﻿id	summary	status	owner	type	milestone	priority
1	12 Jan 10:35 Log created	new	ryanque	Start experiment	2015_01 VIPIR + Topside	normal
2	13 Jan 19:00 Transmitter power measurements	new		Transmitters	2015_01 VIPIR + Topside	normal
3	12 Jan 17:59 Antenna results	new	W. Rojas	Antennas	2015_01 VIPIR + Topside	normal
4	13 Jan 07:55 Start of the experiment	new	I. Manay	Start experiment	2015_01 VIPIR + Topside	normal
6	13 Jan 13:30 Spark-gaps adjustment	new	W. Rojas	Spark Gaps	2015_01 VIPIR + Topside	normal
7	13 Jan 20:00 Stop of the experiment	new	I. Manay	Break Experiment	2015_01 VIPIR + Topside	normal
8	14 Jan 06:54  Start of the experiment	new		Start experiment	2015_01 VIPIR + Topside	normal
9	14 Jan 07:19   Transmitter falls	new		Transmitters	2015_01 VIPIR + Topside	normal
10	14 Jan 09:02 Experiment  Configuration change	new		Acquisition system	2015_01 VIPIR + Topside	normal
11	14 Jan 09:48 Spark Gaps Adjustment	new		Spark Gaps	2015_01 VIPIR + Topside	normal
12	14 Jan 13:20 Spark Gaps adjustment	new		Spark Gaps	2015_01 VIPIR + Topside	normal
13	14 Jan 16:02 Spark Gaps adjustment	new		Spark Gaps	2015_01 VIPIR + Topside	normal
14	14 Jan 17:30 Problems with Channel C or D Stop the experiment	new		General	2015_01 VIPIR + Topside	normal
15	14 Jan 19:15 Spark Gaps adjustment	new		Spark Gaps	2015_01 VIPIR + Topside	normal
16	14 Jan 20:00   Spread F start	new		Physical Phenomena	2015_01 VIPIR + Topside	normal
17	14 Jan 21:00 Coherence 32 Short Pulse   Problem durind the day	new		Plot	2015_01 VIPIR + Topside	normal
18	14 Jan 23:00 Transmitter Power Measurements	new		Transmitters	2015_01 VIPIR + Topside	normal
19	14 Jan 23:33  End of Experiment 150 km Jicamarca	new	AValdez	General	2015_01 VIPIR + Topside	normal
20	15 Jan 07:22 Re-start of the experiment	new	I. Manay	Start experiment	2015_01 VIPIR + Topside	normal
21	15 Jan 07:33 Adjustment at transmitter	new	I. Manay	Transmitters	2015_01 VIPIR + Topside	normal
22	15 Jan 08:00 Events at A, B, G and H channels	new	I. Manay	General	2015_01 VIPIR + Topside	normal
23	15 Jan 19:00 Transmitter Power Measurements	new		Transmitters	2015_01 VIPIR + Topside	normal
24	15 Jan 19:29 spark-gap adjustments	new	I. Manay	Spark Gaps	2015_01 VIPIR + Topside	normal
26	19 Jan 14:30 Experiment manual	new	I. Manay	General	2015_01 VIPIR + Topside	normal
27	04 Feb 08:10 Operation Resumen	new	avaldez	General	2015_01 VIPIR + Topside	normal
28	09 Feb 11:58 Log created	new		Start experiment	2015_02 ISR + Imaging (ISCOD)	normal
29	09 Feb 12:19 Antenna VSWR	new	ryanque	Antennas	2015_02 ISR + Imaging (ISCOD)	normal
30	10 Feb 07:12 Spark gap summary	new	A. Coronado	Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
31	10 Feb 07:15 Start of the experiment	new	I. Manay	Start experiment	2015_02 ISR + Imaging (ISCOD)	normal
32	10 Feb 08:00 Transmitters fall twice	new	I. Manay	Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
33	10 Feb 12:30 Increase of the noise level	new	I. Manay	Plot	2015_02 ISR + Imaging (ISCOD)	normal
34	10 Feb 17:40 Interference was observed	new	I. Manay	Plot	2015_02 ISR + Imaging (ISCOD)	normal
35	10 Feb 17:45 Transmitters fall	new	I. Manay	Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
36	10 Feb 18:00 Imaging experiment is started	new	I. Manay	Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
37	10 Feb 18:08 PC Ares is restarted	new	I. Manay	Reception	2015_02 ISR + Imaging (ISCOD)	normal
38	10 Feb 19:30 Transmitter Power Measurements	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
39	10 Feb 19:59 Operation resume	new	I. Manay	General	2015_02 ISR + Imaging (ISCOD)	normal
40	10 Feb 23:10 Transmitter Power Measurements	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
41	11 Feb 06:15 Spark gap summary	new	AVALDEZ	Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
42	11 Feb 07:00 Transmitter Power Measurements	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
43	11 Feb 07:00 Figures of Experiment	new		Plot	2015_02 ISR + Imaging (ISCOD)	normal
44	11 Feb 06:15 Problems with channel E	new	AVALDEZ	Reception	2015_02 ISR + Imaging (ISCOD)	normal
45	11 Feb 08:00 Operation Resume	new	AVALDEZ	General	2015_02 ISR + Imaging (ISCOD)	normal
46	11 Feb 08:37 Channel E issues	assigned	A. Aguilar	Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
47	11 Feb 09:55 Spark gaps adjustment	new	A. Aguilar	Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
48	11 Feb 19:25 Transmitter power measurement	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
49	11 Feb 11:11 Lost of data	new	A. Aguilar	Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
50	11 Feb 12:20 Sun appears in data	new	A. Aguilar	Physical Phenomena	2015_02 ISR + Imaging (ISCOD)	normal
51	11 Feb 14:14 Spark Gaps adjustment	new	A. Aguilar	Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
52	11 Feb 17:40  Imaging Experiment was started	new	A. Aguilar	Start experiment	2015_02 ISR + Imaging (ISCOD)	normal
53	11 Feb 18:05 Spark Gaps Adjustment	new	A. Aguilar	Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
54	11 Feb 18:49 Transmitters go down	new	A. Aguilar	Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
55	11 Feb 19:52 Operation Resume	new	A. Aguilar	General	2015_02 ISR + Imaging (ISCOD)	normal
56	11 Feb 23:00 Transmitter Power Measurements	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
57	11 Feb 20:31 Problem with PC ARES	new		Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
58	11 Feb 20:32  Faraday Desincronization	new		Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
59	11 Feb 20:32 Restart EW_Drift	new		Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
60	11 Feb 20:40 Restart Faraday	new		Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
61	11 Feb 23:00 Plots of rti and spectra	new		Process/Analysis Program	2015_02 ISR + Imaging (ISCOD)	normal
62	12 Feb 01:40 OFF Imaging	new		Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
63	12 Feb 03:30 Tx Off	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
64	12 Feb 06:20 Moon Pass	new		General	2015_02 ISR + Imaging (ISCOD)	normal
65	12 Feb 06:15 Spark gaps adjustment	new		Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
66	12 Feb 23:00 Transmitter Power Measurements	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
67	12 Feb 07:59 Operation Resume	new		General	2015_02 ISR + Imaging (ISCOD)	normal
68	12 Feb 19:55 Transmitter power measurements	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
69	12 Feb 22:20 Spark gaps adjustment	new		Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
70	13 Feb 00:02 Plots of rti and spectra	new		Plot	2015_02 ISR + Imaging (ISCOD)	normal
71	13 Feb 07:30 Transmitter power measurements	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
72	13 Feb 00:30 Imaging system shut down, EW drift RF signal reconnected	new		Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
73	13 Feb 00:35 Internet conection intermitent, uploaded plots aren´t great or take too much time to upload	new		Plot	2015_02 ISR + Imaging (ISCOD)	normal
74	13 Feb 02:10 Spark gaps adjustment	new		Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
75	13 Feb 06:20 Spark gaps adjustment	new		Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
76	13 Feb 12:15 Interference was observed	new		Plot	2015_02 ISR + Imaging (ISCOD)	normal
77	13 Feb 17:45 Imaging experiment was started	new		Start experiment	2015_02 ISR + Imaging (ISCOD)	normal
78	13 Feb 18:01 Spark Gaps Adjustment	new		Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
79	13 Feb 19:20 Transmitter Power Measurements	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
80	13 Feb 19:59 Operation Resume	new		General	2015_02 ISR + Imaging (ISCOD)	normal
81	13 Feb 23:59 Experiment plots	new	I. Manay	Plot	2015_02 ISR + Imaging (ISCOD)	normal
82	14 Feb 01:30 Imaging experiment is finished	new	I. Manay	Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
83	14 Feb 03:30 Transmitters fall	new	I. Manay	Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
84	14 Feb 06:30 Spark gaps summary	new	J. Lavado	Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
85	14 Feb 07:59 Operation resume	new	I. Manay	General	2015_02 ISR + Imaging (ISCOD)	normal
86	14 Feb 19:10 Spark gaps summary	new	AVALDEZ	Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
87	14 Feb 11:50 Attenuation Channel E	new	AVALDEZ	Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
88	14 Feb 19:25 Transmitter power measurement	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
89	14 Feb 22:40 Restart Adquisition	new	P.Condor	Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
90	14 Feb 23:55 Transmitter Power Measurements	new		Start experiment		normal
91	15 Feb 07:05 Transmitter Power Measurements	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
92	14 Feb 19:45 Restart Digisonde	new	P. Condor	Other Instruments	2015_02 ISR + Imaging (ISCOD)	normal
93	14 Feb 19:50 Faraday Desynchronization	new	P. Condor	Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
94	14 Feb 20:10 Problem with Faraday and EW_Drifts	new	P. Condor	General	2015_02 ISR + Imaging (ISCOD)	normal
95	14 Feb 20:43 Problem with Transmitter	new	P. Condor	Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
96	14 Feb 22:00 The problem was the pulse of EW_Drifts	new	P. Condor	Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
97	14 Feb 22:40 Restart Acquisition	new	P. Condor	Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
98	14 Feb 23:59 Plots of rti, noise  and others	new	P. Condor	Process/Analysis Program	2015_02 ISR + Imaging (ISCOD)	normal
99	15 Feb 02:07 Imaging OFF	new	P. Condor	Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
100	14 Feb 23:58 Plot Imaging	new		Process/Analysis Program	2015_02 ISR + Imaging (ISCOD)	normal
101	15 Feb 06:28 Problem with Tx	new	P. Condor	Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
102	15 Feb 06:40 Faraday Desynchronization	new	P. Condor	Acquisition system	2015_02 ISR + Imaging (ISCOD)	normal
103	15 Feb 06:25 Spark gaps adjustment	new	A. Belleza	Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
104	15 Feb Operation Resume	new	P. Condor	General	2015_02 ISR + Imaging (ISCOD)	normal
105	15 Feb 10:40 Spark Gaps Adjusment	new		Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
106	15 Feb 12:10 Hydra	new		Start experiment	2015_02 ISR + Imaging (ISCOD)	normal
107	15 Feb 14:50 Spark Gaps Adjusment	new		Spark Gaps	2015_02 ISR + Imaging (ISCOD)	normal
108	15 Feb 15:20 Change TR of channel A	new		Start experiment	2015_02 ISR + Imaging (ISCOD)	normal
109	15 Feb Operation Resume	new		Start experiment	2015_02 ISR + Imaging (ISCOD)	normal
110	15 Feb 19:00 Transmitter power measurements	new		Transmitters	2015_02 ISR + Imaging (ISCOD)	normal
111	16 Feb 17:00 Operation Resumen	new		General		normal
112	16 Feb 17:00 Operation Resumen	new		Start experiment	2015_02 ISR + Imaging (ISCOD)	normal
113	18 Feb 15:00 Data uploaded to PUMA	new	I. Manay	General	2015_02 ISR + Imaging (ISCOD)	normal
114	Log created	new	ryanque	Start experiment	2015_03 ISR + Imaging CNOFS Support	normal
115	23 Mar 12:30 Antenna VSWR	new	ryanque	Antennas	2015_03 ISR + Imaging CNOFS Support	normal
116	23 Mar 18:40 Start of the experiments	new	I. Manay	Start experiment	2015_03 ISR + Imaging CNOFS Support	normal
117	23 Mar 07:59 Operation resume	new	I. Manay	General	2015_03 ISR + Imaging CNOFS Support	normal
118	23 Mar 23:00 Transmitter power measurements	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
119	23 Mar 23:59 Plot Imaging	new	AVALDEZ	Plot	2015_03 ISR + Imaging CNOFS Support	normal
120	24 Mar 07:00 Transmitter power measurements	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
121	24  Mar 07:59 Operation resume	new	AVALDEZ	General	2015_03 ISR + Imaging CNOFS Support	normal
122	24 Mar 08:45 Noise Level Increase	new		General	2015_03 ISR + Imaging CNOFS Support	normal
123	24 Mar 09:10 Spark gaps adjustment	new		Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
124	24 Mar 09:39 Problem with Tx	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
125	24 Mar 12:08 Spark gaps adjustment	new		Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
126	24 Mar 15:23 Spark gaps adjustment	new		Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
127	24 Mar 17:58 Problem with Transmitter	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
128	24 Mar 18:07 Imaging experiment was started	new		Start experiment	2015_03 ISR + Imaging CNOFS Support	normal
129	24 Mar 18:35 Spark gaps adjustment	new		Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
130	24 Mar 19:30 Transmitter power measurements	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
131	24 Mar 23:00 Transmitter power measurements	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
132	24 Mar 23:59 Plots	new		Process/Analysis Program	2015_03 ISR + Imaging CNOFS Support	normal
133	25 Mar 01:00 Imaging Off	new		Acquisition system	2015_03 ISR + Imaging CNOFS Support	normal
134	25 Mar 02:53 Problem with TX	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
135	25 Mar 07:00 Transmitter Power Measurements	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
136	25 Mar 07:30 Spark gaps adjustment	new		Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
137	25 Mar 08:00 Operation Resume	new		General	2015_03 ISR + Imaging CNOFS Support	normal
138	25 Mar 19:30 Transmitter Power measurements	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
139	25  Mar 10:15 IDL software stopped processing EW drift data.	new		Process/Analysis Program	2015_03 ISR + Imaging CNOFS Support	normal
140	25 Mar 10:20 Faraday experiment unsynchronized	new		Acquisition system	2015_03 ISR + Imaging CNOFS Support	normal
141	25 Mar 10:23 Ares PC rebooted, it was halted.	new		Acquisition system	2015_03 ISR + Imaging CNOFS Support	normal
142	25 Mar 10:29 Spark gaps adjustment	new		Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
143	25 Mar 10:30 Faraday processing software restarted and synchronized.	new		Process/Analysis Program	2015_03 ISR + Imaging CNOFS Support	normal
144	25 Mar 10:50 Restarting clock divider device.	new		Acquisition system	2015_03 ISR + Imaging CNOFS Support	normal
145	25 Mar 10:23 Changing the Trendnet device that change the aquisition computers monitors.	new		Acquisition system	2015_03 ISR + Imaging CNOFS Support	normal
146	25 Mar 11:20 System completely restored with the processing software.	new		Acquisition system	2015_03 ISR + Imaging CNOFS Support	normal
147	25 Mar 14:28 Spark gaps adjustment	new		Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
148	25 Mar 17:40 Imaging system started.	new		Acquisition system	2015_03 ISR + Imaging CNOFS Support	normal
149	25 Mar 18:00 Channels 2 and 8 attenuated by 1 dB	new		Reception	2015_03 ISR + Imaging CNOFS Support	normal
150	25 Mar 18:35 Spark gaps adjustment	new		Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
151	25 Mar 22:35 Spark gaps summary	new	I. Manay	Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
152	25 Mar 23:59 Plots of the experiments	new	I. Manay	Plot	2015_03 ISR + Imaging CNOFS Support	normal
153	26 Mar 01:00 Imaging experiment ended	new	I. Manay	Acquisition system	2015_03 ISR + Imaging CNOFS Support	normal
154	26 Mar 06:20 Problem with channel A of ew_drift experiment	new	I. Manay	General	2015_03 ISR + Imaging CNOFS Support	normal
155	26 Mar 07:30 Transmitter Power measurements	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
156	26 Mar 07:59 Operation resume	new	I. Manay	General	2015_03 ISR + Imaging CNOFS Support	normal
158	26 Mar 8:17 Attenuation has been changed in channel B of the Drift experiment	assigned	dcordova	Reception	2015_03 ISR + Imaging CNOFS Support	normal
160	26 Mar 19:00 Transmitter Power Measurements	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
161	26 Mar 16:00 Transmitters are powered	assigned	dcordova	Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
163	26 Mar 17:50 Start  experiment IMAGING JARS	assigned	dcordova	Start experiment	2015_03 ISR + Imaging CNOFS Support	normal
164	26 Mar 19:30 Spark gaps summary	new	A.Coronado	Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
165	26 Mar 23:59  Plots of the experiment	new		Plot	2015_03 ISR + Imaging CNOFS Support	normal
166	27 Mar 00:45 Imaging experiment ended	new		Acquisition system	2015_03 ISR + Imaging CNOFS Support	normal
167	27 Mar 05:15 Processing software stopped working	new		Process/Analysis Program	2015_03 ISR + Imaging CNOFS Support	normal
168	27 Mar 06:00 Processing software was restarted	new		Process/Analysis Program	2015_03 ISR + Imaging CNOFS Support	normal
169	27 Mar 06:00 Channel 1 Tx was changed	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
170	27 Mar 07:30 Spark gaps summary	new		Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
171	27 Mar 08:00 Transmitter Power measurements	new		Transmitters	2015_03 ISR + Imaging CNOFS Support	normal
172	27 Mar 08:00 Operation Resume	new		General	2015_03 ISR + Imaging CNOFS Support	normal
173	31 Mar 09:56 Operability	new		General	2015_03 ISR + Imaging CNOFS Support	normal
174	31 Mar 14:40 Data uploaded to PUMA	new	I. Manay	General	2015_03 ISR + Imaging CNOFS Support	normal
175	26 Mar 22:00 Imaging Acquisition System Lost of synchronization	new	ryanque	Acquisition system	2015_03 ISR + Imaging CNOFS Support	normal
176	06 Apr 12:00 Log created	new		Start experiment	2015_04 MST - ISR -EEJ	normal
177	06 Apr 12:15 Antenna VSWR	new	ryanque	Antennas	2015_04 MST - ISR -EEJ	normal
178	07 Apr 07:20 Experiment starts	new	I. Manay	Start experiment	2015_04 MST - ISR -EEJ	normal
179	07 Apr 08:00 Decrease of noise at experiment channels	new	I. Manay	Reception	2015_04 MST - ISR -EEJ	normal
180	07 Apr 12:50 Recover of the transmitters	new	I. Manay	Transmitters	2015_04 MST - ISR -EEJ	normal
181	07 Apr 19:25 Spark-gaps summary	new	I. Manay	Spark Gaps	2015_04 MST - ISR -EEJ	normal
182	07 Apr 19:30 Transmitter Power measurements	new		Transmitters	2015_04 MST - ISR -EEJ	normal
183	07 Apr 19:59 Operation resume	new	I. Manay	General	2015_04 MST - ISR -EEJ	normal
184	07 Apr 23:05 Transmitter Power Measurements	new		Transmitters	2015_04 MST - ISR -EEJ	normal
185	07 Apr 03:55 High voltage switch failure	new		Transmitters	2015_04 MST - ISR -EEJ	normal
186	07 Apr 20:45 Problems with metal mesh in East Room	new	AVALDEZ	Antennas	2015_04 MST - ISR -EEJ	normal
187	07 Apr 23:59 Plots of experiment	new		Plot	2015_04 MST - ISR -EEJ	normal
188	08 Apr 00:03 HIgh Voltage Switch failure	new		Transmitters	2015_04 MST - ISR -EEJ	normal
189	08 Apr 07:30 Spark Gaps adjustment	new		Spark Gaps	2015_04 MST - ISR -EEJ	normal
190	08 Apr 08:00 Operation Resume	new		General	2015_04 MST - ISR -EEJ	normal
191	08 Apr 07:00 Transmitter Power Measurements	new		Transmitters	2015_04 MST - ISR -EEJ	normal
192	08 Apr 11:30 Campaign canceled	new	ryanque	End experiment	2015_04 MST - ISR -EEJ	normal
193	13 Apr 14:23 Log created	new	ryanque	Start experiment	2015_04_1 MST - ISR - EEJ	normal
194	13 Apr 14:25 Antenna VSWR	new	ryanque	Antennas	2015_04_1 MST - ISR - EEJ	normal
195	14 Apr 07:15 Restart of the experiment	new	I. Manay	Start experiment	2015_04_1 MST - ISR - EEJ	normal
196	14 Apr 07:43 Fall of the transmitters	new	I. Manay	Transmitters	2015_04_1 MST - ISR - EEJ	normal
197	14 Apr 09:55 adjustment of the vipir clock	new	I. Manay	General	2015_04_1 MST - ISR - EEJ	normal
198	14 Apr 14:42 Interference at channel A	new	I. Manay	Reception	2015_04_1 MST - ISR - EEJ	normal
199	14 Apr 18:36 Spark-gaps summary	new	W. Rojas	Spark Gaps	2015_04_1 MST - ISR - EEJ	normal
200	14 Apr 19:00 Transmitter Power Measurements	new		Transmitters	2015_04_1 MST - ISR - EEJ	normal
201	14 Apr 19:59 Operation resume	new	I. Manay	General	2015_04_1 MST - ISR - EEJ	normal
202	14 Apr 23:05 Transmitter Power Measurements	new		Transmitters	2015_04_1 MST - ISR - EEJ	normal
203	14 Abr 20:00 Ch B had high noise	new	P. Condor	Acquisition system	2015_04_1 MST - ISR - EEJ	normal
204	14 Abr 23:59 Plots of rtis and spectras.	new	P. Condor	Process/Analysis Program	2015_04_1 MST - ISR - EEJ	normal
205	15 Abr 05:00 Spark gaps adjustment	new	A. Huamani	Spark Gaps	2015_04_1 MST - ISR - EEJ	normal
206	15 Apr 07:05 Transmitter Power Measurements	new		Transmitters	2015_04_1 MST - ISR - EEJ	normal
207	15 Abr 08:00 Operation Resume	new	P. Condor	General	2015_04_1 MST - ISR - EEJ	normal
208	15 Abr 10:00 VIPIR stopped for a few minutes.	new		Other Instruments	2015_04_1 MST - ISR - EEJ	normal
209	15 Abr 10:56 Transmitter turned off.	new		Transmitters	2015_04_1 MST - ISR - EEJ	normal
210	15 Abr 11:38 Transmitters turned on again.	new		Transmitters	2015_04_1 MST - ISR - EEJ	normal
211	15 Abr 11:38 Spark gaps adjustment	new		Spark Gaps	2015_04_1 MST - ISR - EEJ	normal
