Se inicia modo imágenes para probar driver.
Todo ok.
"	kkuyeng
1325	04 Jan 17:40 Start of Imaging Experiment	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Start experiment		new	2017-01-04T02:40:52-05:00	2017-01-04T02:40:52-05:00		kkuyeng
1301	02 Jan 19:00 Transmitter Power Measurements	ISR		2017_01 ISR + Imaging (ISCOD)	Transmitters		new	2017-01-02T02:13:54-05:00	2017-01-02T02:13:54-05:00	"13:50 LV  ON
14:20 HV  ON
14:40 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx3 +2.2dBm
Tx4 +2.0, 5.0 dBm
Line voltage and power: 4010 VAC, 310 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx3 +2.2dBm
Tx4 +2.0, 5.0 dBm
Line voltage and power: 4010 VAC, 310 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.2dBm
Tx4 +2.0, 5.1 dBm
Line voltage and power: 4010 VAC, 310 KW
17:00 Driver 2 ON
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.2dBm
Tx4 +2.0 dBm
D2 -7.0 dBm
Line voltage and power: 4010 VAC, 310 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.2dBm
Tx4 +2.0 dBm
D2 -7.0 dBm
Line voltage and power: 4010 VAC, 310 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.4dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line voltage and power: 4080 VAC, 310 KW"	vquesada
1304	03 Jan 07:00 Transmitter Power Measurements	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Transmitters		new	2017-01-02T14:21:07-05:00	2017-01-02T14:21:07-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx3 +2.4 dBm
Tx4 +2.3 dBm
Dr2 -7.0 dBm
Line voltage and power: 4080 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
Dr2 -6.9 dBm
Line voltage and power: 4080 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
Dr2 -6.9 dBm
Line voltage and power: 4080 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
Dr2 -6.6 dBm
Line voltage and power: 4080 VAC, 300 KW

00:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
Dr2 -6.7 dBm
Line voltage and power: 4080 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
Dr2 -6.6 dBm
Line voltage and power: 4080 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
Dr2 -6.6 dBm
Line voltage and power: 4080 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
Dr2 -6.6 dBm
Line voltage and power: 4080 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
Dr2 -6.6 dBm
Line voltage and power: 4050 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx3 +2.4 dBm
Tx4 +2.2 dBm
Dr2 -6.6 dBm
Line voltage and power: 4080 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.6 dBm
Tx3 +2.4 dBm
Tx4 +2.2 dBm
Dr2 -6.6 dBm
Line voltage and power: 4080 VAC, 300 KW
06:10 IMAGING OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.5 dBm
Tx3 +2.4 dBm
Tx4 +2.2,+5.0 dBm
Line voltage and power: 4080 VAC, 310 KW





"	rtadeo
1315	03 Jan 20:17 Transmitter Power Measurements	ISR		2017_01 ISR + Imaging (ISCOD)	Transmitters		new	2017-01-03T03:23:52-05:00	2017-01-03T03:23:52-05:00	"8:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +2.2,5.0 dBm
Voltage Line and Power: 4030 VAC, 310 KW
09:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +2.2,5.0 dBm
Voltage Line and Power: 4030 VAC, 300 KW
10:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.4 dBm
Tx4 +2.2,5.0 dBm
Voltage Line and Power: 4000 VAC, 300 KW
11:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +2.2,5.0 dBm
Voltage Line and Power: 4030 VAC, 310 KW
12:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.3 dBm
Tx4 +2.2,5.0 dBm
Voltage Line and Power: 4080 VAC, 310 KW
13:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +2.2,5.0 dBm
Voltage Line and Power: 4050 VAC, 300 KW
14:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +2.2,5.0 dBm
Voltage Line and Power: 4050 VAC, 310 KW
15:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.2,5.0 dBm
Voltage Line and Power: 4030 VAC, 310 KW
16:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.3 dBm
Tx4 +2.3,5.0 dBm
Voltage Line and Power: 4080 VAC, 310 KW
17:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.2,5.0 dBm
Voltage Line and Power: 4050 VAC, 310 KW
17:30 driver2 ON
18:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -7.0 dBm
Voltage Line and Power: 4050 VAC, 310 KW
19:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.3 dBm
Tx4 +2.3 dBm
D2 -7.0 dBm
Voltage Line and Power: 4080 VAC, 310 KW"	vquesada
1316	03 Jan 23:00 Transmitter Power Measurements	ISR		2017_01 ISR + Imaging (ISCOD)	Transmitters		new	2017-01-03T06:07:30-05:00	2017-01-03T06:07:30-05:00	"20:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.1 dBm
D2 -7.0 dBm
Voltage Line and Power: 4040 VAC, 310 KW
21:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.1 dBm
D2 -7.0 dBm
Voltage Line and Power: 4040 VAC, 310 KW
22:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -7.0 dBm
Voltage Line and Power: 4050 VAC, 310 KW
23:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -7.0 dBm
Voltage Line and Power: 4050 VAC, 310 KW"	vquesada
1318	04 Jan 07:00 Transmitter Power Measurements	ISR		2017_01 ISR + Imaging (ISCOD)	Transmitters		new	2017-01-03T14:08:28-05:00	2017-01-03T14:08:28-05:00	"00:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.1 dBm
D2 -7.0 dBm
Voltage Line and Power: 4040 VAC, 310 KW
01:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.1 dBm
D2 -7.0 dBm
Voltage Line and Power: 4040 VAC, 310 KW
02:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.1 dBm
D2 -7.0 dBm
Voltage Line and Power: 4040 VAC, 310 KW
03:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.1 dBm
D2 -7.0 dBm
Voltage Line and Power: 4040 VAC, 310 KW
04:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.1 dBm
Tx4 +2.0 dBm
D2 -7.0 dBm
Voltage Line and Power: 4030 VAC, 310 KW
05:00 TX Power Sample (-70 dB coupling)
TX1 +6.4 dBm
TX3 +2.1 dBm
Tx4 +2.0 dBm
D2 -7.0 dBm
Voltage Line and Power: 4030 VAC, 310 KW
06:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.2 dBm
Tx4 +2.1 dBm
D2 -6.9 dBm
Voltage Line and Power: 4030 VAC, 310 KW
06:25 Driver 2 OFF
07:00 TX Power Sample (-70 dB coupling)
TX1 +6.7 dBm
TX3 +2.2 dBm
Tx4 +2.1,5.1 dBm
Voltage Line and Power: 4030 VAC, 310 KW"	vquesada
1322	04 Jan 19:17 Transmitter Power Measurements	ISR+Imaging		2017_01 ISR + Imaging (ISCOD)	Transmitters		new	2017-01-04T02:22:51-05:00	2017-01-04T02:22:51-05:00	"08:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.1 dBm
Tx4 +2.2/+5.0 dBm
Voltage Line and Power: 4040 VAC, 310 KW
09:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.1 dBm
Tx4 +2.0/+5.0 dBm
Voltage Line and Power: 4010 VAC, 300 KW
10:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.1/+5.1 dBm
Voltage Line and Power: 4010 VAC, 300 KW
11:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.1/+5.1 dBm
Voltage Line and Power: 4020 VAC, 300 KW
11:23 SCREEN SOURCE FAILURE (TX3)
12:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2/+5.1 dBm
Voltage Line and Power: 4050 VAC, 300 KW
13:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.0 dBm
Tx4 +2.3/+5.1 dBm
Voltage Line and Power: 4050 VAC, 300 KW
14:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.0 dBm
Tx4 +2.3/+5.1 dBm
Voltage Line and Power: 4050 VAC, 300 KW
15:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.3 dBm
Tx4 +2.3/+5.1 dBm
Voltage Line and Power: 4050 VAC, 300 KW
16:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.3 dBm
Tx4 +2.3/+5.1 dBm
Voltage Line and Power: 4050 VAC, 300 KW
17:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.1 dBm
Tx4 +2.1/+5.0 dBm
Voltage Line and Power: 4010 VAC, 300 KW
17:40 iMAGING ON -7.0dBm
18:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.1 dBm
Tx4 +2.2 dBm
Dr2 -6.9 dBm
Voltage Line and Power: 4050 VAC, 300 KW
19:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
Dr2 -6.9 dBm
Voltage Line and Power: 4080 VAC, 310 KW

"	rtadeo
1326	04 Jan 23:00 Transmitter Power Measurements	ISR		2017_01 ISR + Imaging (ISCOD)	Transmitters		new	2017-01-04T06:07:16-05:00	2017-01-04T06:07:16-05:00	"20:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.8 dBm
Voltage Line and Power: 4080 VAC, 310 KW
21:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.8 dBm
Voltage Line and Power: 4080 VAC, 310 KW
22:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.8 dBm
Voltage Line and Power: 4050 VAC, 310 KW
23:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.8 dBm
Voltage Line and Power: 4050 VAC, 310 KW"	vquesada
1332	05 Jan 08:00 Transmitter Power Measurements	ISR		2017_01 ISR + Imaging (ISCOD)	Transmitters		new	2017-01-04T15:06:44-05:00	2017-01-04T15:06:44-05:00	"00:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.9 dBm
Voltage Line and Power: 4080 VAC, 310 KW
01:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.9 dBm
Voltage Line and Power: 4080 VAC, 310 KW
02:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.9 dBm
Voltage Line and Power: 4050 VAC, 310 KW
03:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.9 dBm
Voltage Line and Power: 4030 VAC, 310 KW
04:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.9 dBm
Voltage Line and Power: 4050 VAC, 310 KW
05:00 TX Power Sample (-70 dB coupling)
TX1 +6.5 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.9 dBm
Voltage Line and Power: 4050 VAC, 310 KW
06:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.8 dBm
Voltage Line and Power: 4080 VAC, 310 KW
07:00 TX Power Sample (-70 dB coupling)
TX1 +6.6 dBm
TX3 +2.2 dBm
Tx4 +2.2 dBm
D2 -6.9 dBm
Voltage Line and Power: 4080 VAC, 310 KW
08:00 LV  OFF
08:15 HV  OFF"	vquesada
1349	24 Jan 18:40 JASMET restart	JASMET		2017_01_1 SSW (ISCOD)	Acquisition system		new	2017-01-24T02:44:35-05:00	2017-01-24T02:44:35-05:00	"18:00 - 18:40 Se reinicia toma de datos de JASMET reiniciando los equipos del sistema (JARS y RC) además del programa de adquisicion ya que estaba perdiendo datos constantemente. (quizás por la temperatura del ambiente)

En VIPIR se han abierto las ventanas y se le ha puesto un ventilador al ambiente para que disminuya la temperatura, que estaba en 29 grados."	kkuyeng
1356	25 Jan 06:10 Imaging off	ISR+Imaging		2017_01_1 SSW (ISCOD)	Acquisition system	P.Condor	new	2017-01-24T14:06:59-05:00	2017-01-24T14:06:59-05:00	Imaging off	pcondor
1360	25 Jan 11:00-11:05 Faraday Power off	ISR+Imaging		2017_01_1 SSW (ISCOD)	Acquisition system		new	2017-01-25T02:32:04-05:00	2017-01-25T02:32:04-05:00	Faraday power off for 5 minutes	dlume
1378	26 Jan 17:26 Imaging acquisition and processing started	ISR+Imaging		2017_01_1 SSW (ISCOD)	Acquisition system		new	2017-01-26T02:57:31-05:00	2017-01-26T02:57:31-05:00		jverastegui
1379	26 Jan 18:05 Interference detected on JASMET channels 0 and 3 and Imaging channel 7	ISR+Imaging		2017_01_1 SSW (ISCOD)	Acquisition system		new	2017-01-26T02:59:19-05:00	2017-01-26T02:59:19-05:00		jverastegui
1407	02 Feb 03:59 Acquisition Error	ISR		2017_01_1 SSW (ISCOD)	Acquisition system	abelleza	new	2017-02-01T14:30:17-05:00	2017-02-01T14:30:17-05:00	"03:59 Acquisition Error Detect
04:00 PC ARES Restarting
04:20 PC ARES Restarting
04:59 PC ARES Restarting & EW_Drift Acquisition Start
"	abelleza
1412	02 Feb 15:50 EW_Drifts Acquisition was restarted	ISR		2017_01_1 SSW (ISCOD)	Acquisition system	I. Manay	new	2017-02-02T02:12:25-05:00	2017-02-02T02:13:55-05:00	The acquisition was restarted because its PC was hung. There are not data from 15:40 to 15:50.	imanay
1419	02 Feb 23:40 Jasmet is restarted	ISR+Imaging		2017_01_1 SSW (ISCOD)	Acquisition system	P.Condor	new	2017-02-02T14:02:16-05:00	2017-02-02T14:02:16-05:00	Jasmet is restarted. Pc of adquisition was locked.	pcondor
1420	03 Feb 06:06 Imaging is off	ISR+Imaging		2017_01_1 SSW (ISCOD)	Acquisition system	P.Condor	new	2017-02-02T14:03:09-05:00	2017-02-02T14:03:09-05:00	Imaging is off	pcondor
1336	23 Jan 14:20 Antenna VSWR	ISR		2017_01_1 SSW (ISCOD)	Antennas		new	2017-01-22T23:17:57-05:00	2017-01-22T23:17:57-05:00	"WU 1.03
WD 1.04
ND 1.03
NU 1.10
EU 1.02
ED 1.01
SD 1.06
SU 1.04
Mod Hysell 1.09
Colchoneta 1.11"	ryanque
1389	30 Jan 09:37 Little break at the experiment	ISR		2017_01_1 SSW (ISCOD)	Antennas	I. Manay	new	2017-01-30T02:23:33-05:00	2017-01-30T02:23:33-05:00	The transmitters were off during 4 minutes due to a short-circuit at the south quarter: From 09:33 to 09:37.	imanay
1342	24 Jan 06:00 Finish Imaging Experiment	ISR		2017_01_1 SSW (ISCOD)	End experiment	abelleza	new	2017-01-23T14:10:11-05:00	2017-01-24T00:22:07-05:00	"
Imaging experiment was ended at 06:00"	abelleza
1366	26 Jan 06:02 Imaging off	ISR+Imaging		2017_01_1 SSW (ISCOD)	End experiment		new	2017-01-25T13:04:40-05:00	2017-01-25T13:04:40-05:00		kkuyeng
1384	27 Jan 06:02 Imaging off	ISR+Imaging		2017_01_1 SSW (ISCOD)	End experiment	abelleza	new	2017-01-26T14:48:09-05:00	2017-01-26T14:48:09-05:00	06:02 Imaging off	abelleza
1386	27 Jan 08:01  End experiment	ISR		2017_01_1 SSW (ISCOD)	End experiment	abelleza	new	2017-01-26T15:05:06-05:00	2017-01-26T15:05:06-05:00	End experiment & TX OFF	abelleza
1408	02 Feb 07:19 Imaging Off	ISR+Imaging		2017_01_1 SSW (ISCOD)	End experiment	abelleza	new	2017-02-01T14:31:51-05:00	2017-02-01T14:31:51-05:00	02 Feb 07:19 Imaging Off	abelleza
1436	04 Feb 08:06 End Experiment	ISR+Imaging		2017_01_1 SSW (ISCOD)	End experiment	abelleza	new	2017-02-03T15:18:04-05:00	2017-02-03T15:18:04-05:00	"04 Feb 08:06 End Experiment

EW_DRIFT Acquisition OFF
FARADAY Acquisition OFF "	abelleza
1439	14 Feb 09:00 Final Report	ISR		2017_01_1 SSW (ISCOD)	End experiment		new	2017-02-13T17:19:52-05:00	2017-02-13T17:19:52-05:00	"Attached are the following reports:

Operativity Report
Report from Jan 23 to 27
Report from Jan 30 to Feb 04"	ryanque
1345	23 Jan 19:59 Operation Resume	ISR		2017_01_1 SSW (ISCOD)	General	I. Manay	new	2017-01-23T14:48:03-05:00	2017-01-23T14:48:03-05:00	"Person in Charge: I. Manay.
Experiment: EW_Drift_Faraday_Imaging
1) 17:00 - 20:00
2) Operation Hours: 3h
3) Operation incomplete: 0
4) Reasons:
-None."	imanay
1348	24 Jan 09:20 - 11:13 Jasmet Tests	JASMET		2017_01_1 SSW (ISCOD)	General		new	2017-01-24T02:41:53-05:00	2017-01-24T02:41:53-05:00	"09:20 - 11:13 Jasmet Tests
La interferencia observada son los pulsos de Faraday que tienen delay. Como esos pulsos solo se transmiten los 140 primeros perfiles, para procesar Jasmet se est{an escogiendo los 150 perfiles a procesar (0-149 o 150-299), dependiendo de cuando comienza a adquirir."	kkuyeng
1353	25 Jan 06:06 Noise Levels	ISR+Imaging		2017_01_1 SSW (ISCOD)	General	P.Condor	new	2017-01-24T14:02:19-05:00	2017-01-24T14:02:19-05:00	"24 JAN 2017
21:06
EW DRIFTS
A:23.35 B:22.8 C:23.88 D:22.83 
FARADAY
A:54.7 B:54.8 
IMAGING
1:19.04 2:18.04 3:16.88 4:17.72 5:17.91 6:17.72 7:18.90 8:18.40 
JASMET
1:9.87 2:10.09 3:10.35 4:11.62 5:11.09
25 JAN 2017
00:07
EW DRIFTS
A:24.18 B:23.45 C:23.87 D:22.90 
FARADAY
A:55.8 B:55.9 
IMAGING
1:19.81 2:18.98 3:17.90 4:18.73 5:18.86 6:18.45 7:20.04 8:19.58 
JASMET
1:10.03 2:10.18 3:10.38 4:11.81 5:11.22
03:32
EW DRIFTS
A:23.20 B:22.80 C:23.83 D:22.77 
FARADAY
A:55.2 B:55.4 
IMAGING
1:19.42 2:18.49 3:17.41 4:18.15 5:18.46 6:17.94 7:19.61 8:18.63 
JASMET
1:10.52 2:10.66 3:10.96 4:12.39 5:11.73
06:06
EW DRIFTS
A:23.86 B:23.25 C:24.36 D:23.42 
FARADAY
A:55.9 B:56.2 
IMAGING
1:20.39 2:19.59 3:18.50 4:19.40 5:19.46 6:18.99 7:20.66 8:19.83 
JASMET
1:11.61 2:11.90 3:12.09 4:13.64 5:13.05 
 
 
 
"	pcondor
1358	25 Jan 08:00 Operation Resume	ISR+Imaging		2017_01_1 SSW (ISCOD)	General	P.Condor	new	2017-01-24T15:08:07-05:00	2017-01-24T15:08:07-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Faraday+Imaging+Jasmet
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
1370	25 Jan 20:00 26 Jan 08:00 Operation Resume	ISR+Imaging		2017_01_1 SSW (ISCOD)	General		new	2017-01-25T14:42:24-05:00	2017-01-25T14:42:24-05:00	"Person in Charge: D. Lume.
Experiment: EW_drifts+Faraday+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:
Experiment: JASMET
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	kkuyeng
1390	30 Jan 09:45 Test of filter at channel C of JASMET30 experiment	ISR		2017_01_1 SSW (ISCOD)	General	I. Manay	new	2017-01-30T02:27:45-05:00	2017-01-30T02:27:45-05:00	Interference between experiments at JASMET radar was reduced with a filter. One filter at C channel would be tested during this week.	imanay
1394	30 Jan 19:59 Operation Resume	ISR		2017_01_1 SSW (ISCOD)	General	I. Manay	new	2017-01-30T03:18:59-05:00	2017-01-30T03:18:59-05:00	"Person in Charge: I. Manay.
Experiment: EW_Drift_Faraday_Imaging_JASMET30
1) 08:00 - 20:00
2) Operation Hours: 12h
3) Operation incomplete: 4 minutes
4) Reasons:
-Short circuit at south quarter."	imanay
1401	31 Jan 08:00 - 24:00 Operation Resume	ISR+Imaging		2017_01_1 SSW (ISCOD)	General		new	2017-01-31T07:04:32-05:00	2017-01-31T07:04:32-05:00	"Person in Charge: K.Kuyeng.
Experiment: EW_Drift_Faraday_Imaging_JASMET30
1) 08:00 - 24:00
2) Operation Hours: 16h
3) Operation incomplete: ~70 minutes
4) Reasons:
14:09 restart acquisition system because not synchronized
15:03 restart acquisition system because seems to be the cause of the JASMET interference
15:14 - 16:16 ISR RF OFF, verifying where the interference is coming from (turned off digisonde, ionosonde)
16:16 Digisonde ON, Ionosonde still off -> no interference now, seems to be ionosonde.

Jasmet is not working since channel 5 has a problem. Tx is OFF.
"	kkuyeng
1410	02 Feb 08:40 Digisonde was restablished	ISR		2017_01_1 SSW (ISCOD)	General	I. Manay	new	2017-02-02T01:58:14-05:00	2017-02-02T01:58:14-05:00	An interference caused by the Digisonde was observed at the D channel of the ew_drifts experiment. Digisonde was restarted to align its transmission to the radar pulses. This test was implemented from 8:25 AM to 8:40 AM.	imanay
1415	02 Feb 19:59 Operation Resume	ISR		2017_01_1 SSW (ISCOD)	General	I. Manay	new	2017-02-02T03:14:07-05:00	2017-02-02T03:14:07-05:00	"Person in Charge: I. Manay.
Experiment: EW_Drift_Faraday_Imaging_JASMET30
1) 08:00 - 20:00
2) Operation Hours: 11h50min
3) Operation incomplete: 10 minutes
4) Reasons:
-PC of EW_Drifts experiment was hung."	imanay
1418	02 Feb 22:40 Instant Blackout	ISR+Imaging		2017_01_1 SSW (ISCOD)	General	P.Condor	new	2017-02-02T13:59:40-05:00	2017-02-02T13:59:40-05:00	Instant blackout that transmitter was off and also Jasmet.Transmitter is On.	pcondor
1422	03 Feb 06:11 Noise levels	ISR+Imaging		2017_01_1 SSW (ISCOD)	General	P.Condor	new	2017-02-02T14:20:49-05:00	2017-02-02T14:20:49-05:00	"02 Feb 2017
21:06
EW DRIFTS
A:22.97 B:22.31 C:23.49 D:22.58 
FARADAY
A:54.8 B:54.9 
IMAGING
1:19.26 2:18.36 3:17.21 4:18.12 5:18.77 6:18.07 7:19.33 8:18.23 
JASMET
1:9.79 2:10.0 3:10.36 4:11.59 5:10.49 
03 FEB 2017
00:09
EW DRIFTS
A:22.55 B:21.98 C:23.00 D:21.96 
FARADAY
A:54.8 B:55.1 
IMAGING
1:18.52 2:17.58 3:16.53 4:17.39 5:18.10 6:17.33 7:18.75 8:17.92 
JASMET
1:10.03 2:10.19 3:10.79 4:11.98 5:10.72 
03:30
EW DRIFTS
A:23.49 B:23.06 C:23.80 D:22.92 
FARADAY
A:55.7 B:55.7 
IMAGING
1:19.78 2:19.00 3:17.89 4:18.76 5:19.32 6:18.77 7:20.38 8:19.09 
JASMET
1:10.76 2:10.92 3:11.32 4:12.74 5:11.51
06:11
EW DRIFTS
A:23.91 B:23.54 C:24.31 D:23.78 
FARADAY
A:55.9 B:56.1 
JASMET
1:11.72 2:11.99 3:12.34 4:13.83 5:12.56  "	pcondor
1425	03 Feb Operation Resume	ISR+Imaging		2017_01_1 SSW (ISCOD)	General	P.Condor	new	2017-02-02T15:08:33-05:00	2017-02-02T15:08:33-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Faraday+Imaging+Jasmet
1) 20:00 - 08:00
2) Operation Hours: 11h 50 min
3) Operation incomplete: 10 min
4) Reasons:
 Problem with transmitter"	pcondor
1429	03 Feb 08:00 - 20:00 Operation Resume	ISR+Imaging		2017_01_1 SSW (ISCOD)	General		new	2017-02-03T02:56:59-05:00	2017-02-03T02:56:59-05:00	"Person in Charge: K.Kuyeng
Experiment: EW_drifts+Faraday+Imaging+Jasmet
1) 08:00 - 20:00
2) Operation Hours: 11h 56 min
3) Operation incomplete: 4 min
4) Reasons:
10:15  Failed synchronization on EW Drift (1 min)
10:44 - 10:47  Failed synchronization on Faraday (3 min)
"	kkuyeng
1343	23 Jan 23:59 Plots	ISR		2017_01_1 SSW (ISCOD)	Plot	abelleza	new	2017-01-23T14:11:59-05:00	2017-01-24T00:22:47-05:00	23 Jan 2017 - 23:59 Plots	abelleza
1365	25 Jan 24h-Figures	ISR+Imaging		2017_01_1 SSW (ISCOD)	Plot		new	2017-01-25T12:41:59-05:00	2017-01-25T12:41:59-05:00	RTIs, spectras and parameters figures.	kkuyeng
1369	26 Jan 07:30 Plots	ISR+Imaging		2017_01_1 SSW (ISCOD)	Plot		new	2017-01-25T14:35:26-05:00	2017-01-25T14:35:26-05:00		kkuyeng
1382	26 Jan 23:59 Plots	ISR+Imaging		2017_01_1 SSW (ISCOD)	Plot	abelleza	new	2017-01-26T14:40:33-05:00	2017-01-26T14:40:33-05:00	26 Jan 23:59 Plots	abelleza
1387	27 Jan 08:04 Plots	ISR+Imaging		2017_01_1 SSW (ISCOD)	Plot	abelleza	new	2017-01-26T15:06:58-05:00	2017-01-26T15:06:58-05:00	27 Jan 08:04 Plots	abelleza
1396	30 Jan 23:59 Plots	ISR+Imaging		2017_01_1 SSW (ISCOD)	Plot	abelleza	new	2017-01-30T14:34:09-05:00	2017-01-30T14:34:09-05:00	30 Jan 23:59 Plots	abelleza
1399	31 Jan 07:45 Plots	ISR+Imaging		2017_01_1 SSW (ISCOD)	Plot	abelleza	new	2017-01-30T14:44:48-05:00	2017-01-30T14:44:48-05:00	"31 Jan 07:45 Plots
"	abelleza
1402	31 Jan 24:00 Plots	ISR+Imaging		2017_01_1 SSW (ISCOD)	Plot		new	2017-01-31T07:06:05-05:00	2017-01-31T07:06:05-05:00		kkuyeng
1406	01 Feb 23:59 Plots	ISR		2017_01_1 SSW (ISCOD)	Plot	abelleza	new	2017-02-01T14:21:09-05:00	2017-02-01T14:21:09-05:00	01 Feb 23:59 Plots	abelleza
1431	03 Feb 19:54 Figures	ISR+Imaging		2017_01_1 SSW (ISCOD)	Plot		new	2017-02-03T03:00:22-05:00	2017-02-03T03:00:22-05:00		kkuyeng
1432	03 Feb 23:59 Plots	ISR		2017_01_1 SSW (ISCOD)	Plot	abelleza	new	2017-02-03T14:50:18-05:00	2017-02-03T14:50:18-05:00	03 Feb 23:59 Plots	abelleza
1435	04 Feb 08:05 Plots	ISR+Imaging		2017_01_1 SSW (ISCOD)	Plot	abelleza	new	2017-02-03T15:13:20-05:00	2017-02-03T15:13:20-05:00	04 Feb 08:05 Plots	abelleza
1352	25 Jan 00:00 Figures	ISR+Imaging		2017_01_1 SSW (ISCOD)	Process/Analysis Program	P. Condor	new	2017-01-24T09:43:41-05:00	2017-01-24T09:43:41-05:00	Figures of rtis, spectras and parameters	pcondor
1357	25 Jan 07:40 Figures	ISR+Imaging		2017_01_1 SSW (ISCOD)	Process/Analysis Program	P. Condor	new	2017-01-24T14:34:57-05:00	2017-01-24T14:34:57-05:00	Figures of rtis, spectras and parameters.	pcondor
1374	26 Jan 11:37 EW Drift processing software shut down because of an FTP connection failure.	ISR+Imaging		2017_01_1 SSW (ISCOD)	Process/Analysis Program		new	2017-01-26T02:51:22-05:00	2017-01-26T02:51:22-05:00	The FTP server was taking too much time to respond so it overpass the timeout.	jverastegui
1375	26 Jan 12:31 EW Drift processing software enabled again.	ISR+Imaging		2017_01_1 SSW (ISCOD)	Process/Analysis Program		new	2017-01-26T02:52:11-05:00	2017-01-26T02:54:30-05:00		jverastegui
1397	31 Jan 03:59 Process Problem	ISR		2017_01_1 SSW (ISCOD)	Process/Analysis Program	abelleza	new	2017-01-30T14:41:18-05:00	2017-01-30T14:41:18-05:00	"31 Jan 03:59 Process Problem
DATA Disk Full
** move Data to HOME/DataEW_Drift2016 for free space **"	abelleza
1417	03 Feb 00:05 Figures	ISR+Imaging		2017_01_1 SSW (ISCOD)	Process/Analysis Program	P. Condor	new	2017-02-02T07:23:52-05:00	2017-02-02T07:23:52-05:00	Figures of rtis, spectras and parameters.	pcondor
1424	03 Feb 07:50 Figures	ISR+Imaging		2017_01_1 SSW (ISCOD)	Process/Analysis Program	P. Condor	new	2017-02-02T14:57:00-05:00	2017-02-02T14:57:00-05:00	Figures of rtis, spectras and parameters.	pcondor
1411	02 Feb 12:40 Low noise at E channel of JASMET30 experiment	ISR		2017_01_1 SSW (ISCOD)	Reception	I. Manay	new	2017-02-02T02:09:19-05:00	2017-02-02T02:32:52-05:00	Due to low noise observed at the E channel, this reception line was tested from 9:00 AM to 12:40 PM. The internal P28VDs were out of tune so a calibration was necessary, more gain was obtained and the noise was increased.	imanay
1428	03 Feb 19:42 Noise levels	ISR+Imaging		2017_01_1 SSW (ISCOD)	Reception		new	2017-02-03T02:54:09-05:00	2017-02-03T02:54:09-05:00	"03 Feb 2017
10:16
EW DRIFTS
A:27.4 B:27.4 C:27.3 D:26.9 
FARADAY
A:59.3 B:59.6 
JASMET
1:12.0 2:12.2 3:12.5 4:14.3 5:12.9 


