#245 |
25 May 20:00 Log created
|
|
Start experiment
|
normal
|
ISR
|
|
#247 |
25 May 21:00 Antenna VSWR
|
|
Antennas
|
normal
|
ISR
|
|
#249 |
26 May 19:00 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
|
#250 |
25 May 22:25 EW Drift
|
|
Process/Analysis Program
|
normal
|
ISR
|
|
#251 |
25 May 23:10 TX 4
|
|
Transmitters
|
normal
|
ISR
|
|
#252 |
25 May 23:41 Faraday attenuation
|
|
Reception
|
normal
|
ISR
|
|
#253 |
26 May 06:30 Spark Gaps Adjustment
|
|
Spark Gaps
|
normal
|
ISR
|
|
#254 |
26 May 08:00 Operation Resume
|
|
General
|
normal
|
ISR
|
|
#256 |
26 May 15:36 Spark Gap calibration
|
|
Spark Gaps
|
normal
|
ISR
|
|
#257 |
26 May 17:49 EW Drift Acquisition stops
|
|
Acquisition system
|
normal
|
ISR
|
|
#258 |
26 May 18:12 Changes in Imaging
|
|
Reception
|
normal
|
ISR
|
|
#259 |
26 May 18:54 Faraday attenuation
|
|
Reception
|
normal
|
ISR
|
|
#260 |
26 May 20:00 Operation Resume
|
|
General
|
normal
|
ISR
|
|
#261 |
26 May 23:59 Plots of rtis and spectras
|
|
Plot
|
normal
|
ISR+Imaging
|
|
#262 |
27 May 00:10 Imaging experiment stopped by us.
|
|
Acquisition system
|
normal
|
ISR+Imaging
|
|
#263 |
27 May 01:10 Spark Gap calibration
|
|
Spark Gaps
|
normal
|
ISR+Imaging
|
|
#264 |
27 May 04:20 Some interference detected on channel A of EW Drift
|
|
Reception
|
normal
|
ISR+Imaging
|
|
#265 |
27 May 04:40 Spark Gap calibration
|
|
Spark Gaps
|
normal
|
ISR+Imaging
|
|
#266 |
27 May 05:10 Changing T/R from the channel 1 (A) from EW_Drift
|
|
Reception
|
normal
|
ISR+Imaging
|
|
#267 |
27 May 05:17 Wrong T/R changed, fixing the error now.
|
|
Reception
|
normal
|
ISR+Imaging
|
|
#268 |
27 May 05:28 Interference persist on the channel A
|
|
Reception
|
normal
|
ISR+Imaging
|
|
#269 |
27 May 05:37 Changing channel A T/R load.
|
|
Reception
|
normal
|
ISR+Imaging
|
|
#270 |
27 May 05:40 Interference is gone.
|
|
Reception
|
normal
|
ISR+Imaging
|
|
#271 |
27 May 07:00 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR+Imaging
|
|
#272 |
27 May 07:30 Spark Gap calibration
|
|
Spark Gaps
|
normal
|
ISR+Imaging
|
|
#273 |
27 May 23:32 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
|
#274 |
27 May 23:59 Plots of the experiment
|
|
Plot
|
normal
|
ISR+Imaging
|
JRO Staff
|
#275 |
28 May 00:40 Imaging experiment stopped by us.
|
|
Acquisition system
|
normal
|
ISR
|
|
#276 |
28 May 07:00 Spark Gaps Adjustment
|
|
Spark Gaps
|
normal
|
ISR
|
|
#277 |
28 May 07:00 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
|
#278 |
28 May 08:00 Operation Resume
|
|
General
|
normal
|
ISR
|
|
#279 |
28 May 19:00 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR+Imaging
|
|
#280 |
28 May 23:00 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
|
#281 |
28 May 22:14 Ch A-EW_drifts TR is changed
|
P. Condor
|
Reception
|
normal
|
ISR
|
|
#282 |
28 May 24:00 Plots of Rtis and spectras
|
P. Condor
|
Process/Analysis Program
|
normal
|
ISR
|
|
#283 |
29 May 07:30 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
|
#284 |
29 May 00:36 Imaging Off
|
P. Condor
|
Acquisition system
|
normal
|
ISR
|
|
#285 |
29 May 04:36 Ch A Faraday is attenuated 1 db
|
P. Condor
|
Reception
|
normal
|
ISR
|
|
#286 |
29 May 06:57 Spark gaps adjustment
|
A. Coronado
|
Spark Gaps
|
normal
|
ISR
|
|
#287 |
29 May 08:00 Operation Resume
|
P. Condor
|
General
|
normal
|
ISR
|
|
#288 |
25 May 8:17 Channel B was attenuated in DRIFTS
|
|
Reception
|
normal
|
ISR
|
|
#289 |
25 May 10:20 Spark gap calibration in TR's and ATR's
|
Americo Huamani
|
Spark Gaps
|
normal
|
ISR
|
|
#290 |
26 May 10:50 Interference in channel A
|
|
Reception
|
normal
|
ISR
|
|
#297 |
26 May 00:38 Reset Pc Ares
|
P. Condor
|
Acquisition system
|
normal
|
ISR
|
|
#299 |
25 May 23:59 Plots rtis and spectras.
|
P. Condor
|
Process/Analysis Program
|
normal
|
ISR
|
|
#300 |
25 May 23:26 Change of cable ChB
|
P. Condor
|
Acquisition system
|
normal
|
ISR
|
|
#301 |
25 May 22:20 Test in Channel B and D -EW_Drifts
|
P. Condor
|
Acquisition system
|
normal
|
ISR
|
|
#302 |
25 May 22:15 Change of TR -Faraday
|
P. Condor
|
Acquisition system
|
normal
|
ISR
|
|
#303 |
26 May 07:59 Operation Resume
|
P. Condor
|
General
|
normal
|
ISR
|
|