212	15 Abr 11:40 Channel 4 cable adjustment.	new		Reception	2015_04_1 MST - ISR - EEJ	normal
213	15 Abr 13:40 Acquisition software halted	new		Acquisition system	2015_04_1 MST - ISR - EEJ	normal
214	15 Abr 14:00 Acquisition software halted	new		Acquisition system	2015_04_1 MST - ISR - EEJ	normal
215	15 Abr 14:22 Spark gaps adjustmen.	new		Spark Gaps	2015_04_1 MST - ISR - EEJ	normal
216	15 Abr 16:00 Acquisition system hard drive changed.	new		Acquisition system	2015_04_1 MST - ISR - EEJ	normal
217	15 Abr 16:10 End of the hard drive change.	new		Acquisition system	2015_04_1 MST - ISR - EEJ	normal
218	15 Apr 19:50 Transmitter power measurements	new		Transmitters	2015_04_1 MST - ISR - EEJ	normal
219	15 Abr 19:30 Spark gaps adjustment.	new		Spark Gaps	2015_04_1 MST - ISR - EEJ	normal
220	15 Abr 19:50 Operation resume	new		General	2015_04_1 MST - ISR - EEJ	normal
221	15 Apr 23:00 Transmitter Power Measurements	new		Transmitters	2015_04_1 MST - ISR - EEJ	normal
222	15 Abr 23:59 RTI and Spectra Plots	new		Plot	2015_04_1 MST - ISR - EEJ	normal
223	16 Apr 07:00 Transmitter Power Measurements	new		Transmitters	2015_04_1 MST - ISR - EEJ	normal
224	16 Apr 06:15 Spark gaps summary	new		Spark Gaps	2015_04_1 MST - ISR - EEJ	normal
225	16 Abr 08:00 Operation Resume	new		General	2015_04_1 MST - ISR - EEJ	normal
226	16 Apr 15:14 Spark gap summary	new	ryanque	Antennas	2015_04_1 MST - ISR - EEJ	normal
227	16 Apr 15:25 Transmitter failure	new	ryanque	Transmitters	2015_04_1 MST - ISR - EEJ	normal
228	16 Apr 19:30 Transmitter power measurements	new		Transmitters	2015_04_1 MST - ISR - EEJ	normal
229	16 Apr 20:15 Transmitter failures	new	ryanque	Transmitters	2015_04_1 MST - ISR - EEJ	normal
230	16 Apr 20:22 Operation Resume	new	ryanque	General	2015_04_1 MST - ISR - EEJ	normal
231	16 Abr 21:27 Problem with transmitter	new	P. Condor	Transmitters	2015_04_1 MST - ISR - EEJ	normal
232	17 Abr 00:28 Problem with transmitter	new	P. Condor	Transmitters	2015_04_1 MST - ISR - EEJ	normal
233	17 Abr 00:57 Transmitter is on	new	P. Condor	Transmitters	2015_04_1 MST - ISR - EEJ	normal
234	17 Abr 00:00 Plots of rtis and spectras	new	P. Condor	Process/Analysis Program	2015_04_1 MST - ISR - EEJ	normal
235	17 Apr 01:54 Problem with transmitter	new	P. Condor	Transmitters	2015_04_1 MST - ISR - EEJ	normal
236	17 Apr 02:16 Transmitter is on.	new	P. Condor	Transmitters	2015_04_1 MST - ISR - EEJ	normal
237	17 Apr 07:00 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2015_04_1 MST - ISR - EEJ	normal
238	17 Apr 07:59 Operation Resume	new	P. Condor	General	2015_04_1 MST - ISR - EEJ	normal
239	17 Apr 07:30 Transmitter power measurements	new		Transmitters	2015_04_1 MST - ISR - EEJ	normal
240	17 Apr 12:46 Fall of the transmitters	new	I. Manay	Transmitters	2015_04_1 MST - ISR - EEJ	normal
241	17 Apr 18:36 Spark-gaps summary	new	I. Manay	Spark Gaps	2015_04_1 MST - ISR - EEJ	normal
242	17 Apr 19:59 Operation resume	new	I. Manay	General	2015_04_1 MST - ISR - EEJ	normal
243	17 Apr 20:00 Transmitter Power Measurements	new		Transmitters	2015_04_1 MST - ISR - EEJ	normal
244	05 May 11:40 Operativity report	new		General	2015_04_1 MST - ISR - EEJ	normal
245	25 May 20:00 Log created	new		Start experiment	2015_05 ISR + Imaging	normal
246	29 May 20:00 Log created	new		Start experiment	2015_06 Valley Experiment	normal
247	25 May 21:00 Antenna VSWR	new		Antennas	2015_05 ISR + Imaging	normal
248	25 May 20:40 Start Experiment	new		Start experiment		normal
249	26 May 19:00 Transmitter Power Measurements	new		Transmitters	2015_05 ISR + Imaging	normal
250	25 May 22:25 EW Drift	new		Process/Analysis Program	2015_05 ISR + Imaging	normal
251	25 May 23:10 TX 4	new		Transmitters	2015_05 ISR + Imaging	normal
252	25 May 23:41 Faraday attenuation	new		Reception	2015_05 ISR + Imaging	normal
253	26 May 06:30 Spark Gaps Adjustment	new		Spark Gaps	2015_05 ISR + Imaging	normal
254	26 May 08:00 Operation Resume	new		General	2015_05 ISR + Imaging	normal
255	26 May 12:34 Faraday spectra Channel B a little low	new		Start experiment		normal
256	26 May 15:36 Spark Gap calibration	new		Spark Gaps	2015_05 ISR + Imaging	normal
257	26 May 17:49 EW Drift Acquisition stops	new		Acquisition system	2015_05 ISR + Imaging	normal
258	26 May 18:12 Changes in Imaging	new		Reception	2015_05 ISR + Imaging	normal
259	26 May 18:54 Faraday attenuation	new		Reception	2015_05 ISR + Imaging	normal
260	26 May 20:00 Operation Resume	new		General	2015_05 ISR + Imaging	normal
261	26 May 23:59 Plots of rtis and spectras	new		Plot	2015_05 ISR + Imaging	normal
262	27 May 00:10 Imaging experiment stopped by us.	new		Acquisition system	2015_05 ISR + Imaging	normal
263	27 May 01:10 Spark Gap calibration	new		Spark Gaps	2015_05 ISR + Imaging	normal
264	27 May 04:20 Some interference detected on channel A of EW Drift	new		Reception	2015_05 ISR + Imaging	normal
265	27 May 04:40 Spark Gap calibration	new		Spark Gaps	2015_05 ISR + Imaging	normal
266	27 May 05:10 Changing T/R from the channel 1 (A) from EW_Drift	new		Reception	2015_05 ISR + Imaging	normal
267	27 May 05:17 Wrong T/R changed, fixing the error now.	new		Reception	2015_05 ISR + Imaging	normal
268	27 May 05:28 Interference persist on the channel A	new		Reception	2015_05 ISR + Imaging	normal
269	27 May 05:37 Changing channel A T/R load.	new		Reception	2015_05 ISR + Imaging	normal
270	27 May 05:40 Interference is gone.	new		Reception	2015_05 ISR + Imaging	normal
271	27 May 07:00 Transmitter Power Measurements	new		Transmitters	2015_05 ISR + Imaging	normal
272	27 May 07:30 Spark Gap calibration	new		Spark Gaps	2015_05 ISR + Imaging	normal
273	27 May 23:32 Transmitter Power Measurements	new		Transmitters	2015_05 ISR + Imaging	normal
274	27 May 23:59  Plots of the experiment	new		Plot	2015_05 ISR + Imaging	normal
275	28 May 00:40 Imaging experiment stopped by us.	new		Acquisition system	2015_05 ISR + Imaging	normal
276	28 May 07:00 Spark Gaps Adjustment	new		Spark Gaps	2015_05 ISR + Imaging	normal
277	28 May 07:00 Transmitter Power Measurements	new		Transmitters	2015_05 ISR + Imaging	normal
278	28 May 08:00 Operation Resume	new		General	2015_05 ISR + Imaging	normal
279	28 May 19:00 Transmitter Power Measurements	new		Transmitters	2015_05 ISR + Imaging	normal
280	28 May 23:00 Transmitter Power Measurements	new		Transmitters	2015_05 ISR + Imaging	normal
281	28 May 22:14 Ch A-EW_drifts TR is changed	new	P. Condor	Reception	2015_05 ISR + Imaging	normal
282	28 May 24:00 Plots of Rtis and spectras	new	P. Condor	Process/Analysis Program	2015_05 ISR + Imaging	normal
283	29 May 07:30 Transmitter Power Measurements	new		Transmitters	2015_05 ISR + Imaging	normal
284	29 May 00:36 Imaging Off	new	P. Condor	Acquisition system	2015_05 ISR + Imaging	normal
285	29 May 04:36 Ch A Faraday is attenuated 1 db	new	P. Condor	Reception	2015_05 ISR + Imaging	normal
286	29 May 06:57 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2015_05 ISR + Imaging	normal
287	29 May 08:00 Operation Resume	new	P. Condor	General	2015_05 ISR + Imaging	normal
288	25 May 8:17 Channel B was attenuated in DRIFTS	new		Reception	2015_05 ISR + Imaging	normal
289	25 May 10:20 Spark gap calibration in TR's and ATR's	new	Americo Huamani	Spark Gaps	2015_05 ISR + Imaging	normal
290	26 May 10:50 Interference in channel A	new		Reception	2015_05 ISR + Imaging	normal
291	08 Jun 13:00 Antenna VSWR	new	I. Manay	Antennas	2015_06 Valley Experiment	normal
293	08 Jun 19:30 Transmitter power measurements and events	new		Transmitters	2015_06 Valley Experiment	normal
294	08 Jun 23:25 Tx is off to check antenna	new	P. Condor	Antennas	2015_06 Valley Experiment	normal
295	08 Jun 23:36 Tx is On.	new	P. Condor	Antennas	2015_06 Valley Experiment	normal
296	09 Jun 01:21 We change TR of Ch E	new	P. Condor	Acquisition system	2015_06 Valley Experiment	normal
297	26 May 00:38 Reset Pc Ares	new	P. Condor	Acquisition system	2015_05 ISR + Imaging	normal
299	25 May 23:59 Plots rtis and spectras.	new	P. Condor	Process/Analysis Program	2015_05 ISR + Imaging	normal
300	25 May 23:26 Change of cable ChB	new	P. Condor	Acquisition system	2015_05 ISR + Imaging	normal
301	25 May 22:20 Test in Channel B and D -EW_Drifts	new	P. Condor	Acquisition system	2015_05 ISR + Imaging	normal
302	25 May 22:15 Change of TR -Faraday	new	P. Condor	Acquisition system	2015_05 ISR + Imaging	normal
303	26 May 07:59 Operation Resume	new	P. Condor	General	2015_05 ISR + Imaging	normal
304	09 Jun 07:37 Spark Gaps adjustment	new	A. Belleza	Spark Gaps	2015_06 Valley Experiment	normal
305	09 Jun 07:59 Operation Resume	new	P. Condor	General	2015_06 Valley Experiment	normal
306	09 Jun 07:48 Attenuation ch E	new	P. Condor	Acquisition system	2015_06 Valley Experiment	normal
307	10 Jun 08:10 Restart Adquisition	new	P. Condor	Acquisition system	2015_06 Valley Experiment	normal
308	10 Jun 19:09 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2015_06 Valley Experiment	normal
309	10 Jun 19:30 Transmitter power measurements	new		Transmitters	2015_06 Valley Experiment	normal
310	10 Jun 20:00 Operation Resume	new	P. Condor	General	2015_06 Valley Experiment	normal
311	10 Jun 23:00 Transmitter Power Measurements	new		Transmitters	2015_06 Valley Experiment	normal
312	11 Jun 07:00 Transmitter Power Measurements	new		Transmitters	2015_06 Valley Experiment	normal
313	11 Jun 00:01 Plots of experiment	new	avaldez	Plot	2015_06 Valley Experiment	normal
314	11 Jun 07:09 Spark Gaps adjustment	new	avaldez	Spark Gaps	2015_06 Valley Experiment	normal
315	11 Jun 08:00 Operation Resume	new	avaldez	General	2015_06 Valley Experiment	normal
316	11 Jun 19:26 Spark-gaps summary	new	A. Huamani	Spark Gaps	2015_06 Valley Experiment	normal
317	11 Jun 19:00 Transmitter Power Measurements	new		Transmitters	2015_06 Valley Experiment	normal
318	11 Jun 19:59 Operation resume	new	I. Manay	General	2015_06 Valley Experiment	normal
319	12 Jun 23:05 Transmitter Power Measurements	new		Transmitters	2015_06 Valley Experiment	normal
320	12 Jun 06:28 Spark gaps adjustment	new	A. Belleza	Spark Gaps	2015_06 Valley Experiment	normal
321	12 Jun 07:36 Plots coherence and cross spectra	new	P. Condor	Acquisition system	2015_06 Valley Experiment	normal
322	12 Jun 07:50 Transmitter Power Measurements	new		Transmitters	2015_06 Valley Experiment	normal
323	12 Jun 08:00 Operation Resume	new	P. Condor	General	2015_06 Valley Experiment	normal
324	06 Jul 15:14 Log Created MST-ISR-EEJ	new	ryanque	Start experiment	2015_07 MST-ISR-EEJ	normal
325	06 Jul 15:47 VSWR Antenna	new	ryanque	Antennas	2015_07 MST-ISR-EEJ	normal
326	07 Jul 19:00 Transmitter Power Measurements	new		Transmitters	2015_07 MST-ISR-EEJ	normal
327	07 Jul 11:15 Start of the experiment	new	I. Manay	Start experiment	2015_07 MST-ISR-EEJ	normal
328	07 Jul 14:55 Transmitters were off	new	I. Manay	General	2015_07 MST-ISR-EEJ	normal
329	07 Jul 18:00 Spark-gaps summary	new	W. Rojas	Spark Gaps	2015_07 MST-ISR-EEJ	normal
330	07 Jul 19:59 Operation Resume	new	I. Manay	General	2015_07 MST-ISR-EEJ	normal
331	07 Jul 23:00 Transmitter Power Measurements	new		Transmitters	2015_07 MST-ISR-EEJ	normal
332	07 Jul 23:59 Figures of Experiment	new		Plot	2015_07 MST-ISR-EEJ	normal
333	08 Jul 08:00 Operation Resume	new		General	2015_07 MST-ISR-EEJ	normal
334	08 Jul 07:00  Spark gaps adjustment	new		Spark Gaps	2015_07 MST-ISR-EEJ	normal
335	08 Jul 07:00 Transmitter Power Measurements	new		Transmitters	2015_07 MST-ISR-EEJ	normal
336	08 Jul 08:30 Reset JARS System	new		Acquisition system	2015_07 MST-ISR-EEJ	normal
337	08 Jul 08:30 Run Prosessing Program	new		Process/Analysis Program	2015_07 MST-ISR-EEJ	normal
338	08 Jul 19:30 Transmitter power measurements	new		Transmitters	2015_07 MST-ISR-EEJ	normal
339	08 Jul 13:58 change drive system PC-JARS	new		Acquisition system	2015_07 MST-ISR-EEJ	normal
340	08 Jul 20:00 Operation Resume	new		Process/Analysis Program	2015_07 MST-ISR-EEJ	normal
341	08 Jul 23:00 Transmitter Power Measurements	new		Transmitters	2015_07 MST-ISR-EEJ	normal
342	09 Jul 07:00 Transmitter Power Measurements	new		Transmitters	2015_07 MST-ISR-EEJ	normal
343	08 Jul 23:59 Experiment plots	new		Plot	2015_07 MST-ISR-EEJ	normal
344	09 Jul 08:00 Spark-gaps summary	new		Spark Gaps	2015_07 MST-ISR-EEJ	normal
345	09 July 08:00 Operation Resume	new		General	2015_07 MST-ISR-EEJ	normal
346	09 July 20:00 Operation Resume	new	avaldez	General	2015_07 MST-ISR-EEJ	normal
347	09 July 20:00 Spark gaps adjustment	new	avaldez	Spark Gaps	2015_07 MST-ISR-EEJ	normal
348	09 Jul 16:15 Interference disappear	new	avaldez	General	2015_07 MST-ISR-EEJ	normal
349	09 Jul 19:30 Transmitter power measurements	new		Transmitters	2015_07 MST-ISR-EEJ	normal
350	09 Jul 23:59 Experiment plots	new	I. Manay	Plot	2015_07 MST-ISR-EEJ	normal
351	10 Jul 00:32 Acquisition system was re-started	new	I. Manay	Acquisition system	2015_07 MST-ISR-EEJ	normal
352	10 Jul 06:34 Acquisition was restarted	new	I. Manay	Acquisition system	2015_07 MST-ISR-EEJ	normal
353	10 Jul 06:40 Spark-gaps summary	new	J. Lavado	Spark Gaps	2015_07 MST-ISR-EEJ	normal
354	10 Jul 07:50 Transmitter power measurements	new		Transmitters	2015_07 MST-ISR-EEJ	normal
355	10 Jul 07:59 Operation Resume	new	I. Manay	General	2015_07 MST-ISR-EEJ	normal
356	10 Jul 11:00 Start interference	new	P. Condor	General	2015_07 MST-ISR-EEJ	normal
357	10 Jul 17:30 Spark gaps adjustment	new	A. Huamani	Spark Gaps	2015_07 MST-ISR-EEJ	normal
358	10 Jul 20:00 Plots	new	P. Condor	Process/Analysis Program	2015_07 MST-ISR-EEJ	normal
359	10 Jul 20:00 Plots	new	P. Condor	Process/Analysis Program	2015_07 MST-ISR-EEJ	normal
360	10 Jul 20:00 Transmitter Power Measurements	new		Transmitters	2015_07 MST-ISR-EEJ	normal
361	10 Jul 20:03 Operation Resume	new	P. Condor	General	2015_07 MST-ISR-EEJ	normal
362	13 Jul 12:20 Log Created Hybrid Mode	new		Start experiment	2015_07_1 Support CNOFS	normal
363	13 Jul 12:30 Antenna VSWR	new	ryanque	Antennas	2015_07_1 Support CNOFS	normal
364	13 Jul 19:00 Transmitter Power Measurements	new		Transmitters	2015_07_1 Support CNOFS	normal
365	13 Jul 19:55 Operation Resume	reopened	P. Condor	General	2015_07_1 Support CNOFS	normal
366	13 Jul 20:50 Start of Experiment	new	P. Condor	Start experiment	2015_07_1 Support CNOFS	normal
367	13 Jul 23:59 Plots	new	P. Condor	Process/Analysis Program	2015_07_1 Support CNOFS	normal
368	14 Jul 07:30 Transmitter Power Measurements	new		Transmitters	2015_07_1 Support CNOFS	normal
369	14 Jul 06:55 Spark gaps adjustment	new	J. Lavado	Spark Gaps	2015_07_1 Support CNOFS	normal
370	14 Jul 07:59 Operation Resume	new	P. Condor	General	2015_07_1 Support CNOFS	normal
371	14 Jul 19:25 Transmitter Power Measurements	new		Transmitters	2015_07_1 Support CNOFS	normal
372	14 Jul 19:25 Spark-gaps summary	new	A. Coronado	Spark Gaps	2015_07_1 Support CNOFS	normal
373	14 Jul 19:59 Operation Resume	new	I. Manay	General	2015_07_1 Support CNOFS	normal
374	15 Jul 07:30 Transmitter Power Measurements	new		Transmitters	2015_07_1 Support CNOFS	normal
375	15 Jul 06:30 Spark-gaps summary	new	A. Belleza	Spark Gaps	2015_07_1 Support CNOFS	normal
376	15 Jul 00:01 Plots	new	A. Belleza	Plot	2015_07_1 Support CNOFS	normal
377	15 Jul 07:59 Operation Resume	new	A. Belleza	General	2015_07_1 Support CNOFS	normal
378	15 Jul 08:29 Transmitters were off	assigned	jortiz	Transmitters	2015_07_1 Support CNOFS	normal
379	15 Jul 19:00 Spark-gaps summary	new	jortiz	Spark Gaps	2015_07_1 Support CNOFS	normal
380	15 Jul 19:20 Transmitter power measurement	new		Transmitters	2015_07_1 Support CNOFS	normal
381	15 Jul 23:05 Transmitter Power Measurement	new		Transmitters	2015_07_1 Support CNOFS	normal
382	15 Jul 23:59 Plots	new		Plot	2015_07_1 Support CNOFS	normal
383	16 Jul 07:00 Transmitter Power Measurement	new		Transmitters	2015_07_1 Support CNOFS	normal
384	16 Jul 07:00 Spark-gaps summary	new		Spark Gaps	2015_07_1 Support CNOFS	normal
385	16 Jul 08:00 Operation Resume	new		General	2015_07_1 Support CNOFS	normal
387	16 Jul 17:28 Spark Gap Adjustment	new		Antennas	2015_07_1 Support CNOFS	normal
388	16 Jul 19:00 Transmitter Power Measurement	new		Transmitters	2015_07_1 Support CNOFS	normal
389	16 Jul 20:00 Operation Resume	new		Transmitters	2015_07_1 Support CNOFS	normal
390	17 Jul 00:01 Plots of experiment	new	avaldez	Plot	2015_07_1 Support CNOFS	normal
391	17 Jul 07:00 Transmitter Power Measurement	new		Transmitters	2015_07_1 Support CNOFS	normal
392	17 Jul 07:00 Spark-gaps summary	new	avaldez	Spark Gaps	2015_07_1 Support CNOFS	normal
393	17 Jul 08:00 Operation Resume	new	avaldez	General	2015_07_1 Support CNOFS	normal
394	15 Jul 20:00 Operation Resume	reopened		General	2015_07_1 Support CNOFS	normal
395	17 Jul 19:00 Transmitter Power Measurement	new		Transmitters	2015_07_1 Support CNOFS	normal
396	17 Jul 19:05 Spark-gaps summary	new	W. Rojas	Spark Gaps	2015_07_1 Support CNOFS	normal
397	17 Jul 19:30 plots	new	I. Manay	Plot	2015_07_1 Support CNOFS	normal
398	17 Jul 19:59 Operation Resume	new	I. Manay	General	2015_07_1 Support CNOFS	normal
399	20 Jul 12:30 Log created	new		Start experiment	2015_07_2 Support ISR School	normal
400	20 Jul 12:34 VSWR Antenna	new		Antennas	2015_07_2 Support ISR School	normal
401	20 Jul 17:19 Farday	new		Process/Analysis Program	2015_07_2 Support ISR School	normal
402	20 Jul 19:00 Transmitter Power Measurement	new		Transmitters	2015_07_2 Support ISR School	normal
403	21 Jul 07:30 Transmitter Power Measurement	new		Transmitters	2015_07_2 Support ISR School	normal
404	21 Jul 09:23 Plot Faraday OK	new	P. Condor	Process/Analysis Program	2015_07_2 Support ISR School	normal
406	20 Jul 16:05 Start with TX	new	P. Condor	Process/Analysis Program	2015_07_2 Support ISR School	normal
407	20 Jul 18:00 Change of Hybrid	new	P. Condor	Antennas	2015_07_2 Support ISR School	normal
408	20 Jul 16:30 Start Imaging	new	P. Condor	Acquisition system	2015_07_2 Support ISR School	normal
409	21 Jul 08:00 Imaging Off and restart Faraday	new	P. Condor	Acquisition system	2015_07_2 Support ISR School	normal
410	21 Jul 08:08 Ch B - Faraday is attenuated 2 db	new	P. Condor	Acquisition system	2015_07_2 Support ISR School	normal
411	21 Jul 08:09 We changed ChA for Ch B faraday	new	P. Condor	Acquisition system	2015_07_2 Support ISR School	normal
412	21 Jul 08:26 TR Faraday is changed and a flip is connected in faraday that was not put	new	P.Condor	Process/Analysis Program	2015_07_2 Support ISR School	normal
413	21 Jul 10:00 Low power at PA2 and PA4	new	Rommel	Transmitters	2015_07_2 Support ISR School	normal
414	21 Jul 19:00 Transmitter Power Measurement	new		Transmitters	2015_07_2 Support ISR School	normal
415	21 Jul 08:00 Operation Resume	new		General	2015_07_2 Support ISR School	normal
416	21 Jul 08:00 Spark Gap Summary	new		Antennas	2015_07_2 Support ISR School	normal
417	21 Jul 11:37 Attenuations	new		Antennas	2015_07_2 Support ISR School	normal
418	21 Jul 17:40 Start Imaging	new		Other Instruments	2015_07_2 Support ISR School	normal
419	21 Jul 18:37 Spark Gaps resume	new		Antennas	2015_07_2 Support ISR School	normal
420	21 Jul 20:00 Operation Resume	new		General	2015_07_2 Support ISR School	normal
421	21 Jul 22:10 Spark Gap Adjustment	new		Antennas	2015_07_2 Support ISR School	normal
422	21 Jul 22:20 Galaxy pass	new		Antennas	2015_07_2 Support ISR School	normal
423	21 Jul 23:59 Stop Imaging	new		Other Instruments	2015_07_2 Support ISR School	normal
424	22 Jul 01:17 Spark Gap Adjustment	new		Antennas	2015_07_2 Support ISR School	normal
425	22 Jul 04:40 Spark Gap Adjustment	new		Antennas	2015_07_2 Support ISR School	normal
426	22 Jul 07:25 Transmitter Power Measurement	new		Transmitters	2015_07_2 Support ISR School	normal
427	22 Jul 08:00 Operation Resume	new		General	2015_07_2 Support ISR School	normal
428	22 Jul 08:20 Restart Faraday	new	P. Condor	Acquisition system	2015_07_2 Support ISR School	normal
429	22 Jul 10:00 Reset batch Faraday for desinchronization	new	P. Condor	Acquisition system	2015_07_2 Support ISR School	normal
430	22 Jul 11:00 Attenuation in Faraday	new	P. Condor	Acquisition system	2015_07_2 Support ISR School	normal
431	22 Jul 14:59 Reset pc Faraday	new	P. Condor	Acquisition system	2015_07_2 Support ISR School	normal
432	22 Jul 16:15 Restart Faraday	new	P. Condor	Acquisition system	2015_07_2 Support ISR School	normal
433	22 Jul 17:31 Start Imaging	new	P. Condor	Acquisition system	2015_07_2 Support ISR School	normal
434	22 Jul 17:29 Spark gaps Adjustment	new	A. Coronado	Spark Gaps	2015_07_2 Support ISR School	normal
435	22 Jul 19:50 Tx off	new	P. Condor	Transmitters	2015_07_2 Support ISR School	normal
436	22 Jul 19:45 Transmitter power measurements	new		Transmitters	2015_07_2 Support ISR School	normal
437	22 Jul 19:59 Operation resume	new	P. Condor	General	2015_07_2 Support ISR School	normal