14:06
EW DRIFTS
A:23.2 B:23.0 C:23.6 D:23.1 
FARADAY
A:54.6 B:54.9 
JASMET
1:10.12 2:10.8 3:10.3 4:12.4 5:10.98 

17:47
EW DRIFTS
A:22.9 B:22.1 C:23.2 D:22.2 
FARADAY
A:54.3 B:54.5 
IMAGING
1:18.3 2:17.3 3:16.5 4:17.7 5:18.0 6:17.4 7:19.2 8:17.2 
JASMET
1:9.2 2:9.3 3:9.6 4:11.0 5:9.9 "	kkuyeng
1339	23 Jan 19:29 Spark gaps adjustment history	ISR		2017_01_1 SSW (ISCOD)	Spark Gaps	A. Coronado	new	2017-01-23T02:45:04-05:00	2017-01-23T02:45:04-05:00	"23 Jan 16:30 Spark gaps adjustment
23 Jan 19:29 Spark gaps adjustment"	imanay
1344	24 Jan 07:30 Spark gaps adjustment history	ISR		2017_01_1 SSW (ISCOD)	Spark Gaps	abelleza	new	2017-01-23T14:32:05-05:00	2017-01-23T14:32:05-05:00	" 24 Jan 07:30 Spark gaps adjustment history

23 Jan 22:37 Spark gaps adjustment
24 Jan 01:45 Spark gaps adjustment
24 Jan 04:35 Spark gaps adjustment
24 Jan 07:30 Spark gaps adjustment

By José Lavado"	abelleza
1347	24 Jan 19:36 Spark gaps adjustment history	ISR+Imaging		2017_01_1 SSW (ISCOD)	Spark Gaps		new	2017-01-24T02:39:15-05:00	2017-01-24T02:39:15-05:00	"24 Jan 11:32 Spark gaps adjustment
24 Jan 13:38 Spark gaps adjustment
24 Jan 16:37 Spark gaps adjustment
24 Jan 19:30 Spark gaps adjustment

by Walter Rojas

"	kkuyeng
1355	25 Jan 05:00 Spark gaps adjustment	ISR+Imaging		2017_01_1 SSW (ISCOD)	Spark Gaps	A. Huamani	new	2017-01-24T14:04:35-05:00	2017-01-24T14:04:35-05:00	"24 jan 2017
22:50 Spark gaps adjustment
25 Jan 2017
02:00 Spark gaps adjustment
05:00 Spark gaps adjustment"	pcondor
1361	25 Jan 19:30 Spark gaps adjustment	ISR+Imaging		2017_01_1 SSW (ISCOD)	Spark Gaps		new	2017-01-25T02:33:45-05:00	2017-01-25T02:33:45-05:00	"25 Jan 2017
11:04 Spark gaps adjustment
14:06 Spark gaps adjustment
16:56 Spark gaps adjustment"	dlume
1368	26 Jan 07:30 Spark gaps adjustment	ISR+Imaging		2017_01_1 SSW (ISCOD)	Spark Gaps		new	2017-01-25T14:32:06-05:00	2017-01-25T14:32:06-05:00	"25 Jan 2017
20:19 Spark gaps adjustment
23:02 Spark gaps adjustment
26 Jan 2017
02:15 Spark gaps adjustment
05:20 Spark gaps adjustment"	kkuyeng
1380	26 Jan 20:00 Spark gaps adjustment	ISR+Imaging		2017_01_1 SSW (ISCOD)	Spark Gaps		new	2017-01-26T03:06:21-05:00	2017-01-26T03:06:21-05:00	"26 Jan 2017
10:55 Spark gaps adjustment
15:39 Spark gaps adjustment
18:47 Spark gaps adjustment"	jverastegui
1385	27 Jan 06:59 Spark gaps adjustment	ISR+Imaging		2017_01_1 SSW (ISCOD)	Spark Gaps	abelleza	new	2017-01-26T14:50:36-05:00	2017-01-26T14:50:36-05:00	"26 Jan 2017
21:57 Spark gaps adjustment

27 Jan 2017
01:08 Spark gaps adjustment
03:54 Spark gaps adjustment
06:59 Spark gaps adjustment

By Walter Rojas"	abelleza
1393	30 Jan 17:00 Spark gaps adjustment history	ISR		2017_01_1 SSW (ISCOD)	Spark Gaps	J. Lavado	new	2017-01-30T03:18:53-05:00	2017-01-30T03:18:53-05:00	"30 Jan 07:43 Spark gaps adjustment
30 Jan 10:43 Spark gaps adjustment
30 Jan 13:43 Spark gaps adjustment
30 Jan 17:00 Spark gaps adjustment"	imanay
1398	31 Jan 05:24 Spark gaps adjustment	ISR		2017_01_1 SSW (ISCOD)	Spark Gaps	abelleza	new	2017-01-30T14:43:35-05:00	2017-01-30T14:43:35-05:00	"     

30 Jan 2017
20:21 Spark gaps adjustment
23:30 Spark gaps adjustment

31 Jan 2017
02:22 Spark gaps adjustment
05:24 Spark gaps adjustment

By Walter Rojas"	abelleza
1400	31 Jan 08:00 - 24:00 Spark gaps adjustment	ISR+Imaging		2017_01_1 SSW (ISCOD)	Spark Gaps		new	2017-01-31T06:47:14-05:00	2017-01-31T06:47:14-05:00	"31 Jan 2017
08:42 Spark gaps adjustment
11:44 Spark gaps adjustment
14:47 Spark gaps adjustment
17:41 Spark gaps adjustment
21:30 Spark gaps adjustment

By Jose Lavado"	kkuyeng
1409	02 Feb 06:56 Spark Gaps Adjustment	ISR+Imaging		2017_01_1 SSW (ISCOD)	Spark Gaps	abelleza	new	2017-02-01T14:35:00-05:00	2017-02-01T14:35:00-05:00	"01 Feb 21:09 Spark gaps adjustment
02 Feb 00:09 Spark gaps adjustment
02 Feb 04:03 Spark gaps adjustment
02 Feb 06:57 Spark gaps adjustment


 By Américo Coronado"	abelleza
1413	02 Feb 19:20 Spark gaps adjustment history	ISR		2017_01_1 SSW (ISCOD)	Spark Gaps	J. Lavado	new	2017-02-02T02:29:10-05:00	2017-02-02T02:29:10-05:00	"02 Feb 10:40 Spark gaps adjustment
02 Feb 13:05 Spark gaps adjustment
02 Feb 16:21 Spark gaps adjustment
02 Feb 19:20 Spark gaps adjustment"	imanay
1423	03 Feb 07:00 Spark gaps adjustment	ISR+Imaging		2017_01_1 SSW (ISCOD)	Spark Gaps	W. Rojas	new	2017-02-02T14:48:03-05:00	2017-02-02T14:48:03-05:00	"02 Feb 2017
22:14 Spark gaps adjustment
03 Feb 2017
01:46 Spark gaps adjustment
04:35 Spark gaps adjustment
07:30 Spark gaps adjustment"	pcondor
1427	03 Feb 19:40 Spark gaps adjustment	ISR+Imaging		2017_01_1 SSW (ISCOD)	Spark Gaps		new	2017-02-03T02:47:36-05:00	2017-02-03T02:47:36-05:00	"03 Feb 2017
08:45 Spark gaps adjustment
11:43 Spark gaps adjustment
14:35 Spark gaps adjustment
17:51 Spark gaps adjustment"	kkuyeng
1434	04 Feb 06:07 Spark Gaps Adjustment	ISR+Imaging		2017_01_1 SSW (ISCOD)	Spark Gaps	abelleza	new	2017-02-03T14:57:03-05:00	2017-02-03T14:57:03-05:00	"03 Feb 21:00 Spark gaps adjustment
04 Feb 00:00 Spark gaps adjustment
04 Feb 03:14 Spark gaps adjustment
04 Feb 06:07 Spark gaps adjustment

By Walter Rojas"	abelleza
1333	23 Jan 09:10 Log created for Campaign SSW - ISCOD	ISR		2017_01_1 SSW (ISCOD)	Start experiment		new	2017-01-22T16:17:57-05:00	2017-01-22T16:17:57-05:00	"The campaign starts:
Starts: Monday January 23 2017
Ends:   Thursday Febrarury 02 2017

Systems running:
- ISR Radar (EW Drift + Faraday + Imaging)
- Digisonde (05 minutes) 
- JASMET 30 MHz
- FPI Meryhill"	ryanque
1337	23 Jan 17:00 Start of the experiment	ISR		2017_01_1 SSW (ISCOD)	Start experiment	I. Manay	new	2017-01-23T01:01:35-05:00	2017-01-23T01:01:35-05:00	Experiment: EW_Drifts, Faraday, Imaging and JASMET30.	imanay
1338	23 Jan 17:30 Imaging experiment started	ISR		2017_01_1 SSW (ISCOD)	Start experiment	I. Manay	new	2017-01-23T01:03:01-05:00	2017-01-23T01:03:01-05:00	Imaging experiment was tested and started at 17:30	imanay
1350	24 Jan 17:20 Inicio de Imagenes	ISR+Imaging		2017_01_1 SSW (ISCOD)	Start experiment		new	2017-01-24T02:45:19-05:00	2017-01-24T02:45:19-05:00	17:20 se inica experimento de imagenes	kkuyeng
1362	25 Jan 12:00 JASMET was fixed	JASMET		2017_01_1 SSW (ISCOD)	Start experiment		new	2017-01-25T02:36:24-05:00	2017-01-25T02:36:24-05:00		dlume
1363	25 Jan 20:00 Operation Resume	ISR+Imaging		2017_01_1 SSW (ISCOD)	Start experiment		new	2017-01-25T02:44:26-05:00	2017-01-25T02:44:26-05:00	"Person in Charge: D. Lume.
Experiment: EW_drifts+Faraday+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:
Experiment: JASMET
1) 12:00 - 20:00
2) Operation Hours : 8h == min
3) Operation incomplete: 4h 00 min
4) Reasons: Stop Acquisition due to some failed components"	dlume
1388	30 Jan 07:52 Start of the experiment	ISR		2017_01_1 SSW (ISCOD)	Start experiment	I. Manay	new	2017-01-30T02:20:53-05:00	2017-01-30T02:20:53-05:00		imanay
1391	30 Jan 17:35 Imaging experiment started	ISR		2017_01_1 SSW (ISCOD)	Start experiment	I. Manay	new	2017-01-30T02:28:41-05:00	2017-01-30T02:28:41-05:00		imanay
1430	03 Feb 17:40 Imaging	ISR+Imaging		2017_01_1 SSW (ISCOD)	Start experiment		new	2017-02-03T02:59:29-05:00	2017-02-03T02:59:29-05:00	17:40 Imaging experiment started	kkuyeng
1340	23 Jan 23:05 Transmitter Power Measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-23T06:07:56-05:00	2017-01-23T06:07:56-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.4 dBm
D2 -7.5 dMb
Line Voltage and Power: 4040 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.4 dBm
D2 -7.5 dMb
Line Voltage and Power: 4040 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.4 dBm
D2 -7.5 dMb
Line Voltage and Power: 4030 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.4 dBm
D2 -7.5 dMb
Line Voltage and Power: 4030 VAC, 300 KW"	vquesada
1341	24 Jan 07:00 Transmitter Power Measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-23T14:01:34-05:00	2017-01-23T14:01:34-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
D2 -7.5 dBm
Line Voltage and Power: 4080 VAC, 310 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
D2 -7.5 dBm
Line Voltage and Power: 4080 VAC, 310 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
D2 -7.5 dBm
Line Voltage and Power: 4080 VAC, 310 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
D2 -7.5 dBm
Line Voltage and Power: 4080 VAC, 310 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
D2 -7.5 dBm
Line Voltage and Power: 4070 VAC, 300 KW
04:58 Crowbar
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
D2 -7.5 dBm
Line Voltage and Power: 4080 VAC, 310 KW
06:00 Driver 2 OFF
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3,5.6 dBm
Line Voltage and Power: 4080 VAC, 310 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3,5.6 dBm
Line Voltage and Power: 4080 VAC, 310 KW"	vquesada
1346	24 Jan 19:00 Transmitter Power Measurements	ISR+Imaging		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-24T02:20:59-05:00	2017-01-24T02:20:59-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.2/+5.2 dBm
Line Voltage and Power: 4050 VAC, 300 KW
08:50 Fault per circuit HV crowbar
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.2/+5.2 dBm
Line Voltage and Power: 4050 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3/+5.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
10:30 RF OFF
10:34 RF ON
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3/+5.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3/+5.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.3/+5.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.1 dBm
Tx4 +2.3/+5.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
14:00 RF OFF/ON
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.1 dBm
Tx4 +2.3/+5.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.1 dBm
Tx4 +2.4/+5.4 dBm
Line Voltage and Power: 4060 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +1.9 dBm
Tx4 +2.3/+5.2 dBm
Line Voltage and Power: 4020 VAC, 300 KW
17:20 TX Power sample (-70 dB coupling)
Dr2 -7.5 dBm Imaging ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.6 dBm
Line Voltage and Power: 4020 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.6 dBm
Line Voltage and Power: 4020 VAC, 300 KW
"	rtadeo
1351	24 Jan 23:05 Transmitter Power Measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-24T06:05:42-05:00	2017-01-24T06:05:42-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4040 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4040 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +1.9 dBm
Tx4 +2.2 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +1.9 dBm
Tx4 +2.2 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW"	vquesada
1354	25 Jan 07:00 Transmitter Power Measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-24T14:02:41-05:00	2017-01-24T14:02:41-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4050 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.2 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4050 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4050 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +1.9 dBm
Tx4 +2.2 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +1.9 dBm
Tx4 +2.2 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.1 dBm
Tx4 +2.3 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4090 VAC, 310 KW
06:10 Driver 2 OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3,5.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW"	vquesada
1359	25 Jan 19:00 Transmitter Power Measurements	ISR+Imaging		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-25T02:08:18-05:00	2017-01-25T02:08:18-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3/+5.3 dBm
Line Voltage and Power: 4030 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +1.9 dBm
Tx4 +2.2/+5.2 dBm
Line Voltage and Power: 4030 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +1.9 dBm
Tx4 +2.2/+5.2 dBm
Line Voltage and Power: 4000 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +1.9 dBm
Tx4 +2.2/+5.2 dBm
Line Voltage and Power: 4000 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +1.9 dBm
Tx4 +2.2/+5.2 dBm
Line Voltage and Power: 4000 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +1.9 dBm
Tx4 +2.2/+5.2 dBm
Line Voltage and Power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.2/+5.2 dBm
Line Voltage and Power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.2/+5.2 dBm
Line Voltage and Power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +2.0 dBm
Tx4 +2.2/+5.1 dBm
Line Voltage and Power: 4000 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +2.0 dBm
Tx4 +2.2/+5.1 dBm
Line Voltage and Power: 4000 VAC, 300 KW
17:30 Imaging ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4050 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +1.9 dBm
Tx4 +2.4 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4050 VAC, 300 KW
"	rtadeo
1364	25 Jan 23:00 Transmitter Power Measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-25T06:02:44-05:00	2017-01-25T06:02:44-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4020 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4020 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4050 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4050 VAC, 300 KW"	vquesada
1367	26 Jan 07:00 Transmitter Power Measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-25T14:03:14-05:00	2017-01-25T14:03:14-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4060 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4060 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.1 dBm
Tx4 +2.4 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4080 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.1 dBm
Tx4 +2.4 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4080 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.1 dBm
Tx4 +2.4 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4080 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.1 dBm
Tx4 +2.4 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4080 VAC, 300 KW
06:00 Driver 2 OFF
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.2 dBm
Tx4 +2.4,5.6 dBm
Line Voltage and Power: 4080 VAC, 310 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.2 dBm
Tx4 +2.4,5.6 dBm
Line Voltage and Power: 4080 VAC, 310 KW"	vquesada
1371	26 Jan 19:00 Transmitter Power Measurements	ISR+Imaging		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-26T02:30:36-05:00	2017-01-26T02:30:36-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.1 dBm
Tx4 +2.3/5.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +2.0 dBm
Tx4 +2.2/5.2 dBm
Line Voltage and Power: 4050 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +2.0 dBm
Tx4 +2.2/5.2 dBm
Line Voltage and Power: 4050 VAC, 300 KW
10:02 RF OFF
10:16 RF ON
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.1 dBm
Tx4 +2.2/5.2 dBm
Line Voltage and Power: 4050 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.3/5.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
12:40 Filament Source Failure PA1
14:35 RF ON Transmission Reset
14:35 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.2/5.2 dBm
Line Voltage and Power: 4050 VAC, 300 KW
14:51 Falla Screen PA1
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +1.9 dBm
Tx4 +2.2/5.2 dBm
Line Voltage and Power: 4050 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +1.9 dBm
Tx4 +2.2/5.2 dBm
Line Voltage and Power: 4050 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +1.9 dBm
Tx4 +2.2/5.2 dBm
Line Voltage and Power: 4050 VAC, 300 KW
17:15 Ajuste de potencia PA(1,3,4)
17:30 Imaging ON -7.4 dBm
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.2 dBm
Dr2 -7.4
Line Voltage and Power: 4050 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.4
Line Voltage and Power: 4050 VAC, 300 KW
"	rtadeo
1372	26 Jan 10:00 Transmitter off for the change of power switches	ISR+Imaging		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-26T02:41:12-05:00	2017-01-26T02:41:12-05:00		jverastegui
1373	26 Jan 10:15 Transmitter on	ISR+Imaging		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-26T02:44:51-05:00	2017-01-26T02:44:51-05:00		jverastegui
1376	26 Jan 12:50 Transmitter went down	ISR+Imaging		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-26T02:53:01-05:00	2017-01-26T02:54:53-05:00		jverastegui
1377	26 Jan 14:33 Transmitter up again	ISR+Imaging		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-26T02:53:42-05:00	2017-01-26T02:55:11-05:00		jverastegui
1381	26 Jan 20:00 Operation Resume	ISR+Imaging		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-26T03:09:13-05:00	2017-01-26T03:09:13-05:00	"Person in Charge: J. Verastegui
Experiment: EW_drifts+Faraday+Imaging
1) 08:00 - 20:00
2) Operation Hours: 10h 02 min
3) Operation incomplete: 1h 58 min
4) Reasons: Transmitter went down
Experiment: JASMET
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	jverastegui
1383	27 Jan 07:30 Transmitter power measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-26T14:45:11-05:00	2017-01-26T14:45:11-05:00	"26/01/2017
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4020 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4000 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.2 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4010 VAC, 300 KW
27/01/2017
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4010 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4050 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.1 dBm
Tx4 +2.3 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 3980 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4030 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.1 dBm
Tx4 +2.4 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
06:00 Driver 2 OFF
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.4
Line Voltage and Power: 4000 VAC, 310 KW
06.05 Dr2 OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3,5.2 dBm
Line Voltage and Power: 4000 VAC, 310 KW"	ryaya
1392	30 Jan 19:30 Transmitter power measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-30T02:43:38-05:00	2017-01-30T02:43:38-05:00	"07:00 LV ON
07:26 HV ON - Heating time
07:40 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.1 dBm
Tx4 +2.0/5.0 dBm
Line Voltage and Power: 4000 VAC, 300 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.0/5.0 dBm
Line Voltage and Power: 4000 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.2/5.2 dBm
Line Voltage and Power: 4000 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.3/5.4 dBm
Line Voltage and Power: 4020 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +1.9 dBm
Tx4 +2.3/5.3 dBm
Line Voltage and Power: 3980 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 4030 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.1 dBm
Tx4 +2.5/5.5 dBm
Line Voltage and Power: 4000 VAC, 300 KW
17:38 Imaging ON -7.3 dBm
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.4 dBm
Dr2 -7.3 dBm
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.2 dBm
Tx4 +2.6 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4000 VAC, 300 KW"	ryaya
1395	31 Jan 07:00 Transmitter power measurements	ISR+Imaging		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-01-30T14:23:02-05:00	2017-01-30T14:23:02-05:00	"
20:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.1 dBm
Tx4 +2.6 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4000 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.1 dBm
Tx4 +2.6 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4000 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4000 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4000 VAC, 300 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4000 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4000 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4000 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.0 dBm
Tx4 +2.3 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
Dr2 -7.4 dBm 
Line Voltage and Power: 4000 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
06:08 Imaging OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.5/+5.5dBm
Line Voltage and Power: 4030 VAC, 300 KW
"	rtadeo
1403	01 Feb .19:30 Transmitter Sources measurements	ISR+Imaging		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-02-01T02:44:33-05:00	2017-02-01T02:44:33-05:00	"24/01/2017

DRIVER           1                2                3               *4
PULSE         EW-DRIFT         Imaging          Faraday      Faraday+EW_Drift
IPP
%
V(Atrad)
CODE         
Vfill.          13.9V            13.8V            13.8V          14.6V 
V/I(Placa)       9.9KV            9.9KV             9.9KV           10.0KV                      
V/I(Bias)     350V/45mA        340V/35mA         340V/20mA        345V/40mA
V/I(Screen)   750V/26mA        600V/4mA          760V/20mA        700V/25mA
I(Cathode)       0<                0               200mA          245mA
P(Inc.)         -5.6dBm         -7.6dBm           -9.5dBm        -9.3dBm
P(Ref.)         -22.3dBm        -25.2dBm          -18.5dBm       -20.6dBm
PA               1                2                3                4
V/I(Placa)      19.8KV/5A     -----------        19.8KV/1.2A     19.8KV/OFF
V/I(Bias)       460V/55mA     -----------        450V/15mA       460V/26mA
V/I(Screen)     900V/0<       -----------        900V/22mA       900V/40mA
Fill             16.5V        -----------         16.5V           16.5
P(Inc)           +6.1dBm      -----------         +2.0dBm         +2.3dBm                     
P(Ref)          -17.9dBm      -----------         -21.4dBm       -14.6dBm
V(Linea)         4040VAC      -----------          4040VAC        4040VAC

*Note: The pulse of Ew_Drift is not output in PA4







"	rtadeo
1404	01 Feb 23:00 Transmitter Power Measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-02-01T06:05:25-05:00	2017-02-01T06:05:25-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.1 dBm
Tx4 +2.2 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4020 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.1 dBm
Tx4 +2.2 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4020 VAC, 300 KW"	vquesada
1405	02 Feb 07:00 Transmitter Power Measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-02-01T14:06:06-05:00	2017-02-01T14:06:06-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
01:20 Interloock disable Tx1
01:22 Txs OK
01:54 Interloock disable Tx1, relays control failure K3, K10 y K15
03:00 Txs OK
03:05 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4020 VAC, 300 KW
03:15 Screen source failure Tx1
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.3 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.2 dBm
Tx4 +2.6 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4060 VAC, 310 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.2 dBm
Tx4 +2.6 dBm
Dr2 -7.5 dBm
Line Voltage and Power: 4060 VAC, 310 KW"	vquesada
1414	02 Feb 19:30 Transmitter power measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-02-02T02:50:01-05:00	2017-02-02T02:50:01-05:00	"07:20 D2 OFF
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 4030 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.5/5.5 dBm
Line Voltage and Power: 4000 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.5/5.5 dBm
Line Voltage and Power: 4000 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 3980 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.4/5.4 dBm
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4/+5.4  dBm
18:10 D2 ON
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.4 dBm
Tx4 +2.6 dBm
Dr2 -7.2 dBm
Line Voltage and Power: 4100 VAC, 300 KW"	ryaya
1416	02 Feb 23:05 Transmitter Power Measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-02-02T06:13:15-05:00	2017-02-02T06:13:15-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.3 dBm
Tx4 +2.5 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4090 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.3 dBm
Tx4 +2.5 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4090 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.0 dBm
Tx4 +2.4 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4020 VAC, 300 KW
22:26 Blackout
22:41 Txs OK
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.4 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4020 VAC, 300 KW
"	vquesada
1421	02 Feb 07:00 Transmitter Power Measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-02-02T14:05:37-05:00	2017-02-02T14:05:37-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.4 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4020 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.4 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4020 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.4 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4030 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.1 dBm
Tx4 +2.4 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4030 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4030 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4030 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.4 dBm
Tx4 +2.6 dBm
Dr2 -7.2 dBm
Line Voltage and Power: 4080 VAC, 310 KW
06:07 Driver 2 OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.4 dBm
Tx4 +2.6 dBm
Dr2 -7.2 dBm
Line Voltage and Power: 4080 VAC, 310 KW"	vquesada
1426	3 Feb 19:30 Transmitter power measurements	ISR		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-02-03T02:45:00-05:00	2017-02-03T02:45:00-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.4 dBm
Tx4 +2.6/5.5 dBm
Line Voltage and Power: 4050 VAC, 300 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.6/5.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.6/5.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.4/5.4 dBm
Line Voltage and Power: 4000 VAC, 300 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.5/5.5 dBm
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.4 dBm
Tx4 +2.6/5.6 dBm
Line Voltage and Power: 4030 VAC, 300 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.5/5.5 dBm
17:40 D2 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.6 dBm
D2  -7.3 dBm
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.4 dBm
Tx4 +2.6 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW"	ryaya
1433	04 Feb 07:30 Transmitter power measurements	ISR+Imaging		2017_01_1 SSW (ISCOD)	Transmitters		new	2017-02-03T14:51:48-05:00	2017-02-03T14:51:48-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.4 dBm
Tx4 +2.6 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.4 dBm
Tx4 +2.6 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.4 dBm
Tx4 +2.6 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.4 dBm
Tx4 +2.6 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.4 dBm
Tx4 +2.6 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.4 dBm
Tx4 +2.6 dBm
Dr2 -7.3 dBm
Line Voltage and Power: 4050 VAC, 300 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.3 dBm
Tx4 +2.5 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4030 VAC, 300 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.3 dBm
Tx4 +2.5 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4030 VAC, 300 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.3 dBm
Tx4 +2.5 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4030 VAC, 300 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.3 dBm
Tx4 +2.5 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4030 VAC, 300 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.3 dBm
Tx4 +2.5 dBm
Dr2 -7.4 dBm
Line Voltage and Power: 4030 VAC, 300 KW
06:08 Imaging OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.3 dBm
Tx4 +2.5/+5.5 dBm
Line Voltage and Power: 4030 VAC, 300 KW
08:00 TX OFF END"	rtadeo
1438	14 Feb 09:10 Antenna VSWR	ISR		2017_02 Sun Pass	Antennas		new	2017-02-13T16:45:50-05:00	2017-02-13T16:45:50-05:00	"WUp 1.02
WDn 1.05
NDn 1.08
NUp 1.09
EUp 1.00
EDn 1.01
SDn 1.05
SUp 1.08"	ryanque
1437	14 Feb 09:00 Log created	ISR		2017_02 Sun Pass	Start experiment		new	2017-02-13T16:38:59-05:00	2017-02-13T16:46:13-05:00	"Sun Pass campaign
High Power Transmitter, with 2 transmitters and phase alignment
Start: Tuesday Feb 14 2017
Ends:  Thursday Feb 16 2017"	ryanque
1461	31 Mar 06:07 Imaging is off	ISR+Imaging		2017_03 ISCOD CONGSS	Acquisition system	P.Condor	new	2017-03-30T13:42:10-05:00	2017-03-30T13:42:10-05:00	Imaging is off.	pcondor
1441	29 Mar 10:00 Antenna VSWR	ISR		2017_03 ISCOD CONGSS	Antennas		new	2017-03-28T17:14:11-05:00	2017-03-28T17:14:11-05:00	"WUp 1.03
WDn 1.03
NUp 1.08
NDn 1.07
EUp 1.05
EDn 1.02
SDn 1.06
SUp 1.05"	ryanque
1455	30 Mar 18:20 Imaging Off	ISR		2017_03 ISCOD CONGSS	Antennas		new	2017-03-30T02:44:55-05:00	2017-03-30T02:44:55-05:00	"18:20 Imaging is turned off due to high reflected power.

A cable had blown that is why Imaging Driver had high reflected power.

19:10 Imaging restart without TR
19:24 Imaging starts "	ryanque
1450	30 Mar 06:52 Finish Imaging Experiment	ISR+Imaging		2017_03 ISCOD CONGSS	End experiment		new	2017-03-29T14:37:30-05:00	2017-03-29T14:37:30-05:00	30 Mar 06:52 Finish Imaging Experiment	abelleza
1476	01 Apr 06:10 Finish Imaging Experiment	ISR+Imaging		2017_03 ISCOD CONGSS	End experiment	abelleza	new	2017-03-31T14:33:58-05:00	2017-03-31T14:33:58-05:00	01 Apr 06:10 Finish Imaging Experiment	abelleza
1478	01 Apr 08:05 Finished experiment	ISR+Imaging		2017_03 ISCOD CONGSS	End experiment	abelleza	new	2017-03-31T15:13:27-05:00	2017-03-31T15:13:27-05:00	01 Apr 08:05 Finished experiment	abelleza
1481	05 Apr 15:00 Report	ISR		2017_03 ISCOD CONGSS	End experiment		new	2017-04-04T22:59:05-05:00	2017-04-04T22:59:05-05:00	"Attached are the following files:

Final Report and

Operativity"	ryanque
1447	29 Mar 19:59 Operation Resume	ISR		2017_03 ISCOD CONGSS	General	I. Manay	new	2017-03-29T02:57:50-05:00	2017-03-29T02:57:50-05:00	"Person in Charge: I. Manay.
Experiment: EW_Drift_Faraday_Imaging
1) 14:45 - 20:00
2) Operation Hours: 5h15min
3) Operation incomplete: 0 minutes
4) Reasons:
-None."	imanay
1462	31 Mar 05:42 Noise levels	ISR+Imaging		2017_03 ISCOD CONGSS	General	P.Condor	new	2017-03-30T13:56:54-05:00	2017-03-30T13:56:54-05:00	"30-03-2017
20:40
EW DRIFTS
A:23.25 B:23.52 C:21.96 D:22.79 
FARADAY
A:55.1 B:55.2 
IMAGING
1:18.89 2:18.51 3:17.98 4:20.47 5:18.10 6:19.04 7:21.74 8:21.17 
23:30
EW DRIFTS
A:23.87 B:22.84 C:23.96 D:23.47 
FARADAY
A:55.5 B:56.0 
IMAGING
1:20.02 2:19.51 3:19.15 4:21.56 5:19.09 6:20.03 7:22.55 8:22.30 
02:57
EW DRIFTS
A:25.15 B:24.35 C:25.06 D:24.51 
FARADAY
A:57.2 B:57.7 
IMAGING
1:26.88 2:26.51 3:20.88 4:23.37 5:20.65 6:21.81 7:24.24 8:24.30 
05:42
EW DRIFTS
A:29.34 B:28.77 C:29.57 D:29.42 
FARADAY
A:61.7 B:62.2 
IMAGING
1:27.09 2:27.04 3:26.11 4:28.75 5:25.95 6:27.07 7:29.39 8:29.17 
"	pcondor
1466	31 Mar 08:00 Operation resume	ISR+Imaging		2017_03 ISCOD CONGSS	General	P.Condor	new	2017-03-30T15:06:07-05:00	2017-03-30T15:06:07-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Faraday+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
1469	31 Mar 08:00 - 20:00 Noise Levels	ISR+Imaging		2017_03 ISCOD CONGSS	General		new	2017-03-31T02:54:46-05:00	2017-03-31T02:54:46-05:00	"08:40
EW DRIFTS
A:24.4 B:23.8 C:24.7 D:24.18 
FARADAY
A:56.1 B:56.7 

10:35
EW DRIFTS
A:23.7 B:23.19 C:24.02 D:23.7 
FARADAY
A:55.2 B:55.8 

13:30
EW DRIFTS
A:23.6 B:23.1 C:23.8 D:23.3 
FARADAY
A:55.0 B:55.6 

16:32
EW DRIFTS
A:22.9 B:22.3 C:23.29 D:22.6 
FARADAY
A:54.2 B:54.8 

18:00
EW DRIFTS
A:24.0 B:23.29 C:24.3 D:23.9 
FARADAY
A:55.6 B:56.1 
IMAGING
1:20.4 2:20.0 3:19.5 4:22.0 5:19.5 6:20.5 7:23.0 8:22.6 

19:21
EW DRIFTS
A:24.3 B:23.5 C:24.3 D:23.8 
FARADAY
A:56.1 B:56.9 
IMAGING
1:20.5 2:20.1 3:19.5 4:22.0 5:19.8 6:20.45 7:23.02 8:22.13
"	kkuyeng
1472	31 Mar 08:00-20:00 Operation resume	ISR+Imaging		2017_03 ISCOD CONGSS	General		new	2017-03-31T03:25:36-05:00	2017-03-31T03:25:36-05:00	"Person in Charge: K.Kuyeng
Experiment: EW_drifts+Faraday+Imaging
1) 08:00 - 20:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	kkuyeng
1480	04 Apr 17:00 Experiment data uploaded to PUMA	ISR		2017_03 ISCOD CONGSS	General	I. Manay	new	2017-04-03T23:46:25-05:00	2017-04-03T23:46:25-05:00	"EW_Drifts : 1,186 files (84.6 GB)
Faraday : 464 files (24.4 GB)
Imaging : files 355(278 GB)"	imanay
1444	29 Mar 18:30 vipir was stopped	ISR		2017_03 ISCOD CONGSS	Plot	I. Manay	new	2017-03-29T01:57:21-05:00	2017-03-29T01:57:21-05:00	Vipir malfunction was observed at the Imaging and EW_Drifts experiments (See attached files). Vipir was stopped because of this malfunction.	imanay
1449	29 Mar 23:59 Plots	ISR+Imaging		2017_03 ISCOD CONGSS	Plot	abelleza	new	2017-03-29T14:32:30-05:00	2017-03-29T14:35:49-05:00	29 Mar 2017 - 23:59 Plots	abelleza
1452	30 Mar 07:50 Plots	ISR+Imaging		2017_03 ISCOD CONGSS	Plot		new	2017-03-29T14:51:32-05:00	2017-03-29T14:51:32-05:00	30 Mar 07:50 Plots	abelleza
1460	31 Mar 00:05 Figures	ISR+Imaging		2017_03 ISCOD CONGSS	Plot	P. Condor	new	2017-03-30T07:28:20-05:00	2017-03-30T07:28:20-05:00	Figures of rtis, spectras and parameters of march 30.	pcondor
1471	31 Mar 20:00 Figures	ISR+Imaging		2017_03 ISCOD CONGSS	Plot		new	2017-03-31T03:19:15-05:00	2017-03-31T03:19:15-05:00		kkuyeng
1474	31 Mar 23:59 Plots	ISR+Imaging		2017_03 ISCOD CONGSS	Plot	abelleza	new	2017-03-31T14:22:01-05:00	2017-03-31T14:22:01-05:00	31 Mar 23:59 Plots	abelleza
1477	01 Apr 08:00 Plots	ISR+Imaging		2017_03 ISCOD CONGSS	Plot	abelleza	new	2017-03-31T15:04:33-05:00	2017-03-31T15:04:33-05:00	01 Apr 08:00 Plots	abelleza
1465	31 Mar 07:50 Figures	ISR+Imaging		2017_03 ISCOD CONGSS	Process/Analysis Program	P. Condor	new	2017-03-30T14:56:36-05:00	2017-03-30T14:56:36-05:00	Figures of rtis, spectra and parameter.	pcondor
1454	30 Mar 17:30 Imaging Mode starts	ISR		2017_03 ISCOD CONGSS	Reception		new	2017-03-30T02:38:35-05:00	2017-03-30T02:39:04-05:00	Imaging mode starts	ryanque
1457	30 Mar 19:40 Noise Levels	ISR		2017_03 ISCOD CONGSS	Reception		new	2017-03-30T02:51:05-05:00	2017-03-30T02:51:05-05:00	"11:00
EW Drift
A  25.04      B  23.80    C  24.82    D  24.06
Faraday
A  57.2       B  56.9

17:50
EW Drift
A  24.27     B 23.42    C   24.38   D  23.70
Faraday
A 56.6     B  56.4
Imaging 
A 20.21   B 19.85   C  19.27    D  21.84
E 19.23   F 2032    G  22.80    H  22.29"	ryanque
1446	29 Mar 19:45 Spark gaps adjustment history	ISR		2017_03 ISCOD CONGSS	Spark Gaps	A. Coronado	new	2017-03-29T02:49:16-05:00	2017-03-29T02:49:16-05:00	"29 Mar 14:45 Spark gaps adjustment
29 Mar 17:15 Spark gaps adjustment
29 Mar 19:45 Spark gaps adjustment"	imanay
1451	30 Mar 07:44 Spark gaps adjustment history	ISR+Imaging		2017_03 ISCOD CONGSS	Spark Gaps		new	2017-03-29T14:50:28-05:00	2017-03-29T14:50:28-05:00	"30 Mar 07:44 Spark gaps adjustment history

29 Jan 22:49 Spark gaps adjustment
30 Jan 01:47 Spark gaps adjustment
30 Jan 04:49 Spark gaps adjustment
30 Jan 07:44 Spark gaps adjustment

By Walter Rojas"	abelleza
1456	30 Mar 19:20 Spark Gap adjustments	ISR		2017_03 ISCOD CONGSS	Spark Gaps		new	2017-03-30T02:47:25-05:00	2017-03-30T02:47:25-05:00	"10:11 Spark Gap adjustment
13:12 Spark Gap adjustment
15:00 Spark Gap adjustment
19:20 Spark Gap adjustment "	ryanque
1463	31 Mar 04:57 Spark gaps adjustment	ISR+Imaging		2017_03 ISCOD CONGSS	Spark Gaps	W. Rojas	new	2017-03-30T14:00:11-05:00	2017-03-30T14:00:11-05:00	"30-03-2017
22:57 Spark gaps adjustment
31-03-2017
01:44 Spark gaps adjustment
04:57 Spark gaps adjustment"	pcondor
1470	31 Mar 20:00 Spark gaps adjustment	ISR+Imaging		2017_03 ISCOD CONGSS	Spark Gaps		new	2017-03-31T02:55:04-05:00	2017-03-31T02:55:04-05:00	"08:01 Spark gaps adjustment
10:42 Spark gaps adjustment
13:27 Spark gaps adjustment
16:40 Spark gaps adjustment
19:30 Spark gaps adjustment
"	kkuyeng
1475	01 Apr 04:34 Spark gaps adjustment history	ISR+Imaging		2017_03 ISCOD CONGSS	Spark Gaps	abelleza	new	2017-03-31T14:32:02-05:00	2017-03-31T14:32:02-05:00	"

01 Apr 04:34 Spark gaps adjustment history

31 Mar 22:55 Spark gaps adjustment
01 Apr 01:35 Spark gaps adjustment
01 Apr 04:34 Spark gaps adjustment

By Americo Coronado"	abelleza
1440	28 Mar 14:00 Log Created	ISR		2017_03 ISCOD CONGSS	Start experiment		new	2017-03-27T21:47:59-05:00	2017-03-27T21:47:59-05:00	"ISCOD CONGSS Campaign

Start: 29 March 2017
End  : 01 April 2017

Mode: ISR - Imaging

"	ryanque
1442	29 Mar 14:45 ISR experiments started	ISR		2017_03 ISCOD CONGSS	Start experiment	I. Manay	new	2017-03-28T23:18:59-05:00	2017-03-29T01:00:20-05:00	Two experiments, EW_Drifts and Faraday, were started at 14:45.Digisonde and vipir are working every 5 minutes. These three systems are synchronized by GPS.	imanay
1443	29 Mar 17:40 Imaging experiment started	ISR		2017_03 ISCOD CONGSS	Start experiment	I. Manay	new	2017-03-29T00:47:58-05:00	2017-03-29T00:47:58-05:00	Imaging experiment was tested and started. I will run from 6PM to next day 6AM.	imanay
1467	31 Mar 18:00 Imaging ON	ISR+Imaging		2017_03 ISCOD CONGSS	Start experiment		new	2017-03-31T02:13:35-05:00	2017-03-31T02:13:35-05:00	18:00 Start of Imaging experiment	kkuyeng
1445	29 Mar 19:10 Transmitter Power Measurements	ISR		2017_03 ISCOD CONGSS	Transmitters		new	2017-03-29T02:12:39-05:00	2017-03-29T02:12:39-05:00	"14:20 LV ON
14:30 HV OPN
14:44 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.3 dBm
Tx4 +2.0/5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.3 dBm
Tx4 +2.0/5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.2/5.1 dBm
Line Voltage and Power: 4050 VAC, 280 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2/5.1 dBm
Line Voltage and Power: 4030 VAC, 280 KW
17:35 Driver 2 ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.1 dBm
D2/7.4 dBm
Line Voltage and Power: 4030 VAC, 280 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.1 dBm
D2/7.4 dBm
Line Voltage and Power: 4030 VAC, 280 KW"	vquesada
1448	30 Mar 07:02 Transmitter Power Measurements	ISR+Imaging		2017_03 ISCOD CONGSS	Transmitters		new	2017-03-29T14:19:24-05:00	2017-03-29T14:19:24-05:00	"
20:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +2.2 dBm
Tx4 +2.0 dBm
Dr2 -9.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +2.2 dBm
Tx4 +2.0 dBm
Dr2 -9.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.4 dBm
Tx4 +2.2 dBm
Dr2 -8.0 dBm
Line Voltage and Power: 4070 VAC, 280 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.2 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4070 VAC, 280 KW

00:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.2 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4070 VAC, 280 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.2 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4070 VAC, 280 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.2 dBm
Dr2 -6.8 dBm
Line Voltage and Power: 4070 VAC, 280 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.2 dBm
Dr2 -7.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.2 dBm
Dr2 -7.0 dBm
Line Voltage and Power: 4070 VAC, 280 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.2 dBm
Dr2 -10-0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.0 dBm
Dr2 -11.2 dBm
Line Voltage and Power: 4050 VAC, 280 KW
07:00 iMAGING OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4020 VAC, 280 KW


"	rtadeo
1453	30 Mar 09:20 TX Fall	ISR		2017_03 ISCOD CONGSS	Transmitters		new	2017-03-30T02:37:57-05:00	2017-03-30T02:37:57-05:00	The transmitter falled for 2 minutes	ryanque
1458	30 Mar 19:30 Transmitter power measurments	ISR		2017_03 ISCOD CONGSS	Transmitters		new	2017-03-30T02:52:27-05:00	2017-03-30T02:52:27-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4000 VAC, 280 KW
09:23 Failure at PA1 screen power supply
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.3 dBm
Tx4 +2.1/+5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.1/+5.0 dBm
Line Voltage and Power: 4020 VAC, 280 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.3 dBm
Tx4 +2.2/+5.1 dBm
Line Voltage and Power: 4050 VAC, 280 KW
12:17 Failure at PA1 screen power supply
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.3 dBm
Tx4 +2.2/+5.1 dBm
Line Voltage and Power: 4050 VAC, 280 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +2.1 dBm
Tx4 +2.1/+5.0 dBm
Line Voltage and Power: 4000 VAC, 280 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.1 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4000 VAC, 280 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.3 dBm
Tx4 +2.2/+5.1 dBm
Line Voltage and Power: 4050 VAC, 280 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2/+5.1 dBm
Line Voltage and Power: 4020 VAC, 280 KW
17:35 Dr2 ON
18:00 Problem detected at Dr2, reflected power is too high, the problem was found on antenna connection. 
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.1 dBm
Dr2 -7.0 dBm"	ryaya
1459	30 Mar 23:00 Transmitter Power Measurements	ISR		2017_03 ISCOD CONGSS	Transmitters		new	2017-03-30T06:04:20-05:00	2017-03-30T06:04:20-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.3 dBm
D2  -7.2 dBm
Line Voltage and Power: 4070 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.3 dBm
D2  -7.2 dBm
Line Voltage and Power: 4070 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.4 dBm
Tx4 +2.3 dBm
D2  -7.2 dBm
Line Voltage and Power: 4080 VAC, 280 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.3 dBm
Tx3 +2.4 dBm
Tx4 +2.3 dBm
D2  -7.2 dBm
Line Voltage and Power: 4080 VAC, 280 KW"	vquesada
1464	31 Mar 07:00 Transmitter Power Measurements	ISR		2017_03 ISCOD CONGSS	Transmitters		new	2017-03-30T14:05:23-05:00	2017-03-30T14:05:23-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.3 dBm
D2 -7.2 dBm
Line Voltage and Power: 4020 VAC, 280 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.4 dBm
Tx4 +2.3 dBm
D2 -7.2 dBm
Line Voltage and Power: 4020 VAC, 280 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.2 dBm
Line Voltage and Power: 4060 VAC, 280 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.2 dBm
Line Voltage and Power: 4060 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.2 dBm
Line Voltage and Power: 4050 VAC, 280 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.2 dBm
Line Voltage and Power: 4050 VAC, 280 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.2 dBm
Line Voltage and Power: 4050 VAC, 280 KW
06:06 Driver 2 OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.0/5.0 dBm
Line Voltage and Power: 4080 VAC, 280 KW"	vquesada
1468	31 Mar 19:00 Transmitter Power Measurements	ISR+Imaging		2017_03 ISCOD CONGSS	Transmitters		new	2017-03-31T02:31:52-05:00	2017-03-31T02:31:52-05:00	"
08:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +6.4 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +6.0 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.2 dBm
Tx4 +2.0/+5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
18:00 Imaging ON
18:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.0 dBm
Dr2 -7.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.1 dBm
Dr2 -7.1 dBm
Line Voltage and Power: 4060 VAC, 280 KW


"	rtadeo
1473	31 Mar 23:00 Transmitter Power Measurements	ISR		2017_03 ISCOD CONGSS	Transmitters		new	2017-03-31T06:03:35-05:00	2017-03-31T06:03:35-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.2 dBm
Line Voltage and Power: 4050 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.2 dBm
Line Voltage and Power: 4050 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.2 dBm
Line Voltage and Power: 4050 VAC, 280 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.2 dBm
Line Voltage and Power: 4050 VAC, 280 KW"	vquesada
1479	01 Apr 08:10 Transmitter Power Measurements	ISR		2017_03 ISCOD CONGSS	Transmitters		new	2017-03-31T15:14:43-05:00	2017-03-31T15:14:43-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.1 dBm
D2 -7.2 dBm
Line Voltage and Power: 4040 VAC, 280 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.1 dBm
D2 -7.2 dBm
Line Voltage and Power: 4040 VAC, 280 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.2 dBm
Line Voltage and Power: 4050 VAC, 280 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.2 dBm
Line Voltage and Power: 4050 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.1 dBm
D2 -7.2 dBm
Line Voltage and Power: 4030 VAC, 280 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +6.1 dBm
Tx3 +2.2 dBm
Tx4 +2.1 dBm
D2 -7.2 dBm
Line Voltage and Power: 4030 VAC, 280 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2 dBm
D2 -7.1 dBm
Line Voltage and Power: 4030 VAC, 280 KW
06:10 Driver 2 OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +6.2 dBm
Tx3 +2.3 dBm
Tx4 +2.2/5.1 dBm
Line Voltage and Power: 4030 VAC, 280 KW
08:00 HV  OFF
08:15 LV  OFF


"	vquesada
1487	18 Apr 10:00 Antenna VSWR	ISR		2017_04 MST-ISR-EEJ	Antennas		new	2017-04-17T18:51:11-05:00	2017-04-17T18:51:11-05:00	"WUp 1.03
WDn 1.10
NDn 1.09
NUp 1.09
EUp 1.01
EDn 1.03
SDn 1.06
SUp 1.04"	ryanque
1495	20 Apr 17:50 Spark Gap Adjustment	ISR		2017_04 MST-ISR-EEJ	Antennas		new	2017-04-20T02:39:35-05:00	2017-04-20T02:39:35-05:00	"07:23 Spark Gap Adjustment
10:07 Spark Gap Adjustment
12:24 Spark Gap Adjustment
15:03 Spark Gap Adjustment
17:51 Spark Gap Adjustment"	ryanque
1484	17 Apr 1959 Operation Resume	ISR		2017_04 MST-ISR-EEJ	General	I. Manay	new	2017-04-17T03:35:08-05:00	2017-04-17T03:35:08-05:00	"Person in Charge: I. Manay.
Experiment: MST_ISR_EEJ
1) 18:15 - 20:00
2) Operation Hours: 1h45min
3) Operation incomplete: 0 minutes
4) Reasons:
-None."	imanay
1492	20 Apr 07:59 Operation Resume	ISR		2017_04 MST-ISR-EEJ	General	I. Manay	new	2017-04-19T14:52:48-05:00	2017-04-19T14:52:48-05:00	"Person in Charge: I. Manay.
Experiment: MST_ISR_EEJ
1) 20:00 - 08:00
2) Operation Hours: 11h55min
3) Operation incomplete: 5 minutes
4) Reasons:
-Disk change."	imanay
1498	20 Apr 19:50 Operation Resume	ISR		2017_04 MST-ISR-EEJ	General		new	2017-04-20T02:51:00-05:00	2017-04-20T02:51:00-05:00	"Person in Charge: R. Yanque.
Experiment: MST_ISR_EEJ
1) 08:00 - 20:00
2) Operation Hours: 12h
3) Operation incomplete: 0 minutes
4) Reasons:
"	ryanque
1502	19 Apr 07:32 Noise Levels	ISR		2017_04 MST-ISR-EEJ	General	P.Condor	new	2017-04-20T07:06:40-05:00	2017-04-20T07:06:40-05:00	"18-04-17
21:53
MST
1:22.16 2:21.05 3:21.50 4:21.41 
EEJ 
1:21.99 2:20.83 3:21.32 4:21.30 
ISR
1:21.58 2:20.82 3:21.38 4:21.71
19-04-17
01:02
MST
1:23.15 2:22.12 3:22.39 4:22.48 
EEJ 
1:22.98 2:21.85 3:22.08 4:22.10 
ISR
1:22.54 2:21.86 3:22.18 4:22.70
04:30
MST
1:31.01 2:32.29 3:27.83 4:28.34 
EEJ 
1:27.01 2:26.25 3:26.79 4:26.47 
ISR
1:27.99 2:28.31 3:27.79 4:28.20
07:32
MST
1:22.82 2:21.87 3:22.13 4:22.16 
EEJ 
1:22.86 2:22.74 3:22.04 4:22.06 
ISR
1:22.68 2:21.89 3:22.27 4:22.68    
"	pcondor
1505	19 Apr 08:00 Operation Resume	ISR		2017_04 MST-ISR-EEJ	General	P.Condor	new	2017-04-20T07:36:55-05:00	2017-04-20T07:36:55-05:00	"Person in Charge: P. Condor.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 11h 43 min
3) Operation incomplete: 17 min
4) Reasons:
 Problem with Transmitter
 Change in Spark gaps."	pcondor
1508	21 Apr 07:06 Noise levels	ISR		2017_04 MST-ISR-EEJ	General	P.Condor	new	2017-04-20T14:25:43-05:00	2017-04-20T14:25:43-05:00	"20-04-17
22:22
ISR
1:20.57 2:19.49 3:18.67 4:19.46 
EEJ
1:20.10 2:18.23 3:18.28 4:18.65 
MST
1:22.92 2:26.27 3:26.88 4:21.26
21-04-17
01:18
ISR
1:19.31 2:17.88 3:18.18 4:18.61 
EEJ
1:20.63 2:18.76 3:18.90 4:19.25 
MST
1:20.77 2:19.14 3:19.26 4:19.45
04:11
ISR
1:23.02 2:22.16 3:22.36 4:22.60 
EEJ
1:24.42 2:23.07 3:23.03 4:23.23 
MST
1:24.55 2:23.20 3:23.23 4:23.43
07:06
ISR
1:19.84 2:17.67 3:18.14 4:18.44 
EEJ
1:21.43 2:18.90 3:18.86 4:19.47 
MST
1:21.29 2:19.08 3:18.99 4:19.54 
"	pcondor
1511	21 Apr 08:00 Operation Resume	ISR		2017_04 MST-ISR-EEJ	General	P.Condor	new	2017-04-20T15:03:23-05:00	2017-04-20T15:03:23-05:00	"Person in Charge: P. Condor.
Experiment: MST-ISR-EEJ
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
1533	16 May 10:00 Campaign Report	ISR		2017_04 MST-ISR-EEJ	General		new	2017-05-15T17:55:21-05:00	2017-05-15T17:55:21-05:00	"Attached are the
Final Report and the 
Operativity of the April MST-ISR-EEJ Campaign"	ryanque
1488	19 Apr 23:59 Plots	ISR		2017_04 MST-ISR-EEJ	Plot	I. Manay	new	2017-04-19T07:11:41-05:00	2017-04-19T07:11:41-05:00		imanay
1503	19 Apr 00:01 Plots	ISR		2017_04 MST-ISR-EEJ	Plot	P. Condor	new	2017-04-20T07:16:55-05:00	2017-04-20T07:16:55-05:00	Plots of rti and spectra	pcondor
1504	19 Apr 08:00 Figures	ISR		2017_04 MST-ISR-EEJ	Plot	P. Condor	new	2017-04-20T07:22:01-05:00	2017-04-20T07:22:01-05:00	Figures of rti and spectra.	pcondor
1506	21 Apr 00:05 Figures	ISR		2017_04 MST-ISR-EEJ	Plot	P. Condor	new	2017-04-20T07:38:43-05:00	2017-04-20T07:38:43-05:00	Figures of rti and spectra.	pcondor
1510	21 Apr 07:50 Figures	ISR		2017_04 MST-ISR-EEJ	Plot	P. Condor	new	2017-04-20T15:00:34-05:00	2017-04-20T15:00:34-05:00	Figures of rti and spectra	pcondor
1496	20 Apr 08:14 Increase gain	ISR		2017_04 MST-ISR-EEJ	Reception		new	2017-04-20T02:41:40-05:00	2017-04-20T02:41:40-05:00	"The gain in all the channels are increased in 2 dB due to change of filter in JARS.
The dB range is also changed to the range of 16 dB to 36 dB"	ryanque
1497	20 Apr 19:30 Noise Levels	ISR		2017_04 MST-ISR-EEJ	Reception		new	2017-04-20T02:49:29-05:00	2017-04-20T02:49:29-05:00	"08:14 MST          EEJ              ISR
   0 20.75 1 18.47 0 20.12 1 18.17  0 19.00 1 17.01
   2 18.40 3 18.93 2 18.18 3 19.06  2 17.46 3 17.76
12:18 MST          EEJ              ISR
   0 20.51 1 18.00 0 20.57 1 17.77  0 19.26 1 16.72
   2 17.88 3 18.72 2 17.66 3 18.24  2 17.26 3 17.42
17:26 MST          EEJ              ISR
   0 19.21 1 17.69 0 20.66 1 18.74  0 19.21 1 17.69
   2 18.61 3 19.24 2 18.64 3 18.70  2 17.85 3 18.50
19:35 MST          EEJ              ISR
   0 20.88 1 17.98 0 19.58 1 17.03  0 18.54 1 16.78
   2 17.86 3 19.53 2 17.14 3 18.93  2 16.61 3 17.87"	ryanque
1483	17 Apr 18:22 Spark-gaps adjusment	ISR		2017_04 MST-ISR-EEJ	Spark Gaps	I. Manay	new	2017-04-17T02:47:36-05:00	2017-04-17T02:48:40-05:00	18:22 Spark gap adjusment.	J Lavado
1491	20 Apr 07:30 Spark gaps adjustment history	ISR		2017_04 MST-ISR-EEJ	Spark Gaps	J. Lavado	new	2017-04-19T14:28:33-05:00	2017-04-19T14:28:33-05:00	"19 Apr 21:48 Spark gaps adjustment
20 Apr 00:01 Spark gaps adjustment
20 Apr 02:35 Spark gaps adjustment
20 Apr 05:10 Spark gaps adjustment
20 Apr 07:23 Spark gaps adjustment"	imanay
1500	19 Apr 05:20 Change in spark gap	ISR		2017_04 MST-ISR-EEJ	Spark Gaps	P. Condor	new	2017-04-20T06:21:46-05:00	2017-04-20T06:21:46-05:00	Change in spark gaps	pcondor
1501	19 Apr 07:00 Spark gaps adjustment	ISR		2017_04 MST-ISR-EEJ	Spark Gaps	W. Rojas	new	2017-04-20T06:49:38-05:00	2017-04-20T06:49:38-05:00	"18 04 17
22:02 Spark gaps adjustment
19-04-17
00:41 Spark gaps adjustment
03:04 Spark gaps adjustment
07:00 Spark gaps adjustment"	pcondor
1507	21 Apr 06:09 Spark gaps adjustment	ISR		2017_04 MST-ISR-EEJ	Spark Gaps	J. Lavado	new	2017-04-20T14:15:21-05:00	2017-04-20T14:15:21-05:00	"20-04-17
20:30 Spark gaps adjustment
23:20 Spark gaps adjustment
21-04-17
03:11 Spark gaps adjustment
06:09 Spark gaps adjustment"	pcondor
1482	17 Apr 18:15 Start of the experiment	ISR		2017_04 MST-ISR-EEJ	Start experiment	I. Manay	new	2017-04-17T02:45:29-05:00	2017-04-17T02:45:29-05:00	Two big transmitters and some changes at the EW phasing antenna. An interference was observerd at the EEJ and MST rtis. Tests with vipir and digisonde will be implemented. 	imanay
1485	17 Apr 23:00 Transmitter Power Measurements	ISR		2017_04 MST-ISR-EEJ	Transmitters		new	2017-04-17T06:12:45-05:00	2017-04-17T06:12:45-05:00	"
15:00 LV ON
18:00 HV ON
18:25 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4060 VAC, 270 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4100 VAC, 280 KW
20:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.6 dBm
Line Voltage and Power: 4050 VAC, 270 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.6 dBm
Line Voltage and Power: 4050 VAC, 270 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.6 dBm
Line Voltage and Power: 4050 VAC, 270 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4050 VAC, 270 KW





"	vquesada
1486	18 Apr 07:00 Transmitter Power Measurements	ISR		2017_04 MST-ISR-EEJ	Transmitters		new	2017-04-17T14:11:46-05:00	2017-04-17T14:11:46-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4070 VAC, 270 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4070 VAC, 270 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4050 VAC, 270 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4050 VAC, 270 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4050 VAC, 270 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4050 VAC, 270 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4080 VAC, 270 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4080 VAC, 270 KW
"	vquesada
1490	20 Apr 07:00 Transmitter Power Measurements	ISR		2017_04 MST-ISR-EEJ	Transmitters		new	2017-04-19T14:24:40-05:00	2017-04-19T14:24:40-05:00	"
20:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4070 VAC, 270 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4070 VAC, 270 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4070 VAC, 270 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4070 VAC, 270 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4070 VAC, 270 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4060 VAC, 270 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4060 VAC, 270 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4060 VAC, 270 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 +4.3 dBm
Line Voltage and Power: 4060 VAC, 270 KW
04:01 Hard disk change ""Rf off""
05:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4060 VAC, 270 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4060 VAC, 270 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4060 VAC, 270 KW
"	rtadeo
1493	20 Apr 17:20 Transmitter Power Measurements	ISR		2017_04 MST-ISR-EEJ	Transmitters		new	2017-04-20T00:21:11-05:00	2017-04-20T00:21:11-05:00	"'''18 APRIL 2017'''
20:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.6 dBm
Line Voltage and Power: 4050 VAC, 270 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.6 dBm
Line Voltage and Power: 4050 VAC, 270 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.6 dBm
Line Voltage and Power: 4050 VAC, 270 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4050 VAC, 270 KW