438	22 Jul 23:00 Transmitter Power Measurement	new		Transmitters	2015_07_2 Support ISR School	normal
439	22 Jul 23:59 Load Plots	new		Plot	2015_07_2 Support ISR School	normal
440	23 Jul 06:30 Stop Imaging	new		Acquisition system	2015_07_2 Support ISR School	normal
441	23 Jul 07:00 Transmitter Power Measurement	new		Transmitters	2015_07_2 Support ISR School	normal
442	23 Jul 08:00 Operation Resume	new		General	2015_07_2 Support ISR School	normal
443	23 Jul 08:20 Experiment ended	new		End experiment	2015_07_2 Support ISR School	normal
444	27 Jul 11:30 Data was uploaded to PUMA	new	I. Manay	General	2015_07_2 Support ISR School	normal
445	21 Jul 23:59 Plots	new	D. Lume	General	2015_07_1 Support CNOFS	normal
447	27 Jul 17:50 Data was uploaded to PUMA	new		End experiment	2015_07_1 Support CNOFS	normal
448	30 Jul 13:00 Resume MST-ISR-EEJ Apr 2015	new		End experiment	2015_04_1 MST - ISR - EEJ	normal
449	30 Jul 14:00 Operativity Resume	new		End experiment	2015_06 Valley Experiment	normal
450	30 Jul 17:00 Operativity	new		End experiment	2015_07 MST-ISR-EEJ	normal
451	30 Jul 17:30 Operativity DP Faraday July	new		End experiment	2015_07_1 Support CNOFS	normal
452	31 Jul 11:40 Operativity ISR+Imaging July	new		End experiment	2015_07_2 Support ISR School	normal
453	12 Aug 10:00 Final Report	new		End experiment	2015_07_1 Support CNOFS	normal
454	08 Jul 15:30 Transmitter Off	new	A. Belleza	Transmitters	2015_07 MST-ISR-EEJ	normal
455	09 Jul 11:04 Transmitter off	new	A. Valdez	Transmitters	2015_07 MST-ISR-EEJ	normal
456	09 Jul 16:58 Transmitter off	new	A. Valdez	Transmitters	2015_07 MST-ISR-EEJ	normal
457	20 Aug 10:00 Final Report	new		End experiment	2015_07 MST-ISR-EEJ	normal
458	24 Aug 14:20 Log created	new		Start experiment	2015_08 Support CNOFS	normal
459	24 Aug 14:28 VSWR Antenna	new		Antennas	2015_08 Support CNOFS	normal
460	25 Agu 14:00 Plots of the Experiment	new	avaldez	Start experiment	2015_08 Support CNOFS	normal
461	25 Aug 19:00 Transmitter Power Measurement	new		Transmitters	2015_08 Support CNOFS	normal
462	25 Agu 23:59 Last Plots of the Experiment	new		Plot	2015_03 ISR + Imaging CNOFS Support	normal
463	26 Aug 07:30 Transmitter Power Measurement	new		Transmitters	2015_08 Support CNOFS	normal
464	26 Aug 00:16 Imaging Off	new		Process/Analysis Program	2015_03 ISR + Imaging CNOFS Support	normal
465	26 Aug 01:10 Restart Faraday	new		Process/Analysis Program	2015_03 ISR + Imaging CNOFS Support	normal
466	26 Aug 19:10 Transmitter power measurements	new		Transmitters	2015_08 Support CNOFS	normal
467	26 Ago 20:26 Faraday loss synchronization	new	P. Condor	Acquisition system	2015_08 Support CNOFS	normal
468	26 Ago 21:01 Noise levels	new	P. Condor	Process/Analysis Program	2015_08 Support CNOFS	normal
469	26 Ago 22:00 Interference for Moon	new	P. Condor	General	2015_08 Support CNOFS	normal
470	26 Ago 23:01 Noise levels	new	P. Condor	Process/Analysis Program	2015_08 Support CNOFS	normal
471	27 Ago 00:00 Plots	new	P. Condor	Process/Analysis Program	2015_08 Support CNOFS	normal
472	27 Ago 02:23 Noise levels	new	P. Condor	Process/Analysis Program	2015_08 Support CNOFS	normal
473	27 Ago 04:03 Noise Levels	new	P. Condor	Process/Analysis Program	2015_08 Support CNOFS	normal
474	27 Aug 07:00 Transmitter Power Measurement	new		Transmitters	2015_08 Support CNOFS	normal
475	27 Ago 06:27 Pass CNOFS	new	P. Condor	General	2015_08 Support CNOFS	normal
476	27 Ago 07:10 Turn off Imaging	new	P. Condor	Acquisition system	2015_08 Support CNOFS	normal
477	27 Ago 07:20 Noise levels	new	P. Condor	Acquisition system	2015_08 Support CNOFS	normal
478	27 Ago 07:30 Spark gaps summary	new	J. Lavado	Spark Gaps	2015_08 Support CNOFS	normal
479	27 Ago 07:40 Plots rtis, noise and spectra	new	P. Condor	Process/Analysis Program	2015_08 Support CNOFS	normal
480	27 Ago 08:00 Operation resume	new	P. Condor	General	2015_08 Support CNOFS	normal
481	27 Aug 08:16 Faraday acquisition was restarted	new	I. Manay	Acquisition system	2015_08 Support CNOFS	normal
482	27 Aug 11:44 Faraday acquisition was restarted	new	I. Manay	Acquisition system	2015_08 Support CNOFS	normal
483	27 Aug 15:16 Fall of transmitters	new	I. Manay	Transmitters	2015_08 Support CNOFS	normal
484	27 Aug 16:00 Plots of the experiments	new	I. Manay	Plot	2015_08 Support CNOFS	normal
485	27 Aug 19:00 Noise levels	new	I. Manay	Reception	2015_08 Support CNOFS	normal
486	27 Aug 19:00 Spark-gaps summary	new	W. Rojas	Spark Gaps	2015_08 Support CNOFS	normal
487	27 Aug 19:15 Change of reception hybrid	new	W. Rojas	Antennas	2015_08 Support CNOFS	normal
488	27 Aug 19:30 Transmitter power measurements	new		Transmitters	2015_08 Support CNOFS	normal
489	27 Aug 19:59 Operation Resume	new	I. Manay	General	2015_08 Support CNOFS	normal
490	27 Aug 23:00 Transmitter Power Measurement	new		Transmitters	2015_08 Support CNOFS	normal
491	27 Agu 23:59 Last Plots of the Experiment	new	AVALDEZ	Plot	2015_08 Support CNOFS	normal
492	28 Agu 07:20 Spark gaps adjustment	new	AVALDEZ	Spark Gaps	2015_08 Support CNOFS	normal
493	28 Agu 07:30 OPERATION RESUME	new	AVALDEZ	General	2015_08 Support CNOFS	normal
494	28 Aug 08:00 Transmitter Power Measurement	new		Transmitters	2015_08 Support CNOFS	normal
495	31 Aug 15:21 Data uploaded to PUMA	new	I. Manay	General	2015_08 Support CNOFS	normal
496	17 Sep 17:00 Log created for ISR+Imaging	new		Start experiment	2015_09_1 Support CNOFS	normal
497	17 Sep 17:10 VSWR Antenna	new		Antennas	2015_09_1 Support CNOFS	normal
498	22 Sep 07:10 Experiment starts	new	I. Manay	Start experiment	2015_09_1 Support CNOFS	normal
499	22 Sep 11:17 Faraday acquisition was restarted	new	I. Manay	Acquisition system	2015_09_1 Support CNOFS	normal
500	22 Sep 16:55 Fall of the transmitters	new	I. Manay	Transmitters	2015_09_1 Support CNOFS	normal
501	22 Sep 18:00 Plots of the experiment	new	I. Manay	Plot	2015_09_1 Support CNOFS	normal
502	22 Sep 18:30 Spark gaps adjustment	new	I. Manay	Spark Gaps	2015_09_1 Support CNOFS	normal
503	22 Set 19:00 Transmitter Power Measurement	new		Transmitters	2015_09_1 Support CNOFS	normal
504	22 Sep 19:59 Operation Resume	new	I. Manay	General	2015_09_1 Support CNOFS	normal
505	22 Sep 23:50 Experiment Plot	new		Plot	2015_03 ISR + Imaging CNOFS Support	normal
506	23 Sep 00:06 Imaging Off	new		Acquisition system	2015_03 ISR + Imaging CNOFS Support	normal
507	23 Set 07:33 Spark gaps adjustment	new		Spark Gaps	2015_03 ISR + Imaging CNOFS Support	normal
508	23 Set 07:50 Transmitter Power Measurement	new		Transmitters	2015_09_1 Support CNOFS	normal
509	23 Sep 00:01 Plots	new	A. Belleza	Plot	2015_09_1 Support CNOFS	normal
510	23 Sep 06:50 Spark gaps adjustment	new	A. Belleza	Spark Gaps	2015_09_1 Support CNOFS	normal
511	23 Sep 07:22 Fall of transmitters	new	A. Belleza	Transmitters	2015_09_1 Support CNOFS	normal
512	23 Sep 07:59 Operation Resume	new	A. Belleza	General	2015_09_1 Support CNOFS	normal
513	23 Sep 08:50 Transmitter went down	new		Transmitters	2015_09_1 Support CNOFS	normal
514	23 Sep 08:55 Transmitter turned on	new		Transmitters	2015_09_1 Support CNOFS	normal
515	23 Sep 09:04 Faraday plots were restarted, the software were not sending the data to the FTP	new		Process/Analysis Program	2015_09_1 Support CNOFS	normal
516	23 Sep 09:10 Faraday plot was restarted, the digisonde file used for the plot was not reading	new		Process/Analysis Program	2015_09_1 Support CNOFS	normal
517	23 Sep 19:30 Transmitter power measurements	new		Transmitters	2015_09_1 Support CNOFS	normal
518	23 Sep 09:57 ATR adjustment	new		Spark Gaps	2015_09_1 Support CNOFS	normal
519	23 Sep 11:00 Transmitter turned off for a connection checking. The channel A noise floor was too strong	new		Transmitters	2015_09_1 Support CNOFS	normal
520	23 Sep 13:05 ATR adjustment	new		Spark Gaps	2015_09_1 Support CNOFS	normal
521	23 Sep 15:41 Faraday plots were restarted, signal chain were not sending the data to the FTP	new		Process/Analysis Program	2015_09_1 Support CNOFS	normal
522	23 Sep 18:00 Imaging system turned on	new		Acquisition system	2015_09_1 Support CNOFS	normal
523	23 Sep 18:12 Transmitter went down	new		Transmitters	2015_09_1 Support CNOFS	normal
524	23 Sep 18:23 Transmitter turned on, the protection circuit failed	new		Transmitters	2015_09_1 Support CNOFS	normal
525	23 Sep 18:32 ATR adjustment	new		Spark Gaps	2015_09_1 Support CNOFS	normal
526	23 Sep 14:00 Experiments plots	new		Plot	2015_09_1 Support CNOFS	normal
527	23 Sep 21:50 Restart Faraday Pc	new	P. Condor	Acquisition system	2015_09_1 Support CNOFS	normal
528	23 Sep 22:10 Restart Faraday	new	P. Condor	Acquisition system	2015_09_1 Support CNOFS	normal
529	23 Sep 22:14 Reset of Faraday Pc	new	P. Condor	Acquisition system	2015_09_1 Support CNOFS	normal
530	23 Sep 23:15 Restart EW Drift and Faraday batches	new	P. Condor	Acquisition system	2015_09_1 Support CNOFS	normal
531	24 Sep 00:00 Plots	new	P. Condor	Process/Analysis Program	2015_09_1 Support CNOFS	normal
532	24 Sep 00:16 Noise levels	new	P. Condor	General	2015_09_1 Support CNOFS	normal
533	24 Sep 01:43 Off Imaging	new	P. Condor	Acquisition system	2015_09_1 Support CNOFS	normal
534	24 Sep 03:05 Noise levels	new	P. Condor	General	2015_09_1 Support CNOFS	normal
535	24 Sep 05:50 Restart EW Drifts and faraday batches	new	P. Condor	Acquisition system	2015_09_1 Support CNOFS	normal
536	24 Sep 06:15 Noise levels	new	P. Condor	General	2015_09_1 Support CNOFS	normal
537	24 Sep 06:20 Spark gaps adjustment	new	J. Lavado	Spark Gaps	2015_09_1 Support CNOFS	normal
538	24 Set 07:10 Transmitter Power Measurement	new		Transmitters	2015_09_1 Support CNOFS	normal
539	24 Sep 07:40 plots	new	P. Condor	Process/Analysis Program	2015_09_1 Support CNOFS	normal
540	24 Sep 07:59 Operation Resume	new	P. Condor	General	2015_09_1 Support CNOFS	normal
541	24 Sep 18:00 Noise levels	new	I. Manay	General	2015_09_1 Support CNOFS	normal
542	24 Sep 18:40 spark gaps adjustment	new	W. Rojas	Spark Gaps	2015_09_1 Support CNOFS	normal
543	24 Sep 19:00 Plots	new	I. Manay	Plot	2015_09_1 Support CNOFS	normal
544	24 Sep 19:30 Weird behaviour at ew_drift A channel	new	I. Manay	General	2015_09_1 Support CNOFS	normal
545	24 Sep 19:40 Transmitter power measurements	new		Transmitters	2015_09_1 Support CNOFS	normal
546	24 Sep 19:59 Operation Resume	new	I. Manay	General	2015_09_1 Support CNOFS	normal
547	24 Set 23:00 Transmitter Power Measurement	new		Transmitters	2015_09_1 Support CNOFS	normal
548	24 Sep 23:59 Plots	new	AVALDEZ	Start experiment	2015_09_1 Support CNOFS	normal
549	25 Sep 07:30 Spark Gaps adjustment	new	AVALDEZ	Spark Gaps	2015_09_1 Support CNOFS	normal
550	25 Sep 07:59 Operation Resume	new	AVALDEZ	General	2015_09_1 Support CNOFS	normal
551	25 Set 08:00 Transmitter Power Measurement	new		Transmitters	2015_09_1 Support CNOFS	normal
552	28 Sep 09:00 Data uploaded to PUMA	new	I. Manay	General	2015_09_1 Support CNOFS	normal
553	29 Set 07:00 Log Created	new		Start experiment	2015_09_2 MST-ISR-EEJ	normal
554	29 Sep 06:58 Experiment starts	new	AVALDEZ	Start experiment	2015_09_2 MST-ISR-EEJ	normal
555	29 Sep 07:05 Fall of the transmitters	new	AVALDEZ	Transmitters	2015_09_2 MST-ISR-EEJ	normal
556	29 Sep 17:00 SCADA  System of Transmitter  was restarted	new	AVALDEZ	Transmitters	2015_09_2 MST-ISR-EEJ	normal
557	29 Sep 18:00 Spark-gaps summary	new	AVALDEZ	Spark Gaps	2015_09_2 MST-ISR-EEJ	normal
558	29 Sep 23:30 Upload Plots	new		Plot	2015_09_2 MST-ISR-EEJ	normal
559	30 Set 07:30 Transmitter Power Measurement	new		Transmitters	2015_09_2 MST-ISR-EEJ	normal
560	30 Sep 07:30 Spark-gaps (summary)	new		Spark Gaps	2015_09_2 MST-ISR-EEJ	normal
561	30 Sep 14:00 Upload Plots	new		Plot	2015_09_2 MST-ISR-EEJ	normal
562	30 Sep 19:30 Transmitter power measurements	new		Transmitters	2015_09_2 MST-ISR-EEJ	normal
563	30 Sep 20:00 Spark-gaps (summary)	new		Spark Gaps	2015_09_2 MST-ISR-EEJ	normal
564	30 Sep 23:15 Transmitter power measurements	new		Transmitters	2015_09_2 MST-ISR-EEJ	normal
565	30 Sep 21:18 Noise levels	new	P. Condor	General	2015_09_2 MST-ISR-EEJ	normal
566	01 Oct 00:00 Plots	new	P. Condor	Process/Analysis Program	2015_09_2 MST-ISR-EEJ	normal
567	01 Oct 00:06 Noise levels	new	P. Condor	General	2015_09_2 MST-ISR-EEJ	normal
568	01 Oct 02:00 Problem with Tx	new	P. Condor	Transmitters	2015_09_2 MST-ISR-EEJ	normal
569	01 Oct 03:07 Noise levels	new	P. Condor	General	2015_09_2 MST-ISR-EEJ	normal
570	01 Oct 06:16 Noise levels	new	P. Condor	General	2015_09_2 MST-ISR-EEJ	normal
571	01 Oct 06:35 Spark gaps adjustment	new	J. Lavado	Spark Gaps	2015_09_2 MST-ISR-EEJ	normal
572	01 Oct 07:10 Transmitter power measurements	new		Transmitters	2015_09_2 MST-ISR-EEJ	normal
573	01 Oct 07:50 Plots	new	P. Condor	Process/Analysis Program	2015_09_2 MST-ISR-EEJ	normal
574	01 Oct 08:00 Operation resume	new	P. Condor	General	2015_09_2 MST-ISR-EEJ	normal
575	01 Oct 09:07 Noise levels	assigned	dlume	General	2015_09_2 MST-ISR-EEJ	normal
576	01 Oct 09:39 Spark gaps adjustment	assigned	dlume	Spark Gaps	2015_09_2 MST-ISR-EEJ	normal
577	01 Oct 12:07 Spark gaps adjustment	assigned	dlume	Spark Gaps	2015_09_2 MST-ISR-EEJ	normal
578	01 Oct 12:08 Noise level	assigned	dlume	General	2015_09_2 MST-ISR-EEJ	normal
579	01 Oct 14:12 Plots	assigned	dlume	Plot	2015_09_2 MST-ISR-EEJ	normal
580	01 Oct 15:00 Spark gaps adjustment	new	dlume	Spark Gaps	2015_09_2 MST-ISR-EEJ	normal
581	01 Oct 16:16 Noise level	new	dlume	General	2015_09_2 MST-ISR-EEJ	normal
582	01 Oct 17:10 Change storage disk	new	dlume	General	2015_09_2 MST-ISR-EEJ	normal
583	01 Oct 17:44 Spark gaps adjustment	new	dlume	Spark Gaps	2015_09_2 MST-ISR-EEJ	normal
584	01 Oct 18:07 Noise level	new	dlume	General	2015_09_2 MST-ISR-EEJ	normal
585	01 Oct 17:20 Transmitter power measurements	new		Transmitters	2015_09_2 MST-ISR-EEJ	normal
586	01 Oct 20:00 Operation resume	new	dlume	General	2015_09_2 MST-ISR-EEJ	normal
587	01 Oct 23:05 Transmitter power measurements	new		Transmitters	2015_09_2 MST-ISR-EEJ	normal
588	01 Oct 23:40 Upload Plots	new		Plot	2015_09_2 MST-ISR-EEJ	normal
589	02 Oct 07:05 Transmitter power measurements	new		Transmitters	2015_09_2 MST-ISR-EEJ	normal
590	01 Oct 07:30 Spark-gaps (summary)	new		Spark Gaps	2015_09_2 MST-ISR-EEJ	normal
591	02 Oct 16:30 Plots	new	I. Manay	Plot	2015_09_2 MST-ISR-EEJ	normal
592	02 Oct 17:30 Noise levels	new	I. Manay	General	2015_09_2 MST-ISR-EEJ	normal
593	02 Oct 18:14 Spark-gaps summary	new	W. Rojas	Spark Gaps	2015_09_2 MST-ISR-EEJ	normal
594	02 Oct 19:55 Transmitter power measurements	new		Transmitters	2015_09_2 MST-ISR-EEJ	normal
595	02 Oct 19:59 Operation Resume	new	I. Manay	General	2015_09_2 MST-ISR-EEJ	normal
596	07 Oct 17:00 Final Report	new		End experiment	2015_09_1 Support CNOFS	normal
597	14 Oct 14:00 Report Campaign	new		End experiment	2015_07_2 Support ISR School	normal
598	09 Dec 12:45 Log for ISR December campaign	new		Start experiment	2015_12 ISR ISCOD	normal
599	09 Dec 12:45 Main JRO Antenna VSWR	new		Antennas	2015_12 ISR ISCOD	normal
600	09 Dec 23:59 Last Plots of the Experiment	new		Plot	2015_12 ISR ISCOD	normal
601	10 Dec 03:52 - Imaging System Turn Off	new		End experiment	2015_12 ISR ISCOD	normal
602	10 Dec 07:00 Spark-gaps summary	new		Spark Gaps	2015_12 ISR ISCOD	normal
603	10 Dec 07:00 Transmitter Power Measurements	new		Transmitters	2015_12 ISR ISCOD	normal
604	10 Dec 19:00 Transmitter Power Measurements	new		Transmitters	2015_12 ISR ISCOD	normal
605	10 Dec 09:30 Off DDS Imaging	new	P. Condor	Acquisition system	2015_12 ISR ISCOD	normal
606	10 Dec 12:27 Off Transmitter	new	P. Condor	Acquisition system	2015_12 ISR ISCOD	normal
607	10 Dec 12:43 On transmitter	new	P. Condor	Transmitters	2015_12 ISR ISCOD	normal
608	10 Dec 13:30 Not noise in Ch B	new	P. Condor	Process/Analysis Program	2015_12 ISR ISCOD	normal
609	10 Dec 14:19 On VIPIR with new IPP	new	P. Condor	Acquisition system	2015_12 ISR ISCOD	normal
610	10 Dec 17:56 Off tx	new	P. Condor	Antennas	2015_12 ISR ISCOD	normal
611	10 Dec 18:20 Attenuated ch 5 imaging	new	P. Condor	Acquisition system	2015_12 ISR ISCOD	normal
612	10 Dec 19:12 Noise levels	new	P. Condor	General	2015_12 ISR ISCOD	normal
613	10 Dec 20:00 PLOTS	new	P. Condor	Process/Analysis Program	2015_12 ISR ISCOD	normal
614	10 Dec 20:00 Strange interference at B channel of ew_drift experiment	new	I. Manay	General	2015_12 ISR ISCOD	normal
615	10 Dec 22:10 Transmitters were off to change the B field amplifier of the Imaging experiment	new	I. Manay	Reception	2015_12 ISR ISCOD	normal
616	10 Dec 23:50 Full checking of B Imaging channel finished.	new	I. Manay	General	2015_12 ISR ISCOD	normal
617	10 Dec 23:59 plots of experiments	new	I. Manay	Plot	2015_12 ISR ISCOD	normal
618	11 Dec 07:00 Spark-gaps summary	new	J. Lavado	Spark Gaps	2015_12 ISR ISCOD	normal
619	11 Dec 07:10 Transmitter power measurements	new		Transmitters		normal
620	11 Dec 07:59 Operation Resume	new	I. Manay	General	2015_12 ISR ISCOD	normal
621	11 Dec 12:17 Transmitter OFF	new		Transmitters	2015_12 ISR ISCOD	normal
622	11 Dec 12:40 Transmitter ON	new		Transmitters	2015_12 ISR ISCOD	normal
623	11 Dec 13:40 Transmitter OFF	new		Transmitters	2015_12 ISR ISCOD	normal
624	11 Dec 14:20 Transmitter ON	new		Transmitters	2015_12 ISR ISCOD	normal
625	11 Dec 19:20 Spark-gaps summary	new		Spark Gaps	2015_12 ISR ISCOD	normal
626	11 Dec 19:26 Transmitter power measurements	new		Transmitters	2015_12 ISR ISCOD	normal
627	11 Dec 19:59 Operation Resume	new		Start experiment	2015_12 ISR ISCOD	normal
628	11 Dec 23:10 Transmitter Power Measurements	new		Transmitters	2015_12 ISR ISCOD	normal
629	12 Dec 07:10 Transmitter Power Measurements	new		Transmitters	2015_12 ISR ISCOD	normal
630	12 Dec 07:20 Spark-gaps summary	new	AValdez	Spark Gaps	2015_12 ISR ISCOD	normal
631	11 Dec 23:59 plots of experiments	new	AValdez	Plot	2015_12 ISR ISCOD	normal
632	12 Dec 07:40 Operation Resume	new	AValdez	General	2015_12 ISR ISCOD	normal
633	12 Dec 19:06 Spark-gaps summary	new	DLume	Spark Gaps	2015_12 ISR ISCOD	normal
634	12 Dec 11:59 Plots of experiments	new	DLume	Plot	2015_12 ISR ISCOD	normal
635	12 Dec 19:14 Noise levels summary	new	DLume	Start experiment	2015_12 ISR ISCOD	normal
636	12 Dec 19:27 Transmitter Power Measurements	new		Transmitters	2015_12 ISR ISCOD	normal
637	12 Dec 19:42 Operation Resume	new	Dlume	End experiment	2015_12 ISR ISCOD	normal
638	12 Dec 23:00 Transmitter Power Measurements	new		Transmitters	2015_12 ISR ISCOD	normal
639	12 Dec 21:03 Noise levels	new	P. Condor	Process/Analysis Program	2015_12 ISR ISCOD	normal
640	13 Dec 00:05 Plots	new	P. Condor	Process/Analysis Program	2015_12 ISR ISCOD	normal
641	13 Dec 00:34 Noise levels	new	P. Condor	Process/Analysis Program	2015_12 ISR ISCOD	normal
642	13 Dec 03:00 Noise levels	new	P. Condor	Process/Analysis Program	2015_12 ISR ISCOD	normal
643	13 Dec 03:11 OFF IMAGING	new	p	Acquisition system	2015_12 ISR ISCOD	normal
644	10 Dec 18:31 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2015_12 ISR ISCOD	normal
645	13 Dec 07:05 Transmitter Power Measurements	new		Transmitters	2015_12 ISR ISCOD	normal
646	10 Dec 20:01 Operation Resume	new	P. Condor	General	2015_12 ISR ISCOD	normal
647	13 Dec 06:45 Noise levels	new	P. Condor	Process/Analysis Program	2015_12 ISR ISCOD	normal
648	13 Dec 06:30 Spark gaps adjustment	new	A. Huamani	Spark Gaps	2015_12 ISR ISCOD	normal
649	13 Dec 07:50 Plots	new	P. Condor	Process/Analysis Program	2015_12 ISR ISCOD	normal
650	13 Dec 07:59 Operation Resume	new	P. Condor	General	2015_12 ISR ISCOD	normal
651	13 Dec 19:50 Transmitter power measurements	new		Transmitters		normal
652	13 Dec 20:00 Spark-gaps adjustment	new		Spark Gaps	2015_12 ISR ISCOD	normal
653	13 JDec 20:00 End of Experiment ISR	new		End experiment	2015_12 ISR ISCOD	normal
654	13 Dec 20:00 Operation resume	new		Plot	2015_12 ISR ISCOD	normal
655	15 Dec 08:00 Data uploaded to PUMA	new	I. Manay	General	2015_12 ISR ISCOD	normal
656	09 Dec 19:22 Interference observed at the B channel of EW_Drift experiment	new	A. Valdez	Acquisition system	2015_12 ISR ISCOD	normal
657	04 Jan 17:10 Experiment Started	new		Start experiment	2016_01_1 ISR+Imaging (ISCOD)	normal
658	04 Jan 17:12 Antena VSWR	new	I. Manay	Antennas	2016_01_1 ISR+Imaging (ISCOD)	normal
659	04 Jan 18:50 Transmitters were down	new	I. Manay	Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
660	04 Jan 19:59 Operation Resume	new	I. Manay	General	2016_01_1 ISR+Imaging (ISCOD)	normal
661	04 Jan 22:10 Problems with Driver 1 FIxed	new	AValdez	Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
662	04 January 22:23 Noise Level	new	AValdez	General	2016_01_1 ISR+Imaging (ISCOD)	normal
663	04 Jan 23:59 Plots	new	AValdez	Plot	2016_01_1 ISR+Imaging (ISCOD)	normal
664	05 Jan 01:00  Problems with PA 2	new	AValdez	Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
665	05 Jan 06:00  am Spark Gaps	new	AValdez	Spark Gaps	2016_01_1 ISR+Imaging (ISCOD)	normal
666	05 Jan 07:30 Transmitter power measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
667	05 Jan 07:59  am  Operation Resume	new	AValdez	General	2016_01_1 ISR+Imaging (ISCOD)	normal
668	05 Jan 13:10 Campaign Report	new		End experiment	2015_12 ISR ISCOD	normal
669	05 Ene 10:30 Tx off	new	P Condor	Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
670	05 Ene 11:45 Transmitter on	new	P Condor	Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
671	05 Ene 14:35 Low power is increased	new	P Condor	Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
672	05 Ene 14:39 Tx off	new	P Condor	Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
673	05 Ene 14:46 Tx On	new	P Condor	Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
674	05 Ene 14:47 Noise levels	new	P Condor	General	2016_01_1 ISR+Imaging (ISCOD)	normal
675	05 Ene 17:23 Noise levels	new	P Condor	Process/Analysis Program	2016_01_1 ISR+Imaging (ISCOD)	normal
676	05 Ene 17:36 Imaging On	new	P Condor	Acquisition system	2016_01_1 ISR+Imaging (ISCOD)	normal
677	05 Ene 17:42 Tx off to arrange ch 5-Imaging	new	P Condor	Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
678	05 Ene 17:49 Tx on	new	P Condor	Acquisition system	2016_01_1 ISR+Imaging (ISCOD)	normal
679	05 Ene 19:00 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2016_01_1 ISR+Imaging (ISCOD)	normal
680	05 Jan 19:30 Transmitter Power Measurements	new		Transmitters		normal
681	05 Ene 19:31 Noise levels	new	P.Condor	General	2016_01_1 ISR+Imaging (ISCOD)	normal
682	05 Ene 19:50 Plots	new	P.Condor	Process/Analysis Program	2016_01_1 ISR+Imaging (ISCOD)	normal
683	05 Ene 20:00 Operation resume	new	P.Condor	General	2016_01_1 ISR+Imaging (ISCOD)	normal
684	05 Jan 23:59 Plots	new		Plot	2016_01_1 ISR+Imaging (ISCOD)	normal
685	06 Jan 07:00 Transmitter Power Measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
686	06 Jan 07:00 Spark gaps adjustment	new		Spark Gaps	2016_01_1 ISR+Imaging (ISCOD)	normal
687	06 Jan  19:00 Transmitter Power Measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
688	06 Jan 23:59 Plots	new	I. Manay	Plot	2016_01_1 ISR+Imaging (ISCOD)	normal
689	07 Jan 02:25 Fall of transmitters	new	I. Manay	Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
690	07 Jan 02:50 Imaging experiment is stopped	new	I. Manay	General	2016_01_1 ISR+Imaging (ISCOD)	normal
691	07 Jan 07:40 Spark-gaps summary	new	W. Rojas	Spark Gaps	2016_01_1 ISR+Imaging (ISCOD)	normal
692	07 Jan 07:30 Transmitter power measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
693	07 Jan 07:59 Operation Resume	new	I. Manay	General	2016_01_1 ISR+Imaging (ISCOD)	normal
694	07 Jan 08:00 Plots	new	F. Montenegro	Plot	2016_01_1 ISR+Imaging (ISCOD)	normal
695	07 Jan 17:45 Plots	new	F. Montenegro	Plot	2016_01_1 ISR+Imaging (ISCOD)	normal
696	07 Jan 19:00 Transmitter Power Measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
697	07 Jan 19:50 Spark gaps Resume	new	F. Montenegro	Spark Gaps	2016_01_1 ISR+Imaging (ISCOD)	normal
698	07 Jan 19:55 Operation Resume	new	F. Montenegro	General	2016_01_1 ISR+Imaging (ISCOD)	normal
699	07 Jan 23:59 Plots	new	AVALDEZ	Plot	2016_01_1 ISR+Imaging (ISCOD)	normal
700	08 Jan 01:00 Turn Off Imaging	new	AValdez	Acquisition system	2016_01_1 ISR+Imaging (ISCOD)	normal
701	08 Jan 07:00 Spark Gaps adjustment	new	AValdez	Spark Gaps	2016_01_1 ISR+Imaging (ISCOD)	normal
702	08 Jan 07:30 Transmitter power measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
703	08 Jan 07:50 Operation Resume	new	AValdez	Acquisition system	2016_01_1 ISR+Imaging (ISCOD)	normal
704	08 Jan 19:00 Transmitter power measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
705	08 Jan 19:50 Operation summary	new	Karim Kuyeng	General	2016_01_1 ISR+Imaging (ISCOD)	normal
706	08 Jan 23:00 Transmitter Power Measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
707	09 Ene 00:09 Plots	new	P.Condor	Process/Analysis Program	2016_01_1 ISR+Imaging (ISCOD)	normal
708	08 Ene 20:56 Noise levels	new	P.Condor	General	2016_01_1 ISR+Imaging (ISCOD)	normal
709	08 Ene 23:56 Noise levels	new	P.Condor	General	2016_01_1 ISR+Imaging (ISCOD)	normal
710	09 Ene 02:10 Imaging Off	new	P.Condor	Acquisition system	2016_01_1 ISR+Imaging (ISCOD)	normal
711	09 Jan 07:00 Transmitter Power Measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
712	09 Ene 04:31 Noise levels	new	P.Condor	General	2016_01_1 ISR+Imaging (ISCOD)	normal
713	09 Ene 07:00 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2016_01_1 ISR+Imaging (ISCOD)	normal
714	09 Ene 07:40 plots	new	P.Condor	Process/Analysis Program	2016_01_1 ISR+Imaging (ISCOD)	normal
715	09 Ene 08:00 Operation Resume	new	P.Condor	General	2016_01_1 ISR+Imaging (ISCOD)	normal
716	09 Ene 19:15 Spark gaps adjustment	new	dlume	Start experiment	2016_01_1 ISR+Imaging (ISCOD)	normal
717	09 Jan 19:00 Transmitter Power Measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
718	09 Ene 19:40 Operation Resume	new	dlume	Start experiment	2016_01_1 ISR+Imaging (ISCOD)	normal
719	09 Jan 23:15 Transmitter Power Measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
720	10 Jan 07:00 Transmitter Power Measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
721	09 Jan  23:59 Plots	new	AValdez	Plot	2016_01_1 ISR+Imaging (ISCOD)	normal
722	10 Jan 07:00 Spark gaps adjustment	new	AValdez	Spark Gaps	2016_01_1 ISR+Imaging (ISCOD)	normal
723	10 Jan  01:15 Imaging Off	new	AValdez	General	2016_01_1 ISR+Imaging (ISCOD)	normal
724	10 Jan 08:00 Operation Resume	new	AValdez	General	2016_01_1 ISR+Imaging (ISCOD)	normal
725	10 Ene 10:30 Noise levels	new	P.Condor	General	2016_01_1 ISR+Imaging (ISCOD)	normal
726	10 Ene 12:49 Noise levels	new	P.Condor	General	2016_01_1 ISR+Imaging (ISCOD)	normal
727	10 Ene 16:12  Noise levels	new	P.Condor	General	2016_01_1 ISR+Imaging (ISCOD)	normal
728	10 Ene 17:50 We processing online with IDL	new	P.Condor	Process/Analysis Program	2016_01_1 ISR+Imaging (ISCOD)	normal
729	10 Ene 18:40 Start Imaging	new	P.Condor	Process/Analysis Program	2016_01_1 ISR+Imaging (ISCOD)	normal
730	10 Ene 18:05 Spark gaps adjustment	new	J. Lavado	Spark Gaps	2016_01_1 ISR+Imaging (ISCOD)	normal
731	10 Ene 19:00 Plots	new	P.Condor	Process/Analysis Program	2016_01_1 ISR+Imaging (ISCOD)	normal
732	10 Jan 19:30 Transmitter power measurements	new		Transmitters	2016_01_1 ISR+Imaging (ISCOD)	normal
733	10 Ene 20:00 Operation resume	new	P.Condor	General	2016_01_1 ISR+Imaging (ISCOD)	normal
734	10 Ene 20:01 End	new	P.Condor	End experiment	2016_01_1 ISR+Imaging (ISCOD)	normal
735	11 Jan 13:00 Log created	new	ryanque	Start experiment	2016_01_2 Gyro Synchro	normal
736	11 Jan 13:10 Antenna VSWR	new	ryanque	Start experiment	2016_01_2 Gyro Synchro	normal
737	10 Jan 23:00 Transmitter power measurements	new		Transmitters	2016_01_2 Gyro Synchro	normal
738	12 Ene 22:07 Noise levels	new	P.Condor	General	2016_01_2 Gyro Synchro	normal
739	13 Ene 00:00 Figures	new	P.Condor	Process/Analysis Program	2016_01_2 Gyro Synchro	normal
740	13 Ene 01:15 Noise levels	new	P.Condor	General	2016_01_2 Gyro Synchro	normal
741	13 Ene 04:18 Noise levels	new	P.Condor	General	2016_01_2 Gyro Synchro	normal
742	13 Jan 07:00 Transmitter power measurements	new		Transmitters	2016_01_2 Gyro Synchro	normal
743	13 Ene 07:06 Noise Levels	new	P.Condor	General	2016_01_2 Gyro Synchro	normal
744	13 Ene 07:33 Noise Levels	new	P.Condor	General	2016_01_2 Gyro Synchro	normal
745	13 Ene 07:23 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2016_01_2 Gyro Synchro	normal
746	13 Ene 07:50 Figures	new	P.Condor	Process/Analysis Program	2016_01_2 Gyro Synchro	normal
747	13 Ene 08:00 Operation Resume	new	P.Condor	General	2016_01_2 Gyro Synchro	normal
748	13 Jan 19:00 Transmitter power measurements	new		Transmitters	2016_01_2 Gyro Synchro	normal
749	13 Jan 19:30 Cuts and falls of the transmitters	new	I. Manay	General	2016_01_2 Gyro Synchro	normal
750	13 Jan 19:40 Spark-gaps summary	assigned	J. Lavado	Spark Gaps	2016_01_2 Gyro Synchro	normal
751	13 Jan 19:59 Operation Resume	new	I. Manay	Start experiment	2016_01_2 Gyro Synchro	normal
752	13 Jan 25:05 Transmitter power measurements	new		Transmitters	2016_01_2 Gyro Synchro	normal
753	13 Jan 23:40 Plots	new	AValdez	Plot	2016_01_2 Gyro Synchro	normal
754	14 Jan 06:30 Cuts and falls of the transmitters	new	AValdez	Transmitters	2016_01_2 Gyro Synchro	normal
755	14 Jan 07:40 Spark-gaps summary	new	AValdez	Start experiment	2016_01_2 Gyro Synchro	normal
756	14 Jan 07:00 Transmitter power measurements	new		Transmitters	2016_01_2 Gyro Synchro	normal
757	14 Jan 08:00 Operation Resume	new	AValdez	General	2016_01_2 Gyro Synchro	normal
758	14 Jan 19:00 Transmitter power measurements	new		Transmitters	2016_01_2 Gyro Synchro	normal
759	21 Jan 23:00 Transmitter power measurements	new		Transmitters	2016_01_2 Gyro Synchro	normal
760	21 Jan 18:10 Start of the experiment	new	I. Manay	Start experiment	2016_01_3 MST-ISR-EEJ	normal
761	21 Jan 18:45 Transmitter were on	new	I. Manay	Transmitters	2016_01_3 MST-ISR-EEJ	normal
762	21 Jan 18:22 Spark-gaps summary	new	I. Manay	Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
763	21 Jan 20:25 Restart of the experiment	new	I. Manay	General	2016_01_3 MST-ISR-EEJ	normal
764	21 Jan 19:59 Operation Resume	new	I. Manay	General	2016_01_3 MST-ISR-EEJ	normal
765	21 Ene 20:20 Restart batch in Jars	new	P.Condor	Acquisition system	2016_01_3 MST-ISR-EEJ	normal
766	21 Ene 21:08 Noise levels	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
767	21 Ene 23:59 Plots	new	P. Condor	Process/Analysis Program	2016_01_3 MST-ISR-EEJ	normal
768	22 Ene 00:15 Noise levels	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
769	22 Ene 00:22 There is not network in PC-OPERACIONES	new	P.Condor	Process/Analysis Program	2016_01_3 MST-ISR-EEJ	normal
770	22 Ene 00:44 Reset Pc operaciones	new	P.Condor	Acquisition system	2016_01_3 MST-ISR-EEJ	normal
771	22 Ene 03:15 Problem with Transmitter	new	P.Condor	Transmitters	2016_01_3 MST-ISR-EEJ	normal
772	22 Ene 03:23 Transmitter is on	new	P.Condor	Transmitters	2016_01_3 MST-ISR-EEJ	normal
773	22 Ene 04:01 Noise levels	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
774	22 Ene 06:15 Noise levels	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
775	22 Ene 05:02 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
776	22 Jan 07:00 Transmitter Power Measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
777	22 Ene 07:50 figures	new	P. Condor	Process/Analysis Program	2016_01_3 MST-ISR-EEJ	normal
778	22  Ene 08:00 resume operation	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
779	22 Ene 06:22 JASMET system went down	new		General	2016_01_3 MST-ISR-EEJ	normal
780	22 Ene 08:30 220 VAC line was lower than 100 VAC on the JASMET cabin	new		Start experiment	2016_01_3 MST-ISR-EEJ	normal
781	22 Jan 19:30 Transmitter Power Measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
782	22 Ene 09:40 JASMET system went up but without network connection	new		General	2016_01_3 MST-ISR-EEJ	normal
783	22 Ene 10:00 Transmitter was shutdown because of a failure on the power supply	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
784	22 Ene 11:00 Transmitter up with half of the maximum power	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
785	22 Ene 11:20 Transmitter up at full power	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
786	22 Ene 11:24 ATR adjustment	new		Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
787	22 Ene 12:19 Plots	new		Plot	2016_01_3 MST-ISR-EEJ	normal
788	22 Ene 13:44 Noise levels	new		Process/Analysis Program	2016_01_3 MST-ISR-EEJ	normal
789	22 Jan 14:15 ATR adjustment	new		Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
790	22 Ene 16:36 Energy up on the JASMET cabin	new		General	2016_01_3 MST-ISR-EEJ	normal
791	22 Ene 17:06 ATR adjustment	new		Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
792	22 Ene 17:00 JASMET processing begins	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
793	22 Ene 18:47 JASMET processing fixed, the header of the processed data has CodeType=17, this seems to be the problem	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
794	22 Ene 18:49 Noise levels	new		General	2016_01_3 MST-ISR-EEJ	normal
795	22 Jan 23:00 Transmitter Power Measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
796	22 Jan 23:59 plots of experiments	new	AValdez	Plot	2016_01_3 MST-ISR-EEJ	normal
797	23 Jan  05:10 Change data Path	new	AVALDEZ	Acquisition system	2016_01_3 MST-ISR-EEJ	normal
798	23 Jan 06:50 Spark-gaps summary	new	AVALDEZ	Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
799	23 Jan 07:00 Transmitter Power Measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
800	23 Jan 07:59  Operation Resume	new	AVALDEZ	General	2016_01_3 MST-ISR-EEJ	normal
801	23 Jan 19:15 Transmitter Power Measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
802	Turno 23/01/2016 - 08:00 - 20:00	new		General		normal
803	23 Jan 23:00 Transmitter Power Measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
804	23 Jan 23:59 Figures	new	P.Condor	Process/Analysis Program	2016_01_3 MST-ISR-EEJ	normal
805	24 Jan 07:00 Transmitter Power Measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
806	24 Jan 06:34 Noise levels	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
807	24 Jan 06:08 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
808	24 Jan 07:59 Figures	new	P.Condor	Process/Analysis Program	2016_01_3 MST-ISR-EEJ	normal
809	24 Jan 08:00 Resume Operation	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
810	24 Jan 14:50 20 KV main power supply problem	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
811	24 Jan 19:25 Transmitter power measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
812	24 JAN  12:10 Problems with JARS	new	AValdez	Acquisition system	2016_01_3 MST-ISR-EEJ	normal
813	24 JAN  18:03 Spark gaps adjustment	new	AValdez	Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
814	24 jAN  19:59  Operation Resume	new	AValdez	General	2016_01_3 MST-ISR-EEJ	normal
815	24 Jan 23:59 Plots of the experiments	new	I. Manay	Plot	2016_01_3 MST-ISR-EEJ	normal
816	25 Jan 06:45 Spark-gaps summary	new	I. Manay	Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
817	25 Jan 07:00 Acq. re-starts	new	I. Manay	Acquisition system	2016_01_3 MST-ISR-EEJ	normal
819	25 Jan 07:00 Plots of the experiments	new	I. Manay	Plot	2016_01_3 MST-ISR-EEJ	normal
820	25 Jan 07:30 Transmitter power measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
821	25 Jan 07:59 Operation Resume	new	I. Manay	General	2016_01_3 MST-ISR-EEJ	normal
822	25 Jan 09:37 Spark Gap Maintenance	new		Break Experiment	2016_01_3 MST-ISR-EEJ	normal
823	25 Jan 10:25 Acquisition system stopped	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
824	25 Jan 12:40 TX Failure	new		General	2016_01_3 MST-ISR-EEJ	normal
825	25 Jan 14:05 Acquisition system restarted	new		General	2016_01_3 MST-ISR-EEJ	normal
826	25 Jan 16:03 TX Failure	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
827	25 Jan 17:11 Spark Gap Summary	new		Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
828	25 Jan 17:41 Acquisition restarted	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
829	25 Jan 17:47 Noise mesaurement	new		General	2016_01_3 MST-ISR-EEJ	normal
830	25 Jan 19:30 Transmitter power measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
831	25 Jan 19:18 Acquisition restarted	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
832	25 Jan 19:58 Operation Resume	new		General	2016_01_3 MST-ISR-EEJ	normal
833	25 Jan 23:20 Transmitter Power Measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
835	25 Jan 20:50 Acquisition restarted	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
836	25 Jan 22:14 Acquisition restarted	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
837	25 Jan 23:51 Plots	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
838	26 Jan 00:12 Acquisition restarted	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
839	26 Jan 00:21 Acquisition restarted	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
840	26 Jan 00:30 Acquisition restarted	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
841	26 Jan 02:40 TX Failure	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
842	25 Jan 07:05 Transmitter Power Measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
843	26 Jan 07:30 Spark-gaps summary	new		Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
844	26 Jan 07:55 Operation Resume	new		General	2016_01_3 MST-ISR-EEJ	normal
845	26 Jan 19:30 Transmitter power measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
846	26 Jan 23:50 Transmitter Power Measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
847	26 Jan 23:59 Figures	new	P. Condor	Process/Analysis Program	2016_01_3 MST-ISR-EEJ	normal
848	27 Jan 07:00 Transmitter Power Measurement	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
849	27 Jan 06:33 Noise levels	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
850	27 Jan 05:40 Spark gaps adjustment	new	A. Huamani	Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
851	27 Jan 07:50 Figures	new	P. Condor	Process/Analysis Program	2016_01_3 MST-ISR-EEJ	normal
852	27 Jan 08:00 Resume Operation	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
853	27 Jan 19:00 Transmitter Power Measurement	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
854	27 Jan 07:29 Spark gaps adjustment	new	dlume	Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
855	27 Jan 07:33 Noise levels	new	dlume	General	2016_01_3 MST-ISR-EEJ	normal
856	27 Jan 20:00 Resume Operation	new	dlume	Start experiment	2016_01_3 MST-ISR-EEJ	normal
857	27 Jan 23:59 Figures	new		Process/Analysis Program	2016_01_3 MST-ISR-EEJ	normal
858	28 Jan 08:00 Spark gaps adjustment	new		Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
859	28 Jan 07:00 Transmitter power measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
860	28 Jan 08:00 Resume Operation	new		General	2016_01_3 MST-ISR-EEJ	normal
861	28 Jan 19:00 Operation Resume	new		General	2016_01_3 MST-ISR-EEJ	normal
862	28 Jan 19:59 Transmitter Power Measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
863	28 Jan 20:25 Acquisition system was restarted	new	I. Manay	Acquisition system	2016_01_3 MST-ISR-EEJ	normal
864	29 Jan 00:09 Restart of the acquisition	new	I. Manay	Acquisition system	2016_01_3 MST-ISR-EEJ	normal
865	29 Jan 00:10 Plots	new	I. Manay	Plot	2016_01_3 MST-ISR-EEJ	normal
867	29 Jan 07:15 Spark-gaps summary	new	J. Lavado	Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
868	29 Jan 07:30 Transmitter power measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
869	29 Jan 07:59 Operation Resume	new	I. Manay	General	2016_01_3 MST-ISR-EEJ	normal
870	29 Jan 10:00 Spark gaps - tungstens replacement	new		Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
871	29 Jan 10:35 Acquisition restarted	new		Acquisition system	2016_01_3 MST-ISR-EEJ	normal
872	29 Jan 19:00 Transmitter power measurements	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
873	29 Jan 23:00 Transmitter Power Measurement	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
874	30 Jan 07:05 Transmitter Power Measurement	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
876	29 Jan 23:59 Plots of Experiment	new	AVALDEZ	Plot	2016_01_3 MST-ISR-EEJ	normal
877	30 Jan  07:20 Spark-gaps summary	new	AVALDEZ	Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
878	30 Jan  04:00 Change of disks	new	AVALDEZ	General	2016_01_3 MST-ISR-EEJ	normal
879	30 Jan  07:59 RESUME OPERATION	new	AVALDEZ	General	2016_01_3 MST-ISR-EEJ	normal
880	30 Jan 18:08 Noise Levels	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
881	30 Jan 17:00 Interference in EEJ from 10 to 14 hours.	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
882	30 Jan 18:00 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
883	30 Jan 19:30 Transmitter Power Measurement	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
885	30 Jan 20:00 Resume Operation	new	P.Condor	General	2016_01_3 MST-ISR-EEJ	normal
886	30 Jan 23:00 Transmitter Power Measurement	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
887	30 Jan 23:59 Plots of Experiment	new		Plot	2016_01_3 MST-ISR-EEJ	normal
888	31 Jan 07:00 Transmitter Power Measurement	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
889	31 Jan 07:15 Spark gaps summary	new		Spark Gaps	2016_01_3 MST-ISR-EEJ	normal
890	31 Jan 08:00 Resume Operation	new		General	2016_01_3 MST-ISR-EEJ	normal
891	Turno 31-Enero2016  8am - 8pm	new		General	2016_01_3 MST-ISR-EEJ	normal
892	Turno 31-Enero2016  8am - 8pm	new		End experiment	2016_01_3 MST-ISR-EEJ	normal
893	31 Jan 20:00 Transmitter Power Measurement	new		Transmitters	2016_01_3 MST-ISR-EEJ	normal