'''19 APRIL 2017'''

00:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4060 VAC, 270 KW
00:00 CROWBAR
01:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4090 VAC, 270 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4090 VAC, 270 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4090 VAC, 270 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4050 VAC, 270 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4050 VAC, 270 KW
05:08 HV OFF TO CHANGE TUNGSTEN IN THE US
05:25 HV ON
06:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4100 VAC, 270 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4080 VAC, 270 KW"	vquesada
1494	20 Apr 19:00 Transmitter Power Measurements	ISR		2017_04 MST-ISR-EEJ	Transmitters		new	2017-04-20T02:01:49-05:00	2017-04-20T02:01:49-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.6 dBm
Line Voltage and Power: 4060 VAC, 270 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.7 dBm
Line Voltage and Power: 4040 VAC, 270 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.7 dBm
Line Voltage and Power: 4080 VAC, 270 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.7 dBm
Line Voltage and Power: 4070 VAC, 270 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.7 dBm
Line Voltage and Power: 4040 VAC, 270 KW
13:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.7 dBm
Line Voltage and Power: 4040 VAC, 270 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +4.6 dBm
Tx4 +4.7 dBm
Line Voltage and Power: 4030 VAC, 270 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.6 dBm
Line Voltage and Power: 4070 VAC, 270 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4080 VAC, 270 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4080 VAC, 270 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4080 VAC, 270 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4080 VAC, 270 KW

"	vquesada
1499	19 Apr 00:09 Problem with transmitter	ISR		2017_04 MST-ISR-EEJ	Transmitters	P. Condor	new	2017-04-20T06:20:05-05:00	2017-04-20T06:20:05-05:00	 Problem with transmitter	pcondor
1509	21 Apr 07:00 Transmitter Power Measurement	ISR		2017_04 MST-ISR-EEJ	Transmitters		new	2017-04-20T14:33:39-05:00	2017-04-20T14:33:39-05:00	"
20:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.6 dBm
Line Voltage and Power: 4060 VAC, 270 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4060 VAC, 270 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4060 VAC, 270 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4060 VAC, 270 KW
04/21/2017
00:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4060 VAC, 270 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4050 VAC, 270 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +4.5 dBm
Tx4 +4.5 dBm
Line Voltage and Power: 4050 VAC, 270 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4050 VAC, 270 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4050 VAC, 270 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 +4.3 dBm
Line Voltage and Power: 4050 VAC, 270 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +4.3 dBm
Tx4 +4.3 dBm
Line Voltage and Power: 4050 VAC, 270 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +4.4 dBm
Tx4 +4.4 dBm
Line Voltage and Power: 4050 VAC, 270 KW
"	rtadeo
1514	02 May 11:00 Antenna VSWR	ISR		2017_05 Driver Mode for EW Drift	Antennas		new	2017-05-01T17:53:49-05:00	2017-05-01T17:53:49-05:00	"WUp 1.06
WDn 1.07
NDn 1.10
NUp 1.06
EUp 1.05
EDn 1.01
SDn 1.08
SUp 1.04"	ryanque
1530	05 May End Experiment	ISR		2017_05 Driver Mode for EW Drift	End experiment		new	2017-05-04T23:43:40-05:00	2017-05-04T23:43:40-05:00	15:30 Finalización de experimento	kkuyeng
1534	16 May 11:00 Operativity	ISR		2017_05 Driver Mode for EW Drift	End experiment		new	2017-05-15T18:18:10-05:00	2017-05-15T18:18:10-05:00	Operativity of the Vertical Drift Driver Campaign	ryanque
1517	2 May 2017 19:26 Noise Levels	ISR		2017_05 Driver Mode for EW Drift	General		new	2017-05-02T02:35:30-05:00	2017-05-02T02:35:30-05:00	"19:16
ISR
0: 10.59, 1: 12.13, 2: 10.6, 3: 8.28, 4: 11.08, 5: 11.57

CSR
0: 11.46, 1: 12.53, 2: 11.49, 3: 10.39, 4: 11.74, 5: 12.10"	kkuyeng
1519	2 May 20:00 Operation Resume	ISR		2017_05 Driver Mode for EW Drift	General		new	2017-05-02T03:12:39-05:00	2017-05-02T03:12:39-05:00	"Person in Charge: K.Kuyeng
Experiment: DriverMode for Vertical Drifts
1) 17:36 - 20:00
2) Operation Hours: 
3) Operation incomplete: 0 min
4) Reasons:"	kkuyeng
1523	04 May 20:00 Operation Resume	ISR		2017_05 Driver Mode for EW Drift	General		new	2017-05-04T03:06:07-05:00	2017-05-04T03:06:07-05:00	"Person in Charge: R.Yanque
Experiment: DriverMode for Vertical Drifts
1) 14:50 - 20:00
2) Operation Hours: 05:10 
3) Operation incomplete: 0 min
4) Reasons:"	ryanque
1529	05 May 08:00 - 15:30 Operation Resume	ISR		2017_05 Driver Mode for EW Drift	General		new	2017-05-04T23:43:16-05:00	2017-05-04T23:43:16-05:00	"Person in Charge: K.Kuyeng
Experiment: DriverMode for Vertical Drifts
1) 08:00 - 15:30
2) Operation Hours: 07:30 
3) Operation incomplete: 0 min
4) Reasons:"	kkuyeng
1532	10 May 08:00 Experiment Manual	ISR		2017_05 Driver Mode for EW Drift	General		new	2017-05-09T16:57:40-05:00	2017-05-09T16:57:40-05:00	The Experiment Manual	ryanque
1518	2 May 2017 19:30 Figures	ISR		2017_05 Driver Mode for EW Drift	Plot		new	2017-05-02T02:36:44-05:00	2017-05-02T02:36:44-05:00		kkuyeng
1521	02 May 23:59 Plots	ISR		2017_05 Driver Mode for EW Drift	Plot	abelleza	new	2017-05-02T14:15:07-05:00	2017-05-02T14:15:07-05:00	02 May 23:59 Plots	abelleza
1524	04 May 23:59 Plots	ISR		2017_05 Driver Mode for EW Drift	Plot	abellleza	new	2017-05-04T14:00:37-05:00	2017-05-04T14:00:37-05:00	04 May 23:59 Plots	abelleza
1527	05 May 07:30 Plots	ISR		2017_05 Driver Mode for EW Drift	Plot	abelleza	new	2017-05-04T14:12:39-05:00	2017-05-04T14:12:39-05:00	05 May 07:30 Plots	abelleza
1531	05 May 15:30 Plots	ISR		2017_05 Driver Mode for EW Drift	Plot		new	2017-05-04T23:43:51-05:00	2017-05-04T23:43:51-05:00		kkuyeng
1516	2 May 19:25 Spark gaps adjustment	ISR		2017_05 Driver Mode for EW Drift	Spark Gaps		new	2017-05-02T02:31:52-05:00	2017-05-02T02:31:52-05:00	"2-05-17
15:53 Spark gaps adjustment
18:52 Spark gaps adjustment
"	kkuyeng
1522	03 May 07:01 Spark Gaps Adjustment	ISR		2017_05 Driver Mode for EW Drift	Spark Gaps	abelleza	new	2017-05-02T14:24:00-05:00	2017-05-02T14:24:00-05:00	"03 May 07:01 Spark Gaps Adjustment

02 May 22:03
03 May 01:12
03 May 04:06
03 May 07:01

By Americo Coronado.

"	abelleza
1526	05 May 06:01 Spark Gaps Adjustment	ISR		2017_05 Driver Mode for EW Drift	Spark Gaps	abelleza	new	2017-05-04T14:10:29-05:00	2017-05-04T14:10:29-05:00	" 05 May 06:01 Spark Gaps Adjustment

04 May 21:00
05 May 00:01
05 May 03:02
05 May 06:01

By Americo Coronado."	abelleza
1528	05 May 15:00 Spark Gaps Adjustment	ISR		2017_05 Driver Mode for EW Drift	Spark Gaps		new	2017-05-04T23:42:57-05:00	2017-05-04T23:42:57-05:00	"5-05-17
09:25 Spark gaps adjustment
10:28 Spark gaps adjustment por subida de ruido en canales A y C
13.12 Spark gaps adjustment
13:58 Spark gaps adjustment por subida de ruido en canales A y C"	kkuyeng
1513	02 May 10:40 Log Created for Driver Mode for Vertical Drifts	ISR		2017_05 Driver Mode for EW Drift	Start experiment		new	2017-05-01T17:48:29-05:00	2017-05-01T17:48:29-05:00	"Campaign Driver Mode for Vertical Drifts
User: M. Milla

Starts: Tuesday May 02 2017
Ends:   Thursday May 04 2017

Pointing ON Axis
Using 2 Drivers whole antenna to calculate Vertical Drifts"	ryanque
1515	17:36  Start experiment	ISR		2017_05 Driver Mode for EW Drift	Start experiment		new	2017-05-02T02:29:25-05:00	2017-05-02T02:29:25-05:00	"14:43
Comienzo de experimento con códigos aleatorios para ISR (128 perfiles) y código aleatorio barker13 para CSR (22 perfiles).

19:37
Comienzo de experimento con códigos aleatorios modificados (suma = 0) para ISR (128 perfiles) y código aleatorio barker13 para CSR (22 perfiles).

"	kkuyeng
1520	2 May 07:05 Transmitter Power Measurements	ISR		2017_05 Driver Mode for EW Drift	Transmitters		new	2017-05-02T14:11:19-05:00	2017-05-02T14:11:19-05:00	"'''May 2 2017'''

20:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.6 dBm
Line Voltage: 4130 VAC
21:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.6 dBm
Line Voltage: 4130 VAC
22:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.6 dBm
Line Voltage: 4130 VAC
23:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.6 dBm
Line Voltage: 4130 VAC

'''May 3 2017'''

00:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.6 dBm
Line Voltage: 4130 VAC
01:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.6 dBm
Line Voltage: 4130 VAC
02:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.6 dBm
Line Voltage: 4130 VAC
02:52 Blow fuse from source + B Driver 2
03:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.5 dBm
Line Voltage: 4130 VAC
04:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.5 dBm
Line Voltage: 4130 VAC
05:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.5 dBm
Line Voltage: 4130 VAC
06:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.5 dBm
Line Voltage: 4130 VAC
07:00 TX Power sample (-70 dB coupling)
D2 -5.5 dBm
D4 -5.5 dBm
Line Voltage: 4130 VAC"	vquesada
1525	5 May 07:00 Transmitter Power Measurements	ISR		2017_05 Driver Mode for EW Drift	Transmitters		new	2017-05-04T14:07:51-05:00	2017-05-04T14:07:51-05:00	"'''May 4 2017'''
20:00 TX Power sample (-70 dB coupling)
D2 -5.3 dBm
D4 -5.3 dBm
Line Voltage: 4120 VAC
21:00 TX Power sample (-70 dB coupling)
D2 -5.3 dBm
D4 -5.3 dBm
Line Voltage: 4120 VAC
22:00 TX Power sample (-70 dB coupling)
D2 -5.3 dBm
D4 -5.3 dBm
Line Voltage: 4120 VAC
23:00 TX Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
Line Voltage: 4120 VAC
'''May 5 2017'''
00:00 TX Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
Line Voltage: 4120 VAC
01:00 TX Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
Line Voltage: 4120 VAC
02:00 TX Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
Line Voltage: 4110 VAC
03:00 TX Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
Line Voltage: 4110 VAC
04:00 TX Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
Line Voltage: 4110 VAC
05:00 TX Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
Line Voltage: 4110 VAC
06:00 TX Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
Line Voltage: 4110 VAC
07:00 TX Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
Line Voltage: 4110 VAC"	vquesada
1542	24 Jul 21:33 Restart of Faraday	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-07-25T07:17:16-05:00	2017-07-25T07:17:16-05:00	Restart of Faraday batch and PC.	pcondor
1543	25 Jul 00:57 Restart of Faraday	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-07-25T07:18:45-05:00	2017-07-25T07:18:45-05:00	Restart of Faraday batch by desynchronization.	pcondor
1545	25 Jul 04:58 Restart of Faraday	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-07-25T07:21:13-05:00	2017-07-25T07:21:13-05:00	 Restart of Faraday batch and pc.	pcondor
1546	25 Jul 05:15 Restart of Faraday	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-07-25T07:22:15-05:00	2017-07-25T07:22:15-05:00	 Restart of Faraday	pcondor
1547	25 Jul 07:06 Restart of Faraday	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-07-25T07:22:53-05:00	2017-07-25T07:22:53-05:00	 Restart of Faraday	pcondor
1552	31 Jul 17:40 Faraday experiment fails	ISR		2017_07_ISR School	Acquisition system	I. Manay	new	2017-07-31T19:14:11-05:00	2017-07-31T19:14:11-05:00	Acquisition at the Radar PC was restarted due to unsynchronized data.	imanay
1557	31 Jul 20:57 Faraday experiment fails	ISR		2017_07_ISR School	Acquisition system	A. Belleza	new	2017-08-01T09:59:52-05:00	2017-08-01T09:59:52-05:00	Radar PC was restarted.	imanay
1558	01 Aug 02:34 EW_Drifts experiment fails	ISR		2017_07_ISR School	Acquisition system	A. Belleza	new	2017-08-01T10:02:03-05:00	2017-08-01T10:03:56-05:00	PC Ares was hung since 01:15. It was restarted at 02:34	imanay
1559	01 Aug 02:58 Faraday experiment fails	ISR		2017_07_ISR School	Acquisition system	A. Belleza	new	2017-08-01T10:06:51-05:00	2017-08-01T10:06:51-05:00	Radar PC was restarted due to unsynchronized data.	imanay
1563	01 Aug 16:20 Start Imaging	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-08-02T01:19:54-05:00	2017-08-02T10:58:10-05:00	Imaging mode starts	ryanque
1564	01 Aug 21:44 Problem with Faraday system	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-08-02T01:20:50-05:00	2017-08-02T10:56:12-05:00	"01 Aug 21:05 Problem with Faraday system. Restart batch Faraday
01 Aug 21:33 Problem with Faraday system. Restart batch Faraday."	pcondor
1565	01 Aug 17:09 TR Adjustments	ISR		2017_07_ISR School	Acquisition system	P. Condor	new	2017-08-02T01:21:50-05:00	2017-08-02T10:55:24-05:00	"10:34 TR Adjustments
13:50 TR Adjustments
17:09 TR Adjustments"	ryanque
1567	01 Aug 17:54 Problem with Faraday system	ISR		2017_07_ISR School	Acquisition system	P. Condor	new	2017-08-02T01:23:38-05:00	2017-08-02T11:04:49-05:00	"17:54 Restart PC Faraday system
17:45 Restart PC Faraday system
15:15 Faraday lost synchronism
11:17 Faraday lost synchronism
"	pcondor
1571	02 Aug 01:47 Problem with Faraday System	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-08-02T07:24:17-05:00	2017-08-02T10:59:47-05:00	Problem with Faraday System	pcondor
1572	02 Aug 04:06 Problem with Faraday System	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-08-02T07:25:37-05:00	2017-08-02T07:25:37-05:00	Problem with Faraday System. Restart batch.	pcondor
1573	02 Aug 05:18 Problem with Faraday System	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-08-02T07:27:00-05:00	2017-08-02T07:27:00-05:00	Problem with Faraday System. Restart batch.	pcondor
1574	02 Aug 05:36 Problem with Faraday System	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-08-02T07:27:41-05:00	2017-08-02T07:27:41-05:00	Problem with Faraday System	pcondor
1575	02 Aug 05:56 Problem with Faraday System	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-08-02T07:28:22-05:00	2017-08-02T07:28:22-05:00	Problem with Faraday System	pcondor
1576	02 Aug 06:43 Problem with Faraday System	ISR+Imaging		2017_07_ISR School	Acquisition system	P. Condor	new	2017-08-02T07:29:18-05:00	2017-08-31T10:07:15-05:00	"06:26 System restarted
06:24 Problem with Faraday System. Restart batch."	pcondor
1536	24 Jul 16:50 Antenna VSWR	ISR		2017_07_ISR School	Antennas		new	2017-07-24T16:57:42-05:00	2017-07-24T16:57:42-05:00	"       49.72   49.92   50.12
WUp     1.24    1.07    1.19
WDn     1.34    1.06    1.37
NDn     1.16    1.08    1.05
NUp     1.21    1.02    1.08
EUp     1.20    1.09    1.15
EDn     1.22    1.08    1.07
SDn     1.20    1.05    1.15
SUp     1.15    1.03    1.13   "	ryanque
1541	24 Jul 20:49 Change of amplifier in Imaging	ISR+Imaging		2017_07_ISR School	Antennas	P. Condor	new	2017-07-25T07:15:43-05:00	2017-07-25T07:15:43-05:00	 Change of amplifier in Imaging ch D. Channel F is attenuated 5 db.	pcondor
1538	24 Jul 19:59 Operation Resume	ISR		2017_07_ISR School	General	I. Manay	new	2017-07-24T20:12:44-05:00	2017-07-24T20:12:44-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 18:30 - 20:00
2) Operation Hours: 1h30min
3) Operation incomplete: 0 minutes
4) Reasons:
-None"	imanay
1549	25 Jul 08:00 Operation Resume	ISR+Imaging		2017_07_ISR School	General	P. Condor	new	2017-07-25T07:51:41-05:00	2017-07-25T07:51:41-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Faraday+Imaging
1) 20:00 - 08:00
2) Operation Hours: 11h 50 min
3) Operation incomplete: 10 min
4) Reasons:
Problem with transmitter"	pcondor
1554	31 Jul 19:50 Operation Resume	ISR		2017_07_ISR School	General	I. Manay	new	2017-07-31T19:55:32-05:00	2017-07-31T19:55:32-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 16:30 - 20:00
2) Operation Hours: 3h30min
3) Operation incomplete: 0 minutes
4) Reasons:
-None"	imanay
1561	01 Aug 07:59 Operation Resume	ISR		2017_07_ISR School	General	A. Belleza	new	2017-08-01T11:31:26-05:00	2017-08-01T11:31:26-05:00	"Person in Charge: A. Belleza.
Experiment: _ISR-Imaging
1) 20:00 - 08:00
2) Operation Hours: 10h 40 min
3) Operation incomplete: 1h 20min
4) Reasons:
1h20 min without acquisition system."	imanay
1568	01 Aug 19:59 Operation Resume	ISR+Imaging		2017_07_ISR School	General	P. Condor	new	2017-08-02T01:24:46-05:00	2017-08-02T11:07:11-05:00	"Person in Charge: R. Yanque.
Experiment: _ISR-Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 30 min
3) Operation incomplete: 30min
4) Reasons:
15 min Due to restart Faraday system
15 min Due to loss of synchronism"	ryanque
1569	02 Aug 00:05 Plots	ISR+Imaging		2017_07_ISR School	General	P. Condor	new	2017-08-02T01:29:23-05:00	2017-08-02T01:29:23-05:00	Figures of rti, spectras and parameters.	pcondor
1579	02 Aug 07:15 Noise levels	ISR+Imaging		2017_07_ISR School	General	P. Condor	new	2017-08-02T07:42:28-05:00	2017-08-02T07:42:28-05:00	"01-08-17
21:14
EW DRIFT
A:29.24 B:29.28 C:29.51 D:29.24  
FARADAY
A:46 B:46 
IMAGING
1:20.80 2:19.87 3:19.30 4:18.28 5:18.81 6:19.03 7:21.81 8:20.13
02-08-17
01:00
EW DRIFT
A:25.87 B:25.48 C:25.12 D:25.51  
FARADAY
A:43 B:43 
IMAGING
1:16.63 2:14.66 3:15.17 4:14.32 5:15.02 6:15.92 7:17.67 8:16.33
03:15
EW DRIFT
A:25.55 B:25.13 C:24.54 D:25.03  
FARADAY
A:42 B:43 
IMAGING
1:15.84 2:13.96 3:14.49 4:13.59 5:14.26 6:15.18 7:16.88 8:15.47
07:15
EW DRIFT
A:23.71 B:23.09 C:23.19 D:23.54  
FARADAY
A:41 B:41 

 
 
 
"	pcondor
1580	02 Aug 08:00 Operation resume	ISR+Imaging		2017_07_ISR School	General	P. Condor	new	2017-08-02T07:53:20-05:00	2017-08-02T07:53:20-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Faraday+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:
"	pcondor
1581	02 Aug 08:05 Plots	ISR+Imaging		2017_07_ISR School	General	P. Condor	new	2017-08-02T07:56:58-05:00	2017-08-02T07:56:58-05:00	figure of rti, spectras and parameters	pcondor
1584	25 Jul 07:10 Noise levels	ISR+Imaging		2017_07_ISR School	General	P. Condor	new	2017-08-16T14:06:59-05:00	2017-08-16T14:06:59-05:00	"24-07-2017
21:00
EW DRIFT
A:29.13 B:28.26 C:27.83 D:28.51
FARADAY
A:25.52 B:24.68 
IMAGING
1:18.74 2:16.87 3:17.7 4:16.04 5:17.24 6:17.97 7:20.07 8:18.81 
25-07-2017
00:20
EW DRIFT
A:26.59 B:25.55 C:25.03 D:25.89
FARADAY
A:21.61 B:23.3 
IMAGING
1:17.13 2:15.31 3:16.07 4:14.59 5:15.69 6:16.57 7:18.55 8:17.19 
03:40
EW DRIFT
A:25.60 B:24.45 C:24.14 D:24.84
FARADAY
A:23.02 B:22.17 
IMAGING
1:15.79 2:14.06 3:14.79 4:13.28 5:14.58 6:15.23 7:17.19 8:15.83 
07:10
EW DRIFT
A:24.87 B:23.57 C:23.39 D:23.83
FARADAY
A:20.01 B:19.65 
IMAGING
1:14.65 2:13.03 3:13.65 4:12.21 5:13.67 6:14.22 7:16.18 8:14.76 "	pcondor
1539	25 Jul 01:10 Plots	ISR+Imaging		2017_07_ISR School	Plot	P. Condor	new	2017-07-25T01:16:25-05:00	2017-07-25T01:16:25-05:00	Plots of rtis, spectras and parameters.	pcondor
1548	25 Jul 07:50 Plots	ISR+Imaging		2017_07_ISR School	Process/Analysis Program	P. Condor	new	2017-07-25T07:48:23-05:00	2017-07-25T07:48:23-05:00	Plots of rtis, spectras and parameters	pcondor
1551	31 Jul 16:44 Adjustment at EW_Drifts experiment	ISR		2017_07_ISR School	Reception	I. Manay	new	2017-07-31T19:10:41-05:00	2017-07-31T19:10:41-05:00	1dB attenuation at the A EW_Drifts reception channel was applied.	imanay
1566	01 Aug 13:50 Faraday channels attenuation	ISR		2017_07_ISR School	Reception	P. Condor	new	2017-08-02T01:22:38-05:00	2017-08-02T11:01:54-05:00	"10:50 Ch A 7 dB  Ch B 5 dB
13:50 Ch A 7 dB  Ch B 6 dB"	pcondor
1553	31 Jul 18:50 Spark Gaps Adjustment	ISR		2017_07_ISR School	Spark Gaps	J. Lavado	assigned	2017-07-31T19:17:54-05:00	2017-07-31T19:20:33-05:00	18:50 Spark gaps adjustment	J. Lavado
1560	01 Aug 06:58 Spark Gaps Adjustment	ISR		2017_07_ISR School	Spark Gaps	A. Belleza	new	2017-08-01T11:15:24-05:00	2017-08-01T11:15:24-05:00	"31 Jul, 21:57 Spark gaps adjustment
01 Aug, 01:00 Spark gaps adjustment
01 Aug, 03:58 Spark gaps adjustment
01 Aug, 06:58 Spark gaps adjustment"	imanay
1578	02 Aug 05:25 Spark gaps adjustment	ISR+Imaging		2017_07_ISR School	Spark Gaps	A. Coronado	new	2017-08-02T07:31:59-05:00	2017-08-02T07:31:59-05:00	"01 08 2017
23:36 Spark gaps adjustment.
02 08 2017
02:25 Spark gaps adjustment.
05:25 Spark gaps adjustment."	pcondor
1585	25 Jul 07:00 Spark gaps adjustment	ISR+Imaging		2017_07_ISR School	Spark Gaps	A. Coronado	new	2017-08-16T14:12:11-05:00	2017-08-16T14:12:11-05:00	"24-07-2017
22:00 Spark gaps adjustment
25-07-2017
01:06 Spark gaps adjustment
03:58 Spark gaps adjustment
07:00 Spark gaps adjustment"	pcondor
1535	24 Jul 10:00 Log created for ISR School Campaign	ISR		2017_07_ISR School	Start experiment		new	2017-07-23T17:57:38-05:00	2017-07-23T17:57:38-05:00	"ISR School Campaign
L. User: Percy Condor
Mode: EW Drift + Faraday + AMISR
Start: July 24 2017 16:00 - July 25 2017 08:00
End:   July 25 2017 16:00 - July 26 2017 08:00

"	ryanque
1537	24 Jul 18:30 Start of the experiment	ISR		2017_07_ISR School	Start experiment	I. Manay	new	2017-07-24T18:54:43-05:00	2017-07-24T18:54:43-05:00		imanay
1550	31 Jul 16:30 Start of the experiment	ISR		2017_07_ISR School	Start experiment	I. Manay	new	2017-07-31T19:07:47-05:00	2017-07-31T19:07:47-05:00		imanay
1540	25 Jul 07:05 Transmitter Power Measurements	ISR		2017_07_ISR School	Transmitters		new	2017-07-25T07:05:43-05:00	2017-07-25T07:05:43-05:00	"17:00 LV   ON
15:30 HV   ON
18:20 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx3 +6.8 dBm
Tx4 +1.4 dBm
D2  -7.8 dBm
Line Voltage and Power: 4030 VAC, 300 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx3 +6.8 dBm
Tx4 +1.5 dBm
D2  -7.8 dBm
Line Voltage and Power: 4030 VAC, 300 KW
20:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx3 +6.6 dBm
Tx4 +1.4 dBm
D2  -7.8 dBm
Line Voltage and Power: 4030 VAC, 310 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx3 +6.6 dBm
Tx4 +1.4 dBm
D2  -7.8 dBm
Line Voltage and Power: 4050 VAC, 310 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx3 +6.7 dBm
Tx4 +1.5 dBm
D2  -7.4 dBm
Line Voltage and Power: 4050 VAC, 310 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx3 +6.7 dBm
Tx4 +1.5 dBm
D2  -7.4 dBm
Line Voltage and Power: 4030 VAC, 310 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx3 +6.6 dBm
Tx4 +1.4 dBm
D2  -7.6 dBm
Line Voltage and Power: 4030 VAC, 310 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx3 +6.6 dBm
Tx4 +1.4 dBm
D2  -7.6 dBm
Line Voltage and Power: 4030 VAC, 310 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx3 +6.8 dBm
Tx4 +1.6 dBm
D2  -7.6 dBm
Line Voltage and Power: 4080 VAC, 310 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx3 +6.8 dBm
Tx4 +1.6 dBm
D2  -7.6 dBm
Line Voltage and Power: 4080 VAC, 310 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +1.8 dBm
Tx3 +6.7 dBm
Tx4 +1.5 dBm
D2  -7.5 dBm
Line Voltage and Power: 4030 VAC, 310 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +1.8 dBm
Tx3 +6.7 dBm
Tx4 +1.5 dBm
D2  -7.5 dBm
Line Voltage and Power: 4030 VAC, 310 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.2 dBm
Tx3 +6.9 dBm
Tx4 +1.7 dBm
D2  -7.5 dBm
Line Voltage and Power: 4090 VAC, 310 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.2 dBm
Tx3 +6.9 dBm
Tx4 +1.7 dBm
D2  -7.5 dBm
Line Voltage and Power: 4090 VAC, 310 KW