894	04 Feb 10:50 Log Created	new		Start experiment	2016_02_1 ISCOD Gravity Waves	normal
895	04 Feb 17:40 Antenna VSWR	new		Antennas	2016_02_1 ISCOD Gravity Waves	normal
896	05 Feb 07.36 Start Experiment	new		Start experiment	2016_02_1 ISCOD Gravity Waves	normal
897	05 Feb 18:00 Imaging experiment	new		Start experiment	2016_02_1 ISCOD Gravity Waves	normal
898	05 Feb 18:43 Noise Levels ISR + Imaging	new		General	2016_02_1 ISCOD Gravity Waves	normal
899	05 Feb 19:40 VIPER (Ionosonde) and Digisonde (and synchronization)	new		Other Instruments	2016_02_1 ISCOD Gravity Waves	normal
900	05 Feb 19:30 Transmitter Power Measurement	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
901	05 Feb 2016 - Spark Gaps summary	new		Spark Gaps	2016_02_1 ISCOD Gravity Waves	normal
902	05 Feb 23:05 Transmitter Power Measurement	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
903	06 Feb 00:45 Figures	new	P.Condor	Process/Analysis Program	2016_02_1 ISCOD Gravity Waves	normal
904	06 Feb 05:12 Noise levels	new	P.Condor	General	2016_02_1 ISCOD Gravity Waves	normal
905	06 Feb 03:00 Imaging off	new	P.Condor	Acquisition system	2016_02_1 ISCOD Gravity Waves	normal
906	06 Feb 06:25 Spark Gaps adjustment	new	A. Huamani	Spark Gaps	2016_02_1 ISCOD Gravity Waves	normal
907	06 Feb 07:00 Transmitter Power Measurement	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
908	06 Feb 07:50 Figures	new	P.Condor	Process/Analysis Program	2016_02_1 ISCOD Gravity Waves	normal
909	06 Feb 08:00 Operation Resume	new	P.Condor	General	2016_02_1 ISCOD Gravity Waves	normal
910	06 Feb 11:40 Interchang pre-amplifier	new		Reception	2016_02_1 ISCOD Gravity Waves	normal
911	06 Feb 17:40 Imaging Starts	new		Reception	2016_02_1 ISCOD Gravity Waves	normal
912	06 Feb 14:40 Noise Measurements	new		Reception	2016_02_1 ISCOD Gravity Waves	normal
913	06 Feb 18:30 Spark Gap Adjustment	new		Antennas	2016_02_1 ISCOD Gravity Waves	normal
914	06 Feb 19:30 Transmitter power measurements	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
915	06 Feb 19:55 Operation Resume	new		General	2016_02_1 ISCOD Gravity Waves	normal
916	06 Feb 23:00 Transmitter Power Measurements	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
917	07 Feb 07:00 Transmitter Power Measurements	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
918	06 Feb 23:59 Figures	new	AVALDEZ	Process/Analysis Program	2016_02_1 ISCOD Gravity Waves	normal
919	07 Feb 07:20 Spark-gaps summary	new	AVALDEZ	Spark Gaps	2016_02_1 ISCOD Gravity Waves	normal
920	07 Feb 07:55 Operation Resume	new	AVALDEZ	General	2016_02_1 ISCOD Gravity Waves	normal
921	07 Feb 08:03 Restart EW_Drifts	new	P.Condor	Acquisition system	2016_02_1 ISCOD Gravity Waves	normal
922	07 Feb 12:03 Tx  Off	new	P.Condor	Transmitters	2016_02_1 ISCOD Gravity Waves	normal
923	07 Feb 12:15 Tx On	new	P.Condor	Transmitters	2016_02_1 ISCOD Gravity Waves	normal
924	07 Feb 17:45 Imaging is on	new	P.Condor	Acquisition system	2016_02_1 ISCOD Gravity Waves	normal
925	07 Feb 19:15 Transmitter power measurements	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
926	07 Feb 18:30 Noise levels	new	P.Condor	General	2016_02_1 ISCOD Gravity Waves	normal
927	07 Feb 19:05 Spark gaps adjustment	new	J. Lavado	Spark Gaps	2016_02_1 ISCOD Gravity Waves	normal
928	07 Feb 19:50  Figures	new	P.Condor	Process/Analysis Program	2016_02_1 ISCOD Gravity Waves	normal
929	07 Feb 20:00 Operation resume	new	P.Condor	General	2016_02_1 ISCOD Gravity Waves	normal
930	07 Feb 23:59 Plots	new	I. Manay	Plot	2016_02_1 ISCOD Gravity Waves	normal
931	08 Feb 07:10 Transmitter power measurements	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
932	08 Feb 07:10 Imaging experiment was stopped	new	I. Manay	General	2016_02_1 ISCOD Gravity Waves	normal
933	08 Feb 07:40 Spark-gaps summary	new	W. Rojas	Spark Gaps	2016_02_1 ISCOD Gravity Waves	normal
934	08 Feb 07:59 Operation Resume	new	I. Manay	General	2016_02_1 ISCOD Gravity Waves	normal
935	08 Feb 10:50 Transmitter On	new	fmontenegro	Transmitters	2016_02_1 ISCOD Gravity Waves	normal
936	08 Feb 11:09 Figures	new	fmontenegro	Process/Analysis Program	2016_02_1 ISCOD Gravity Waves	normal
937	08 Feb 19:10 Transmitter Power Measurements	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
938	08 Feb 19:55 Noise levels	new	fmontenegro	General	2016_02_1 ISCOD Gravity Waves	normal
939	08 Feb 19:55 Spark gaps adjustment	new	fmontenegro	Spark Gaps	2016_02_1 ISCOD Gravity Waves	normal
940	08 Feb 20:02 Figures	new	fmontenegro	Plot	2016_02_1 ISCOD Gravity Waves	normal
941	08 Feb 08:05 Operation Resume	new	fmontenegro	General	2016_02_1 ISCOD Gravity Waves	normal
942	08 Feb 23:59 Figures	new	dlume	Plot	2016_02_1 ISCOD Gravity Waves	normal
943	09 Feb 07:11 Spark gaps summary	new	dlume	Spark Gaps	2016_02_1 ISCOD Gravity Waves	normal
944	09 Feb 07:30 Transmitter Power Measurements	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
945	09 Feb 07:30 Noise levels	new	dlume	General	2016_02_1 ISCOD Gravity Waves	normal
946	09 Feb 19:00 Transmitter Power Measurements	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
947	10 Feb 00:20 Figures	new	P.Condor	Process/Analysis Program	2016_02_1 ISCOD Gravity Waves	normal
948	10 Feb 01:07 Imaging Off	new	P.Condor	Acquisition system	2016_02_1 ISCOD Gravity Waves	normal
949	10 Feb 07:20 Transmitter power measurements	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
950	10 Feb 05:52 Noise levels	new	P.Condor	General	2016_02_1 ISCOD Gravity Waves	normal
951	10 Feb 05:50 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2016_02_1 ISCOD Gravity Waves	normal
952	10 Feb 07:50 Figures	new	P.Condor	Process/Analysis Program	2016_02_1 ISCOD Gravity Waves	normal
953	10 Feb 08:00 Operation resume	new	P.Condor	General	2016_02_1 ISCOD Gravity Waves	normal
954	10 Feb 17:30 Spark Gap Adjustments	new		Spark Gaps	2016_02_1 ISCOD Gravity Waves	normal
955	10 Feb 17:32 Imaging On	new		General	2016_02_1 ISCOD Gravity Waves	normal
956	10 Feb 17:40 Noise Levels	new		Reception	2016_02_1 ISCOD Gravity Waves	normal
957	10 Feb 19:00 Transmitter power measurements	new		Transmitters	2016_02_1 ISCOD Gravity Waves	normal
958	10 Feb 19:50 Operation Resume	new		End experiment	2016_02_1 ISCOD Gravity Waves	normal
959	15 Feb 10:00 Test starts	new		Start experiment	2016_02_2 Tests Dave Hysell	normal
960	15 Feb 12:00 Antenna VSWR	new		Antennas	2016_02_2 Tests Dave Hysell	normal
961	16 Feb 10:30 Antenna VSWR	new		Antennas	2016_02_2 Tests Dave Hysell	normal
962	18 Feb 14:00 Final Report and Kpi	new		General	2016_01_1 ISR+Imaging (ISCOD)	normal
963	18 Feb 14:00 Final Report and Kpi	new		General	2016_01_1 ISR+Imaging (ISCOD)	normal
964	18 Feb 14:00 Final Report and Kpi	new		General	2016_01_1 ISR+Imaging (ISCOD)	normal
965	31 Jan 20:00 Plots	new		Plot	2016_01_3 MST-ISR-EEJ	normal
966	14 Mar 10:00 ISCOD Log Created	new		Start experiment	2016_03 ISCOD Meridian Circle	normal
967	14 Mar 11:30 Antenna VSWR	new		Antennas	2016_03 ISCOD Meridian Circle	normal
968	14 Mar 18:30 ew_drift and Imaging experiments started	new	I. Manay	Acquisition system	2016_03 ISCOD Meridian Circle	normal
969	14 Mar 19:00 Experiments were re-established	new	I. Manay	Reception	2016_03 ISCOD Meridian Circle	normal
970	14 Mar 19:51 Re-start of ew_drift experiment	new	I. Manay	Acquisition system	2016_03 ISCOD Meridian Circle	normal
971	14 Mar 19:59 Operation Resume	new	I. Manay	General	2016_03 ISCOD Meridian Circle	normal
972	15 Mar 00:05 Transmitter Power Measurements	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
973	15 Mar 07:00 Transmitter Power Measurements	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
976	14 Mar 23:59 FIgures	new	AVALDEZ	Process/Analysis Program	2016_03 ISCOD Meridian Circle	normal
977	15 Mar 07:50 SPARK GAPS ADJUSTMENT	new	AVALDEZ	Spark Gaps	2016_03 ISCOD Meridian Circle	normal
979	15 Mar  07:59 OPERATION RESUME	new	AVALDEZ	General	2016_03 ISCOD Meridian Circle	normal
980	15 Mar 11:42 Transmitter Failure	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
981	15 Mar 12:58 Lower Power	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
982	15 Mar 14:28 Acquisition stopped	new		Acquisition system	2016_03 ISCOD Meridian Circle	normal
983	15 Mar 16:19 Acquisition stopped	new		Acquisition system	2016_03 ISCOD Meridian Circle	normal
984	15 Mar 19:30 Transmitter power measurement	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
985	15 Mar 17:36 Imaging on	new		General	2016_03 ISCOD Meridian Circle	normal
986	15 Mar 17:52 Experiment stopped	new		Break Experiment	2016_03 ISCOD Meridian Circle	normal
987	15 Mar 17:35 Spark Gap Adjustments	new		Spark Gaps	2016_03 ISCOD Meridian Circle	normal
988	15 Mar 19:00 Noise Levels	new		General	2016_03 ISCOD Meridian Circle	normal
989	15 Mar 19:25 Spread F Starts	new		Physical Phenomena	2016_03 ISCOD Meridian Circle	normal
990	15 Mar 19:55 Operation Resume	new		General	2016_03 ISCOD Meridian Circle	normal
991	16 Mar 00:10 Figures	new	P.Condor	Process/Analysis Program	2016_03 ISCOD Meridian Circle	normal
992	15 Mar 20:50 Problem with transmitter	new	P.Condor	Transmitters	2016_03 ISCOD Meridian Circle	normal
993	15 Mar 21:04 Transmitter is On	new	P.Condor	Transmitters	2016_03 ISCOD Meridian Circle	normal
994	16 Mar 06:32 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2016_03 ISCOD Meridian Circle	normal
995	16 Mar 01:36 Imaging off	new	P.Condor	Acquisition system	2016_03 ISCOD Meridian Circle	normal
996	16 Mar 07:00 Transmitter power measurement	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
997	16 Mar 06:08 Noise levels	new	P.Condor	General	2016_03 ISCOD Meridian Circle	normal
998	16 Mar 07:55 Figures	new	P.Condor	Process/Analysis Program	2016_03 ISCOD Meridian Circle	normal
999	16 Mar 08:00 Operation resume	new	P.Condor	General	2016_03 ISCOD Meridian Circle	normal
1000	16 Mar 12:00 JASMET30 Manual Configuration	new		General	2016_01_3 MST-ISR-EEJ	normal
1001	16 Mar 17:35 Imaging Starts	new	fmontenegro	Acquisition system	2016_03 ISCOD Meridian Circle	normal
1002	16 Mar 19:00 Transmitter Power Measurements	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
1003	16 Mar 19:32 Spark gaps adjustment	new	fmontenegro	Spark Gaps	2016_03 ISCOD Meridian Circle	normal
1004	16 Mar 19:36 Noise levels	new	fmontenegro	General	2016_03 ISCOD Meridian Circle	normal
1005	16 Mar 19:38 Figures	new	fmontenegro	Process/Analysis Program	2016_03 ISCOD Meridian Circle	normal
1006	16 Mar 19:52 Operation Resume	new	fmontenegro	General	2016_03 ISCOD Meridian Circle	normal
1007	16 Mar 23:59 Plots	assigned	abelleza	Plot	2016_03 ISCOD Meridian Circle	normal
1008	17 Mar 01:47 upto 02:05 Spark Gaps Change	new	abelleza	Spark Gaps	2016_03 ISCOD Meridian Circle	normal
1009	17 Mar 07:30 Transmitter power measurements	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
1010	16 Mar 07:48 Spark gaps adjustment	new	abelleza	Spark Gaps	2016_03 ISCOD Meridian Circle	normal
1011	17 Mar 19:10 Transmitter power measurements	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
1012	17 Mar 19:59 Operation Resume	new		General	2016_03 ISCOD Meridian Circle	normal
1013	17 Mar 07:50 SPARK GAPS ADJUSTMENT	new		Spark Gaps	2016_03 ISCOD Meridian Circle	normal
1014	17 Mar 23:00 Transmitter Power Measurements	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
1015	17 Mar 23:59 FIGURES	new		Plot	2016_03 ISCOD Meridian Circle	normal
1016	18 Mar 07:00 Transmitter Power Measurements	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
1017	18 Mar 07:48 Spark gaps adjustment	new	AValdez	Spark Gaps	2016_03 ISCOD Meridian Circle	normal
1018	18 Mar 07:59 Operation Resume	new	AValdez	General	2016_03 ISCOD Meridian Circle	normal
1019	18 Mar 17:00 Transmitter Power Measurements	new		Transmitters	2016_03 ISCOD Meridian Circle	normal
1020	18 Apr 11:30 Log Created - LP	new		Start experiment	2016_04_1 LP Farday - Hysell	normal
1021	18 Apr 11:40 Antenna VSWR	new		Antennas	2016_04_1 LP Farday - Hysell	normal
1022	18 Apr 16:00 Acquisition started	new	I. Manay	Reception	2016_04_1 LP Farday - Hysell	normal
1023	18 Apr 19:57 Spark-gaps summary	new	W. Rojas	Spark Gaps	2016_04_1 LP Farday - Hysell	normal
1024	18 Apr 19:59 Operation Resume	new	I. Manay	General	2016_04_1 LP Farday - Hysell	normal
1025	19 Apr 00 :15 Transmitter Power Measurements	new		Transmitters	2016_04_1 LP Farday - Hysell	normal
1026	19 Abr 01:00 Figures	new	P.Condor	Process/Analysis Program	2016_04_1 LP Farday - Hysell	normal
1027	19 Apr 07 :05 Transmitter Power Measurements	new		Transmitters	2016_04_1 LP Farday - Hysell	normal
1028	19 Abr 07:22 Noise levels	new	P.Condor	General	2016_04_1 LP Farday - Hysell	normal
1029	19 Abr 07:33 Spark gaps adjustment	new	J. Lavado	Spark Gaps	2016_04_1 LP Farday - Hysell	normal
1030	19 Abr 07:50 Figures	new	P.Condor	General	2016_04_1 LP Farday - Hysell	normal
1031	19 Abr 08:00 Operation Resume	new	P.Condor	General	2016_04_1 LP Farday - Hysell	normal
1032	19 Apr 14:30 Spark Gap	new		Spark Gaps	2016_04_1 LP Farday - Hysell	normal
1033	19 Apr 15:00 Interference Channel B	new		Physical Phenomena	2016_04_1 LP Farday - Hysell	normal
1034	19 Apr 16:04 Noise Levels	new		General	2016_04_1 LP Farday - Hysell	normal
1035	19 Apr 16:30 End of campaign	new		End experiment	2016_04_1 LP Farday - Hysell	normal
1036	20 Apr 11:50 Start Campaign	new		General	2016_04_1 LP Farday - Hysell	normal
1037	20 Apr 11:51 Antenna VSWR	new		Antennas	2016_04_1 LP Farday - Hysell	normal
1038	20 Apr 15:30 Acquisition started	new	I. Manay	Acquisition system	2016_04_1 LP Farday - Hysell	normal
1039	20 Apr 19:05 Transmitter Power Measurements	new		Transmitters	2016_04_1 LP Farday - Hysell	normal
1040	20 Apr 18:04 Spark Gap	new	J. Lavado	Spark Gaps	2016_04_1 LP Farday - Hysell	normal
1041	21 Apr 07:35 Transmitter Power Measurements	new		Transmitters	2016_04_1 LP Farday - Hysell	normal
1042	20 Apr 19:59 Operation Resume	new	I. Manay	General	2016_04_1 LP Farday - Hysell	normal
1043	21 Apr 05:30 Noise in Channel B	new		Antennas	2016_04_1 LP Farday - Hysell	normal
1044	21 Apr 07:22 Spark Gap Adjustment	new		Spark Gaps	2016_04_1 LP Farday - Hysell	normal
1045	21 Apr 10:30 Spark gaps adjustment	new		Spark Gaps	2016_04_1 LP Farday - Hysell	normal
1046	21 Apr 12:00 Figures	new		Plot	2016_04_1 LP Farday - Hysell	normal
1047	21 Apr 12:36 Channel B goes 2dBs down	new		Reception	2016_04_1 LP Farday - Hysell	normal
1048	21 Apr 13:24 Transmitter turned off because of the channel B power decrease	new		Reception	2016_04_1 LP Farday - Hysell	normal
1049	21 Apr 13:46 Channels power apparently equivalent, transmitter turned on	new		Transmitters	2016_04_1 LP Farday - Hysell	normal
1050	21 Apr 13:49 Channel B went down again	new		Reception	2016_04_1 LP Farday - Hysell	normal
1051	21 Apr 13:53 Spark gaps adjustment	new		Spark Gaps	2016_04_1 LP Farday - Hysell	normal
1052	21 Apr 13:53 Channel A and B are equivalent	new		Reception	2016_04_1 LP Farday - Hysell	normal
1053	21 Apr 16:02 Spark Gaps adjustment	new		Start experiment	2016_04_1 LP Farday - Hysell	normal
1054	21 Apr 16:15 Transmitter Power Measurements	new		Transmitters	2016_04_1 LP Farday - Hysell	normal
1055	25 Apr 10:00 Experiment started	new	I. Manay	Start experiment	2016_04_2_Hydrogen_gyro - Kudeki	normal
1056	25 Apr 18:32 Spark gaps adjustment	assigned	W. Rojas	Spark Gaps	2016_04_2_Hydrogen_gyro - Kudeki	normal
1057	25 Apr 19:30 Transmitter power measurements	new		Transmitters	2016_04_2_Hydrogen_gyro - Kudeki	normal
1058	25 Apr 19:59 Operation Resume	new	I. Manay	General	2016_04_2_Hydrogen_gyro - Kudeki	normal
1059	25 Apr 23:59 Plots	assigned	abelleza	Plot	2016_04_2_Hydrogen_gyro - Kudeki	normal
1060	26 Apr 07:20 Transmitter power measurements	new		Transmitters	2016_04_2_Hydrogen_gyro - Kudeki	normal
1061	26 Apr 07:30 Spark gaps adjustment	new	abelleza	Spark Gaps	2016_04_2_Hydrogen_gyro - Kudeki	normal
1062	Spark gaps adjustment and noise levels	new		Spark Gaps	2016_04_2_Hydrogen_gyro - Kudeki	normal
1063	plots (26 Abril 2016 - 08:00 - 16:20)	new		Plot	2016_04_2_Hydrogen_gyro - Kudeki	normal
1064	End of experiment	new		End experiment	2016_04_2_Hydrogen_gyro - Kudeki	normal
1065	27 Apr 15:10 Log Created HP Meteors & JASMET	new		Start experiment	2016_04_3 HP Meteors JASMET	normal
1066	27 Apr 15:15 VSWR Antenna	new		Antennas	2016_04_3 HP Meteors JASMET	normal
1067	27 Apr 18:00 Experiment started	new	I. Manay	Start experiment	2016_04_3 HP Meteors JASMET	normal
1068	27 Apr 18:22 Beacom	new	I. Manay	General	2016_04_3 HP Meteors JASMET	normal
1069	27 Apr 23:05 Transmitter Power Measurements	new		Transmitters	2016_04_3 HP Meteors JASMET	normal
1070	28 Apr 00:00 Figures	new		Plot	2016_04_3 HP Meteors JASMET	normal
1071	28 Apr 07:00 Transmitter Power Measurements	new		Transmitters	2016_04_3 HP Meteors JASMET	normal
1072	28 Apr 07:30 Spark gaps adjustment	new		Spark Gaps	2016_04_3 HP Meteors JASMET	normal
1073	28 Mar 07:59 Operation Resume	new		General	2016_04_3 HP Meteors JASMET	normal
1074	29 Abr 00:01 Figures	new	P.Condor	Process/Analysis Program	2016_04_3 HP Meteors JASMET	normal
1075	29 Apr 07:00 Transmitter Power Measurements	new		Transmitters	2016_04_3 HP Meteors JASMET	normal
1076	29 Abr 05:49 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2016_04_3 HP Meteors JASMET	normal
1077	29 Abr 05:20 Noise levels	new	P.Condor	General	2016_04_3 HP Meteors JASMET	normal
1078	29 Abr 08:01 Figures	new	P.Condor	Process/Analysis Program	2016_04_3 HP Meteors JASMET	normal
1079	29 Abr 08:00 Operation resume	new	P.Condor	General	2016_04_3 HP Meteors JASMET	normal
1081	31 May 12:30 Log Created	new		Start experiment	2016_05 LP Faraday Meteor	normal
1082	31 May 12:40 Antenna VSWR	new		Antennas	2016_05 LP Faraday Meteor	normal
1083	31 May 13:40 Acquisition started	new	I. Manay	General	2016_05 LP Faraday Meteor	normal
1084	31 May 18:58 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2016_05 LP Faraday Meteor	normal
1085	31 May 15:02 Acquisition re-started	new	I. Manay	Acquisition system	2016_05 LP Faraday Meteor	normal
1086	31 May 19:59 Operation Resume	new	I. Manay	General	2016_05 LP Faraday Meteor	normal
1087	31 May 23:59 Plot	new	abelleza	Plot	2016_05 LP Faraday Meteor	normal
1088	01 Jun. 07:15 Transmitter Power Measurements	new		Transmitters	2016_05 LP Faraday Meteor	normal
1089	01 jun 07:05 Spark gaps adjustment	new		Spark Gaps	2016_05 LP Faraday Meteor	normal
1090	01 Jun 15:30 Operation Resume	new		General	2016_05 LP Faraday Meteor	normal
1091	01 Jun 15:30 Spark gaps adjustment	new		Spark Gaps	2016_05 LP Faraday Meteor	normal
1092	01 Jun 15:30 End Experiment	new		End experiment	2016_05 LP Faraday Meteor	normal
1093	02 Jun 11:40 Meteor HP Campaign	new		Start experiment	2016_05 LP Faraday Meteor	normal
1094	02 Jun 11:45 Antenna VSWR	new		Antennas	2016_05 LP Faraday Meteor	normal
1095	02 Jun 16:30 Operation Resume)	new		Start experiment	2016_05 LP Faraday Meteor	normal
1096	02 jun 20:00 Spark gaps adjustment)	new		Spark Gaps	2016_05 LP Faraday Meteor	normal
1097	02 Jun. 23:05 Transmitter Power Measurements	new		Transmitters	2016_05 LP Faraday Meteor	normal
1098	03 Jun 00:20 Plots	new	P.Condor	Process/Analysis Program	2016_05 LP Faraday Meteor	normal
1099	03 Jun 06:41 Noise levels	new	P.Condor	General	2016_05 LP Faraday Meteor	normal
1100	03 Jun 07:02 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2016_05 LP Faraday Meteor	normal
1101	03 Jun 08:02 Plots	new	P.Condor	Process/Analysis Program	2016_05 LP Faraday Meteor	normal
1102	03 Jun. 08:05 Transmitter Power Measurements	new		Transmitters	2016_05 LP Faraday Meteor	normal
1103	03 Jun 08:00 Operation resume	new	P.Condor	General	2016_05 LP Faraday Meteor	normal
1104	03 Jun 08:04 End Experiment	new	P.Condor	End experiment	2016_05 LP Faraday Meteor	normal
1105	11 Jul 10:30 Start Campaign	new		Start experiment	2016_07_1 EW Drift + AMISR	normal
1106	11 Jul 10:40 Antenna	new		Antennas	2016_07_1 EW Drift + AMISR	normal
1107	13 Jul 18:00 Experiment started	new	I. Manay	Start experiment	2016_07_1 EW Drift + AMISR	normal
1108	13 Jul 20:00 Operation resume	new	I. Manay	General	2016_07_1 EW Drift + AMISR	normal
1109	13 Jul 21:45 Channel A EW Drift	new		Acquisition system	2016_07_1 EW Drift + AMISR	normal
1110	14 Jul 01:15 Acquisition Restarted	new		Acquisition system	2016_07_1 EW Drift + AMISR	normal
1111	14 Jul 05:00 Spread F finished	new		Physical Phenomena	2016_07_1 EW Drift + AMISR	normal
1112	14 Jul 06:00 Imaging turned off	new		End experiment	2016_07_1 EW Drift + AMISR	normal
1113	14 Jul 06:40 Spark Gaps adjustment	new		Reception	2016_07_1 EW Drift + AMISR	normal
1114	14 Jul 06:45 Noise measure	new		Reception	2016_07_1 EW Drift + AMISR	normal
1115	14 Jul 08:00 Operation resume	new		Start experiment	2016_07_1 EW Drift + AMISR	normal
1116	14 Jul 09:17 Acquisition restarted	new		Acquisition system	2016_07_1 EW Drift + AMISR	normal
1117	14 Jul 10:30 Diode proteccion removed	new		Reception	2016_07_1 EW Drift + AMISR	normal
1118	14 Jul 11:26 Remove Interference off	new		Process/Analysis Program	2016_07_1 EW Drift + AMISR	normal
1119	14 Jul 13:20 Transmitter on	new		Transmitters	2016_07_1 EW Drift + AMISR	normal
1120	14 Jul 14:46 Hydra acquisition off	new		Acquisition system	2016_07_1 EW Drift + AMISR	normal
1121	14 Jul 16:18 EW Drift On	new		Transmitters	2016_07_1 EW Drift + AMISR	normal
1122	14 Jul 17:00 Imaging On	new		Acquisition system	2016_07_1 EW Drift + AMISR	normal
1123	14 Jul 18:20 Imaging atenaution	new		Reception	2016_07_1 EW Drift + AMISR	normal
1124	14 Jul 19:20 Transmitter power measurements	new		Transmitters	2016_07_1 EW Drift + AMISR	normal
1125	14 Jul 20:00 Operation Resume	new		General	2016_07_1 EW Drift + AMISR	normal
1126	14 Jul 23:00 Transmitter power measurements	new		Transmitters	2016_07_1 EW Drift + AMISR	normal
1127	14 Jul 23:59 Figures	new	P.Condor	Process/Analysis Program	2016_07_1 EW Drift + AMISR	normal
1128	14 Jul 20:15 Restart Pc Ares	new		Acquisition system	2016_07_1 EW Drift + AMISR	normal
1129	14 Jul 23:05 Tx off	new	P.Condor	Transmitters	2016_07_1 EW Drift + AMISR	normal
1130	15 Jul 01:05 Imaging Off	new	P.Condor	Acquisition system	2016_07_1 EW Drift + AMISR	normal
1131	15 Jul 05:35 Noise Levels	new	P.Condor	General	2016_07_1 EW Drift + AMISR	normal
1132	15 Jul 05:33 Spark gaps adjustment	new	J. Lavado	Spark Gaps	2016_07_1 EW Drift + AMISR	normal
1133	15 Jul 07:00 Transmitter power measurements	new		Transmitters	2016_07_1 EW Drift + AMISR	normal
1134	15 Jul 03:59 Imaging On	new	P.Condor	Acquisition system	2016_07_1 EW Drift + AMISR	normal
1135	15 Jul 06:19 Imaging Off	new	P.Condor	Acquisition system	2016_07_1 EW Drift + AMISR	normal
1136	15 Jul 07:50 Figures	new	P.Condor	Process/Analysis Program	2016_07_1 EW Drift + AMISR	normal
1137	15 Jul 08:00 Operation Resume	new	P.Condor	General	2016_07_1 EW Drift + AMISR	normal
1138	15 Jul 19:23 Spark gaps adjustment	new	J. Inostroza	Spark Gaps	2016_07_1 EW Drift + AMISR	normal
1139	15 Jul 19:30 Transmitter power measurement	new		Transmitters	2016_07_1 EW Drift + AMISR	normal
1140	15 Jul 15:10 JARS for Hydra was stopped	new	I. Manay	Acquisition system	2016_07_1 EW Drift + AMISR	normal
1141	15 Jul 18:00 JARS for Imaging experiment	new	I. Manay	Acquisition system	2016_07_1 EW Drift + AMISR	normal
1142	15 Jul 19:45 Plots	new	I. Manay	Plot	2016_07_1 EW Drift + AMISR	normal
1143	15 Jul 19:59 Operation resume	new	I. Manay	General	2016_07_1 EW Drift + AMISR	normal
1144	15 Jul 23:59 Plots	new		Plot	2016_07_1 EW Drift + AMISR	normal
1145	16 Jul 05:44 Spark gaps adjustment	new		Spark Gaps	2016_07_1 EW Drift + AMISR	normal
1146	16 Jul 03:50 Re-star acquisition	new		Process/Analysis Program	2016_07_1 EW Drift + AMISR	normal
1147	16 jul 07:25 Imaging Acquisition System Off	new		Acquisition system	2016_07_1 EW Drift + AMISR	normal
1148	16 Jul 08:03 System Off	new		End experiment	2016_07_1 EW Drift + AMISR	normal
1149	16 Jul 08:03 Plots	new		Plot	2016_07_1 EW Drift + AMISR	normal
1150	01 Jun 15:30 Transmitter power measurements	new		Transmitters	2016_05 LP Faraday Meteor	normal
1151	25 Jul 10:00 Log Created	new		Start experiment	2016_07_2 ISR School	normal
1152	25 Jul 12:10 Antenna VSWR	new		Antennas	2016_07_2 ISR School	normal
1153	26 Jul 08:12 Digisonde turned off	new	P.Condor	Other Instruments	2016_07_2 ISR School	normal
1154	26 Jul 08:30 Start Experiment	new	P.Condor	Start experiment	2016_07_2 ISR School	normal
1155	26 Jul 10:10 Restart EW-Drift batch in ARES	new	P.Condor	Acquisition system	2016_07_2 ISR School	normal
1156	26 Jul 16:35 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2016_07_2 ISR School	normal
1157	26 Jul 19:32 Figures	new	P.Condor	Process/Analysis Program	2016_07_2 ISR School	normal
1158	26 Jul 19:45 Transmitter power measurements	new		Transmitters	2016_07_2 ISR School	normal
1159	26 Jul 07:31 Operation Resume	new	P.Condor	General	2016_07_2 ISR School	normal
1160	16 Aug 14:00 Log Created	new		Start experiment	2016_08 PA3 Test	normal
1161	16 Aug 15:20 Start Experiment	new		Start experiment	2016_08 PA3 Test	normal
1162	16 Aug 19:57 Operation Resume	new		General	2016_08 PA3 Test	normal
1163	16 Aug 19:30 Spark Gap	new		General	2016_08 PA3 Test	normal
1164	16 Aug 23:00 Transmitter Power Measurements	new		Transmitters	2016_08 PA3 Test	normal
1165	17 Ago 00:05 Figures	new	P.Condor	Process/Analysis Program	2016_08 PA3 Test	normal
1166	16 Jul 07:00 Transmitter Power Measurement7	new		Transmitters	2016_08 PA3 Test	normal
1167	17 Ago 06:20 Spark gaps adjustment	new	J. Lavado	Spark Gaps	2016_08 PA3 Test	normal
1168	17 Ago 05;49 Noise levels	new	P.Condor	General	2016_08 PA3 Test	normal
1169	17 Ago 08:00 Operation Resume	new	P.Condor	General	2016_08 PA3 Test	normal
1170	17 Ago 17:00 Figures	new	P.Condor	Process/Analysis Program	2016_08 PA3 Test	normal
1171	17 Aug 11:00 Report	new		End experiment	2016_07_2 ISR School	normal
1172	17 Aug 17:00 TX Off	new		End experiment	2016_08 PA3 Test	normal
1173	22 Aug 14:30 Report	new		End experiment	2016_08 PA3 Test	normal
1174	27 Aug 08:50 Operativity	new		End experiment	2016_07_1 EW Drift + AMISR	normal
1175	13 Jul 23:59 Plots	new		Plot	2016_07_1 EW Drift + AMISR	normal
1176	28 Sep 17:00 Log Created	new		Start experiment	2016_09 ISCOD Storm EW Drift	normal
1177	28 Sep 18:00 Antenna VSWR	new		Antennas	2016_09 ISCOD Storm EW Drift	normal
1178	29 Sep 11:00 Bad spectra	new		Acquisition system	2016_09 ISCOD Storm EW Drift	normal
1179	29 Sep 15:40 Test with JARS	new	I. Manay	Reception	2016_09 ISCOD Storm EW Drift	normal
1180	29 Sep 19:00 Interference during the experiment	new	I. Manay	Plot	2016_09 ISCOD Storm EW Drift	normal
1181	29 Sep 19:20 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2016_09 ISCOD Storm EW Drift	normal
1182	29 Sep 19:59 Operation resume	new	I. Manay	General	2016_09 ISCOD Storm EW Drift	normal
1183	29 Sep 19:30 Black out	new	I. Manay	General	2016_09 ISCOD Storm EW Drift	normal
1184	29 Set 23:20 Transmitter Power Measurements	new		Transmitters	2016_09 ISCOD Storm EW Drift	normal
1185	30  Sep 07:50 Spark gaps adjustment	new	avaldez	Spark Gaps	2016_09 ISCOD Storm EW Drift	normal
1186	30 Sep 07:50 Operation resume	new	avaldez	General	2016_09 ISCOD Storm EW Drift	normal
1187	30  Sep 00:01 Plots	new		Plot	2016_09 ISCOD Storm EW Drift	normal
1188	30 Sep 07:00 Transmitter Power Measurements	new		Transmitters	2016_09 ISCOD Storm EW Drift	normal
1189	30 Set 11:30 Interchange of Channels	new	P.Condor	Process/Analysis Program	2016_09 ISCOD Storm EW Drift	normal
1190	30 Set 11:38 Restart Acquisition in ARES	new	P.Condor	Acquisition system	2016_09 ISCOD Storm EW Drift	normal
1191	30 Set 11:40 Finish processing of drifts with the interchange of channels.	new	P.Condor	Process/Analysis Program	2016_09 ISCOD Storm EW Drift	normal
1192	30 Set 19:02 Noise levels	new	P.Condor	Process/Analysis Program	2016_09 ISCOD Storm EW Drift	normal
1193	30 Set 17:45 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2016_09 ISCOD Storm EW Drift	normal
1194	30 Sep 19:10 Transmitter power measurements	new		Transmitters	2016_09 ISCOD Storm EW Drift	normal
1195	30 Set 19:50 Figures	new	P.Condor	Process/Analysis Program	2016_09 ISCOD Storm EW Drift	normal
1196	30 Set 20:00 Operation Resume	new	P.Condor	General	2016_09 ISCOD Storm EW Drift	normal
1197	30 Sep 23:08 Transmitter Power Measurements	new		Transmitters	2016_09 ISCOD Storm EW Drift	normal
1198	30 Set 23:59 Plots	new	abelleza	Plot	2016_09 ISCOD Storm EW Drift	normal
1199	01 Oct 06:30 Spark gaps adjustment	new		Spark Gaps	2016_09 ISCOD Storm EW Drift	normal
1200	01 Oct 08:00 Transmitter Power Measurements	new		Transmitters	2016_09 ISCOD Storm EW Drift	normal
1201	01 Oct 08:04 Plots	new		Plot	2016_09 ISCOD Storm EW Drift	normal
1202	19 Oct 09:00 Report Campaign	new		End experiment	2016_09 ISCOD Storm EW Drift	normal
1203	25 Oct 11:00 Log Created	new	ryanque	Start experiment	2016_10 LP Faraday	normal
1204	25 Oct 11:10 Antenna VSWR	new		Antennas	2016_10 LP Faraday	normal
1205	26 Oct 07:30 Start of the experiment	new	I. Manay	Start experiment	2016_10 LP Faraday	normal
1206	26 Oct 07:30 Adjustment of reception line	new	I. Manay	Reception	2016_10 LP Faraday	normal
1207	26 Oct 15:00 Break at the experiment	new	I. Manay	Break Experiment	2016_10 LP Faraday	normal
1208	26 Oct 16:15 Experiment was re-established	new	I. Manay	General	2016_10 LP Faraday	normal
1209	26 Oct 19:30 Transmitter Power Measurements	new		Transmitters	2016_10 LP Faraday	normal
1210	26 Oct 19:00 Spark gaps adjustment history	new	J. Lavado	Spark Gaps	2016_10 LP Faraday	normal
1211	26 Oct 19:59 Operation Resume	new	I. Manay	General	2016_10 LP Faraday	normal
1212	26 Oct 24:00 Figures	new	P.Condor	Process/Analysis Program	2016_10 LP Faraday	normal
1213	27 Oct 07:00 Transmitter Power Measurements	new		Transmitters	2016_10 LP Faraday	normal
1214	27 Oct 07:06 Noise levels	new	P.Condor	General	2016_10 LP Faraday	normal
1215	27 Oct 07:14 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2016_10 LP Faraday	normal
1216	27 Oct 07:50 Operation Resume	new	P.Condor	General	2016_10 LP Faraday	normal
1217	27 Oct 08:00 Interference in Faraday Channel	new		Transmitters	2016_10 LP Faraday	normal
1218	26 Oct 10:00 Transmitter initial values	new		Transmitters	2016_10 LP Faraday	normal
1219	27 Oct 19:38 Noise Levels	new		General	2016_10 LP Faraday	normal
1220	27 Oct 19:42 Spark Gap Adjustment	new		Antennas	2016_10 LP Faraday	normal
1221	27 Oct 19:44 Plots	new		Plot	2016_10 LP Faraday	normal
1222	27 Oct 19:55 Transmitter report	new		Transmitters	2016_10 LP Faraday	normal
1223	27 Oct 19:57 Operation Resume	new		General	2016_10 LP Faraday	normal
1224	02 Nov 11:00 Final Report and Operativity	new		General	2016_10 LP Faraday	normal
1225	28 Nov 10:00 Log Created Nov 2016 Campaign	new		Start experiment	2016_11 ISR + Imaging (ISCOD)	normal
1226	28 Nov 15:00 Antenna VSWR	new		Antennas	2016_11 ISR + Imaging (ISCOD)	normal
1227	28 Nov 19:30 Transmitter power measurement	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1228	28 Nov 23:00 Transmitter Power Measurement	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1229	28 Nov 23:59 Plots	new		Plot	2016_11 ISR + Imaging (ISCOD)	normal
1230	29 Nov 03:40 Fail TX3	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1231	29 Nov 07:00 Transmitter Power Measurements	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1232	29 Nov 07:35 Spark gaps adjustment	new		Spark Gaps	2016_11 ISR + Imaging (ISCOD)	normal
1233	28 Nov 17:50 Start of the experiment	new	I. Manay	Start experiment	2016_11 ISR + Imaging (ISCOD)	normal
1234	28 Nov 19:00 Vipir system was stopped	new	I. Manay	Reception	2016_11 ISR + Imaging (ISCOD)	normal
1235	28 Nov 19:00 Spark gaps adjustment history	new	W. Rojas	Spark Gaps	2016_11 ISR + Imaging (ISCOD)	normal
1236	28 Nov 19:59 Operation Resume	new	I. Manay	General	2016_11 ISR + Imaging (ISCOD)	normal
1237	29 Nov 19:30 Transmitter power measurements	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1238	29 Nov 08:12 Channel B EW Drift	new		General	2016_11 ISR + Imaging (ISCOD)	normal
1239	29 Nov 10:03 VIPIR is turned off	new		General	2016_11 ISR + Imaging (ISCOD)	normal
1240	29 Nov 10:45 Transmitter on	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1241	29 Nov 12:20 Digisonde off	new		Other Instruments	2016_11 ISR + Imaging (ISCOD)	normal
1242	29 Nov 12:45 Transmitter on	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1243	29 Nov 15:33 EW Drift	new		General	2016_11 ISR + Imaging (ISCOD)	normal
1244	29 Nov 16:05 VIPIR on	new		Other Instruments	2016_11 ISR + Imaging (ISCOD)	normal
1245	29 Nov 18:55 Spark Gap adjustments	new		Spark Gaps	2016_11 ISR + Imaging (ISCOD)	normal
1246	29 Nov 19:44 Noise	new		Reception	2016_11 ISR + Imaging (ISCOD)	normal
1247	29 Nov 19:44 Operation Resume	new		General	2016_11 ISR + Imaging (ISCOD)	normal
1248	29 Nov 23:00 Transmitter Power Measurements	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1249	29 Nov 23:59 Plots	new		Plot	2016_11 ISR + Imaging (ISCOD)	normal
1250	29 Nov 21:09  Pc ARES had hanged up	new	avaldez	Acquisition system	2016_11 ISR + Imaging (ISCOD)	normal
1251	30 Nov 06:00 Spark gaps adjustment	new	A Huamani	Spark Gaps	2016_11 ISR + Imaging (ISCOD)	normal
1252	30 Nov 09:43 Restart pc ARES	new	P.Condor	Acquisition system	2016_11 ISR + Imaging (ISCOD)	normal
1253	30 Nov 11:35 Now is running new programs in Faraday	new	P.Condor	Process/Analysis Program	2016_11 ISR + Imaging (ISCOD)	normal
1254	30 Nov 18:07 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2016_11 ISR + Imaging (ISCOD)	normal
1255	30 Nov 18:02 Starting Imaging	new	P.Condor	Acquisition system	2016_11 ISR + Imaging (ISCOD)	normal
1256	30 Nov 19:03 Noise levels	new	P.Condor	General	2016_11 ISR + Imaging (ISCOD)	normal
1257	30 Nov 19:10 Imaging off	new	P.Condor	Acquisition system	2016_11 ISR + Imaging (ISCOD)	normal
1258	30 Nov 19:30 Transmitter power measurements	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1259	30 Nov 20:00 Figures	new	P. Condor	Process/Analysis Program	2016_11 ISR + Imaging (ISCOD)	normal
1260	30 Nov 19:59 Operation Resume	new	P.Condor	General	2016_11 ISR + Imaging (ISCOD)	normal
1261	30 Nov 23:55 Plots of the day	new	I. Manay	Plot	2016_11 ISR + Imaging (ISCOD)	normal
1262	01 Dec 07:30 Transmitter power measurements	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1263	01 Dec 06:18 Spark gaps adjustment history	new	J. Lavado	Spark Gaps	2016_11 ISR + Imaging (ISCOD)	normal
1264	01 Dec 05:15 Imaging experiment on / off	new	I. Manay	General	2016_11 ISR + Imaging (ISCOD)	normal
1265	01 Dec 06:00 Restart of PC ARES	new	I. Manay	Acquisition system	2016_11 ISR + Imaging (ISCOD)	normal
1266	01 Dec 05 :20 Noise history	new	I. Manay	Reception	2016_11 ISR + Imaging (ISCOD)	normal
1267	01 Dec 07:59 Operation Resume	new	I. Manay	General	2016_11 ISR + Imaging (ISCOD)	normal
1268	01 Dec 19:00 Transmitter Power Measurements	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1269	01 Dec 17:48 Starting Imaging	new		Start experiment	2016_11 ISR + Imaging (ISCOD)	normal
1270	01 Dec 20:00 Spark gaps adjustment history	new		Spark Gaps	2016_11 ISR + Imaging (ISCOD)	normal
1271	01 Dec 19:39 Plots of the day	new		Plot	2016_11 ISR + Imaging (ISCOD)	normal
1272	01 Dec 20:00 Operation Resume	new		General	2016_11 ISR + Imaging (ISCOD)	normal
1273	02 Dec 00:10 Figures	new	P. Condor	Process/Analysis Program	2016_11 ISR + Imaging (ISCOD)	normal
1274	02 Dec 06:17 Imaging is off	new	P.Condor	Acquisition system	2016_11 ISR + Imaging (ISCOD)	normal
1275	02 Dec 07:00 Transmitter Power Measurements	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1276	02 Dec 06:22 Restart Faraday because was desynchronized	new	P.Condor	Acquisition system	2016_11 ISR + Imaging (ISCOD)	normal
1277	02 Dec 06:19 Noise levels	new	P.Condor	General	2016_11 ISR + Imaging (ISCOD)	normal
1278	02 Dec 06:03 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2016_11 ISR + Imaging (ISCOD)	normal
1279	02 Dec 07:55 Figures	new	P. Condor	Process/Analysis Program	2016_11 ISR + Imaging (ISCOD)	normal
1280	02 Dec 08:00 Operation Resume	new	P.Condor	General	2016_11 ISR + Imaging (ISCOD)	normal
1281	02 Dic 19:30 Transmitter power measurements	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1282	02 Dec 23:00 Transmitter Power Measurements	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1283	02 Dic 23:59 Plots	new		Plot	2016_11 ISR + Imaging (ISCOD)	normal
1284	02 Dic 23:59 Plots	new	abelleza	Plot	2016_11 ISR + Imaging (ISCOD)	normal
1285	03 Dec 06:12 Imaging is off	new	abelleza	End experiment	2016_11 ISR + Imaging (ISCOD)	normal
1286	03 Dec 06:21 Spark gaps adjustment	new	abelleza	Spark Gaps	2016_11 ISR + Imaging (ISCOD)	normal
1287	03 Dec 08:00 Transmitter Power Measurements	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1288	02 Dec 11:11 Restart Faraday	new	J.Espinoza	Acquisition system	2016_11 ISR + Imaging (ISCOD)	normal
1289	02 Dec 17:25 Start Imaging	new	J.Espinoza	Acquisition system	2016_11 ISR + Imaging (ISCOD)	normal
1290	02 Dec 16:00 Restart Faraday	new	J.Espinoza	Acquisition system	2016_11 ISR + Imaging (ISCOD)	normal
1291	02 Dec 20:00 Operation Resume	new	J.Espinoza	General	2016_11 ISR + Imaging (ISCOD)	normal
1292	02 Dec 18:33 Spark gaps adjustment	new	J.Espinoza	Spark Gaps	2016_11 ISR + Imaging (ISCOD)	normal
1293	03 Dec 08:10 Figures	new	A. Belleza	Process/Analysis Program	2016_11 ISR + Imaging (ISCOD)	normal
1294	03 Dec 08:01 Operation Resume	new	A. Belleza	General	2016_11 ISR + Imaging (ISCOD)	normal
1295	06 Dec 12:00 Transmitters operative parameters	new		Transmitters	2016_11 ISR + Imaging (ISCOD)	normal
1296	26 Dec 11:00 Log Created January 2017 ISCOD Campaign	new		Start experiment	2017_01 ISR + Imaging (ISCOD)	normal
1297	02 Jan 13:50 Antenna VSWR	new	W. Rojas	Antennas	2017_01 ISR + Imaging (ISCOD)	normal
1298	02 Jan 15:23 Inicio de experimento EW-Drift + Faraday	new	kkuyeng	Start experiment	2017_01 ISR + Imaging (ISCOD)	normal
1299	02 Jan 17:15 Inicio modo Imágenes	new	kkuyeng	Start experiment	2017_01 ISR + Imaging (ISCOD)	normal
1300	02 Jan 17:23 Nivel de ruido de los canales	new	kkuyeng	Reception	2017_01 ISR + Imaging (ISCOD)	normal
1301	02 Jan 19:00 Transmitter Power Measurements	new		Transmitters	2017_01 ISR + Imaging (ISCOD)	normal
1302	02 Jan 20:10 Graphics	new	kkuyeng	Plot	2017_01 ISR + Imaging (ISCOD)	normal
1303	02 Jan 23:59 Plots	new	abelleza	Plot	2017_01 ISR + Imaging (ISCOD)	normal
1304	03 Jan 07:00 Transmitter Power Measurements	new		Transmitters	2017_01 ISR + Imaging (ISCOD)	normal
1305	03 Jan 07:41 Spark gaps adjustment	new	abelleza	Spark Gaps	2017_01 ISR + Imaging (ISCOD)	normal
1306	03 Jan 19:30 Spark gaps adjustment history	new	J. Lavado	Spark Gaps	2017_01 ISR + Imaging (ISCOD)	normal
1307	03 Jan 10:10 Ares PC restarted	new		Acquisition system	2017_01 ISR + Imaging (ISCOD)	normal
1308	03 Jan 11:45 ABS control system turned off	new		Other Instruments	2017_01 ISR + Imaging (ISCOD)	normal
1309	03 Jan 15:04 noise floor got a little higher after the spark gaps adjustment	new		Reception	2017_01 ISR + Imaging (ISCOD)	normal
1310	03 Jan 16:41 Faraday processing software restarted	new		Process/Analysis Program	2017_01 ISR + Imaging (ISCOD)	normal
1311	03 Jan 17:29 Imaging acquisition system and processing software started	new		Acquisition system	2017_01 ISR + Imaging (ISCOD)	normal
1312	03 Jan 17:40 noise floor got a little higher after the spark gaps adjustment	new		Reception	2017_01 ISR + Imaging (ISCOD)	normal
1313	03 Jan 19:32 noise floor a little higher on Faraday's channel A due to spark gaps adjustment	new		Reception	2017_01 ISR + Imaging (ISCOD)	normal
1314	03 Jan 19:50 Plots	new		Plot	2017_01 ISR + Imaging (ISCOD)	normal
1315	03 Jan 20:17 Transmitter Power Measurements	new		Transmitters	2017_01 ISR + Imaging (ISCOD)	normal
1316	03 Jan 23:00 Transmitter Power Measurements	new		Transmitters	2017_01 ISR + Imaging (ISCOD)	normal
1317	03 Jan 23:59 Plots	new	AVALDEZ	Plot	2017_01 ISR + Imaging (ISCOD)	normal
1318	04 Jan 07:00 Transmitter Power Measurements	new		Transmitters	2017_01 ISR + Imaging (ISCOD)	normal
1319	04 Jan 07:40 Spark Gaps Adjustment	new	AVALDEZ	Spark Gaps	2017_01 ISR + Imaging (ISCOD)	normal
1320	04 Jan 07:40 Spark Gaps Adjustment	new	AVALDEZ	Spark Gaps	2017_01 ISR + Imaging (ISCOD)	normal
1321	04 Jan 07:59 Operation Resume	new	AVALDEZ	General	2017_01 ISR + Imaging (ISCOD)	normal
1322	04 Jan 19:17 Transmitter Power Measurements	new		Transmitters	2017_01 ISR + Imaging (ISCOD)	normal
1323	04 Jan 20:00 Operation Resume	new		General	2017_01 ISR + Imaging (ISCOD)	normal
1324	04 Jan 20:00 Spark Gap Adjustment Resume	new		Spark Gaps	2017_01 ISR + Imaging (ISCOD)	normal
1325	04 Jan 17:40 Start of Imaging Experiment	new		Start experiment	2017_01 ISR + Imaging (ISCOD)	normal
1326	04 Jan 23:00 Transmitter Power Measurements	new		Transmitters	2017_01 ISR + Imaging (ISCOD)	normal
1327	04 Jan 23:59 Figures	new	P. Condor	General	2017_01 ISR + Imaging (ISCOD)	normal
1328	05 Jan 05:05 Noise levels	new	P.Condor	General	2017_01 ISR + Imaging (ISCOD)	normal
1329	05 Jan 06:00 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2017_01 ISR + Imaging (ISCOD)	normal
1330	05 Jan 07:55 Figures	new	P. Condor	General	2017_01 ISR + Imaging (ISCOD)	normal
1331	05 Jan 08:00 Operation Resume	new	P.Condor	General	2017_01 ISR + Imaging (ISCOD)	normal
1332	05 Jan 08:00 Transmitter Power Measurements	new		Transmitters	2017_01 ISR + Imaging (ISCOD)	normal
1333	23 Jan 09:10 Log created for Campaign SSW - ISCOD	new		Start experiment	2017_01_1 SSW (ISCOD)	normal