"	vquesada
1544	25 Jul 01:55 Transmitter off	ISR+Imaging		2017_07_ISR School	Transmitters	P. Condor	new	2017-07-25T07:20:04-05:00	2017-07-25T07:20:04-05:00	Problem with transmitter for 10 minutes.	pcondor
1555	31 Jul 23:00 Transmitter Power Measurements	ISR		2017_07_ISR School	Transmitters		new	2017-07-31T23:04:03-05:00	2017-07-31T23:04:03-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx2 +6.5 Kw
Tx3 +7.0dBm
D4 -7.0 dBm
Line Voltage and Power: 4030 VAC, 320 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx2 +6.5 Kw
Tx3 +7.0dBm
D4 -7.0 dBm
Line Voltage and Power: 4030 VAC, 320 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx2 +6.5 Kw
Tx3 +7.0dBm
D4 -7.0 dBm
Line Voltage and Power: 4050 VAC, 330 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx2 +6.5 Kw
Tx3 +7.0dBm
D4 -7.0 dBm
Line Voltage and Power: 4050 VAC, 330 KW"	vquesada
1556	01 Aug 07:00 Transmitter Power Measurements	ISR		2017_07_ISR School	Transmitters		new	2017-08-01T07:03:27-05:00	2017-08-01T07:03:27-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +1.8 dBm
Tx2 +6.5 Kw
Tx3 +6.8dBm
D4 -7.0 dBm
Line Voltage and Power: 4030 VAC, 320 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +1.8 dBm
Tx2 +6.5 Kw
Tx3 +6.8dBm
D4 -7.0 dBm
Line Voltage and Power: 4030 VAC, 320 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx2 +6.5 Kw
Tx3 +7.0dBm
D4 -6.9 dBm
Line Voltage and Power: 4080 VAC, 330 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx2 +6.5 Kw
Tx3 +7.0dBm
D4 -6.9 dBm
Line Voltage and Power: 4080 VAC, 330 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx2 +6.5 Kw
Tx3 +7.0dBm
D4 -6.9 dBm
Line Voltage and Power: 4080 VAC, 330 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx2 +6.5 Kw
Tx3 +7.0dBm
D4 -6.9 dBm
Line Voltage and Power: 4080 VAC, 330 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx2 +6.5 Kw
Tx3 +6.8dBm
D4 -7.0 dBm
Line Voltage and Power: 4050 VAC, 320 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +1.9 dBm
Tx2 +6.5 Kw
Tx3 +6.8dBm
D4 -7.0 dBm
Line Voltage and Power: 4050 VAC, 320 KW"	vquesada
1562	01 Aug 23:05 Transmitter Power Measurements	ISR		2017_07_ISR School	Transmitters		new	2017-08-01T23:09:08-05:00	2017-08-01T23:09:08-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +1.8 dBm
Tx2 +6.5 Kw
Tx3 +7.0dBm
D4 -7.0 dBm
Line Voltage and Power: 4050 VAC, 320 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +1.8 dBm
Tx2 +6.5 Kw
Tx3 +7.0dBm
D4 -7.0 dBm
Line Voltage and Power: 4050 VAC, 320 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.2 dBm
Tx2 +6.5 Kw
Tx3 +6.8dBm
D4 -6.9 dBm
Line Voltage and Power: 4080 VAC, 320 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.2 dBm
Tx2 +6.5 Kw
Tx3 +6.8dBm
D4 -6.9 dBm
Line Voltage and Power: 4080 VAC, 320 KW"	vquesada
1570	02 Aug 07:00 Transmitter Power Measurements	ISR		2017_07_ISR School	Transmitters		new	2017-08-02T07:07:15-05:00	2017-08-02T07:07:15-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.8 dBm
D4 -7.0 dBm
Line Voltage and Power: 4040 VAC, 320 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.8 dBm
D4 -7.0 dBm
Line Voltage and Power: 4040 VAC, 320 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.8 dBm
D4 -7.0 dBm
Line Voltage and Power: 4040 VAC, 320 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.8 dBm
D4 -7.0 dBm
Line Voltage and Power: 4040 VAC, 320 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +2.1 dBm
Tx2 +6.5 Kw
Tx3 +6. dBm
D4 -6.9 dBm
Line Voltage and Power: 4090 VAC, 330 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +2.1 dBm
Tx2 +6.5 Kw
Tx3 +6.9 dBm
D4 -6.9 dBm
Line Voltage and Power: 4090 VAC, 330 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.9 dBm
D4 -6.9 dBm
Line Voltage and Power: 4090 VAC, 330 KW
06:40 Driver 4 OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.0/4.6 dBm
Tx2 +6.5 Kw
Tx3 +6.8 dBm
Line Voltage and Power: 4040 VAC, 320 KW"	vquesada
1582	03 Aug 07:00 Transmitter Power Measurements	ISR		2017_07_ISR School	Transmitters		new	2017-08-03T07:05:07-05:00	2017-08-03T07:05:07-05:00	"02 August
20:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.8 dBm
D4 -7.0 dBm
Line Voltage and Power: 4060 VAC, 300 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.8 dBm
D4 -7.0 dBm
Line Voltage and Power: 4060 VAC, 300 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.7 dBm
D4 -7.0 dBm
Line Voltage and Power: 4050 VAC, 310 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.7 dBm
D4 -7.0 dBm
Line Voltage and Power: 4050 VAC, 310 KW

03 August
00:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.7 dBm
D4 -7.0 dBm
Line Voltage and Power: 4030 VAC, 310 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.7 dBm
D4 -7.0 dBm
Line Voltage and Power: 4030 VAC, 310 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.1 dBm
Tx2 +6.5 Kw
Tx3 +6.8 dBm
D4 -7.0 dBm
Line Voltage and Power: 4080 VAC, 310 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.1 dBm
Tx2 +6.5 Kw
Tx3 +6.8 dBm
D4 -7.0 dBm
Line Voltage and Power: 4080 VAC, 310 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.7 dBm
D4 -7.0 dBm
Line Voltage and Power: 4050 VAC, 310 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.7 dBm
D4 -7.0 dBm
Line Voltage and Power: 4050 VAC, 310 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.7 dBm
D4 -7.0 dBm
Line Voltage and Power: 4030 VAC, 310 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.0 dBm
Tx2 +6.5 Kw
Tx3 +6.7 dBm
D4 -7.0 dBm
Line Voltage and Power: 4030 VAC, 310 KW"	vquesada
1598	21 Aug 2017 17:25 Restart of acquisition system	ISR		2017_08 Eclipse Aug 21	Acquisition system	I. Manay	new	2017-08-21T18:50:53-05:00	2017-08-21T18:51:33-05:00	PC of Faraday experiment was restarted due to it was hung.There is not good date from 17:12.	imanay
1611	22 Aug 18:12 Faraday Restart	ISR		2017_08 Eclipse Aug 21	Acquisition system		new	2017-08-22T19:13:21-05:00	2017-08-22T19:13:21-05:00	"11:36 Faraday looses synchronisim
11:38 Faraday restarts

17:02 Faraday looses synchronisim
17:05 Faraday restarts

18:10 Faraday looses synchronisim
18:12 Faraday restarts"	ryanque
1615	23 Aug 00:34 Restart Faraday	ISR+Imaging		2017_08 Eclipse Aug 21	Acquisition system	P. Condor	new	2017-08-23T04:28:09-05:00	2017-08-23T04:28:09-05:00	Restart  Faraday batch because it was desynchronized from several hours 	pcondor
1617	23 Aug 06:09 Imaging is off	ISR+Imaging		2017_08 Eclipse Aug 21	Acquisition system	P. Condor	new	2017-08-23T06:42:40-05:00	2017-08-23T06:42:40-05:00	Imaging is off	pcondor
1586	17 Aug 11:30 Antenna VSWR	ISR		2017_08 Eclipse Aug 21	Antennas		new	2017-08-17T12:42:51-05:00	2017-08-17T12:42:51-05:00	"      49.72   49.92  50.12
WUp   1.17     1.01   1.19
WDn   1.15     1.05   1.19
NDn   1.34     1.06   1.08
NUp   1.33     1.02   1.02
EUp   1.31     1.10   1.11
EDn   1.35     1.06   1.03
SDn   1.24     1.08   1.19
SUp   1.12     1.04   1.14"	ryanque
1622	23 Aug 11:00 Upload data to PUMA	ISR		2017_08 Eclipse Aug 21	End experiment	I. Manay	new	2017-08-23T10:54:57-05:00	2017-08-23T10:54:57-05:00	"1) Faraday :   23.6 GB,  473 files
2) EW_Drifts : 81.6 GB, 1155 files
3) Imaging :   272  GB,  347 files"	imanay
1591	20 Aug 2017 19:40 Operation Resume	ISR+Imaging		2017_08 Eclipse Aug 21	General		new	2017-08-20T19:53:27-05:00	2017-08-20T19:53:27-05:00	"Person in Charge: K.Kuyeng.
Experiment: _ISR-Imaging
1) 16:15 - 20:00
2) Operation Hours: 3h 25 min (complete is 3h 45min)
3) Operation incomplete: 20min
4) Reasons:
Change of EW Drift's spark gap 
"	kkuyeng
1596	21 Aug 2017 07:59 Operation Resume	ISR		2017_08 Eclipse Aug 21	General	AValdez	new	2017-08-21T07:44:42-05:00	2017-08-21T07:44:42-05:00	"Person in Charge: A. Valdez
Experiment: _ISR-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00
3) Operation incomplete: 0 min
4) Reasons:
22:24  EW Drift's spark gap 
01:25  EW Drift's spark gap 
04:25  EW Drift's spark gap
07:30  EW Drift's spark gap "	AValdez
1602	21 Aug 19:50 Operation Resume	ISR		2017_08 Eclipse Aug 21	General	I. Manay	new	2017-08-21T20:09:32-05:00	2017-08-21T20:13:15-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h45min
3) Operation incomplete: 15 minutes
4) Reasons:
-Fall of transmitters : 3 minutes
-Fall of acquisition system : 12 minutes"	imanay
1608	22 Aug 08:00 Operation Resume	ISR		2017_08 Eclipse Aug 21	General		new	2017-08-22T19:05:27-05:00	2017-08-23T09:37:01-05:00	"Person in Charge: A. Belleza
Experiment: ISR + Imaging
1) 20:00 - 08:00
2) Operation Hours: 
3) Operation incomplete: 
4) Reasons:
"	ryanque
1613	22 Aug 20:00 Operation Resume	ISR		2017_08 Eclipse Aug 21	General		new	2017-08-22T20:10:19-05:00	2017-08-22T20:10:19-05:00	"Person in Charge: R. Yanque
Experiment: ISR + Imaging
1) 20:00 - 08:00
2) Operation Hours: 11:45 
3) Operation incomplete: 15
4) Reasons:
Reset of faraday: 10 minutes
Reset of EW Drift: 5 minutes"	ryanque
1616	23 Aug 06:02 Noise levels	ISR+Imaging		2017_08 Eclipse Aug 21	General	P. Condor	new	2017-08-23T06:41:38-05:00	2017-08-23T06:41:38-05:00	"22-08-2017
21:27
EW-DRIFTS
A:26.56 B:26.15 C:25.76 D:26.11 
FARADAY
A:19.07 B:18.45 
IMAGING
1:22.06 2:21.50 3:21.39 4:21.86 5:21.82 6:21.46 7:22.67 8:20.76 
23-08-2017
00:41
EW-DRIFTS
A:23.22 B:22.88 C:22.86 D:22.73 
FARADAY
A:18.10 B:17.52 
IMAGING
1:18.08 2:17.32 3:17.80 4:17.78 5:18.88 6:17.70 7:19.22 8:16.95
03:35
EW-DRIFTS
A:23.12 B:22.58 C:22.54 D:22.56 
FARADAY
A:18.07 B:17.42 
IMAGING
1:17.87 2:17.19 3:17.55 4:17.75 5:18.35 6:17.63 7:19.20 8:16.81
06:02
EW-DRIFTS
A:22.20 B:21.88 C:21.91 D:21.78 
FARADAY
A:17.04 B:16.74 
IMAGING
1:16.54 2:15.90 3:16.11 4:16.66 5:17.92 6:16.43 7:18.19 8:16.20   "	pcondor
1621	23 Aug 08:00 Operation Resume	ISR+Imaging		2017_08 Eclipse Aug 21	General	P. Condor	new	2017-08-23T08:20:41-05:00	2017-08-23T08:20:41-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Faraday+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:
"	pcondor
1592	20 Aug 2017 19:45 Plots	ISR+Imaging		2017_08 Eclipse Aug 21	Plot		new	2017-08-20T19:54:55-05:00	2017-08-20T19:54:55-05:00	"Figures of rti, spectras
Los parametros no se pueden incluir porque se esta usando Signal Chain para procesar Faraday."	kkuyeng
1594	20 Aug 23:59 Plots	ISR		2017_08 Eclipse Aug 21	Plot	AValdez	new	2017-08-21T00:24:36-05:00	2017-08-21T00:24:36-05:00	Figures of rti, spectras	AValdez
1605	21 Aug 2017 23:59 Plots	ISR		2017_08 Eclipse Aug 21	Plot		new	2017-08-22T07:39:21-05:00	2017-08-22T07:39:21-05:00	21 Aug 2017 23:59 Plots	abellleza
1607	22 Aug 2017 07:40 Plots	ISR		2017_08 Eclipse Aug 21	Plot		new	2017-08-22T07:50:59-05:00	2017-08-22T07:50:59-05:00	22 Aug 2017 07:40 Plots	abelleza
1614	23 Aug 00:05 Plots	ISR+Imaging		2017_08 Eclipse Aug 21	Process/Analysis Program	P. Condor	new	2017-08-23T04:22:30-05:00	2017-08-23T04:22:30-05:00	Figures of rti, spectra and parameters	pcondor
1620	23 Aug 08:01 Plots	ISR+Imaging		2017_08 Eclipse Aug 21	Process/Analysis Program	P. Condor	new	2017-08-23T08:12:26-05:00	2017-08-23T08:12:26-05:00	Figures of rti spectra and parameters	pcondor
1588	20 Aug 2017 17:08 Spark gap change	ISR		2017_08 Eclipse Aug 21	Spark Gaps		new	2017-08-20T19:46:25-05:00	2017-08-20T19:46:25-05:00	"17:08 se apagan transmisores para hacer cambio en chispero de EW Drift
17:23 Se culmina con el cambio y se repone transmisores para seguir con la toma"	kkuyeng
1589	20 August 2017 20:00 Spark gaps adjustment	ISR		2017_08 Eclipse Aug 21	Spark Gaps		new	2017-08-20T19:46:40-05:00	2017-08-20T19:46:40-05:00	"20-08-2017
16:34 Spark gaps adjustment
17:23 Spark gap adjustment of EW Drift 
19:24 Spark gaps adjustment
"	kkuyeng
1601	21 Aug 2017 19:25 Spark-gap adjustment	ISR		2017_08 Eclipse Aug 21	Spark Gaps	J. Lavado	new	2017-08-21T19:38:26-05:00	2017-08-21T19:38:26-05:00	"10:50 Spark gaps adjustment
13:00 Spark gaps adjustment
16:40 Spark gaps adjustment
19:25 Spark gaps adjustment"	imanay
1606	22 Aug 2017 07:32 Spark-gap adjustment	ISR		2017_08 Eclipse Aug 21	Spark Gaps		new	2017-08-22T07:49:29-05:00	2017-08-22T07:49:29-05:00	"21 Aug 2017
22:33 Spark gaps adjustment

22 Aug 2017
01:33 Spark gaps adjustment
04:33 Spark gaps adjustment
07:32 Spark gaps adjustment

by Americo Coronado"	abelleza
1609	22 Aug 16:29 Spark Gap Adjustments	ISR		2017_08 Eclipse Aug 21	Spark Gaps		new	2017-08-22T19:08:19-05:00	2017-08-22T19:08:19-05:00	"10:28 Spark Gap Adjustment
13:28 Spark Gap Adjustment
16:29 Spark Gap Adjustment
"	ryanque
1618	23 Aug 07:30 Spark gaps adjustment	ISR+Imaging		2017_08 Eclipse Aug 21	Spark Gaps	A. Coronado	new	2017-08-23T06:44:37-05:00	2017-08-23T06:44:37-05:00	"22-08-2017
22:32 Spark gaps adjustment
23-08-2017
01:30 Spark gaps adjustment
04:27 Spark gaps adjustment
07:30 Spark gaps adjustment"	pcondor
1583	16 Aug 12:00 Log created Eclipse Aug21	ISR		2017_08 Eclipse Aug 21	Start experiment		new	2017-08-16T13:11:36-05:00	2017-08-16T13:11:36-05:00	"Campaign: Eclipse Aug21
Test: Aug 17
Aug 20-23

Mode: EW Drift - Faraday + Imaging
VIPIR and Digisonde on
L. User: P. Condor"	ryanque
1587	20 Aug 2017 16:15 Start Experiment	ISR		2017_08 Eclipse Aug 21	Start experiment		new	2017-08-20T19:41:38-05:00	2017-08-20T20:00:08-05:00	"ISR
CH   Att        Noise
A    0           23.7
B    0           23.4
C    0           23.2
D    1           23.8
E    7 (3amp+1)  18.6
F    5 (3amp+1)  18.3

Other instruments running:
Digisonde (every 5min)
VIPIR (every 5 min)"	kkuyeng
1590	20 Aug 2017 17:55 Start Imaging	ISR+Imaging		2017_08 Eclipse Aug 21	Start experiment		new	2017-08-20T19:49:53-05:00	2017-08-20T19:49:53-05:00	"17:55 Inicio de toma de datos de Imagenes

Ch   Att    Noise level(19:30)
0    -        23.9
1    -        23.2
2    1        21.26
3    0        21.6
4    2        21.0
5    6        21.24
6    3        22.32 
7    6        21.02"	kkuyeng
1599	21 Aug 2017 17:25 Imaging system is started	ISR		2017_08 Eclipse Aug 21	Start experiment	I. Manay	new	2017-08-21T18:52:38-05:00	2017-08-21T18:52:38-05:00		imanay
1610	22 Aug 17:05 Imaging start	ISR		2017_08 Eclipse Aug 21	Start experiment		new	2017-08-22T19:11:16-05:00	2017-08-22T19:11:16-05:00	Imaging starts	ryanque
1593	20 Aug 23:00 Transmitter Power Measurements	ISR		2017_08 Eclipse Aug 21	Transmitters		new	2017-08-20T23:12:07-05:00	2017-08-20T23:12:07-05:00	"16:00 LV  ON
16:18 HV  ON
16:18 TX Power sample (-70 dB coupling)
Tx1 +2.2 dBm
Tx3 +6.6 dBm
Tx4 +2.2/5.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW
16:18 TX Power sample (-70 dB coupling)
Tx1 +2.2 dBm
Tx3 +6.6 dBm
Tx4 +2.2/5.0 dBm
Line Voltage and Power: 4030 VAC, 270 KW
17:05 HV OFF  Spark gaps adjustment
17:20 HV ON
18:00 D2 ON Imging
18:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.8 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line Voltage and Power: 4030 VAC, 270 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.8 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line Voltage and Power: 4030 VAC, 270 KW
20:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.8 dBm
Tx4 +2.5 dBm
D2 -7.1 dBm
Line Voltage and Power: 4090 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.8 dBm
Tx4 +2.5 dBm
D2 -7.1 dBm
Line Voltage and Power: 4090 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.8 dBm
Tx4 +2.5 dBm
D2 -7.1 dBm
Line Voltage and Power: 4080 VAC, 280 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.8 dBm
Tx4 +2.5 dBm
D2 -7.1 dBm
Line Voltage and Power: 4080 VAC, 280 KW
"	vquesada
1595	21 Aug 07:00 Transmitter Power Measurements	ISR		2017_08 Eclipse Aug 21	Transmitters		new	2017-08-21T07:12:31-05:00	2017-08-21T07:12:31-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.9 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line Voltage and Power: 4100 VAC, 280 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.9 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line Voltage and Power: 4100 VAC, 280 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.9 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line Voltage and Power: 4090 VAC, 280 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.9 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line Voltage and Power: 4090 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.6 dBm
Tx4 +2.5 dBm
D2 -7.0 dBm
Line Voltage and Power: 4080 VAC, 280 KW
04:10 Crowbar
05:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.6 dBm
Tx4 +2.5 dBm
D2 -7.0 dBm
Line Voltage and Power: 4080 VAC, 280 KW
06:00 D2 OFF IMAGING
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.5 dBm
Tx4 +2.4/5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.5 dBm
Tx4 +2.4/5.0 dBm
Line Voltage and Power: 4050 VAC, 280 KW"	vquesada
1597	21 Aug 2017 13:40 Fall of transmitters	ISR		2017_08 Eclipse Aug 21	Transmitters	I. Manay	new	2017-08-21T18:39:22-05:00	2017-08-21T18:39:22-05:00		imanay
1600	21 Aug 19:20 Transmitter power measurements	ISR		2017_08 Eclipse Aug 21	Transmitters		new	2017-08-21T19:31:01-05:00	2017-08-21T19:31:01-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.8 dBm
Tx4 +2.6/5.2 dBm
Line Voltage and Power: 4080 VAC, 280 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.8 dBm
Tx4 +2.5/5.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.7 dBm
Tx4 +2.5/5.0 dBm
Line Voltage and Power: 4100 VAC, 270 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.5/4.9 dBm
Line Voltage and Power: 4050 VAC, 270 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.8 dBm
Tx4 +2.5/5.0 dBm
Line Voltage and Power: 4090 VAC, 270 KW
13:41 PA1 screen power supply alarm
14:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.7 dBm
Tx4 +2.4/5.0 dBm
Line Voltage and Power: 4020 VAC, 260 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.8 dBm
Tx4 +2.4/5.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.4/5.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.5/5.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW
17:10 D2 ON ""IMAGING""
17:12 RF OFF - Adquisition system requirement
18:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.7 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.8 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line Voltage and Power: 4100 VAC, 270 KW"	ryaya
1603	21 Aug 23:05 Transmitter Power Measurements	ISR		2017_08 Eclipse Aug 21	Transmitters		new	2017-08-21T23:17:18-05:00	2017-08-21T23:17:18-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.7 dBm
Tx4 +2.5 dBm
D2 -7.1 dBm
Line Voltage and Power: 4090 VAC, 270 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.7 dBm
Tx4 +2.5 dBm
D2 -7.1 dBm
Line Voltage and Power: 4090 VAC, 270 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.7 dBm
Tx4 +2.5 dBm
D2 -7.1 dBm
Line Voltage and Power: 4060 VAC, 270 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.7 dBm
Tx4 +2.5 dBm
D2 -7.1 dBm
Line Voltage and Power: 4060 VAC, 270 KW"	vquesada
1604	22 Aug 07:00 Transmitter Power Measurements	ISR		2017_08 Eclipse Aug 21	Transmitters		new	2017-08-22T07:13:16-05:00	2017-08-22T07:13:16-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.5 dBm
D2 -7.0 dBm
Line Voltage and Power: 4060 VAC, 270 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.5 dBm
D2 -7.0 dBm
Line Voltage and Power: 4060 VAC, 270 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.5 dBm
D2 -7.0 dBm
Line Voltage and Power: 4070 VAC, 270 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.5 dBm
D2 -7.0 dBm
Line Voltage and Power: 4070 VAC, 270 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.3 dBm
D2 -6.8 dBm
Line Voltage and Power: 4040 VAC, 270 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.3 dBm
D2 -6.8 dBm
Line Voltage and Power: 4040 VAC, 270 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.8 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4100 VAC, 270 KW
06:13 D2 OFF Imaging
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.8 dBm
Tx4 +2.4/5.0 dBm
Line Voltage and Power: 4100 VAC, 270 KW"	vquesada
1612	22 Aug 19:10 Transmitter report	ISR		2017_08 Eclipse Aug 21	Transmitters		new	2017-08-22T19:25:36-05:00	2017-08-22T19:25:36-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.8 dBm
Tx4 +2.4/5.0 dBm
Line Voltage and Power: 4080 VAC, 270 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +2.2 dBm
Tx3 +6.6 dBm
Tx4 +2.4/5.0 dBm
Line Voltage and Power: 4000 VAC, 270 KW
09:43 PA1 screen power supply alarm
10:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.8 dBm
Tx4 +2.4/5.0 dBm
Line Voltage and Power: 4080 VAC, 270 KW
10:38 PA1 screen power supply alarm
10:50 PA1 screen power supply alarm
11:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.4/5.0 dBm
Line Voltage and Power: 4000 VAC, 270 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.4/5.0 dBm
14:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.4/4.9 dBm
Line Voltage and Power: 4020 VAC, 270 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +2.2 dBm
Tx3 +6.6 dBm
Tx4 +2.4/5.0 dBm
Line Voltage and Power: 4030 VAC, 270 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.5/5.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW
17:00 D2 ON ""IMAGING""
17:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.5 dBm
D2 -7.0 dBm
Line Voltage and Power: 4040 VAC, 270 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4030 VAC, 270 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.8 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW"	ryaya
1619	23 Aug 07:05 Transmitter Power Measurements	ISR		2017_08 Eclipse Aug 21	Transmitters		new	2017-08-23T07:18:32-05:00	2017-08-23T07:18:32-05:00	"'''22 August'''

20:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.4 dBm
D2 -7.2 dBm
Line Voltage and Power: 4030 VAC, 270 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.4 dBm
D2 -7.7 dBm
Line Voltage and Power: 4030 VAC, 270 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW

'''23 August'''

00:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.8 dBm
Tx4 +2.5 dBm
D2 -7.0 dBm
Line Voltage and Power: 4040 VAC, 270 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.5 dBm
D2 -7.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4030 VAC, 270 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4050 VAC, 270 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4040 VAC, 270 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4040 VAC, 270 KW
06:10 D2 OFF Imaging
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.4 dBm
D2 -7.0 dBm
Line Voltage and Power: 4040 VAC, 270 KW"	vquesada
1654	08 set 17:35 Imaging on	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Acquisition system	P. Condor	new	2017-09-08T19:26:33-05:00	2017-09-08T19:26:33-05:00	Imaging on	pcondor
1655	08 set 18:04 Transmitter on	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Acquisition system	P. Condor	new	2017-09-08T19:28:12-05:00	2017-09-08T19:28:12-05:00	Transmitter on after spark gaps is corrected	pcondor
1670	09 Sep 2017 19:00 Imaging experiment started	ISR		2017_09 ISCOD ISR + Imaging	Acquisition system	I. Manay	new	2017-09-09T20:00:46-05:00	2017-09-09T20:00:46-05:00	It was started at 19:00 while GOES X ray flux was keeping high.	imanay
1684	11 set 06:40 Imaging off	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Acquisition system	P. Condor	new	2017-09-11T07:35:35-05:00	2017-09-11T07:35:35-05:00	Imaging off	pcondor
1642	07 Set 06:32 Imaging is off	ISR		2017_09 ISCOD ISR + Imaging	Break Experiment	abelleza	new	2017-09-07T07:58:13-05:00	2017-09-07T07:58:13-05:00	07 Set 06:32 Imaging is off	abelleza
1665	09 Sep 06:26 Imaging is off	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Break Experiment	abelleza	new	2017-09-09T07:22:38-05:00	2017-09-09T07:22:38-05:00	09 Sep 06:26 Imaging is off	abelleza
1651	08 Set 2017 07:50 Imaging off	ISR+Imaging		2017_09 ISCOD ISR + Imaging	End experiment		new	2017-09-08T08:10:57-05:00	2017-09-08T08:10:57-05:00	07:50 - se apaga imagenes	kkuyeng
1692	11 Sep 2017 19:15 End experiment	ISR+Imaging		2017_09 ISCOD ISR + Imaging	End experiment		new	2017-09-11T19:50:08-05:00	2017-09-11T19:50:08-05:00	"ISR + Imaging end  experiment

Por falla en tramnsmisores (alarma de puerta abierta)"	kkuyeng
1706	20 Sep 09:00 Final Reports	ISR		2017_09 ISCOD ISR + Imaging	End experiment		new	2017-09-20T09:24:45-05:00	2017-09-20T09:24:45-05:00	"The final report of the campaign
The operativity of the campaign"	ryanque
1628	5 Set 2017 19:36 Operation Resume	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General		new	2017-09-05T19:56:11-05:00	2017-09-05T19:56:11-05:00	"Person in Charge: K.Kuyeng
Experiment: _ISR-Imaging
1) 16:40 - 20:00
2) Operation Hours: 3h 20
3) Operation incomplete: 0 min
4) Reasons: - 
"	kkuyeng
1634	6 Set 2017 07:45 Operation Resume	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General	AVALDEZ	new	2017-09-06T08:04:23-05:00	2017-09-06T08:04:23-05:00	"Person in Charge: A.Valdez
Experiment: _ISR-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00
3) Operation incomplete: 0 min
4) Reasons: 
"	AVALDEZ
1638	06 Sep 2017 19:50 Operation Resume	ISR		2017_09 ISCOD ISR + Imaging	General	I. Manay	new	2017-09-06T20:02:58-05:00	2017-09-06T20:02:58-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 08:00 - 20:00
2) Operation Hours: 12h
3) Operation incomplete: 0 minutes
4) Reasons:
-None"	imanay
1644	07 Set 2017 07:45 Operation Resume	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General	abelleza	new	2017-09-07T08:08:05-05:00	2017-09-07T08:08:05-05:00	"
Person in Charge: A.Belleza
Experiment: _ISR-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00
3) Operation incomplete: 
        EWDRIF  15 min
        Faraday 40 min
4) Reasons: "	abelleza
1646	07 Set 2017 20:00 Operation Resume	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General		new	2017-09-08T07:04:12-05:00	2017-09-08T07:04:12-05:00	"Person in Charge: JM. Gomez
Experiment: _ISR-Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 25
3) Operation incomplete: 
EWDRIFT 5 min
Transmsiores 30 min
4) Reasons: 
EWDrift - se colgó la Pc de adquisicion
Transmisores:falla de un instrumento que se tuvo que cambiar"	kkuyeng
1650	08 Set 2017 07:45 Operation Resume	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General		new	2017-09-08T08:04:03-05:00	2017-09-08T08:04:03-05:00	"Person in Charge: K.Kuyeng
Experiment: _ISR-Imaging
1) 20:00 - 08:00
2) Operation Hours: 11h 55
3) Operation incomplete: 
Faraday 5 min
4) Reasons: 
Faraday- PC se desincronizó y tomó 5 min en que comenzara la secuencia de adquisición bien."	kkuyeng
1656	08 set 19:00 Noise levels	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General	P. Condor	new	2017-09-08T19:35:25-05:00	2017-09-08T19:35:25-05:00	"08-09-2017
09:42
EW DRIFTS
A:22.96 B:21.91 C:22.33 D:22.23 
FARADAY
A:32.06 B:32.51
13:43
EW DRIFTS
A:23-19 B:23.27 C:23.02 D:23.53 
FARADAY
A:33.31 B:33.49  
17:02
EW DRIFTS
A:24.17 B:24.27 C:24.26 D:24.23 
FARADAY
A:34.28 B:34.48
19:00
EW DRIFTS
A:27.82 B:28.15 C:28.21 D:28.80 
FARADAY
A:38.99 B:38.52 
IMAGING
1:24.45 2:24.18 3:24.85 4:24.25 5:25.36 6:24.63 7:25.07 8:25.10  "	pcondor
1660	08 set 20:00 Operation resume	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General	P. Condor	new	2017-09-08T20:12:48-05:00	2017-09-08T20:12:48-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Faraday+Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 20 min
3) Operation incomplete: 40 min
4) Reasons:
 Change of spark gaps."	pcondor
1671	09 Sep 2017 19:50 Operation Resume	ISR		2017_09 ISCOD ISR + Imaging	General	I. Manay	new	2017-09-09T20:17:52-05:00	2017-09-09T20:17:52-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 52min
3) Operation incomplete: 8 minutes
4) Reasons:
-Re-start of Faraday acquisition system"	imanay
1676	10 Set 2017 07:47 Operation Resume	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General	AValdez	new	2017-09-10T08:07:25-05:00	2017-09-10T08:07:25-05:00	"Person in Charge: A.Valdez
Experiment: _ISR-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00
3) Operation incomplete:
4) Reasons:
"	abelleza
1678	10 Set 2017 19:45 Operation Resume	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General		new	2017-09-10T20:04:03-05:00	2017-09-10T20:16:40-05:00	"Person in Charge: K.Kuyeng
Experiment: _ISR-Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 30
3) Operation incomplete:
4) Reasons:
-15:XX caida de tx por unos minutos
-18:58 - 19:28 : cambio de chisperos"	kkuyeng
1683	11 set 06:37 Noise levels	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General	P. Condor	new	2017-09-11T07:34:41-05:00	2017-09-11T07:37:02-05:00	"10-09-2017
21:11
EW DRIFTS
A:23.98 B:23.87 C:24.12 D:24.00 
FARADAY
A:34.64 B:34.90 
IMAGING
1:19.27 2:18.58 3:19.18 4:18.81 5:20.34 6:20.08 7:20.25 8:20.54
 