1334	23 Jan 14:00 Final Report and Operativity	new		End experiment	2016_11 ISR + Imaging (ISCOD)	normal
1335	23 Jan 14:10 Final Report and Operativity	new		End experiment	2017_01 ISR + Imaging (ISCOD)	normal
1336	23 Jan 14:20 Antenna VSWR	new		Antennas	2017_01_1 SSW (ISCOD)	normal
1337	23 Jan 17:00 Start of the experiment	new	I. Manay	Start experiment	2017_01_1 SSW (ISCOD)	normal
1338	23 Jan 17:30 Imaging experiment started	new	I. Manay	Start experiment	2017_01_1 SSW (ISCOD)	normal
1339	23 Jan 19:29 Spark gaps adjustment history	new	A. Coronado	Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1340	23 Jan 23:05 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1341	24 Jan 07:00 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1342	24 Jan 06:00 Finish Imaging Experiment	new	abelleza	End experiment	2017_01_1 SSW (ISCOD)	normal
1343	23 Jan 23:59 Plots	new	abelleza	Plot	2017_01_1 SSW (ISCOD)	normal
1344	24 Jan 07:30 Spark gaps adjustment history	new	abelleza	Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1345	23 Jan 19:59 Operation Resume	new	I. Manay	General	2017_01_1 SSW (ISCOD)	normal
1346	24 Jan 19:00 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1347	24 Jan 19:36 Spark gaps adjustment history	new		Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1348	24 Jan 09:20 - 11:13 Jasmet Tests	new		General	2017_01_1 SSW (ISCOD)	normal
1349	24 Jan 18:40 JASMET restart	new		Acquisition system	2017_01_1 SSW (ISCOD)	normal
1350	24 Jan 17:20 Inicio de Imagenes	new		Start experiment	2017_01_1 SSW (ISCOD)	normal
1351	24 Jan 23:05 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1352	25 Jan 00:00 Figures	new	P. Condor	Process/Analysis Program	2017_01_1 SSW (ISCOD)	normal
1353	25 Jan 06:06 Noise Levels	new	P.Condor	General	2017_01_1 SSW (ISCOD)	normal
1354	25 Jan 07:00 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1355	25 Jan 05:00 Spark gaps adjustment	new	A. Huamani	Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1356	25 Jan 06:10 Imaging off	new	P.Condor	Acquisition system	2017_01_1 SSW (ISCOD)	normal
1357	25 Jan 07:40 Figures	new	P. Condor	Process/Analysis Program	2017_01_1 SSW (ISCOD)	normal
1358	25 Jan 08:00 Operation Resume	new	P.Condor	General	2017_01_1 SSW (ISCOD)	normal
1359	25 Jan 19:00 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1360	25 Jan 11:00-11:05 Faraday Power off	new		Acquisition system	2017_01_1 SSW (ISCOD)	normal
1361	25 Jan 19:30 Spark gaps adjustment	new		Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1362	25 Jan 12:00 JASMET was fixed	new		Start experiment	2017_01_1 SSW (ISCOD)	normal
1363	25 Jan 20:00 Operation Resume	new		Start experiment	2017_01_1 SSW (ISCOD)	normal
1364	25 Jan 23:00 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1365	25 Jan 24h-Figures	new		Plot	2017_01_1 SSW (ISCOD)	normal
1366	26 Jan 06:02 Imaging off	new		End experiment	2017_01_1 SSW (ISCOD)	normal
1367	26 Jan 07:00 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1368	26 Jan 07:30 Spark gaps adjustment	new		Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1369	26 Jan 07:30 Plots	new		Plot	2017_01_1 SSW (ISCOD)	normal
1370	25 Jan 20:00 26 Jan 08:00 Operation Resume	new		General	2017_01_1 SSW (ISCOD)	normal
1371	26 Jan 19:00 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1372	26 Jan 10:00 Transmitter off for the change of power switches	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1373	26 Jan 10:15 Transmitter on	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1374	26 Jan 11:37 EW Drift processing software shut down because of an FTP connection failure.	new		Process/Analysis Program	2017_01_1 SSW (ISCOD)	normal
1375	26 Jan 12:31 EW Drift processing software enabled again.	new		Process/Analysis Program	2017_01_1 SSW (ISCOD)	normal
1376	26 Jan 12:50 Transmitter went down	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1377	26 Jan 14:33 Transmitter up again	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1378	26 Jan 17:26 Imaging acquisition and processing started	new		Acquisition system	2017_01_1 SSW (ISCOD)	normal
1379	26 Jan 18:05 Interference detected on JASMET channels 0 and 3 and Imaging channel 7	new		Acquisition system	2017_01_1 SSW (ISCOD)	normal
1380	26 Jan 20:00 Spark gaps adjustment	new		Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1381	26 Jan 20:00 Operation Resume	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1382	26 Jan 23:59 Plots	new	abelleza	Plot	2017_01_1 SSW (ISCOD)	normal
1383	27 Jan 07:30 Transmitter power measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1384	27 Jan 06:02 Imaging off	new	abelleza	End experiment	2017_01_1 SSW (ISCOD)	normal
1385	27 Jan 06:59 Spark gaps adjustment	new	abelleza	Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1386	27 Jan 08:01  End experiment	new	abelleza	End experiment	2017_01_1 SSW (ISCOD)	normal
1387	27 Jan 08:04 Plots	new	abelleza	Plot	2017_01_1 SSW (ISCOD)	normal
1388	30 Jan 07:52 Start of the experiment	new	I. Manay	Start experiment	2017_01_1 SSW (ISCOD)	normal
1389	30 Jan 09:37 Little break at the experiment	new	I. Manay	Antennas	2017_01_1 SSW (ISCOD)	normal
1390	30 Jan 09:45 Test of filter at channel C of JASMET30 experiment	new	I. Manay	General	2017_01_1 SSW (ISCOD)	normal
1391	30 Jan 17:35 Imaging experiment started	new	I. Manay	Start experiment	2017_01_1 SSW (ISCOD)	normal
1392	30 Jan 19:30 Transmitter power measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1393	30 Jan 17:00 Spark gaps adjustment history	new	J. Lavado	Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1394	30 Jan 19:59 Operation Resume	new	I. Manay	General	2017_01_1 SSW (ISCOD)	normal
1395	31 Jan 07:00 Transmitter power measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1396	30 Jan 23:59 Plots	new	abelleza	Plot	2017_01_1 SSW (ISCOD)	normal
1397	31 Jan 03:59 Process Problem	new	abelleza	Process/Analysis Program	2017_01_1 SSW (ISCOD)	normal
1398	31 Jan 05:24 Spark gaps adjustment	new	abelleza	Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1399	31 Jan 07:45 Plots	new	abelleza	Plot	2017_01_1 SSW (ISCOD)	normal
1400	31 Jan 08:00 - 24:00 Spark gaps adjustment	new		Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1401	31 Jan 08:00 - 24:00 Operation Resume	new		General	2017_01_1 SSW (ISCOD)	normal
1402	31 Jan 24:00 Plots	new		Plot	2017_01_1 SSW (ISCOD)	normal
1403	01 Feb .19:30 Transmitter Sources measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1404	01 Feb 23:00 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1405	02 Feb 07:00 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1406	01 Feb 23:59 Plots	new	abelleza	Plot	2017_01_1 SSW (ISCOD)	normal
1407	02 Feb 03:59 Acquisition Error	new	abelleza	Acquisition system	2017_01_1 SSW (ISCOD)	normal
1408	02 Feb 07:19 Imaging Off	new	abelleza	End experiment	2017_01_1 SSW (ISCOD)	normal
1409	02 Feb 06:56 Spark Gaps Adjustment	new	abelleza	Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1410	02 Feb 08:40 Digisonde was restablished	new	I. Manay	General	2017_01_1 SSW (ISCOD)	normal
1411	02 Feb 12:40 Low noise at E channel of JASMET30 experiment	new	I. Manay	Reception	2017_01_1 SSW (ISCOD)	normal
1412	02 Feb 15:50 EW_Drifts Acquisition was restarted	new	I. Manay	Acquisition system	2017_01_1 SSW (ISCOD)	normal
1413	02 Feb 19:20 Spark gaps adjustment history	new	J. Lavado	Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1414	02 Feb 19:30 Transmitter power measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1415	02 Feb 19:59 Operation Resume	new	I. Manay	General	2017_01_1 SSW (ISCOD)	normal
1416	02 Feb 23:05 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1417	03 Feb 00:05 Figures	new	P. Condor	Process/Analysis Program	2017_01_1 SSW (ISCOD)	normal
1418	02 Feb 22:40 Instant Blackout	new	P.Condor	General	2017_01_1 SSW (ISCOD)	normal
1419	02 Feb 23:40 Jasmet is restarted	new	P.Condor	Acquisition system	2017_01_1 SSW (ISCOD)	normal
1420	03 Feb 06:06 Imaging is off	new	P.Condor	Acquisition system	2017_01_1 SSW (ISCOD)	normal
1421	02 Feb 07:00 Transmitter Power Measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1422	03 Feb 06:11 Noise levels	new	P.Condor	General	2017_01_1 SSW (ISCOD)	normal
1423	03 Feb 07:00 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1424	03 Feb 07:50 Figures	new	P. Condor	Process/Analysis Program	2017_01_1 SSW (ISCOD)	normal
1425	03 Feb Operation Resume	new	P.Condor	General	2017_01_1 SSW (ISCOD)	normal
1426	3 Feb 19:30 Transmitter power measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1427	03 Feb 19:40 Spark gaps adjustment	new		Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1428	03 Feb 19:42 Noise levels	new		Reception	2017_01_1 SSW (ISCOD)	normal
1429	03 Feb 08:00 - 20:00 Operation Resume	new		General	2017_01_1 SSW (ISCOD)	normal
1430	03 Feb 17:40 Imaging	new		Start experiment	2017_01_1 SSW (ISCOD)	normal
1431	03 Feb 19:54 Figures	new		Plot	2017_01_1 SSW (ISCOD)	normal
1432	03 Feb 23:59 Plots	new	abelleza	Plot	2017_01_1 SSW (ISCOD)	normal
1433	04 Feb 07:30 Transmitter power measurements	new		Transmitters	2017_01_1 SSW (ISCOD)	normal
1434	04 Feb 06:07 Spark Gaps Adjustment	new	abelleza	Spark Gaps	2017_01_1 SSW (ISCOD)	normal
1435	04 Feb 08:05 Plots	new	abelleza	Plot	2017_01_1 SSW (ISCOD)	normal
1436	04 Feb 08:06 End Experiment	new	abelleza	End experiment	2017_01_1 SSW (ISCOD)	normal
1437	14 Feb 09:00 Log created	new		Start experiment	2017_02 Sun Pass	normal
1438	14 Feb 09:10 Antenna VSWR	new		Antennas	2017_02 Sun Pass	normal
1439	14 Feb 09:00 Final Report	new		End experiment	2017_01_1 SSW (ISCOD)	normal
1440	28 Mar 14:00 Log Created	new		Start experiment	2017_03 ISCOD CONGSS	normal
1441	29 Mar 10:00 Antenna VSWR	new		Antennas	2017_03 ISCOD CONGSS	normal
1442	29 Mar 14:45 ISR experiments started	new	I. Manay	Start experiment	2017_03 ISCOD CONGSS	normal
1443	29 Mar 17:40 Imaging experiment started	new	I. Manay	Start experiment	2017_03 ISCOD CONGSS	normal
1444	29 Mar 18:30 vipir was stopped	new	I. Manay	Plot	2017_03 ISCOD CONGSS	normal
1445	29 Mar 19:10 Transmitter Power Measurements	new		Transmitters	2017_03 ISCOD CONGSS	normal
1446	29 Mar 19:45 Spark gaps adjustment history	new	A. Coronado	Spark Gaps	2017_03 ISCOD CONGSS	normal
1447	29 Mar 19:59 Operation Resume	new	I. Manay	General	2017_03 ISCOD CONGSS	normal
1448	30 Mar 07:02 Transmitter Power Measurements	new		Transmitters	2017_03 ISCOD CONGSS	normal
1449	29 Mar 23:59 Plots	new	abelleza	Plot	2017_03 ISCOD CONGSS	normal
1450	30 Mar 06:52 Finish Imaging Experiment	new		End experiment	2017_03 ISCOD CONGSS	normal
1451	30 Mar 07:44 Spark gaps adjustment history	new		Spark Gaps	2017_03 ISCOD CONGSS	normal
1452	30 Mar 07:50 Plots	new		Plot	2017_03 ISCOD CONGSS	normal
1453	30 Mar 09:20 TX Fall	new		Transmitters	2017_03 ISCOD CONGSS	normal
1454	30 Mar 17:30 Imaging Mode starts	new		Reception	2017_03 ISCOD CONGSS	normal
1455	30 Mar 18:20 Imaging Off	new		Antennas	2017_03 ISCOD CONGSS	normal
1456	30 Mar 19:20 Spark Gap adjustments	new		Spark Gaps	2017_03 ISCOD CONGSS	normal
1457	30 Mar 19:40 Noise Levels	new		Reception	2017_03 ISCOD CONGSS	normal
1458	30 Mar 19:30 Transmitter power measurments	new		Transmitters	2017_03 ISCOD CONGSS	normal
1459	30 Mar 23:00 Transmitter Power Measurements	new		Transmitters	2017_03 ISCOD CONGSS	normal
1460	31 Mar 00:05 Figures	new	P. Condor	Plot	2017_03 ISCOD CONGSS	normal
1461	31 Mar 06:07 Imaging is off	new	P.Condor	Acquisition system	2017_03 ISCOD CONGSS	normal
1462	31 Mar 05:42 Noise levels	new	P.Condor	General	2017_03 ISCOD CONGSS	normal
1463	31 Mar 04:57 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2017_03 ISCOD CONGSS	normal
1464	31 Mar 07:00 Transmitter Power Measurements	new		Transmitters	2017_03 ISCOD CONGSS	normal
1465	31 Mar 07:50 Figures	new	P. Condor	Process/Analysis Program	2017_03 ISCOD CONGSS	normal
1466	31 Mar 08:00 Operation resume	new	P.Condor	General	2017_03 ISCOD CONGSS	normal
1467	31 Mar 18:00 Imaging ON	new		Start experiment	2017_03 ISCOD CONGSS	normal
1468	31 Mar 19:00 Transmitter Power Measurements	new		Transmitters	2017_03 ISCOD CONGSS	normal
1469	31 Mar 08:00 - 20:00 Noise Levels	new		General	2017_03 ISCOD CONGSS	normal
1470	31 Mar 20:00 Spark gaps adjustment	new		Spark Gaps	2017_03 ISCOD CONGSS	normal
1471	31 Mar 20:00 Figures	new		Plot	2017_03 ISCOD CONGSS	normal
1472	31 Mar 08:00-20:00 Operation resume	new		General	2017_03 ISCOD CONGSS	normal
1473	31 Mar 23:00 Transmitter Power Measurements	new		Transmitters	2017_03 ISCOD CONGSS	normal
1474	31 Mar 23:59 Plots	new	abelleza	Plot	2017_03 ISCOD CONGSS	normal
1475	01 Apr 04:34 Spark gaps adjustment history	new	abelleza	Spark Gaps	2017_03 ISCOD CONGSS	normal
1476	01 Apr 06:10 Finish Imaging Experiment	new	abelleza	End experiment	2017_03 ISCOD CONGSS	normal
1477	01 Apr 08:00 Plots	new	abelleza	Plot	2017_03 ISCOD CONGSS	normal
1478	01 Apr 08:05 Finished experiment	new	abelleza	End experiment	2017_03 ISCOD CONGSS	normal
1479	01 Apr 08:10 Transmitter Power Measurements	new		Transmitters	2017_03 ISCOD CONGSS	normal
1480	04 Apr 17:00 Experiment data uploaded to PUMA	new	I. Manay	General	2017_03 ISCOD CONGSS	normal
1481	05 Apr 15:00 Report	new		End experiment	2017_03 ISCOD CONGSS	normal
1482	17 Apr 18:15 Start of the experiment	new	I. Manay	Start experiment	2017_04 MST-ISR-EEJ	normal
1483	17 Apr 18:22 Spark-gaps adjusment	new	I. Manay	Spark Gaps	2017_04 MST-ISR-EEJ	normal
1484	17 Apr 1959 Operation Resume	new	I. Manay	General	2017_04 MST-ISR-EEJ	normal
1485	17 Apr 23:00 Transmitter Power Measurements	new		Transmitters	2017_04 MST-ISR-EEJ	normal
1486	18 Apr 07:00 Transmitter Power Measurements	new		Transmitters	2017_04 MST-ISR-EEJ	normal
1487	18 Apr 10:00 Antenna VSWR	new		Antennas	2017_04 MST-ISR-EEJ	normal
1488	19 Apr 23:59 Plots	new	I. Manay	Plot	2017_04 MST-ISR-EEJ	normal
1490	20 Apr 07:00 Transmitter Power Measurements	new		Transmitters	2017_04 MST-ISR-EEJ	normal
1491	20 Apr 07:30 Spark gaps adjustment history	new	J. Lavado	Spark Gaps	2017_04 MST-ISR-EEJ	normal
1492	20 Apr 07:59 Operation Resume	new	I. Manay	General	2017_04 MST-ISR-EEJ	normal
1493	20 Apr 17:20 Transmitter Power Measurements	new		Transmitters	2017_04 MST-ISR-EEJ	normal
1494	20 Apr 19:00 Transmitter Power Measurements	new		Transmitters	2017_04 MST-ISR-EEJ	normal
1495	20 Apr 17:50 Spark Gap Adjustment	new		Antennas	2017_04 MST-ISR-EEJ	normal
1496	20 Apr 08:14 Increase gain	new		Reception	2017_04 MST-ISR-EEJ	normal
1497	20 Apr 19:30 Noise Levels	new		Reception	2017_04 MST-ISR-EEJ	normal
1498	20 Apr 19:50 Operation Resume	new		General	2017_04 MST-ISR-EEJ	normal
1499	19 Apr 00:09 Problem with transmitter	new	P. Condor	Transmitters	2017_04 MST-ISR-EEJ	normal
1500	19 Apr 05:20 Change in spark gap	new	P. Condor	Spark Gaps	2017_04 MST-ISR-EEJ	normal
1501	19 Apr 07:00 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2017_04 MST-ISR-EEJ	normal
1502	19 Apr 07:32 Noise Levels	new	P.Condor	General	2017_04 MST-ISR-EEJ	normal
1503	19 Apr 00:01 Plots	new	P. Condor	Plot	2017_04 MST-ISR-EEJ	normal
1504	19 Apr 08:00 Figures	new	P. Condor	Plot	2017_04 MST-ISR-EEJ	normal
1505	19 Apr 08:00 Operation Resume	new	P.Condor	General	2017_04 MST-ISR-EEJ	normal
1506	21 Apr 00:05 Figures	new	P. Condor	Plot	2017_04 MST-ISR-EEJ	normal
1507	21 Apr 06:09 Spark gaps adjustment	new	J. Lavado	Spark Gaps	2017_04 MST-ISR-EEJ	normal
1508	21 Apr 07:06 Noise levels	new	P.Condor	General	2017_04 MST-ISR-EEJ	normal
1509	21 Apr 07:00 Transmitter Power Measurement	new		Transmitters	2017_04 MST-ISR-EEJ	normal
1510	21 Apr 07:50 Figures	new	P. Condor	Plot	2017_04 MST-ISR-EEJ	normal
1511	21 Apr 08:00 Operation Resume	new	P.Condor	General	2017_04 MST-ISR-EEJ	normal
1513	02 May 10:40 Log Created for Driver Mode for Vertical Drifts	new		Start experiment	2017_05 Driver Mode for EW Drift	normal
1514	02 May 11:00 Antenna VSWR	new		Antennas	2017_05 Driver Mode for EW Drift	normal
1515	17:36  Start experiment	new		Start experiment	2017_05 Driver Mode for EW Drift	normal
1516	2 May 19:25 Spark gaps adjustment	new		Spark Gaps	2017_05 Driver Mode for EW Drift	normal
1517	2 May 2017 19:26 Noise Levels	new		General	2017_05 Driver Mode for EW Drift	normal
1518	2 May 2017 19:30 Figures	new		Plot	2017_05 Driver Mode for EW Drift	normal
1519	2 May 20:00 Operation Resume	new		General	2017_05 Driver Mode for EW Drift	normal
1520	2 May 07:05 Transmitter Power Measurements	new		Transmitters	2017_05 Driver Mode for EW Drift	normal
1521	02 May 23:59 Plots	new	abelleza	Plot	2017_05 Driver Mode for EW Drift	normal
1522	03 May 07:01 Spark Gaps Adjustment	new	abelleza	Spark Gaps	2017_05 Driver Mode for EW Drift	normal
1523	04 May 20:00 Operation Resume	new		General	2017_05 Driver Mode for EW Drift	normal
1524	04 May 23:59 Plots	new	abellleza	Plot	2017_05 Driver Mode for EW Drift	normal
1525	5 May 07:00 Transmitter Power Measurements	new		Transmitters	2017_05 Driver Mode for EW Drift	normal
1526	05 May 06:01 Spark Gaps Adjustment	new	abelleza	Spark Gaps	2017_05 Driver Mode for EW Drift	normal
1527	05 May 07:30 Plots	new	abelleza	Plot	2017_05 Driver Mode for EW Drift	normal
1528	05 May 15:00 Spark Gaps Adjustment	new		Spark Gaps	2017_05 Driver Mode for EW Drift	normal
1529	05 May 08:00 - 15:30 Operation Resume	new		General	2017_05 Driver Mode for EW Drift	normal
1530	05 May End Experiment	new		End experiment	2017_05 Driver Mode for EW Drift	normal
1531	05 May 15:30 Plots	new		Plot	2017_05 Driver Mode for EW Drift	normal
1532	10 May 08:00 Experiment Manual	new		General	2017_05 Driver Mode for EW Drift	normal
1533	16 May 10:00 Campaign Report	new		General	2017_04 MST-ISR-EEJ	normal
1534	16 May 11:00 Operativity	new		End experiment	2017_05 Driver Mode for EW Drift	normal
1535	24 Jul 10:00 Log created for ISR School Campaign	new		Start experiment	2017_07_ISR School	normal
1536	24 Jul 16:50 Antenna VSWR	new		Antennas	2017_07_ISR School	normal
1537	24 Jul 18:30 Start of the experiment	new	I. Manay	Start experiment	2017_07_ISR School	normal
1538	24 Jul 19:59 Operation Resume	new	I. Manay	General	2017_07_ISR School	normal
1539	25 Jul 01:10 Plots	new	P. Condor	Plot	2017_07_ISR School	normal
1540	25 Jul 07:05 Transmitter Power Measurements	new		Transmitters	2017_07_ISR School	normal
1541	24 Jul 20:49 Change of amplifier in Imaging	new	P. Condor	Antennas	2017_07_ISR School	normal
1542	24 Jul 21:33 Restart of Faraday	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1543	25 Jul 00:57 Restart of Faraday	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1544	25 Jul 01:55 Transmitter off	new	P. Condor	Transmitters	2017_07_ISR School	normal
1545	25 Jul 04:58 Restart of Faraday	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1546	25 Jul 05:15 Restart of Faraday	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1547	25 Jul 07:06 Restart of Faraday	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1548	25 Jul 07:50 Plots	new	P. Condor	Process/Analysis Program	2017_07_ISR School	normal
1549	25 Jul 08:00 Operation Resume	new	P. Condor	General	2017_07_ISR School	normal
1550	31 Jul 16:30 Start of the experiment	new	I. Manay	Start experiment	2017_07_ISR School	normal
1551	31 Jul 16:44 Adjustment at EW_Drifts experiment	new	I. Manay	Reception	2017_07_ISR School	normal
1552	31 Jul 17:40 Faraday experiment fails	new	I. Manay	Acquisition system	2017_07_ISR School	normal
1553	31 Jul 18:50 Spark Gaps Adjustment	assigned	J. Lavado	Spark Gaps	2017_07_ISR School	normal
1554	31 Jul 19:50 Operation Resume	new	I. Manay	General	2017_07_ISR School	normal
1555	31 Jul 23:00 Transmitter Power Measurements	new		Transmitters	2017_07_ISR School	normal
1556	01 Aug 07:00 Transmitter Power Measurements	new		Transmitters	2017_07_ISR School	normal
1557	31 Jul 20:57 Faraday experiment fails	new	A. Belleza	Acquisition system	2017_07_ISR School	normal
1558	01 Aug 02:34 EW_Drifts experiment fails	new	A. Belleza	Acquisition system	2017_07_ISR School	normal
1559	01 Aug 02:58 Faraday experiment fails	new	A. Belleza	Acquisition system	2017_07_ISR School	normal
1560	01 Aug 06:58 Spark Gaps Adjustment	new	A. Belleza	Spark Gaps	2017_07_ISR School	normal
1561	01 Aug 07:59 Operation Resume	new	A. Belleza	General	2017_07_ISR School	normal
1562	01 Aug 23:05 Transmitter Power Measurements	new		Transmitters	2017_07_ISR School	normal
1563	01 Aug 16:20 Start Imaging	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1564	01 Aug 21:44 Problem with Faraday system	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1565	01 Aug 17:09 TR Adjustments	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1566	01 Aug 13:50 Faraday channels attenuation	new	P. Condor	Reception	2017_07_ISR School	normal
1567	01 Aug 17:54 Problem with Faraday system	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1568	01 Aug 19:59 Operation Resume	new	P. Condor	General	2017_07_ISR School	normal