11-09-2017
00:02
EW DRIFTS
A:22.66 B:22.49 C:22.93 D:22.72 
FARADAY
A:33.10 B:33.42 
IMAGING
1:17.67 2:17.00 3:17.78 4:17.24 5:19.13 6:18.78 7:19.34 8:19.06 
03:24
EW DRIFTS
A:21.94 B:21.80 C:22.13 D:21.87 
FARADAY
A:32.44 B:32.78 
IMAGING
1:16.86 2:16.15 3:16.97 4:16.39 5:18.36 6:18.11 7:18.51 8:17.86
06:37
EW DRIFTS
A:22.13 B:22.01 C:22.54 D:22.36 
FARADAY
A:32.69 B:33.06 
IMAGING
1:17.34 2:16.60 3:17.49 4:16.89 5:18.64 6:18.51 7:18.89 8:18.60  "	pcondor
1688	11 set 08:00 Operation resume	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General	P. Condor	new	2017-09-11T08:13:24-05:00	2017-09-11T08:13:24-05:00	"Person in Charge: P. Condor.
Experiment: EW_drifts+Faraday+Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
1689	11 Set 2017 19:30 Operation Resume	ISR+Imaging		2017_09 ISCOD ISR + Imaging	General		new	2017-09-11T19:46:11-05:00	2017-09-11T19:46:11-05:00	"Person in Charge: K.Kuyeng
Experiment: _ISR-Imaging
1) 08:00 - 20:00
2) Operation Hours: 09h 15
3) Operation incomplete:
4) Reasons:
-12:30 - 14:30  falla en tx por falla de switch en banco de condensadores
-19:15: falla de Tx  - alarma de puerta abierta"	kkuyeng
1694	12 Sep 12:30 Upload data to PUMA	ISR		2017_09 ISCOD ISR + Imaging	General	I. Manay	new	2017-09-14T10:57:31-05:00	2017-09-14T10:57:31-05:00	"Faraday: 1045 files, 54.5G
Drifts: 2664 files, 188G
Imaging: 747 files, 587G"	imanay
1629	5 Set 19:40 Plots	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Plot		new	2017-09-05T19:57:51-05:00	2017-09-05T19:57:51-05:00		kkuyeng
1631	6 Set 00:01 Plots	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Plot	AVALDEZ	assigned	2017-09-06T06:52:42-05:00	2017-09-06T06:58:18-05:00		AVALDEZ
1639	06 Set 23:59 Plots	ISR		2017_09 ISCOD ISR + Imaging	Plot	abelleza	new	2017-09-07T07:48:08-05:00	2017-09-07T07:48:08-05:00	06 Set 23:59 Plots	abelleza
1643	07 Set 07:45 Plots	ISR		2017_09 ISCOD ISR + Imaging	Plot	abelleza	new	2017-09-07T08:00:13-05:00	2017-09-07T08:00:13-05:00	07 Set 07:45 Plots	abelleza
1649	07-08 Set 2017 07:45 Plots	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Plot		new	2017-09-08T07:59:51-05:00	2017-09-08T07:59:51-05:00	07 - 08 Set 07:45 Plots	kkuyeng
1662	08 Sep 23:59 Plots	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Plot	abelleza	new	2017-09-09T07:08:55-05:00	2017-09-09T07:08:55-05:00	08 Sep 23:59 Plots	abelleza
1666	09 Set 07:45 Plots	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Plot	abelleza	new	2017-09-09T07:24:20-05:00	2017-09-09T07:24:20-05:00	09 Set 07:45 Plots	abelleza
1673	09 Set 23:59   Plots	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Plot	AValdez	new	2017-09-10T06:58:42-05:00	2017-09-10T06:58:42-05:00		abelleza
1681	10 Set 19:50 Plots	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Plot		new	2017-09-10T20:08:52-05:00	2017-09-10T20:08:52-05:00		kkuyeng
1693	11 Set 19:30 Plots	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Plot		new	2017-09-11T19:50:33-05:00	2017-09-11T19:50:33-05:00		kkuyeng
1659	08 set 19:50 Plots	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Process/Analysis Program	P. Condor	new	2017-09-08T20:07:32-05:00	2017-09-08T20:07:32-05:00	Plots of rtis, spectras and parameters.	pcondor
1682	11 Set 00:10 Plots	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Process/Analysis Program	P. Condor	new	2017-09-11T01:05:24-05:00	2017-09-11T01:05:24-05:00	Plots of rtis, spectras and parameters.	pcondor
1687	11 Set 07:50 Plots	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Process/Analysis Program	P. Condor	new	2017-09-11T08:08:59-05:00	2017-09-11T08:08:59-05:00	Plots of  rtis, spectras and parameters.	pcondor
1669	09 Sep 2017 11:45 Adjustment at Faraday reception line	ISR		2017_09 ISCOD ISR + Imaging	Reception	I. Manay	new	2017-09-09T19:57:44-05:00	2017-09-09T19:57:44-05:00	"09:32 AM:
1dB attenuation at 'A' channel of Faraday reception was added to balance the increase of noise due to spark-gaps adjustment. One of the ARTs was affected due to the high humidity weather conditions. 
11:45 AM:
'A' channel recovered itself so the original attenuation was back."	imanay
1627	5 Set 2017 , 19:35 Spark gaps adjustment	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Spark Gaps		new	2017-09-05T19:54:24-05:00	2017-09-05T19:54:24-05:00	"16:45 Spark gaps adjustment
19:30 Spark gaps adjustment
"	kkuyeng
1632	6 Set 07:00 Spark gaps adjustment	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Spark Gaps	AVALDEZ	new	2017-09-06T07:04:38-05:00	2017-09-06T07:04:38-05:00	"*******05-09-2017**********
19:30 Spark gaps adjustment
22:34 Spark gaps adjustment
*******06-09-2017**********
01:38 Spark gaps adjustment
05:00 Spark gaps adjustment
"	AValdez
1635	06 Sep 2017 18:13 Spark-gap adjustment	ISR		2017_09 ISCOD ISR + Imaging	Spark Gaps	W. Rojas	new	2017-09-06T19:20:39-05:00	2017-09-06T19:20:39-05:00	"08:12 Spark gaps adjustment
11:25 Spark gaps adjustment
15:07 Spark gaps adjustment
18:13 Spark gaps adjustment"	imanay
1641	07 Set 06:14 Spark gaps adjustment	ISR		2017_09 ISCOD ISR + Imaging	Spark Gaps	abelleza	new	2017-09-07T07:55:44-05:00	2017-09-07T07:55:44-05:00	"
06 Set 21:12 Spark gaps adjustment

07 Set 00:17 Spark gaps adjustment
07 Set 03:17 Spark gaps adjustment
07 Set 06:14 Spark gaps adjustment

By José Lavado"	abelleza
1647	08 Set 07:00 Spark gaps adjustment	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Spark Gaps		new	2017-09-08T07:08:07-05:00	2017-09-08T07:08:07-05:00	"07-09-2017
09:20 Spark gaps adjustment
12:20 Spark gaps adjustment
15:30 Spark gaps adjustment
18:27 Spark gaps adjustment
21:35 Spark gaps adjustment
08-09-2017
00:38 Spark gaps adjustment
03:36 Spark gaps adjustment
06:34 Spark gaps adjustment"	kkuyeng
1652	08 set 17:20 Change of spark gaps	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Spark Gaps	W. Rojas	new	2017-09-08T19:24:53-05:00	2017-09-08T19:24:53-05:00	Change of spark gaps and calibration	pcondor
1657	08 set 18:04 Spark gaps adjustment	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Spark Gaps	W. Rojas	new	2017-09-08T19:37:52-05:00	2017-09-08T19:37:52-05:00	"10:18 Spark gaps adjustment
12:36 Spark gaps adjustment
15:44 Spark gaps adjustment
18:04 Spark gaps adjustment"	pcondor
1663	09 Sep 06:00 Spark gaps adjustment	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Spark Gaps	abelleza	new	2017-09-09T07:21:06-05:00	2017-09-09T07:21:06-05:00	"
08 Set 21:15 Spark gaps adjustment

09 Set 00:00 Spark gaps adjustment
09 Set 03:20 Spark gaps adjustment
09 Set 06:00 Spark gaps adjustment

By Américo Huamaní"	abelleza
1668	09 Sep 2017 19:26 Spark-gap adjustment	ISR		2017_09 ISCOD ISR + Imaging	Spark Gaps	J. Lavado	new	2017-09-09T19:47:25-05:00	2017-09-09T19:47:25-05:00	"09:23 Spark gaps adjustment
12:34 Spark gaps adjustment
15:32 Spark gaps adjustment
19:26 Spark gaps adjustment (Peak at GOES-X ray flux)
"	imanay
1674	10 Sep 2017 06:50 am Spark-gap adjustment	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Spark Gaps	AValdez	new	2017-09-10T07:20:06-05:00	2017-09-10T07:20:06-05:00	"08:50 pm Spark gaps adjustment
00:01 am Spark gaps adjustment
03:01 am Spark gaps adjustment
06 02 am Spark gaps adjustment
"	abelleza
1679	10 Sep 2017 19:45 Spark-gap adjustment	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Spark Gaps		new	2017-09-10T20:06:09-05:00	2017-09-10T20:06:09-05:00	"08:57 Spark gaps adjustment
12:05 Spark gaps adjustment
15:01 Spark gaps adjustment
18:58 - 19:28 Se cambian los chisperos (Faraday central e EWDrift)
19:28 Spark gaps adjustment"	kkuyeng
1685	11 set 04:49 Spark gaps adjustment	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Spark Gaps	W. Rojas	new	2017-09-11T07:39:20-05:00	2017-09-11T07:39:20-05:00	"10-09-2017
22:38 Spark gaps adjustment
11-09-2017
01:35 Spark gaps adjustment
04:49 Spark gaps adjustment"	pcondor
1690	11 Sep 2017 19:30 Spark-gap adjustment	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Spark Gaps		new	2017-09-11T19:47:23-05:00	2017-09-11T19:47:23-05:00	"08:59 Spark gaps adjustment
12:04 Spark gaps adjustment
16:34 Spark gaps adjustment
"	kkuyeng
1624	05 Sep 14:00 Log created	ISR		2017_09 ISCOD ISR + Imaging	Start experiment		new	2017-09-05T14:45:03-05:00	2017-09-05T14:45:03-05:00	ISCOD Campaign	ryanque
1625	5 Set 2017 16:40 Inicio de experimento	ISR		2017_09 ISCOD ISR + Imaging	Start experiment		new	2017-09-05T19:51:37-05:00	2017-09-05T19:51:37-05:00	"Se inicia experimento ISR

Niveles de ruido:
EWDrift
A 23.6
B 23.7
C 23.8
D 24.0

Faraday
A 20.5
B 20.0

Medidas de VSWR de antenas a 49.92MHz
Wup 1.08
Wdn 1.04
Ndn 1.09
Nup 1.02
Eup 1.01
Edn 1.05
Sdn 1.03 
Sup 1.10"	kkuyeng
1626	5 Set 2017 16:40 Inicio de experimento Imagenes	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Start experiment		new	2017-09-05T19:53:05-05:00	2017-09-05T19:53:05-05:00	"17:00 Inicio de experimento Imágenes

17:47 Noise levels
A 20.38
B 19.78
C 20.61
D 19.93
E 20.43
F 20.87
G 20.55
H 21.55"	kkuyeng
1636	06 Sep 2017 17:30 Imaging was started	ISR		2017_09 ISCOD ISR + Imaging	Start experiment	I. Manay	new	2017-09-06T19:22:50-05:00	2017-09-06T19:22:50-05:00	Imaging experiment was started.	imanay
1680	10 Sep 2017 17:50 Imaging experiment started	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Start experiment		new	2017-09-10T20:07:13-05:00	2017-09-10T20:07:13-05:00	It was started at 17:50	kkuyeng
1691	11 Sep 2017 17:30 Imaging experiment started	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Start experiment		new	2017-09-11T19:49:02-05:00	2017-09-11T19:49:02-05:00		kkuyeng
1630	05 Set 23:10 Transmitter Power Measurements	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-05T23:29:02-05:00	2017-09-05T23:29:02-05:00	"20:00 TX Power sample (-70 dB coupling)
D2 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4060 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
D2 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4060 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
D2 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4090 VAC, 285 KW
23:00 TX Power sample (-70 dB coupling)
D2 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4090 VAC, 285 KW"	vquesada
1633	06 Set 07:00 Transmitter Power Measurements	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-06T07:19:10-05:00	2017-09-06T07:19:10-05:00	"00:00 TX Power sample (-70 dB coupling)
D2 -7.5 dBm
Tx2 +2.8 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4090 VAC, 280 KW
01:00 TX Power sample (-70 dB coupling)
D2 -7.5 dBm
Tx2 +2.8 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4090 VAC, 280 KW
02:00 TX Power sample (-70 dB coupling)
D2 -7.5 dBm
Tx2 +2.8 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4080 VAC, 280 KW
03:00 TX Power sample (-70 dB coupling)
D2 -7.5 dBm
Tx2 +2.8 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4080 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
D2 -7.5 dBm
Tx2 +2.6 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4050 VAC, 280 KW
05:00 TX Power sample (-70 dB coupling)
D2 -7.5 dBm
Tx2 +2.6 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4050 VAC, 280 KW
06:00 Driver 1 OFF
06:00 TX Power sample (-70 dB coupling)
Tx2 +2.6/4.9 dBm
Tx3 +6.8 dBm
Tx4 +2.9 dBm
Line Voltage and Power: 4090 VAC, 280 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +2.6/4.9 dBm
Tx3 +6.8 dBm
Tx4 +2.9 dBm
Line Voltage and Power: 4090 VAC, 280 KW

"	vquesada
1637	06 Set 19:20 Transmitter report	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-06T19:39:48-05:00	2017-09-06T19:39:48-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/4.8 dBm
Tx3 +6.5 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4020 VAC, 260 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/4.7 dBm
Tx3 +6.5 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4040 VAC, 270 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/4.7 dBm
Tx3 +6.5 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4020 VAC, 260 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +2.5/4.8 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4060 VAC, 260 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/4.8 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4030 VAC, 260 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/4.5 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4080 VAC, 270 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +2.5/4.8 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4100 VAC, 260 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/4.8 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4000 VAC, 260 KW
17:30 D1 ON
18:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
D1  -7.4 dBm
Line Voltage and Power: 4030 VAC, 260 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +2.5 dBm
Tx3 +6.6 dBm
Tx4 +2.9 dBm
D1  -7.4 dBm
Line Voltage and Power: 4050 VAC, 260 KW"	ryaya
1640	07 Set 07:00 Transmitter Power Measurements	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-07T07:52:53-05:00	2017-09-07T07:52:53-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
D1  -7.5 dBm
Line Voltage and Power: 4080 VAC, 260 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.5 dBm
Tx4 +2.8 dBm
D1  -7.5 dBm
Line Voltage and Power: 4080 VAC, 260 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.5 dBm
Tx4 +2.8 dBm
D1  -7.5 dBm
Line Voltage and Power: 4080 VAC, 260 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.5 dBm
Tx4 +2.8 dBm
D1  -7.5 dBm
Line Voltage and Power: 4080 VAC, 260 KW
00:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
D1  -7.5 dBm
Line Voltage and Power: 4090 VAC, 280 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
D1  -7.5 dBm
Line Voltage and Power: 4090 VAC, 280 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
D1  -7.5 dBm
Line Voltage and Power: 4090 VAC, 280 KW
02:43 screen failure PA2
03:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
D1  -7.5 dBm
Line Voltage and Power: 4090 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
D1  -7.5 dBm
Line Voltage and Power: 4090 VAC, 280 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +2.2 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
D1  -7.5 dBm
Line Voltage and Power: 4080 VAC, 280 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +2.2 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
D1  -7.5 dBm
Line Voltage and Power: 4080 VAC, 280 KW
06:35 Off TX Imaging
07:00 TX Power sample (-70 dB coupling)
Tx2 +2.2 dBm/+4.7dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4060 VAC, 260 KW
"	rtadeo
1645	07 Set 19:20 Transmitter report	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-07T19:33:26-05:00	2017-09-07T19:33:26-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx2 +2.2/4.7 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4060 VAC, 270 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +2.2/4.7 dBm
Tx3 +6.5 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4060 VAC, 260 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/4.8 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4090 VAC, 260 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/4.8 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4100 VAC, 260 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/4.7 dBm
Tx3 +6.3 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4050 VAC, 260 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/4.7 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4050 VAC, 260 KW
15:05 Failure at PA3 filament meter
15:25 PA3 restarted
16:00 TX Power sample (-70 dB coupling)
Tx2 +2.2/4.7 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4060 VAC, 260 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/4.6 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4020 VAC, 260 KW
17:38 D1 ON
18:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
D1 -7.4 dBm
Line Voltage and Power: 4090 VAC, 260 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
D1 -7.4 dBm
Line Voltage and Power: 4060 VAC, 260 KW"	ryaya
1648	08 Set 07:00 Transmitter report	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-08T07:33:15-05:00	2017-09-08T07:33:15-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
Dr1 -7.4 dBm
Line Voltage and Power: 4080 VAC, 260 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
Dr1 -7.4 dBm
Line Voltage and Power: 4080 VAC, 260 KW
21:50 Data Acquisition Failure
22:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.5 dBm
Tx4 +2.8 dBm
Dr1 -7.5 dBm
Line Voltage and Power: 4100 VAC, 260 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Dr1 -7.5 dBm
Line Voltage and Power: 4090 VAC, 260 KW
08/09/2017
00:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Dr1 -7.5 dBm
Line Voltage and Power: 4090 VAC, 260 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Dr1 -7.5 dBm
Line Voltage and Power: 4090 VAC, 260 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Dr1 -7.5 dBm
Line Voltage and Power: 4090 VAC, 260 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Dr1 -7.5 dBm
Line Voltage and Power: 4090 VAC, 260 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Dr1 -7.5 dBm
Line Voltage and Power: 4090 VAC, 260 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Dr1 -7.5 dBm
Line Voltage and Power: 4090 VAC, 260 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Dr1 -7.5 dBm
Line Voltage and Power: 4090 VAC, 260 KW
07:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Dr1 -7.5 dBm
Line Voltage and Power: 4090 VAC, 260 KW
"	rtadeo
1653	08 set 17:34 Transmitter on	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Transmitters	P. Condor	new	2017-09-08T19:25:50-05:00	2017-09-08T19:25:50-05:00	transmitter on	pcondor
1658	08 Set 19:20 Transmitter report	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-08T19:38:45-05:00	2017-09-08T19:38:45-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx2 +2.2/4.9 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4100 VAC, 270 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/4.8 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4100 VAC, 270 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/4.8 dBm
Tx3 +6.3 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4040 VAC, 260 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/4.8 dBm
Tx3 +6.2 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4060 VAC, 260 KW
13:00 TX Power sample (-70 dB coupling)
Tx2 +2.2/4.6 dBm
Tx3 +6.2 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4020 VAC, 260 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/4.7 dBm
Tx3 +6.2 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4050 VAC, 260 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/4.8 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4080 VAC, 260 KW
16:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/4.8 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4080 VAC, 260 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +2.5/4.9 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4080 VAC, 260 KW
17:20 HV OFF (Antenna request)
17:40 HV ON
17:50 HV OFF (Adquisition request)
18:10 HV ON, D1 ON ""IMAGING""
19:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
D1 -7.4 dBm
Line Voltage and Power: 4100 VAC, 270 KW
19:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
D1 -7.4 dBm
Line Voltage and Power: 4060 VAC, 260 KW"	ryaya
1661	08 Set 23:10 Transmitter Power Measurements	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-08T23:27:46-05:00	2017-09-08T23:27:46-05:00	"20:00 TX Power sample (-70 dB coupling)
D1 -7.5 dBm
Tx2 +2.4 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4080 VAC, 270 KW
21:00 TX Power sample (-70 dB coupling)
D1-7.5 dBm
Tx2 +2.4 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4080 VAC, 270 KW
22:00 TX Power sample (-70 dB coupling)
D1 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4100 VAC, 275 KW
23:00 TX Power sample (-70 dB coupling)
D1 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4100 VAC, 275 KW"	vquesada
1664	09 Set 07:00 Transmitter Power Measurements	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-09T07:21:56-05:00	2017-09-09T07:21:56-05:00	"00:00 TX Power sample (-70 dB coupling)
D1 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4100 VAC, 275 KW
01:00 TX Power sample (-70 dB coupling)
D1 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4100 VAC, 275 KW
02:00 TX Power sample (-70 dB coupling)
D1 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4100 VAC, 275 KW
03:00 TX Power sample (-70 dB coupling)
D1 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4100 VAC, 275 KW
04:00 TX Power sample (-70 dB coupling)
D1 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4080 VAC, 270 KW
05:00 TX Power sample (-70 dB coupling)
D1 -7.5 dBm
Tx2 +2.5 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4080 VAC, 270 KW
06:00 TX Power sample (-70 dB coupling)
D1 -7.5 dBm
Tx2 +2.6 dBm
Tx3 +6.5 dBm
Tx4 +2. dBm
Line Voltage and Power: 4100 VAC, 275 KW
06:25 Driver 1 OFF ""Imaging""
07:00 TX Power sample (-70 dB coupling)
Tx2 +2.6/5.0 dBm
Tx3 +6.5 dBm
Tx4 +2. dBm
Line Voltage and Power: 4100 VAC, 275 KW "	vquesada
1667	09 Set 19:00 Transmitter Power Measurements	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-09T19:35:56-05:00	2017-09-09T19:35:56-05:00	"08:00 TX Power sample (-70 dB coupling)
Tx2 +2.6/+5.0 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4090 VAC, 260 KW
09:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/+5.0 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4090 VAC, 260 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/+5.0 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4090 VAC, 260 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/+5.0 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4090 VAC, 260 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/+5.0 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4090 VAC, 260 KW
13:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/+5.0 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4090 VAC, 260 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +2.4/+5.0 dBm
Tx3 +6.6 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4090 VAC, 260 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/+4.9 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4050 VAC, 260 KW
15:19 Faraday RF Off
15:21 Faraday RF ON
16:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/+4.9 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4050 VAC, 260 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/+4.9 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4050 VAC, 260 KW
18:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/+4.9 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4050 VAC, 260 KW
18:55 Imaging ON
19:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
Dr1 -7.7 dBm
Line Voltage and Power: 4050 VAC, 260 KW
"	rtadeo
1672	09 Set 23:00 Transmitter Power Measurements	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-09T23:20:12-05:00	2017-09-09T23:20:12-05:00	"20:00 TX Power sample (-70 dB coupling)
D1 -7.6 dBm
Tx2 +2.5 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4070 VAC, 275 KW
21:00 TX Power sample (-70 dB coupling)
D1 -7.6 dBm
Tx2 +2.5 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4070 VAC, 275 KW
22:00 TX Power sample (-70 dB coupling)
D1 -7.6 dBm
Tx2 +2.5 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4080 VAC, 275 KW
23:00 TX Power sample (-70 dB coupling)
D1 -7.6 dBm
Tx2 +2.5 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4080 VAC, 275 KW"	vquesada
1675	10 Set 07:00 Transmitter Power Measurements	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-10T07:20:39-05:00	2017-09-10T07:20:39-05:00	"00:00 TX Power sample (-70 dB coupling)
D1 -7.6 dBm
Tx2 +2.5 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4080 VAC, 275 KW
01:00 TX Power sample (-70 dB coupling)
D1 -7.6 dBm
Tx2 +2.5 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4080 VAC, 275 KW
02:00 TX Power sample (-70 dB coupling)
D1 -7.6 dBm
Tx2 +2.5 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4080 VAC, 275 KW
03:00 TX Power sample (-70 dB coupling)
D1 -7.6 dBm
Tx2 +2.5 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4080 VAC, 275 KW
04:00 TX Power sample (-70 dB coupling)
D1 -7.8 dBm
Tx2 +2.4 dBm
Tx3 +6.3 dBm
Tx4 +2.5 dBm
Line Voltage and Power: 4070 VAC, 270 KW
05:00 TX Power sample (-70 dB coupling)
D1 -7.8 dBm
Tx2 +2.4 dBm
Tx3 +6.3 dBm
Tx4 +2.5 dBm
Line Voltage and Power: 4070 VAC, 270 KW
06:00 TX Power sample (-70 dB coupling)
D1 -7.8 dBm
Tx2 +2.6 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4100 VAC, 275 KW
06:05 Driver 1 OFF IMAGING
07:00 TX Power sample (-70 dB coupling)
Tx2 +2.6/5.3 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4100 VAC, 275 KW



"	vquesada
1677	10 Set 19:45 Transmitter report	ISR		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-10T20:00:44-05:00	2017-09-10T20:00:44-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx2 +2.6/5.2 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4000 VAC, 270 KW
10:00 TX Power sample (-70 dB coupling)
Tx2 +2.6/5.2 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4080 VAC, 270 KW
11:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/5.0 dBm
Tx3 +6.2 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4030 VAC, 270 KW
12:00 TX Power sample (-70 dB coupling)
Tx2 +2.5/5.1 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
Line Voltage and Power: 4070 VAC, 270 KW
14:00 TX Power sample (-70 dB coupling)
Tx2 +2.5/5.2 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
Line Voltage and Power: 4100 VAC, 270 KW
15:00 TX Power sample (-70 dB coupling)
Tx2 +2.6/5.2 dBm
Tx3 +6.4 dBm
Tx4 +2.9 dBm
Line Voltage and Power: 4080 VAC, 260 KW
15:10 PA3 interlock alarm, PA3 restarted
16:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/4.9 dBm
Tx3 +6.2 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4000 VAC, 260 KW
17:00 TX Power sample (-70 dB coupling)
Tx2 +2.2/4.9 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4020 VAC, 270 KW
17:50 D1 ON ""IMAGING""
18:00 TX Power sample (-70 dB coupling)
Tx2 +2.4 dBm
Tx3 +6.4 dBm
Tx4 +2.7 dBm
D1 -7.4 dBm
Line Voltage and Power: 4050 VAC, 270 KW
19:00 HV OFF (Antenna request)
19:25 HV ON, RF ON
"	ryaya
1686	11 Set 07:00 Transmitter Power Measurements	ISR+Imaging		2017_09 ISCOD ISR + Imaging	Transmitters		new	2017-09-11T07:56:26-05:00	2017-09-11T07:56:26-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
DR1 -7.7 dBm
Line Voltage and Power: 4050 VAC, 260 KW
21:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
DR1 -7.7 dBm
Line Voltage and Power: 4050 VAC, 260 KW
22:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
DR1 -7.7 dBm
Line Voltage and Power: 4050 VAC, 260 KW
23:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
DR1 -7.7 dBm
Line Voltage and Power: 4050 VAC, 260 KW
00:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
DR1 -7.6 dBm
Line Voltage and Power: 4100 VAC, 270 KW
01:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
DR1 -7.6 dBm
Line Voltage and Power: 4100 VAC, 270 KW
02:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
DR1 -7.6 dBm
Line Voltage and Power: 4100 VAC, 270 KW
03:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
DR1 -7.6 dBm
Line Voltage and Power: 4100 VAC, 270 KW
04:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
DR1 -7.6 dBm
Line Voltage and Power: 4100 VAC, 270 KW
05:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
DR1 -7.6 dBm
Line Voltage and Power: 4080 VAC, 270 KW
06:00 TX Power sample (-70 dB coupling)
Tx2 +2.3 dBm
Tx3 +6.6 dBm
Tx4 +2.7 dBm
DR1 -7.6 dBm
Line Voltage and Power: 4080 VAC, 270 KW
06:37 Off Imaging
07:00 TX Power sample (-70 dB coupling)
Tx2 +2.3/+4.9 dBm
Tx3 +6.5 dBm
Tx4 +2.6 dBm
Line Voltage and Power: 4050 VAC, 260 KW
"	rtadeo
1698	19 Sep 19:50 Operation Resume	ISR		2017_09_01 Meteors	General	I. Manay	new	2017-09-19T20:11:02-05:00	2017-09-19T20:11:02-05:00	"Person in Charge: I. Manay.
Experiment: Meteors
1) 17:30 - 20:00
2) Operation Hours: 2h 30min
3) Operation incomplete: 0 minutes
4) Reasons:
-None"	imanay
1703	20 Sep 06:29 Noise Levels	ISR		2017_09_01 Meteors	General	P. Condor	new	2017-09-20T07:46:40-05:00	2017-09-20T07:46:40-05:00	"19-09-2017
21:17
1:22.97 2:22.94 3:23.03
20-09-2017
00:35
1:21.61 2:21.56 3:22.00
03:41
1:23.51 2:23.12 3:24.02
06:29
1:23.42 2:22.91 3:24.11"	pcondor
1705	20 Sep 08:00 Operation Resume	ISR		2017_09_01 Meteors	General	P. Condor	new	2017-09-20T08:16:57-05:00	2017-09-20T08:16:57-05:00	"Person in Charge: P. Condor.
Experiment: Meteor
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 0 min
4) Reasons:"	pcondor
1709	20 Sep 20:00 Operation Resume	ISR		2017_09_01 Meteors	General		new	2017-09-20T20:40:31-05:00	2017-09-20T20:41:46-05:00		ryanque
1697	19 Sep 17:50 Turn digisonde off	ISR		2017_09_01 Meteors	Other Instruments	I. Manay	new	2017-09-19T19:32:40-05:00	2017-09-19T19:32:40-05:00	Digisonde and vipir were off for this experiment.	imanay
1711	20 sep 23:59 Plots	ISR		2017_09_01 Meteors	Plot		new	2017-09-21T06:52:17-05:00	2017-09-21T06:52:17-05:00		avaldez
1701	20 sep 01:00 Plots	ISR		2017_09_01 Meteors	Process/Analysis Program	P. Condor	new	2017-09-20T01:34:15-05:00	2017-09-20T01:34:15-05:00	Plots of rti and spectrogram of Meteor.	pcondor
1704	20 Sep 07:50 Plots	ISR		2017_09_01 Meteors	Process/Analysis Program	P. Condor	new	2017-09-20T08:15:37-05:00	2017-09-20T08:15:37-05:00	Plots of rti and spectrogram	pcondor
1695	19 Sep 17:00 Log Created	ISR		2017_09_01 Meteors	Start experiment		new	2017-09-19T17:32:03-05:00	2017-09-19T17:32:03-05:00	"Campaign Meteors
L. User K. Kuyeng

Starts Tue 19 ends Thu 21 in the morning
1 TX 1 Quarter"	ryanque
1696	19 Sep 17:30 Experiment started	ISR		2017_09_01 Meteors	Start experiment	I. Manay	new	2017-09-19T19:31:12-05:00	2017-09-19T19:31:12-05:00	"For this day:

ipp=1500Km
tx=67.5Km
DC=4.5%"	imanay
1707	20 Sep 17:15 Experiment Start	ISR		2017_09_01 Meteors	Start experiment		new	2017-09-20T19:32:51-05:00	2017-09-20T19:32:51-05:00	"The adquisition was started
17:28 Digisonde turned off"	ryanque
1699	19 Set 20:00 Transmitter report	ISR		2017_09_01 Meteors	Transmitters		new	2017-09-19T20:17:15-05:00	2017-09-19T20:17:15-05:00	"17:30 TX Power sample (-70 dB coupling)
Tx1 +3.0 dBm
Line Voltage and Power: 4100 VAC, 200 KW
18:00 TX Power sample (-70 dB coupling)
Tx1 +3.0 dBm
Line Voltage and Power: 4100 VAC, 200 KW
18:10 TX Screen OFF
19:00 TX Power sample (-70 dB coupling)
Tx1 +3.1 dBm
Line Voltage and Power: 4100 VAC, 200 KW
20:00 TX Power sample (-70 dB coupling)
Tx1 +3.0 dBm
Line Voltage and Power: 4100 VAC, 200 KW
"	rtadeo
1700	19 Set 23:00 Transmitter Power Measurements	ISR		2017_09_01 Meteors	Transmitters		new	2017-09-19T23:25:15-05:00	2017-09-19T23:25:15-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +3.0 dBm
Line Voltage and Power: 4100 VAC, 200 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +3.2 dBm
Line Voltage and Power: 4100 VAC, 200 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +3.3 dBm
Line Voltage and Power: 4100 VAC, 200 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +3.4 dBm
Line Voltage and Power: 4100 VAC, 200 KW"	vquesada
1702	20 Set 07:00 Transmitter Power Measurements	ISR		2017_09_01 Meteors	Transmitters		new	2017-09-20T07:25:07-05:00	2017-09-20T07:25:07-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +3.4 dBm
Line Voltage and Power: 4100 VAC, 200 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +3.4 dBm
Line Voltage and Power: 4100 VAC, 200 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +3.3 dBm
Line Voltage and Power: 4090 VAC, 200 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +3.3 dBm
Line Voltage and Power: 4090 VAC, 200 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +3.2 dBm
Line Voltage and Power: 4090 VAC, 200 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +3.2 dBm
Line Voltage and Power: 4090 VAC, 200 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +3.2 dBm
Line Voltage and Power: 4090 VAC, 200 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +3.4 dBm
Line Voltage and Power: 4100 VAC, 200 KW"	vquesada
1708	20 Sep 18:03 Transmitter off	ISR		2017_09_01 Meteors	Transmitters		new	2017-09-20T19:33:47-05:00	2017-09-20T19:33:47-05:00	"18:03 Transmitter off
18:06 Transmitter on"	ryanque
1710	20 Set 23:00 Transmitter Power Measurements	ISR		2017_09_01 Meteors	Transmitters		new	2017-09-20T23:24:59-05:00	2017-09-20T23:24:59-05:00	"17:00   LV
17:30   HV
17:30 Power sample (-70 dB coupling)
Tx1 +3.0 dBm
Line Voltage and Power: 4060 VAC, 200 KW
17:33 Drops screen power supply Tx1
17:57 Drops screen power supply Tx1
18:03 Crowbar  Drops HV power supply
18:05 Power sample (-70 dB coupling)
Tx1 +2.9 dBm
Line Voltage and Power: 4060 VAC, 200 KW
19:00 Power sample (-70 dB coupling)
Tx1 +2.9 dBm
Line Voltage and Power: 4100 VAC, 200 KW
20:00 Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Line Voltage and Power: 4100 VAC, 200 KW
21:00 Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Line Voltage and Power: 4100 VAC, 200 KW
22:00 Power sample (-70 dB coupling)
Tx1 +2.9 dBm
Line Voltage and Power: 4100 VAC, 200 KW
23:00 Power sample (-70 dB coupling)
Tx1 +2.9 dBm
Line Voltage and Power: 4100 VAC, 200 KW







"	vquesada
1712	21 Set 07:00 Transmitter Power Measurements	ISR		2017_09_01 Meteors	Transmitters		new	2017-09-21T07:24:55-05:00	2017-09-21T07:24:55-05:00	"00:00 Power sample (-70 dB coupling)
Tx1 +2.9 dBm
Line Voltage and Power: 4100 VAC, 200 KW
01:00 Power sample (-70 dB coupling)
Tx1 +2.9 dBm
Line Voltage and Power: 4100 VAC, 200 KW
02:00 Power sample (-70 dB coupling)
Tx1 +2.9 dBm
Line Voltage and Power: 4100 VAC, 200 KW
03:00 Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Line Voltage and Power: 4090 VAC, 200 KW
04:00 Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Line Voltage and Power: 4090 VAC, 200 KW
05:00 Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Line Voltage and Power: 4090 VAC, 200 KW
06:00 Power sample (-70 dB coupling)
Tx1 +2.9 dBm
Line Voltage and Power: 4100 VAC, 200 KW
07:00 Power sample (-70 dB coupling)
Tx1 +2.9 dBm
Line Voltage and Power: 4100 VAC, 200 KW
"	vquesada
1725	27 Sep 16:20 VIPIR On	ISR		2017_09_02 Drifts Meduim Power	Acquisition system		new	2017-09-27T18:03:05-05:00	2017-09-27T18:03:05-05:00	Vipir is turned on with an IPP of 1500 Km	ryanque
1714	25 Sep 15:00 Antenna VSWR	ISR		2017_09_02 Drifts Meduim Power	Antennas		new	2017-09-25T16:45:45-05:00	2017-09-25T16:45:45-05:00	"      49.72   49.92   50.12
WUp   1.15     1.08    1.30
WDn   1.20     1.02    1.28
NDn   1.19     1.10    1.14
NUp   1.26     1.02    1.06
EUp   1.20     1.07    1.10
EDn   1.20     1.08    1.08
SDn   1.38     1.06    1.32
SUp   1.11     1.05    1.16"	ryanque
1721	26 Sep 20:00 Operation Resume	ISR		2017_09_02 Drifts Meduim Power	General		new	2017-09-27T16:16:52-05:00	2017-09-27T20:15:27-05:00		ryanque
1723	26 Sep 09:50 Reciever	ISR		2017_09_02 Drifts Meduim Power	General		new	2017-09-27T17:51:33-05:00	2017-09-27T17:51:33-05:00	1 dB is attenuated to have same noise in each channel	ryanque
1726	27 Sep 17:17 Imaging On	ISR		2017_09_02 Drifts Meduim Power	General		new	2017-09-27T18:03:50-05:00	2017-09-27T18:03:50-05:00	Imaging experiment on	ryanque
1730	27 Sep 20:00 Operation Resume	ISR		2017_09_02 Drifts Meduim Power	General		new	2017-09-27T20:16:49-05:00	2017-09-27T20:16:49-05:00	"Person in Charge: R. Yanque
Experiment: Medium Power
1) 08:00 - 20:00
2) Operation Hours: 12 h 
3) Operation incomplete:  0 min
4) Reasons:
"	ryanque
1733	28 Sep 07:04 Noise levels	ISR		2017_09_02 Drifts Meduim Power	General	P. Condor	new	2017-09-28T07:57:04-05:00	2017-09-28T07:57:04-05:00	"27-09-2017
22:05
EW-DRIFTS
A:25.93 C:27.17
IMAGING
1:15.95 2:15.12 3:16.07 4:14.84 5:16.03 6:15.95 7:16.07 8:16.06 
28-09-2017
01:28
EW-DRIFTS
A:25.59 C:26.77
IMAGING
1:15.63 2:14.73 3:15.65 4:14.48 5:15.81 6:15.55 7:15.72 8:15.63 
04:10
EW-DRIFTS
A:25.00 C:25.91
IMAGING
1:14.43 2:13.55 3:14.53 4:13.23 5:14.13 6:14.43 7:15.00 8:14.50 
07:04
EW-DRIFTS
A:26.39 C:27.21
IMAGING
1:16.36 2:15.41 3:16.49 4:15.22 5:15.84 6:16.42 7:16.87 8:16.58 
"	pcondor
1736	28 Sep 08:00 Operation Resume	ISR		2017_09_02 Drifts Meduim Power	General	P. Condor	new	2017-09-28T08:30:18-05:00	2017-09-28T08:30:18-05:00	"Person in Charge: P. Condor.
Experiment: drifts Medium power
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
1739	29 Sep 08:00 Operation Resume	ISR		2017_09_02 Drifts Meduim Power	General	AValdez	new	2017-09-29T08:18:47-05:00	2017-09-29T08:18:47-05:00	"Person in Charge: A. Valdez.
Experiment: drifts Medium power
1) 20:00 - 08:00
2) Operation Hours: 00h 50 min
3) Operation incomplete: 11h 10 min
4) Reasons:
 cut off energy"	avaldez
1716	25 sep 23:59 Plots	ISR		2017_09_02 Drifts Meduim Power	Plot	AVALDEZ	new	2017-09-26T01:56:33-05:00	2017-09-26T01:56:33-05:00	Plots of experiment before and after problems and midnight	avaldez
1717	26 Sep 08:00 Operation Resume	ISR		2017_09_02 Drifts Meduim Power	Plot	AVALDEZ	new	2017-09-26T07:22:13-05:00	2017-09-26T07:22:13-05:00	"Person in Charge: A.Valdez.
Experiment: Medium Power
1) 20:00 - 08:00
2) Operation Hours: 10 h 00 min
3) Operation incomplete: 2 hours 0 min
             Problems started  at 21:40 pm
             RC JARS IMAGING  off at 23: 50 pm.
             
4) Reasons:
              Problems RC JARS- IMAGING"	avaldez
1738	29 Sep 00:05 Plots	ISR		2017_09_02 Drifts Meduim Power	Plot	AValdez	new	2017-09-29T07:54:56-05:00	2017-09-29T07:54:56-05:00	Plots of rti, spectrometers and drifts.	avaldez
1731	28 Sep 00:05 Plots	ISR		2017_09_02 Drifts Meduim Power	Process/Analysis Program	P. Condor	new	2017-09-28T02:14:29-05:00	2017-09-28T02:14:29-05:00	Plots of rti, spectrometers and drifts.	pcondor
1735	28 Sep 07:40 Plots	ISR		2017_09_02 Drifts Meduim Power	Process/Analysis Program	P. Condor	new	2017-09-28T08:08:48-05:00	2017-09-28T08:08:48-05:00	Plots of rti, spectrogram and drifts.	pcondor
1729	27 Sep 19:38 Noise Levels	ISR		2017_09_02 Drifts Meduim Power	Reception		new	2017-09-27T20:09:55-05:00	2017-09-27T20:10:20-05:00	"Meduim Power
ChB 2 dB Attenuation
ChA 0 dB Attenuation"	ryanque
1724	26 Sep  20:07 Spark Gaps	ISR		2017_09_02 Drifts Meduim Power	Spark Gaps		new	2017-09-27T17:59:24-05:00	2017-09-27T17:59:24-05:00	"10:49 Spark Gap Adjustment
15:36 Spark Gap Adjustment
20:07 Spark Gap Adjustment"	ryanque
1728	27 Sep 18:04 Spark Gaps	ISR		2017_09_02 Drifts Meduim Power	Spark Gaps		new	2017-09-27T20:08:41-05:00	2017-09-27T20:08:41-05:00	"09:06 Spark Gaps Adjustment
13:21 Spark Gaps Adjustment
18:04 Spark Gaps Adjustment"	ryanque
1734	28 Sep 04:13 Spark gaps adjustment	ISR		2017_09_02 Drifts Meduim Power	Spark Gaps	J. Lavado	new	2017-09-28T07:58:46-05:00	2017-09-28T07:58:46-05:00	"27-09-2017
23:23 Spark gaps adjustment
28-09-2017
04:13 Spark gaps adjustment"	pcondor
1713	25 Sep 09:00 Log Created	ISR		2017_09_02 Drifts Meduim Power	Start experiment		new	2017-09-25T09:23:07-05:00	2017-09-25T09:23:07-05:00	"L. User: P. Condor
Starts: Mon Sep 25 2017
Ends:   Sat Sep 30 2017

Drifts with Meduim Power
2 Drivers, 1 pointing direction with each polarization
1 Driver for Imaging"	ryanque
1715	25 Set 23:20 Transmitter Power Measurements	ISR		2017_09_02 Drifts Meduim Power	Transmitters		new	2017-09-25T23:45:04-05:00	2017-09-25T23:45:04-05:00	"17:30 LV ON
17:50 HV ON
18:00 Power sample (-70 dB coupling)
D1 -8.8 dBm
D2 -5.2 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
19:00 Power sample (-70 dB coupling)
D1 -8.7 dBm
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
20:00 Power sample (-70 dB coupling)
D1 -10.1 dBm
D2 -5.1 dBm
D4 -4.9 dBm
Line Voltage and Power: 4140 VAC, 30 KW
20:05 Spark gaps adjustment
21:00 Power sample (-70 dB coupling)
D1 -8.7 dBm
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
21:42 D1 imaging OFF
22:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
23:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
23:05 Spark gaps adjustment"	vquesada
1718	26 Set 07:00 Transmitter Power Measurements	ISR		2017_09_02 Drifts Meduim Power	Transmitters		new	2017-09-26T07:27:04-05:00	2017-09-26T07:27:04-05:00	"00:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
01:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
02:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
03:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
03:05 Spark gaps adjustment
04:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
05:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
06:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
06:05 Spark gaps adjustment
07:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW"	vquesada
1719	26 Set 23:05 Transmitter Power Measurements	ISR		2017_09_02 Drifts Meduim Power	Transmitters		new	2017-09-26T23:32:25-05:00	2017-09-26T23:32:25-05:00	"20:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
21:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
22:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW
23:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.1 dBm
D4 -5.0 dBm
Line Voltage and Power: 4140 VAC, 30 KW"	vquesada
1720	27 Set 07:00 Transmitter Power Measurements	ISR		2017_09_02 Drifts Meduim Power	Transmitters		new	2017-09-27T07:28:49-05:00	2017-09-27T07:28:49-05:00	"00:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.0 dBm
D4 -4.9 dBm
Line Voltage and Power: 4140 VAC, 40 KW
01:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.0 dBm
D4 -4.9 dBm
Line Voltage and Power: 4140 VAC, 40 KW
02:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.0 dBm
D4 -4.9 dBm
Line Voltage and Power: 4140 VAC, 40 KW
03:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.0 dBm
D4 -4.9 dBm
Line Voltage and Power: 4140 VAC, 40 KW
04:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.0 dBm
D4 -4.9 dBm
Line Voltage and Power: 4140 VAC, 40 KW
05:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.0 dBm
D4 -4.9 dBm
Line Voltage and Power: 4140 VAC, 40 KW
06:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.0 dBm
D4 -4.9 dBm
Line Voltage and Power: 4140 VAC, 40 KW
07:00 Power sample (-70 dB coupling)
D1 -8.1 dBm
D2 -5.0 dBm
D4 -4.9 dBm
Line Voltage and Power: 4140 VAC, 40 KW"	vquesada
1727	27 Sept 19:30 Transmitter report	ISR		2017_09_02 Drifts Meduim Power	Transmitters		new	2017-09-27T19:58:48-05:00	2017-09-27T19:58:48-05:00	"09:00 Power sample (-70 dB coupling)
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4130 VAC
10:00 Power sample (-70 dB coupling)
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4100 VAC
11:00 Power sample (-70 dB coupling)
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4130 VAC
12:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.2 dBm
14:00 Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
Line Voltage and Power: 4100 VAC
15:00 Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
16:00 Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.2 dBm
Line Voltage and Power: 4100 VAC
17:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.1 dBm
17:20 D1 ON ""IMAGING""
18:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4120 VAC
19:00 Power sample (-70 dB coupling)
D1 -8.2 dBm
D2 -5.0 dBm
D4 -5.0 dBm
"	ryaya
1732	28 Sept 07:30 Transmitter report	ISR		2017_09_02 Drifts Meduim Power	Transmitters		new	2017-09-28T07:53:01-05:00	2017-09-28T07:53:01-05:00	"
20:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
21:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
22:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
23:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
00:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
01:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
02:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
03:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
04:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
05:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
06:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
07:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.0 dBm
D4 -5.0 dBm
Line Voltage and Power: 4150 VAC
"	rtadeo
1737	28 Sep 19:30 Transmitter report	ISR		2017_09_02 Drifts Meduim Power	Transmitters		new	2017-09-28T19:59:49-05:00	2017-09-28T19:59:49-05:00	"09:00 Power sample (-70 dB coupling)
D2 -5.0 dBm
D4 -5.1 dBm
Line Voltage and Power: 4120 VAC
10:00 Power sample (-70 dB coupling)
D2 -5.0 dBm
D4 -5.1 dBm
Line Voltage and Power: 4110 VAC
11:00 Power sample (-70 dB coupling)
D2 -5.0 dBm
D4 -5.1 dBm
Line Voltage and Power: 4100 VAC
12:00 Power sample (-70 dB coupling)
D2 -5.0 dBm
D4 -5.0 dBm
14:00 Power sample (-70 dB coupling)
D2 -5.2 dBm
D4 -5.4 dBm
Line Voltage and Power: 4100 VAC
15:00 Power sample (-70 dB coupling)
D2 -5.0 dBm
D4 -5.2 dBm
16:00 Power sample (-70 dB coupling)
D2 -5.1 dBm
D4 -5.3 dBm
Line Voltage and Power: 4100 VAC
17:00 Power sample (-70 dB coupling)
D2 -5.0 dBm
D4 -5.2 dBm
17:33 D1 ON ""IMAGING""
18:00 Power sample (-70 dB coupling)
D1 -8.3 dBm
D2 -5.1 dBm
D4 -5.3 dBm
Line Voltage and Power: 4130 VAC
19:00 Power sample (-70 dB coupling)
D1 -8.2 dBm
D2 -5.0 dBm
D4 -5.1 dBm
Line Voltage and Power: 4120 VAC"	ryaya
1741	19 Oct 17:10 VSWR Antenna	ISR		2017_10_Solar Radar	Antennas		new	2017-10-19T18:21:25-05:00	2017-10-19T18:21:25-05:00	"WUp 1.08
WDn 1.06
NDn 1.09
NUp 1.03
EUp 1.04
EDn 1.07
SDn 1.05
SUp 1.04"	ryanque
1740	19 Oct 17:00 Log created	ISR		2017_10_Solar Radar	Start experiment		new	2017-10-19T18:19:43-05:00	2017-10-19T18:20:12-05:00	"The Solar Radar Campaign:
Starts Wed Oct 25
Ends   Fri Oct 27
3 TX´s 2 ms pulse 5% "	ryanque
1744	15 Nov 06:18 Hydra pass	ISR		2017_11 MIMO	Acquisition system	I. Manay	new	2017-11-15T07:23:37-05:00	2017-11-15T07:31:11-05:00	DSS and drivers were off during an hour, 05:18 to 06:18. The devices were on after 06:18.	imanay
1743	13 Nov 15:10 Antenna VSWR	ISR		2017_11 MIMO	Antennas		new	2017-11-13T16:15:52-05:00	2017-11-13T16:15:52-05:00	"W15:    1.05
Hysell: 1.05"	ryanque
1745	15 Nov 07:00 Temperature of connectors	ISR		2017_11 MIMO	Antennas	J. Lavado	new	2017-11-15T07:38:39-05:00	2017-11-15T07:58:27-05:00	"Temperature of the RG218 connector at the six inch junction was measured:

14 Nov, 22:50 : 30° (W14), ?? (E3)
14 Nov, 22:50 : 20° (W14), ?? (E3)
14 Nov, 22:50 : 18° (W14), 20 (E3)
15 Nov, 01:50 : 19° (W14), 20 (E3)
15 Nov, 04:50 : 20° (W14), 19 (E3)
15 Nov, 07:50 : 20° (W14), 21 (E3)"	imanay
1756	14 Nov 07:54 End Expeirment	ISR		2017_11 MIMO	End experiment		new	2017-11-17T15:26:58-05:00	2017-11-17T15:26:58-05:00		kkuyeng
1758	15 Nov 07:50 End Expeirment	ISR		2017_11 MIMO	End experiment		new	2017-11-17T15:55:34-05:00	2017-11-17T15:55:34-05:00	07:50 Se observó que los sitemas estaban desfasados 10seg. Se aprovecho que el experimento terminó para actualizar la hora en las PCs	kkuyeng
1760	16 Nov 07:35 End Experiment	ISR		2017_11 MIMO	End experiment		new	2017-11-17T17:21:49-05:00	2017-11-17T17:21:49-05:00		kkuyeng
1764	17 Nov 08:00 End  Experiment	ISR		2017_11 MIMO	End experiment		new	2017-11-17T17:26:52-05:00	2017-11-17T17:26:52-05:00	"08:00 se termina experimento
08:16 se prende Digisonda"	kkuyeng
1751	16 Nov 08:00 Operation Resume	ISR		2017_11 MIMO	General	P. Condor	new	2017-11-16T08:23:15-05:00	2017-11-16T08:23:15-05:00	"Person in Charge: P. Condor.
Experiment: MIMO
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
1754	13 Nov 20:00 TR W15 failure	ISR		2017_11 MIMO	General		new	2017-11-17T15:19:09-05:00	2017-11-17T15:19:09-05:00	"20:00 Falla de TR de antena W15, se para transmision para reparar TR.

23:35 Se repara y se reinicia el experimento

"	kkuyeng
1746	15 Nov 07:00 plot	ISR		2017_11 MIMO	Plot	I. Manay	new	2017-11-15T07:41:55-05:00	2017-11-15T07:41:55-05:00		imanay
1748	16 Nov 00:05 Plots	ISR		2017_11 MIMO	Plot	P. Condor	new	2017-11-16T02:17:11-05:00	2017-11-16T02:17:11-05:00	Plots of spectra and rti	pcondor
1752	16 Nov 07:40 Plots	ISR		2017_11 MIMO	Plot	P. Condor	new	2017-11-16T08:24:29-05:00	2017-11-16T08:24:29-05:00	Plots	pcondor
1762	16 Nov 20:15 Noise increased	ISR		2017_11 MIMO	Reception		new	2017-11-17T17:24:25-05:00	2017-11-17T17:24:25-05:00	20:15 En todos los canales subió el nivel de ruido 1dB aproximadamente	kkuyeng
1763	17 Nov 01:15 Noise decreased	ISR		2017_11 MIMO	Reception		new	2017-11-17T17:25:45-05:00	2017-11-17T17:25:45-05:00	01:15 se bajó el nivel de ruido 1dB en todos los canales	kkuyeng
1742	13 Nov 15:00 Log created	ISR		2017_11 MIMO	Start experiment		new	2017-11-13T16:13:51-05:00	2017-11-13T16:14:51-05:00	"Campaign: MIMO
L. User : J. Chau

Starts: 13 Nov 2017
Ends  : 15 Nov 2017

Transmitter: Two drivers (W15 amd Hysell)
"	ryanque
1753	13 Nov 17:00 Start Experiment	ISR		2017_11 MIMO	Start experiment		new	2017-11-17T15:14:44-05:00	2017-11-17T15:14:44-05:00	"Driver 2 Tx RFA CodeA -> Hysell module (Rx channel H)
Driver 4 Tx RFB CodeB -> W15 Up module (Rx channel G)

"	kkuyeng
1755	14 Nov 05:15 - 07:15 Hydra pass	ISR		2017_11 MIMO	Start experiment		new	2017-11-17T15:22:50-05:00	2017-11-17T15:26:06-05:00	"Drivers were off from 05:15 to 07:18. The devices were on after 07:18.

05:21 W15 TR is removed for hydra pass

07:10 W15 TR is reconnected to continue with transmission."	kkuyeng
1757	14 Nov 16:33 Start Experiment	ISR		2017_11 MIMO	Start experiment		new	2017-11-17T15:30:21-05:00	2017-11-17T15:30:21-05:00	"MIMO without TRs

Driver 2 Tx RFA CodeA -> W14 module - only Tx
Driver 4 Tx RFB CodeB -> E3 Up module - only Tx

VSWR   antenna   all-path
W14     1.05       1.10
E3      1.03       1.08"	kkuyeng
1759	15 Nov 17:26 Start Experiment	ISR		2017_11 MIMO	Start experiment		new	2017-11-17T17:20:32-05:00	2017-11-17T17:20:32-05:00	"Se observan interferencias tipo spikes en todo el rango de frecuencia.
Se ha comprobado que es externo.
La intensidad de la interferencia varía dependiendo del canal, de mayor a menor va de H (Hysell) hasta la antena E7 (canal B). El canal A (E4) no ve la interferencia.

No es la bomba de agua ni el wifi del huayco, ya que se apagaron y la interferencia siguió"	kkuyeng
1761	16 Nov 16:30 Start Experiment	ISR		2017_11 MIMO	Start experiment		new	2017-11-17T17:23:18-05:00	2017-11-17T17:23:18-05:00		kkuyeng
1747	15 Nov 07:10 Transmitter power	Other Instruments		2017_11 MIMO	Transmitters		new	2017-11-15T07:56:22-05:00	2017-11-15T07:56:22-05:00	"05:20 transmitter power
Dr2: -6.0 dBm (51Kw) Screen 600V
Dr4: -6.2 dBm (49Kw) Screen 750V
05:20 OFF TX PASS FROM HYDRA
06:20 ON  TX PASS FROM HYDRA
06:25 transmitter power
Dr2: -5.6 dBm (56Kw) Screen 600V
Dr4: -5.9 dBm (52Kw) Screen 760V
"	rtadeo
1749	16 Nov 05:07 Transmitter off	ISR		2017_11 MIMO	Transmitters	P. Condor	new	2017-11-16T08:17:50-05:00	2017-11-16T08:17:50-05:00	Transmitter off	pcondor
1750	16 Nov 06:26 Transmitter on	ISR		2017_11 MIMO	Transmitters	P. Condor	new	2017-11-16T08:18:31-05:00	2017-11-16T08:18:31-05:00	Transmitter on	pcondor
1787	18 Dec 06:06 Imaging off	ISR		2017_12 Convection Polar Cap	Acquisition system	P. Condor	new	2017-12-18T04:49:08-05:00	2017-12-18T04:49:08-05:00	Imaging off	pcondor
1807	19 Dec 17:39 Faraday restart	ISR		2017_12 Convection Polar Cap	Acquisition system		new	2017-12-21T06:03:31-05:00	2017-12-21T06:03:31-05:00	Faraday restart due to loss of sincronization	ryanque
1809	19 Dec 10:17 Faraday Processing stopped	ISR		2017_12 Convection Polar Cap	Acquisition system		new	2017-12-21T06:17:33-05:00	2017-12-21T06:17:33-05:00	"10:17 Faraday processing stopped
10:30 Faraday processing restarted"	ryanque
1769	16 Dic Arcos de malla en la antena	ISR+Imaging		2017_12 Convection Polar Cap	Antennas		new	2017-12-16T16:44:21-05:00	2017-12-16T16:44:21-05:00	"09:38 y 10:05
se apaga un rato el transmisor para sacar la malla enredada en las líneas de transmisión en la antena para que no haga arco.
Se han encontrado 2 varillas que están chispeando, se han marcado para próxima revisión"	kkuyeng
1808	19 Dec 18:41 Spark gap adjustments	ISR		2017_12 Convection Polar Cap	Antennas		new	2017-12-21T06:05:39-05:00	2017-12-21T06:05:39-05:00	"09:11 Spark gap adjustment
12:31 Spark gap adjustment
15:36 Spark gap adjustment
18:41 Spark gap adjustment
"	ryanque
1799	20 Dec 06:00 stop of experiment	ISR		2017_12 Convection Polar Cap	End experiment	I. Manay	new	2017-12-20T03:49:36-05:00	2017-12-20T03:49:36-05:00	Imaging experiment was stopped	imanay
1813	04 Jan FInal Report	ISR		2017_12 Convection Polar Cap	End experiment		new	2018-01-04T14:56:13-05:00	2018-01-04T14:56:13-05:00		ryanque
1775	16 Dic 20:00 Operation Resume	ISR+Imaging		2017_12 Convection Polar Cap	General		new	2017-12-16T17:18:49-05:00	2017-12-16T17:19:14-05:00	"Person in Charge: K.Kuyeng.
Experiment: ISR + Imaging
1) 07:30 - 20:00
2) Operation Hours: 10h 20 min
3) Operation incomplete: 1h 40 min
4) Reasons:
- Falla del divisor de sincronismo
- Fallas en el transmisor
- Retiro de malla de la antena"	kkuyeng
1783	17 Dec 19:50 Operation Resume	ISR		2017_12 Convection Polar Cap	General	I. Manay	new	2017-12-17T17:18:18-05:00	2017-12-19T21:55:54-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 52min
3) Operation incomplete: 41 minutes
4) Reasons:
-Transmitters were off for system revision."	imanay
1785	18 Dec 07:00 Noise levels	ISR		2017_12 Convection Polar Cap	General	P. Condor	new	2017-12-18T04:45:28-05:00	2017-12-18T04:45:28-05:00	"17-12-2017
22:50
EW DRIFTS 
A:22.21 B:21.49 C:22.28 D:21.71 
FARADAY
A:22.04 B:22.65 
IMAGING
1:15.43 2:15.05 3:14.88 4:15.19 5:17.27 6:16.17 7:16.32 8:16.30 

18-12-2017
01:25
EW DRIFTS 
A:23.73 B:23.53 C:23.38 D:23.38 
FARADAY
A:23.82 B:24.40 
IMAGING
1:17.86 2:17.42 3:17.48 4:17.64 5:19.83 6:18.25 7:19.16 8:18.42

04:32
EW DRIFTS 
A:21.88 B:21.18 C:21.94 D:21.57 
FARADAY
A:22.14 B:22.94 
IMAGING
1:15.61 2:15.21 3:15.17 4:15.44 5:17.93 6:16.31 7:16.99 8:16.37

07:00
EW DRIFTS 
A:23.00 B:22.85 C:22.59 D:22.58 
FARADAY
A:22.81 B:23.39 
  "	pcondor
1790	18 Dec 08:00 Operation Resume	ISR		2017_12 Convection Polar Cap	General	P. Condor	new	2017-12-18T05:36:39-05:00	2017-12-18T05:36:39-05:00	"Person in Charge: P. Condor.
Experiment: EW Drifts-Faraday-Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h 00 min
3) Operation incomplete: 00 min
4) Reasons:"	pcondor
1803	20 Dec 07:50 Operation Resume	ISR		2017_12 Convection Polar Cap	General	I. Manay	new	2017-12-20T05:29:04-05:00	2017-12-20T05:29:04-05:00	"Person in Charge: I. Manay.
Experiment: ISR + Imaging
1) 20:00 - 08:00
2) Operation Hours: 12h
3) Operation incomplete: 0 minutes
4) Reasons:
-None."	imanay
1806	19 Dec 17:33 Imaging on	ISR		2017_12 Convection Polar Cap	General		new	2017-12-21T06:02:42-05:00	2017-12-21T06:02:42-05:00	"Imaging experiment starts
"	ryanque
1811	19 Dec 20:00 Operation Resume	ISR		2017_12 Convection Polar Cap	General		new	2017-12-21T06:44:43-05:00	2017-12-21T06:44:43-05:00	"Person in Charge: R. Yanque
Experiment: ISR + Imaging
1) 08:00 - 20:00
2) Operation Hours: 11h 35´
3) Operation incomplete: 25 minutes
4) Reasons:
-Repair of arcing of 20 KV power supply
-Transmitter falls due to crowbar (4 minutes)"	ryanque
1814	08 Jan 11:00 Upload data to PUMA	ISR		2017_12 Convection Polar Cap	General	I. Manay	new	2018-01-08T10:45:55-05:00	2018-01-08T10:45:55-05:00	"ew_drifts: 1730 files, 122 GB
faraday: 682 files, 35.6 GB
imaging: 465 files, 362 GB"	imanay
1776	16 Dec 11:59 plot	ISR+Imaging		2017_12 Convection Polar Cap	Plot	abelleza	new	2017-12-16T21:39:42-05:00	2017-12-16T21:39:42-05:00	"16 Dec 11:59 plot

"	abelleza
1781	17 Dec 18:40 plots	ISR		2017_12 Convection Polar Cap	Plot	I. Manay	new	2017-12-17T16:21:15-05:00	2017-12-19T21:55:33-05:00		imanay
1793	18 Dec 11:59 plot	ISR+Imaging		2017_12 Convection Polar Cap	Plot	abelleza	new	2017-12-19T04:38:33-05:00	2017-12-19T04:38:33-05:00	18 Dec 11:59 plot	abelleza
1798	19 Dec 23:58 plots	ISR		2017_12 Convection Polar Cap	Plot	I. Manay	new	2017-12-19T21:32:22-05:00	2017-12-19T21:53:50-05:00		imanay
1802	20 Dec 07:00 plots	ISR		2017_12 Convection Polar Cap	Plot	I. Manay	new	2017-12-20T04:46:18-05:00	2017-12-20T04:46:18-05:00		imanay
1784	18 Dec 00:05 Plots	ISR		2017_12 Convection Polar Cap	Process/Analysis Program	P. Condor	new	2017-12-17T21:58:54-05:00	2017-12-17T21:58:54-05:00	Plots of rtis, spectras and parameters	pcondor
1789	18 Dec 07:30 Plots	ISR		2017_12 Convection Polar Cap	Process/Analysis Program	P. Condor	new	2017-12-18T05:08:02-05:00	2017-12-18T05:08:02-05:00	Plots of rtis, spectras and parameters.	pcondor
1812	04 Jan Final Faraday Plots	ISR		2017_12 Convection Polar Cap	Process/Analysis Program		new	2018-01-04T14:35:22-05:00	2018-01-04T14:35:22-05:00		ryanque
1768	16 Dic 08:25 Faraday Restart	ISR+Imaging		2017_12 Convection Polar Cap	Reception		new	2017-12-16T16:36:26-05:00	2017-12-16T16:36:26-05:00	Faraday había arrancado mal, se reinicia programa de adquisición.	kkuyeng
1810	19 Dec 19:20 Noise levels	ISR		2017_12 Convection Polar Cap	Reception		new	2017-12-21T06:42:43-05:00	2017-12-21T06:42:43-05:00	"08:03  EW Drift  ChA 23.05   ChB 22.44
                 ChC 22.58   ChD 22.85

       Faraday   ChA 23.64   ChB 22.89

12:25  EW Drift  ChA 28.45   ChB 28.28
                 ChC 27.88   ChD 28.29

       Faraday   ChA 28.55   ChB 29.11

16:08  EW Drift  ChA 23.76   ChB 27.96
                 ChC 23.18   ChD 23.08

       Faraday   ChA 19.22   ChB 19.70

19:20  EW Drift  ChA 23.33   ChB 22.55
                 ChC 22.93   ChD 22.84

       Faraday   ChA 18.56   ChB 19.12

       Imaging   ChA 16.78   ChB 16.05   ChC 16.12
                 ChD 15.87   ChE 15.94   ChF 17.16
                 ChG 17.48   ChH 17.64

"	ryanque
1773	16 Dic  07:00-20:00 Spark Gap calibración	ISR+Imaging		2017_12 Convection Polar Cap	Spark Gaps		new	2017-12-16T17:06:17-05:00	2017-12-16T17:06:17-05:00	"Spark Gap calibración
10:33
14:10
17:10


"	kkuyeng
1778	17 Dec 18:00 Spark-gap adjustment	ISR		2017_12 Convection Polar Cap	Spark Gaps	J. Lavado	new	2017-12-17T16:03:07-05:00	2017-12-19T21:54:28-05:00	"08:40 Spark gaps adjustment
11:32 Spark gaps adjustment
14:37 Spark gaps adjustment
17:55 Spark gaps adjustment"	imanay
1786	18 Dec 06:05 Spark gaps adjustment	ISR		2017_12 Convection Polar Cap	Spark Gaps	W. Rojas	new	2017-12-18T04:48:20-05:00	2017-12-18T04:48:20-05:00	"17-12-2017
21:15 Spark gaps adjustment
18-12-2017
00:05 Spark gaps adjustment
03:05 Spark gaps adjustment
06:05 Spark gaps adjustment"	pcondor
1795	17 Dec 05:32 Spark Gaps	ISR+Imaging		2017_12 Convection Polar Cap	Spark Gaps	abelleza	new	2017-12-19T04:47:11-05:00	2017-12-19T04:47:11-05:00	"
16 Dec 20:39 Spark Gaps Adjustment
16 Dec 23:31 Spark Gaps Adjustment
17 Dec 02:37 Spark Gaps Adjustment
17 Dec 05:32 Spark Gaps Adjustment

By Walter Rojas"	abelleza
1796	19 Dec 06:05 Spark Gaps	ISR+Imaging		2017_12 Convection Polar Cap	Spark Gaps	abelleza	new	2017-12-19T04:49:32-05:00	2017-12-19T04:49:32-05:00	"
18 Dec 21:08 Spark Gaps Adjustment
19 Dec 00:08 Spark Gaps Adjustment
19 Dec 02:56 Spark Gaps Adjustment
19 Dec 06:05 Spark Gaps Adjustment

By Americo Coronado"	abelleza
1800	20 Dec 06:26 Spark-gap adjustment	ISR		2017_12 Convection Polar Cap	Spark Gaps	A. Coronado	new	2017-12-20T04:06:25-05:00	2017-12-20T04:06:25-05:00	"19 Dec, 21:29 Spark gaps adjustment
20 Dec, 00:34 Spark gaps adjustment
20 Dec, 03:36 Spark gaps adjustment
20 Dec, 06:26 Spark gaps adjustment"	imanay
1765	14 Dec 17:30 Log created	ISR		2017_12 Convection Polar Cap	Start experiment		new	2017-12-14T15:10:17-05:00	2017-12-14T15:10:17-05:00	"Campaign: Convection Polar Cap (ISCOD)
Mode: ISR + Imaging
Starts: Sat 16 Dec 2017
Ends:   Wed 20 Dec 2017
L. User: P. Condor"	ryanque
1767	16 Dic 07:49 Start Experiment	ISR+Imaging		2017_12 Convection Polar Cap	Start experiment		new	2017-12-16T16:35:11-05:00	2017-12-16T16:35:11-05:00	"Luego de problemas con el divisor, se llega a arrancar el experimento.

"	kkuyeng
1772	16 Dic 18:09 Start Imaging	ISR+Imaging		2017_12 Convection Polar Cap	Start experiment		new	2017-12-16T16:53:22-05:00	2017-12-16T16:53:22-05:00	Se inicia Imaging	kkuyeng
1780	17 Dec 18:00 Imaging experiment is started	ISR		2017_12 Convection Polar Cap	Start experiment	I. Manay	new	2017-12-17T16:11:45-05:00	2017-12-19T21:55:12-05:00		imanay
1766	16 Dec 19:00 Transmitter Power Measurements	ISR		2017_12 Convection Polar Cap	Transmitters		new	2017-12-16T16:33:54-05:00	2017-12-16T16:33:54-05:00	"06:54   LV  ON
07:07   HV  ON
07:45 TX Power sample (-70 dB coupling)
Tx1 +2.7 dBm
Tx3 +6.4 dBm
Tx4 +2.7/5.0 dBm
Line voltage and power: 4040 VAC, 280 KW
08:30 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.5 dBm
Tx4 +2.7/5.0 dBm
Line voltage and power: 4040 VAC, 280 KW
09:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.5 dBm
Tx4 +2.7/5.0 dBm
Line voltage and power: 4040 VAC, 280 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.5 dBm
Tx4 +2.7/5.0 dBm
Line voltage and power: 4040 VAC, 280 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.5 dBm
Tx4 +2.7/5.0 dBm
Line voltage and power: 4040 VAC, 280 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.5 dBm
Tx4 +2.7/5.0 dBm
Line voltage and power: 4040 VAC, 280 KW
12:15 RF control fails
13:00 TX Power sample (-70 dB coupling)
Tx1 +2.7 dBm
Tx3 +6.5 dBm
Tx4 +2.7/5.0 dBm
Line voltage and power: 4040 VAC, 280 KW
14:00 TX Power sample (-70 dB coupling)
Tx1 +2.7 dBm
Tx3 +6.5 dBm
Tx4 +2.7/5.0 dBm
Line voltage and power: 4040 VAC, 280 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +2.7 dBm
Tx3 +6.5 dBm
Tx4 +2.7/5.0 dBm
Line voltage and power: 4040 VAC, 280 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +2.9 dBm
Tx3 +6.5 dBm
Tx4 +2.7/5.2 dBm
Line voltage and power: 4040 VAC, 280 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +2.9 dBm
Tx3 +6.5 dBm
Tx4 +2.7/5.2 dBm
Line voltage and power: 4040 VAC, 280 KW
17:28 Overcurrent in the Tx3 screen source
18:06 Txs Ok.
18:10 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
D2  -7.1 dBm
Line voltage and power: 4040 VAC, 280 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +2.8 dBm
D2  -7.1 dBm





"	vquesada
1770	16 Dic 12:15 - 12:55 Falla de control en TX	ISR+Imaging		2017_12 Convection Polar Cap	Transmitters		new	2017-12-16T16:46:48-05:00	2017-12-16T16:46:48-05:00	"Se ve que el control de la RF por PLC no est{a funcionando ya que hace que una fuente de 5VDC se chupe a 2.5VDC.
Por ahora no se est{a usando el control y la habilitaci{on de la RF se est{a haciendo manualmente."	kkuyeng
1771	16 Dic 17:30 - 18:07 Fallal en TX	ISR+Imaging		2017_12 Convection Polar Cap	Transmitters		new	2017-12-16T16:52:35-05:00	2017-12-16T16:52:35-05:00	No quería entrar el voltaje de alta	kkuyeng
1777	17 Dec 07:00 Transmitter Power Measurements	ISR+Imaging		2017_12 Convection Polar Cap	Transmitters		new	2017-12-17T04:58:12-05:00	2017-12-17T04:58:12-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +2.9 dBm
Dr2 -7.1 dBm
Line voltage and power: 4040 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +2.9 dBm
Dr2 -7.0 dBm
Line voltage and power: 4040 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +2.9 dBm
Dr2 -7.0 dBm
Line voltage and power: 4040 VAC, 280 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +2.9 dBm
Dr2 -7.0 dBm
Line voltage and power: 4040 VAC, 280 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +2.9 dBm
Dr2 -7.0 dBm
Line voltage and power: 4040 VAC, 280 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +2.9 dBm
Dr2 -7.0 dBm
Line voltage and power: 4040 VAC, 280 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +3.0 dBm
Dr2 -6.8 dBm
Line voltage and power: 4050 VAC, 280 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +3.0 dBm
Dr2 -6.8 dBm
Line voltage and power: 4050 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +3.0 dBm
Dr2 -6.8 dBm
Line voltage and power: 4050 VAC, 280 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +3.0 dBm
Dr2 -6.8 dBm
Line voltage and power: 4050 VAC, 280 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +3.0 dBm
Dr2 -6.8 dBm
Line voltage and power: 4050 VAC, 280 KW
07:00 Imaging OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.4 dBm
Tx4 +3.0/+5.3 dBm
Line voltage and power: 4060 VAC, 280 KW
"	rtadeo
1779	17 Dec 18:00 Experiment without transmitters	ISR		2017_12 Convection Polar Cap	Transmitters	I. Manay	new	2017-12-17T16:10:41-05:00	2017-12-19T21:54:52-05:00	"Two main falls until 18h00:

1. From 08:22 to 08:27, Fail at transmitters.

2. From 12:30 to 13:06, Transmitters were off for system revision. It was requested for transmitter monitor and implemented during peak-galaxy pass."	imanay
1782	17 Dec 19:40 Transmitter report	ISR		2017_12 Convection Polar Cap	Transmitters		new	2017-12-17T17:14:23-05:00	2017-12-17T17:15:35-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.3 dBm
Tx4 +2.8/5.2 dBm
Line voltage and power: 4000 VAC, 280 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.2 dBm
Tx4 +2.8/5.2 dBm
Line voltage and power: 4050 VAC, 280 KW
11:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.3 dBm
Tx4 +2.8/5.2 dBm
Line voltage and power: 4020 VAC, 280 KW
12:00 TX Power sample (-70 dB coupling)
Tx1 +2.8 dBm
Tx3 +6.2 dBm
Tx4 +2.8/5.2 dBm
12:25 HV OFF, restart system to fix RF control failure
13:06 HV ON, RF ON
14:00 TX Power sample (-70 dB coupling)
Tx1 +2.7 dBm
Tx3 +6.2 dBm
Tx4 +2.7/5.2 dBm
Line voltage and power: 4030 VAC, 280 KW
15:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.1 dBm
Tx4 +2.6/5.2 dBm
Line voltage and power: 4000 VAC, 280 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.0 dBm
Tx4 +2.6/5.2 dBm
Line voltage and power: 4000 VAC, 280 KW
17:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.1 dBm
Tx4 +2.6/5.2 dBm
17:50 D2 ON ""IMAGING""
18:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.1 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line voltage and power: 4000 VAC, 280 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.2 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line voltage and power: 4000 VAC, 280 KW"	ryaya
1788	18 Dec 07:00 Transmitter Power Measurements	ISR+Imaging		2017_12 Convection Polar Cap	Transmitters		new	2017-12-18T04:56:03-05:00	2017-12-18T04:56:03-05:00	"17/12/17
20:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.2 dBm
Tx4 +2.6 dBm
Dr2 -7.0 dBm
Line voltage and power: 4000 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.3 dBm
Tx4 +2.5 dBm
Dr2 -7.1 dBm
Line voltage and power: 4040 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.3 dBm
Tx4 +2.5 dBm
Dr2 -7.1 dBm
Line voltage and power: 4040 VAC, 280 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.3 dBm
Tx4 +2.5 dBm
Dr2 -7.1 dBm
Line voltage and power: 4040 VAC, 280 KW
00:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.3 dBm
Tx4 +2.5 dBm
Dr2 -7.1 dBm
Line voltage and power: 4040 VAC, 280 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.3 dBm
Tx4 +2.5 dBm
Dr2 -7.1 dBm
Line voltage and power: 4040 VAC, 280 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.3 dBm
Tx4 +2.5 dBm
Dr2 -7.1 dBm
Line voltage and power: 4040 VAC, 280 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.7 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
Dr2 -7.0 dBm
Line voltage and power: 4070 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +2.7 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
Dr2 -7.0 dBm
Line voltage and power: 4070 VAC, 280 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 +2.7 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
Dr2 -7.0 dBm
Line voltage and power: 4070 VAC, 280 KW
06:00 OFF IMAGING
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.7 dBm
Tx3 +6.4 dBm
Tx4 +2.7/+5.0 dBm
Line voltage and power: 4070 VAC, 280 KW
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.7 dBm
Tx3 +6.4 dBm
Tx4 +2.7/+5.0 dBm
Line voltage and power: 4070 VAC, 280 KW
"	rtadeo
1791	18 Dec 19:30 Transmitter report	ISR		2017_12 Convection Polar Cap	Transmitters		new	2017-12-18T17:05:39-05:00	2017-12-18T17:05:39-05:00	"09:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.3 dBm
Tx4 +2.6/5.2 dBm
Line voltage and power: 4010 VAC, 280 KW
10:00 TX Power sample (-70 dB coupling)
Tx1 +2.7 dBm
Tx3 +6.1 dBm
Tx4 +2.7/5.2 dBm
Line voltage and power: 4030 VAC, 280 KW
10:53 PA 1 control failure
11:10 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.1 dBm
Tx4 +2.7/5.2 dBm
12:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.1 dBm
Tx4 +2.6/5.2 dBm
12:50 HV OFF - Antenna request
13:14 HV ON
14:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.1 dBm
Tx4 +2.6/5.2 dBm
Line voltage and power: 4000 VAC, 280 KW
14:17 PA 1 control failure
15:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.2 dBm
Tx4 +2.7/5.2 dBm
Line voltage and power: 4070 VAC, 280 KW
16:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.2 dBm
Tx4 +2.7/5.2 dBm
17:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.2 dBm
Tx4 +2.6/5.2 dBm
Line voltage and power: 4000 VAC, 280 KW
17:40 D2 ON ""IMAGING""
18:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.2 dBm
Tx4 +2.8 dBm
D2 -7.0 dBm
Line voltage and power: 4030 VAC, 280 KW
19:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.2 dBm
Tx4 +2.8 dBm
D2 -7.0 dBm
"	ryaya
1792	18 Dec 20:00 Transmitter Power Measurements	ISR	JRO Staff	2017_12 Convection Polar Cap	Transmitters		new	2017-12-18T20:35:09-05:00	2017-12-18T20:35:09-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.2 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line voltage and power: 4040 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.2 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line voltage and power: 4040 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.2 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line voltage and power: 4040 VAC, 280 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.2 dBm
Tx4 +2.6 dBm
D2 -7.0 dBm
Line voltage and power: 4040 VAC, 280 KW"	vquesada
1794	19 Dec 07:10 Transmitter Power Measurements	ISR	JRO Staff	2017_12 Convection Polar Cap	Transmitters		new	2017-12-19T04:44:35-05:00	2017-12-19T04:44:35-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
D2 -6.9 dBm
Line voltage and power: 4050 VAC, 280 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
D2 -6.9 dBm
Line voltage and power: 4050 VAC, 280 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
D2 -6.9 dBm
Line voltage and power: 4050 VAC, 280 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
D2 -6.9 dBm
Line voltage and power: 4050 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 +2.6 dBm
Tx3 +6.4 dBm
Tx4 +2.6 dBm
D2 -6.9 dBm
Line voltage and power: 4050 VAC, 280 KW
04:45 Crowbar
05:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.6 dBm
D2 -6.9 dBm
Line voltage and power: 4070 VAC, 280 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.6 dBm
D2 -6.9 dBm
Line voltage and power: 4070 VAC, 280 KW
06:55 Driver 2 OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 +2.5 dBm
Tx3 +6.5 dBm
Tx4 +2.6/5.0 dBm
Line voltage and power: 4070 VAC, 280 KW"	vquesada
1797	19 Dec 23:05 Transmitter Power Measurements	ISR	JRO Staff	2017_12 Convection Polar Cap	Transmitters		new	2017-12-19T20:40:50-05:00	2017-12-19T20:40:50-05:00	"20:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 8 Kw
D2 1.24 Vpp
Line voltage and power: 4050 VAC, 280 KW
21:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 8 Kw
D2 1.24 Vpp
Line voltage and power: 4050 VAC, 280 KW
22:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 8 Kw
D2 1.24 Vpp
Line voltage and power: 4050 VAC, 280 KW
23:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 8 Kw
D2 1.24 Vpp
Line voltage and power: 4050 VAC, 280 KW"	vquesada
1801	20 Dec 07:08 Transmitter Power Measurements	ISR		2017_12 Convection Polar Cap	Transmitters		new	2017-12-20T04:42:55-05:00	2017-12-20T04:42:55-05:00	"00:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 8 Kw
D2 1.24 Vpp
Line voltage and power: 4050 VAC, 280 KW
01:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 8 Kw
D2 1.24 Vpp
Line voltage and power: 4050 VAC, 280 KW
02:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 8 Kw
D2 1.24 Vpp
Line voltage and power: 4050 VAC, 280 KW
03:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 8 Kw
D2 1.24 Vpp
Line voltage and power: 4050 VAC, 280 KW
04:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 8 Kw
D2 1.24 Vpp
Line voltage and power: 4060 VAC, 280 KW
05:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 8 Kw
D2 1.24 Vpp
Line voltage and power: 4060 VAC, 280 KW
06:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 8 Kw
D2 1.24 Vpp
Line voltage and power: 4060 VAC, 280 KW
06:08 Driver 2 OFF
07:00 TX Power sample (-70 dB coupling)
Tx1 9 Kw
Tx3 10 Kw
Tx4 10/12 Kw
Line voltage and power: 4050 VAC, 280 KW"	vquesada
1804	19 Dec 12:06 Transmitter off	ISR		2017_12 Convection Polar Cap	Transmitters		new	2017-12-21T06:00:35-05:00	2017-12-21T06:00:35-05:00	"Due to an arc in one of the 20 KV power line
This was corrected
12:25 Transmitter on"	ryanque
1805	19 Dec 17:32 Transmitter on	ISR		2017_12 Convection Polar Cap	Transmitters		new	2017-12-21T06:01:49-05:00	2017-12-21T06:01:49-05:00	"13:18 Transmitter off
13:20 Trnasmitter on

17:29 Transmitter off
17:32 Transmitter on"	ryanque
5	13 Jan 13:30 Change of DDS	ISR		2015_01 VIPIR + Topside	Break Experiment	I. Manay	new	2015-01-13T19:57:15-05:00	2015-01-13T19:57:15-05:00	It was found that two channels of the DDS were not coding properly, so it was changed. This change was implemented at 13:30.	imanay
25	16 Jan 11:00 Tests after the end of experiment	ISR		2015_01 VIPIR + Topside	General	I. Manay	new	2015-01-19T09:35:13-05:00	2015-01-20T08:51:02-05:00	Because channels C and D suddenly behaved weird (See coherence plot in Figure 1), a test was implemented after the end of the experiment: Two pairs of hybrid inputs were exchanged, the one that generates the A and B channels were exchanged with the one that generates the C and D channels. According to Figure 2, the problem found in the CD coherence plot, it is showed at the AB coherence plot now. A VSWR measure of the antenna showed that it had not problem, also ues lines were checked and they were ok. Only a part of the ATR was pending to check.	imanay
159	26 Mar 13:23 Stop power transmission	ISR		2015_03 ISR + Imaging CNOFS Support	Break Experiment	dcordova	assigned	2015-03-26T19:00:28-05:00	2015-03-26T19:38:11-05:00	"Because of a failure in the water pump, we have to stpo thw power transmission.
One of the phases of low pressure water-pump showed  high current, compared with the other phases, so this activated the current protection of this pump, besides generated a signal alarm in the transmitter control program.
The currents that we measured when the pump is turn on are(A): 55,53, 71
Then, we changed the pump for another, the currents that we measured when the pump is turn on are(A): 54,54, 54
The voltages in the pump are 470VAC
"	dcordova
162	26 Mar 16:25 Problem in channel A was corrected	ISR		2015_03 ISR + Imaging CNOFS Support	Reception	dcordova	assigned	2015-03-26T19:12:10-05:00	2015-03-26T19:37:23-05:00	"The problem in channel A was located in the spark-gaps, A.Coronado calibrated the spark gaps and the problem was solved.
Then, start the normal radar operation"	dcordova
157	26 Mar 16:42RW Pump failure	ISR		2015_03 ISR + Imaging CNOFS Support	Transmitters		new	2015-03-26T16:44:26-05:00	2015-03-26T16:44:26-05:00	"13:26 RW Pump failure
15:30 RW Pump is replaced by an repaired.
16:00 LV ON
16:20 HV ON
16:25 TXs OK.
"	vquesada
292	08 Jun 17:50 Report of the experiment	ISR		2015_06 Valley Experiment	Start experiment	I. Manay	new	2015-06-08T17:59:02-05:00	2015-06-08T18:01:32-05:00	Experiment started at 16:30 but a weird behaviour was found at the switchyard: Six inches coaxial line looks like it was charged.	imanay
386	16 Jul 08:30 Channel B Noise problem	ISR		2015_07_1 Support CNOFS	General		new	2015-07-16T18:28:22-05:00	2015-07-16T18:28:22-05:00	"From 00:50 to 08:30 there is a noise fluctuation in channel B.
This was fixed reconnecting the cables of channel B.
It looks like it stared with the Spark Gap adjustment, only channel B was affected."	ryanque
405	21 Jul 21:33 Stop Acquisition Faraday	ISR		2015_07_2 Support ISR School	Acquisition system	P. Condor	new	2015-07-21T09:55:15-05:00	2015-10-15T13:06:37-05:00	Faraday acquisition stopped due to reset of PC	pcondor
1080	09 May 10:00 Data not good for LP Farday experiment	ISR		2016_04_1 LP Farday - Hysell	End experiment		new	2016-05-16T11:42:58-05:00	2016-05-16T11:42:58-05:00	"The data recolected for this campaign is not good.

Problems:
- ATR´s not correctly matched.
- There is some pulse transmitted at the ending of the pulse.
- There are some issues at 7,500 Km
- The sampling of the transmitter didn´t start from height 0.

Work is done to fix all these problems and a new campaign is going to be scheduled."	ryanque
1512	18 Apr 12:05 Change of Length´s of U	ISR		2017_04 MST-ISR-EEJ	Antennas		new	2017-04-25T16:04:50-05:00	2017-04-25T16:04:50-05:00	"The pointing of the antenna was considering the length of the U´s in meters.
When the length of U´s where in lambda fourths.

The U´s where changed to the correct value"	ryanque
1489	20 Apr 04:05 Filter changed	ISR		2017_04 MST-ISR-EEJ	General	I. Manay	new	2017-04-19T14:07:37-05:00	2017-04-25T16:01:34-05:00	"5 minutes cut of the experiment due to data disk change. 

Also a improved digital filter were set up."	imanay
1577	31 Aug 09:00 Final Report	ISR+Imaging		2017_07_ISR School	General	P. Condor	new	2017-08-02T07:29:51-05:00	2017-08-31T10:12:34-05:00	"Final Report
Operativity"	ryanque
1623	31 Aug 09:00 Final Report	ISR+Imaging		2017_08 Eclipse Aug 21	General		new	2017-08-31T10:13:40-05:00	2017-08-31T10:13:40-05:00	"Final Report
Operativity"	ryanque
1722	26 Sep 09:30 Radar down	ISR		2017_09_02 Drifts Meduim Power	General		new	2017-09-27T17:43:35-05:00	2017-09-27T17:43:35-05:00	"The radar was down due to the following:
Change of the hard disk for the acquisition system
Cut of the trees near the antena
Putting back Module G for transmission
09:50 Radar on"	ryanque