1569	02 Aug 00:05 Plots	new	P. Condor	General	2017_07_ISR School	normal
1570	02 Aug 07:00 Transmitter Power Measurements	new		Transmitters	2017_07_ISR School	normal
1571	02 Aug 01:47 Problem with Faraday System	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1572	02 Aug 04:06 Problem with Faraday System	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1573	02 Aug 05:18 Problem with Faraday System	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1574	02 Aug 05:36 Problem with Faraday System	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1575	02 Aug 05:56 Problem with Faraday System	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1576	02 Aug 06:43 Problem with Faraday System	new	P. Condor	Acquisition system	2017_07_ISR School	normal
1578	02 Aug 05:25 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2017_07_ISR School	normal
1579	02 Aug 07:15 Noise levels	new	P. Condor	General	2017_07_ISR School	normal
1580	02 Aug 08:00 Operation resume	new	P. Condor	General	2017_07_ISR School	normal
1581	02 Aug 08:05 Plots	new	P. Condor	General	2017_07_ISR School	normal
1582	03 Aug 07:00 Transmitter Power Measurements	new		Transmitters	2017_07_ISR School	normal
1583	16 Aug 12:00 Log created Eclipse Aug21	new		Start experiment	2017_08 Eclipse Aug 21	normal
1584	25 Jul 07:10 Noise levels	new	P. Condor	General	2017_07_ISR School	normal
1585	25 Jul 07:00 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2017_07_ISR School	normal
1586	17 Aug 11:30 Antenna VSWR	new		Antennas	2017_08 Eclipse Aug 21	normal
1587	20 Aug 2017 16:15 Start Experiment	new		Start experiment	2017_08 Eclipse Aug 21	normal
1588	20 Aug 2017 17:08 Spark gap change	new		Spark Gaps	2017_08 Eclipse Aug 21	normal
1589	20 August 2017 20:00 Spark gaps adjustment	new		Spark Gaps	2017_08 Eclipse Aug 21	normal
1590	20 Aug 2017 17:55 Start Imaging	new		Start experiment	2017_08 Eclipse Aug 21	normal
1591	20 Aug 2017 19:40 Operation Resume	new		General	2017_08 Eclipse Aug 21	normal
1592	20 Aug 2017 19:45 Plots	new		Plot	2017_08 Eclipse Aug 21	normal
1593	20 Aug 23:00 Transmitter Power Measurements	new		Transmitters	2017_08 Eclipse Aug 21	normal
1594	20 Aug 23:59 Plots	new	AValdez	Plot	2017_08 Eclipse Aug 21	normal
1595	21 Aug 07:00 Transmitter Power Measurements	new		Transmitters	2017_08 Eclipse Aug 21	normal
1596	21 Aug 2017 07:59 Operation Resume	new	AValdez	General	2017_08 Eclipse Aug 21	normal
1597	21 Aug 2017 13:40 Fall of transmitters	new	I. Manay	Transmitters	2017_08 Eclipse Aug 21	normal
1598	21 Aug 2017 17:25 Restart of acquisition system	new	I. Manay	Acquisition system	2017_08 Eclipse Aug 21	normal
1599	21 Aug 2017 17:25 Imaging system is started	new	I. Manay	Start experiment	2017_08 Eclipse Aug 21	normal
1600	21 Aug 19:20 Transmitter power measurements	new		Transmitters	2017_08 Eclipse Aug 21	normal
1601	21 Aug 2017 19:25 Spark-gap adjustment	new	J. Lavado	Spark Gaps	2017_08 Eclipse Aug 21	normal
1602	21 Aug 19:50 Operation Resume	new	I. Manay	General	2017_08 Eclipse Aug 21	normal
1603	21 Aug 23:05 Transmitter Power Measurements	new		Transmitters	2017_08 Eclipse Aug 21	normal
1604	22 Aug 07:00 Transmitter Power Measurements	new		Transmitters	2017_08 Eclipse Aug 21	normal
1605	21 Aug 2017 23:59 Plots	new		Plot	2017_08 Eclipse Aug 21	normal
1606	22 Aug 2017 07:32 Spark-gap adjustment	new		Spark Gaps	2017_08 Eclipse Aug 21	normal
1607	22 Aug 2017 07:40 Plots	new		Plot	2017_08 Eclipse Aug 21	normal
1608	22 Aug 08:00 Operation Resume	new		General	2017_08 Eclipse Aug 21	normal
1609	22 Aug 16:29 Spark Gap Adjustments	new		Spark Gaps	2017_08 Eclipse Aug 21	normal
1610	22 Aug 17:05 Imaging start	new		Start experiment	2017_08 Eclipse Aug 21	normal
1611	22 Aug 18:12 Faraday Restart	new		Acquisition system	2017_08 Eclipse Aug 21	normal
1612	22 Aug 19:10 Transmitter report	new		Transmitters	2017_08 Eclipse Aug 21	normal
1613	22 Aug 20:00 Operation Resume	new		General	2017_08 Eclipse Aug 21	normal
1614	23 Aug 00:05 Plots	new	P. Condor	Process/Analysis Program	2017_08 Eclipse Aug 21	normal
1615	23 Aug 00:34 Restart Faraday	new	P. Condor	Acquisition system	2017_08 Eclipse Aug 21	normal
1616	23 Aug 06:02 Noise levels	new	P. Condor	General	2017_08 Eclipse Aug 21	normal
1617	23 Aug 06:09 Imaging is off	new	P. Condor	Acquisition system	2017_08 Eclipse Aug 21	normal
1618	23 Aug 07:30 Spark gaps adjustment	new	A. Coronado	Spark Gaps	2017_08 Eclipse Aug 21	normal
1619	23 Aug 07:05 Transmitter Power Measurements	new		Transmitters	2017_08 Eclipse Aug 21	normal
1620	23 Aug 08:01 Plots	new	P. Condor	Process/Analysis Program	2017_08 Eclipse Aug 21	normal
1621	23 Aug 08:00 Operation Resume	new	P. Condor	General	2017_08 Eclipse Aug 21	normal
1622	23 Aug 11:00 Upload data to PUMA	new	I. Manay	End experiment	2017_08 Eclipse Aug 21	normal
1624	05 Sep 14:00 Log created	new		Start experiment	2017_09 ISCOD ISR + Imaging	normal
1625	5 Set 2017 16:40 Inicio de experimento	new		Start experiment	2017_09 ISCOD ISR + Imaging	normal
1626	5 Set 2017 16:40 Inicio de experimento Imagenes	new		Start experiment	2017_09 ISCOD ISR + Imaging	normal
1627	5 Set 2017 , 19:35 Spark gaps adjustment	new		Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1628	5 Set 2017 19:36 Operation Resume	new		General	2017_09 ISCOD ISR + Imaging	normal
1629	5 Set 19:40 Plots	new		Plot	2017_09 ISCOD ISR + Imaging	normal
1630	05 Set 23:10 Transmitter Power Measurements	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1631	6 Set 00:01 Plots	assigned	AVALDEZ	Plot	2017_09 ISCOD ISR + Imaging	normal
1632	6 Set 07:00 Spark gaps adjustment	new	AVALDEZ	Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1633	06 Set 07:00 Transmitter Power Measurements	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1634	6 Set 2017 07:45 Operation Resume	new	AVALDEZ	General	2017_09 ISCOD ISR + Imaging	normal
1635	06 Sep 2017 18:13 Spark-gap adjustment	new	W. Rojas	Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1636	06 Sep 2017 17:30 Imaging was started	new	I. Manay	Start experiment	2017_09 ISCOD ISR + Imaging	normal
1637	06 Set 19:20 Transmitter report	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1638	06 Sep 2017 19:50 Operation Resume	new	I. Manay	General	2017_09 ISCOD ISR + Imaging	normal
1639	06 Set 23:59 Plots	new	abelleza	Plot	2017_09 ISCOD ISR + Imaging	normal
1640	07 Set 07:00 Transmitter Power Measurements	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1641	07 Set 06:14 Spark gaps adjustment	new	abelleza	Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1642	07 Set 06:32 Imaging is off	new	abelleza	Break Experiment	2017_09 ISCOD ISR + Imaging	normal
1643	07 Set 07:45 Plots	new	abelleza	Plot	2017_09 ISCOD ISR + Imaging	normal
1644	07 Set 2017 07:45 Operation Resume	new	abelleza	General	2017_09 ISCOD ISR + Imaging	normal
1645	07 Set 19:20 Transmitter report	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1646	07 Set 2017 20:00 Operation Resume	new		General	2017_09 ISCOD ISR + Imaging	normal
1647	08 Set 07:00 Spark gaps adjustment	new		Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1648	08 Set 07:00 Transmitter report	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1649	07-08 Set 2017 07:45 Plots	new		Plot	2017_09 ISCOD ISR + Imaging	normal
1650	08 Set 2017 07:45 Operation Resume	new		General	2017_09 ISCOD ISR + Imaging	normal
1651	08 Set 2017 07:50 Imaging off	new		End experiment	2017_09 ISCOD ISR + Imaging	normal
1652	08 set 17:20 Change of spark gaps	new	W. Rojas	Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1653	08 set 17:34 Transmitter on	new	P. Condor	Transmitters	2017_09 ISCOD ISR + Imaging	normal
1654	08 set 17:35 Imaging on	new	P. Condor	Acquisition system	2017_09 ISCOD ISR + Imaging	normal
1655	08 set 18:04 Transmitter on	new	P. Condor	Acquisition system	2017_09 ISCOD ISR + Imaging	normal
1656	08 set 19:00 Noise levels	new	P. Condor	General	2017_09 ISCOD ISR + Imaging	normal
1657	08 set 18:04 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1658	08 Set 19:20 Transmitter report	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1659	08 set 19:50 Plots	new	P. Condor	Process/Analysis Program	2017_09 ISCOD ISR + Imaging	normal
1660	08 set 20:00 Operation resume	new	P. Condor	General	2017_09 ISCOD ISR + Imaging	normal
1661	08 Set 23:10 Transmitter Power Measurements	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1662	08 Sep 23:59 Plots	new	abelleza	Plot	2017_09 ISCOD ISR + Imaging	normal
1663	09 Sep 06:00 Spark gaps adjustment	new	abelleza	Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1664	09 Set 07:00 Transmitter Power Measurements	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1665	09 Sep 06:26 Imaging is off	new	abelleza	Break Experiment	2017_09 ISCOD ISR + Imaging	normal
1666	09 Set 07:45 Plots	new	abelleza	Plot	2017_09 ISCOD ISR + Imaging	normal
1667	09 Set 19:00 Transmitter Power Measurements	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1668	09 Sep 2017 19:26 Spark-gap adjustment	new	J. Lavado	Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1669	09 Sep 2017 11:45 Adjustment at Faraday reception line	new	I. Manay	Reception	2017_09 ISCOD ISR + Imaging	normal
1670	09 Sep 2017 19:00 Imaging experiment started	new	I. Manay	Acquisition system	2017_09 ISCOD ISR + Imaging	normal
1671	09 Sep 2017 19:50 Operation Resume	new	I. Manay	General	2017_09 ISCOD ISR + Imaging	normal
1672	09 Set 23:00 Transmitter Power Measurements	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1673	09 Set 23:59   Plots	new	AValdez	Plot	2017_09 ISCOD ISR + Imaging	normal
1674	10 Sep 2017 06:50 am Spark-gap adjustment	new	AValdez	Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1675	10 Set 07:00 Transmitter Power Measurements	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1676	10 Set 2017 07:47 Operation Resume	new	AValdez	General	2017_09 ISCOD ISR + Imaging	normal
1677	10 Set 19:45 Transmitter report	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1678	10 Set 2017 19:45 Operation Resume	new		General	2017_09 ISCOD ISR + Imaging	normal
1679	10 Sep 2017 19:45 Spark-gap adjustment	new		Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1680	10 Sep 2017 17:50 Imaging experiment started	new		Start experiment	2017_09 ISCOD ISR + Imaging	normal
1681	10 Set 19:50 Plots	new		Plot	2017_09 ISCOD ISR + Imaging	normal
1682	11 Set 00:10 Plots	new	P. Condor	Process/Analysis Program	2017_09 ISCOD ISR + Imaging	normal
1683	11 set 06:37 Noise levels	new	P. Condor	General	2017_09 ISCOD ISR + Imaging	normal
1684	11 set 06:40 Imaging off	new	P. Condor	Acquisition system	2017_09 ISCOD ISR + Imaging	normal
1685	11 set 04:49 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1686	11 Set 07:00 Transmitter Power Measurements	new		Transmitters	2017_09 ISCOD ISR + Imaging	normal
1687	11 Set 07:50 Plots	new	P. Condor	Process/Analysis Program	2017_09 ISCOD ISR + Imaging	normal
1688	11 set 08:00 Operation resume	new	P. Condor	General	2017_09 ISCOD ISR + Imaging	normal
1689	11 Set 2017 19:30 Operation Resume	new		General	2017_09 ISCOD ISR + Imaging	normal
1690	11 Sep 2017 19:30 Spark-gap adjustment	new		Spark Gaps	2017_09 ISCOD ISR + Imaging	normal
1691	11 Sep 2017 17:30 Imaging experiment started	new		Start experiment	2017_09 ISCOD ISR + Imaging	normal
1692	11 Sep 2017 19:15 End experiment	new		End experiment	2017_09 ISCOD ISR + Imaging	normal
1693	11 Set 19:30 Plots	new		Plot	2017_09 ISCOD ISR + Imaging	normal
1694	12 Sep 12:30 Upload data to PUMA	new	I. Manay	General	2017_09 ISCOD ISR + Imaging	normal
1695	19 Sep 17:00 Log Created	new		Start experiment	2017_09_01 Meteors	normal
1696	19 Sep 17:30 Experiment started	new	I. Manay	Start experiment	2017_09_01 Meteors	normal
1697	19 Sep 17:50 Turn digisonde off	new	I. Manay	Other Instruments	2017_09_01 Meteors	normal
1698	19 Sep 19:50 Operation Resume	new	I. Manay	General	2017_09_01 Meteors	normal
1699	19 Set 20:00 Transmitter report	new		Transmitters	2017_09_01 Meteors	normal
1700	19 Set 23:00 Transmitter Power Measurements	new		Transmitters	2017_09_01 Meteors	normal
1701	20 sep 01:00 Plots	new	P. Condor	Process/Analysis Program	2017_09_01 Meteors	normal
1702	20 Set 07:00 Transmitter Power Measurements	new		Transmitters	2017_09_01 Meteors	normal
1703	20 Sep 06:29 Noise Levels	new	P. Condor	General	2017_09_01 Meteors	normal
1704	20 Sep 07:50 Plots	new	P. Condor	Process/Analysis Program	2017_09_01 Meteors	normal
1705	20 Sep 08:00 Operation Resume	new	P. Condor	General	2017_09_01 Meteors	normal
1706	20 Sep 09:00 Final Reports	new		End experiment	2017_09 ISCOD ISR + Imaging	normal
1707	20 Sep 17:15 Experiment Start	new		Start experiment	2017_09_01 Meteors	normal
1708	20 Sep 18:03 Transmitter off	new		Transmitters	2017_09_01 Meteors	normal
1709	20 Sep 20:00 Operation Resume	new		General	2017_09_01 Meteors	normal
1710	20 Set 23:00 Transmitter Power Measurements	new		Transmitters	2017_09_01 Meteors	normal
1711	20 sep 23:59 Plots	new		Plot	2017_09_01 Meteors	normal
1712	21 Set 07:00 Transmitter Power Measurements	new		Transmitters	2017_09_01 Meteors	normal
1713	25 Sep 09:00 Log Created	new		Start experiment	2017_09_02 Drifts Meduim Power	normal
1714	25 Sep 15:00 Antenna VSWR	new		Antennas	2017_09_02 Drifts Meduim Power	normal
1715	25 Set 23:20 Transmitter Power Measurements	new		Transmitters	2017_09_02 Drifts Meduim Power	normal
1716	25 sep 23:59 Plots	new	AVALDEZ	Plot	2017_09_02 Drifts Meduim Power	normal
1717	26 Sep 08:00 Operation Resume	new	AVALDEZ	Plot	2017_09_02 Drifts Meduim Power	normal
1718	26 Set 07:00 Transmitter Power Measurements	new		Transmitters	2017_09_02 Drifts Meduim Power	normal
1719	26 Set 23:05 Transmitter Power Measurements	new		Transmitters	2017_09_02 Drifts Meduim Power	normal
1720	27 Set 07:00 Transmitter Power Measurements	new		Transmitters	2017_09_02 Drifts Meduim Power	normal
1721	26 Sep 20:00 Operation Resume	new		General	2017_09_02 Drifts Meduim Power	normal
1723	26 Sep 09:50 Reciever	new		General	2017_09_02 Drifts Meduim Power	normal
1724	26 Sep  20:07 Spark Gaps	new		Spark Gaps	2017_09_02 Drifts Meduim Power	normal
1725	27 Sep 16:20 VIPIR On	new		Acquisition system	2017_09_02 Drifts Meduim Power	normal
1726	27 Sep 17:17 Imaging On	new		General	2017_09_02 Drifts Meduim Power	normal
1727	27 Sept 19:30 Transmitter report	new		Transmitters	2017_09_02 Drifts Meduim Power	normal
1728	27 Sep 18:04 Spark Gaps	new		Spark Gaps	2017_09_02 Drifts Meduim Power	normal
1729	27 Sep 19:38 Noise Levels	new		Reception	2017_09_02 Drifts Meduim Power	normal
1730	27 Sep 20:00 Operation Resume	new		General	2017_09_02 Drifts Meduim Power	normal
1731	28 Sep 00:05 Plots	new	P. Condor	Process/Analysis Program	2017_09_02 Drifts Meduim Power	normal
1732	28 Sept 07:30 Transmitter report	new		Transmitters	2017_09_02 Drifts Meduim Power	normal
1733	28 Sep 07:04 Noise levels	new	P. Condor	General	2017_09_02 Drifts Meduim Power	normal
1734	28 Sep 04:13 Spark gaps adjustment	new	J. Lavado	Spark Gaps	2017_09_02 Drifts Meduim Power	normal
1735	28 Sep 07:40 Plots	new	P. Condor	Process/Analysis Program	2017_09_02 Drifts Meduim Power	normal
1736	28 Sep 08:00 Operation Resume	new	P. Condor	General	2017_09_02 Drifts Meduim Power	normal
1737	28 Sep 19:30 Transmitter report	new		Transmitters	2017_09_02 Drifts Meduim Power	normal
1738	29 Sep 00:05 Plots	new	AValdez	Plot	2017_09_02 Drifts Meduim Power	normal
1739	29 Sep 08:00 Operation Resume	new	AValdez	General	2017_09_02 Drifts Meduim Power	normal
1740	19 Oct 17:00 Log created	new		Start experiment	2017_10_Solar Radar	normal
1741	19 Oct 17:10 VSWR Antenna	new		Antennas	2017_10_Solar Radar	normal
1742	13 Nov 15:00 Log created	new		Start experiment	2017_11 MIMO	normal
1743	13 Nov 15:10 Antenna VSWR	new		Antennas	2017_11 MIMO	normal
1744	15 Nov 06:18 Hydra pass	new	I. Manay	Acquisition system	2017_11 MIMO	normal
1745	15 Nov 07:00 Temperature of connectors	new	J. Lavado	Antennas	2017_11 MIMO	normal
1746	15 Nov 07:00 plot	new	I. Manay	Plot	2017_11 MIMO	normal
1747	15 Nov 07:10 Transmitter power	new		Transmitters	2017_11 MIMO	normal
1748	16 Nov 00:05 Plots	new	P. Condor	Plot	2017_11 MIMO	normal
1749	16 Nov 05:07 Transmitter off	new	P. Condor	Transmitters	2017_11 MIMO	normal
1750	16 Nov 06:26 Transmitter on	new	P. Condor	Transmitters	2017_11 MIMO	normal
1751	16 Nov 08:00 Operation Resume	new	P. Condor	General	2017_11 MIMO	normal
1752	16 Nov 07:40 Plots	new	P. Condor	Plot	2017_11 MIMO	normal
1753	13 Nov 17:00 Start Experiment	new		Start experiment	2017_11 MIMO	normal
1754	13 Nov 20:00 TR W15 failure	new		General	2017_11 MIMO	normal
1755	14 Nov 05:15 - 07:15 Hydra pass	new		Start experiment	2017_11 MIMO	normal
1756	14 Nov 07:54 End Expeirment	new		End experiment	2017_11 MIMO	normal
1757	14 Nov 16:33 Start Experiment	new		Start experiment	2017_11 MIMO	normal
1758	15 Nov 07:50 End Expeirment	new		End experiment	2017_11 MIMO	normal
1759	15 Nov 17:26 Start Experiment	new		Start experiment	2017_11 MIMO	normal
1760	16 Nov 07:35 End Experiment	new		End experiment	2017_11 MIMO	normal
1761	16 Nov 16:30 Start Experiment	new		Start experiment	2017_11 MIMO	normal
1762	16 Nov 20:15 Noise increased	new		Reception	2017_11 MIMO	normal
1763	17 Nov 01:15 Noise decreased	new		Reception	2017_11 MIMO	normal
1764	17 Nov 08:00 End  Experiment	new		End experiment	2017_11 MIMO	normal
1765	14 Dec 17:30 Log created	new		Start experiment	2017_12 Convection Polar Cap	normal
1766	16 Dec 19:00 Transmitter Power Measurements	new		Transmitters	2017_12 Convection Polar Cap	normal
1767	16 Dic 07:49 Start Experiment	new		Start experiment	2017_12 Convection Polar Cap	normal
1768	16 Dic 08:25 Faraday Restart	new		Reception	2017_12 Convection Polar Cap	normal
1769	16 Dic Arcos de malla en la antena	new		Antennas	2017_12 Convection Polar Cap	normal
1770	16 Dic 12:15 - 12:55 Falla de control en TX	new		Transmitters	2017_12 Convection Polar Cap	normal
1771	16 Dic 17:30 - 18:07 Fallal en TX	new		Transmitters	2017_12 Convection Polar Cap	normal
1772	16 Dic 18:09 Start Imaging	new		Start experiment	2017_12 Convection Polar Cap	normal
1773	16 Dic  07:00-20:00 Spark Gap calibración	new		Spark Gaps	2017_12 Convection Polar Cap	normal
1774	16 Dec 19:34 Transmitter  Failures	new		Transmitters		normal
1775	16 Dic 20:00 Operation Resume	new		General	2017_12 Convection Polar Cap	normal
1776	16 Dec 11:59 plot	new	abelleza	Plot	2017_12 Convection Polar Cap	normal
1777	17 Dec 07:00 Transmitter Power Measurements	new		Transmitters	2017_12 Convection Polar Cap	normal
1778	17 Dec 18:00 Spark-gap adjustment	new	J. Lavado	Spark Gaps	2017_12 Convection Polar Cap	normal
1779	17 Dec 18:00 Experiment without transmitters	new	I. Manay	Transmitters	2017_12 Convection Polar Cap	normal
1780	17 Dec 18:00 Imaging experiment is started	new	I. Manay	Start experiment	2017_12 Convection Polar Cap	normal
1781	17 Dec 18:40 plots	new	I. Manay	Plot	2017_12 Convection Polar Cap	normal
1782	17 Dec 19:40 Transmitter report	new		Transmitters	2017_12 Convection Polar Cap	normal
1783	17 Dec 19:50 Operation Resume	new	I. Manay	General	2017_12 Convection Polar Cap	normal
1784	18 Dec 00:05 Plots	new	P. Condor	Process/Analysis Program	2017_12 Convection Polar Cap	normal
1785	18 Dec 07:00 Noise levels	new	P. Condor	General	2017_12 Convection Polar Cap	normal
1786	18 Dec 06:05 Spark gaps adjustment	new	W. Rojas	Spark Gaps	2017_12 Convection Polar Cap	normal
1787	18 Dec 06:06 Imaging off	new	P. Condor	Acquisition system	2017_12 Convection Polar Cap	normal
1788	18 Dec 07:00 Transmitter Power Measurements	new		Transmitters	2017_12 Convection Polar Cap	normal
1789	18 Dec 07:30 Plots	new	P. Condor	Process/Analysis Program	2017_12 Convection Polar Cap	normal
1790	18 Dec 08:00 Operation Resume	new	P. Condor	General	2017_12 Convection Polar Cap	normal
1791	18 Dec 19:30 Transmitter report	new		Transmitters	2017_12 Convection Polar Cap	normal
1792	18 Dec 20:00 Transmitter Power Measurements	new		Transmitters	2017_12 Convection Polar Cap	normal
1793	18 Dec 11:59 plot	new	abelleza	Plot	2017_12 Convection Polar Cap	normal
1794	19 Dec 07:10 Transmitter Power Measurements	new		Transmitters	2017_12 Convection Polar Cap	normal
1795	17 Dec 05:32 Spark Gaps	new	abelleza	Spark Gaps	2017_12 Convection Polar Cap	normal
1796	19 Dec 06:05 Spark Gaps	new	abelleza	Spark Gaps	2017_12 Convection Polar Cap	normal
1797	19 Dec 23:05 Transmitter Power Measurements	new		Transmitters	2017_12 Convection Polar Cap	normal
1798	19 Dec 23:58 plots	new	I. Manay	Plot	2017_12 Convection Polar Cap	normal
1799	20 Dec 06:00 stop of experiment	new	I. Manay	End experiment	2017_12 Convection Polar Cap	normal
1800	20 Dec 06:26 Spark-gap adjustment	new	A. Coronado	Spark Gaps	2017_12 Convection Polar Cap	normal
1801	20 Dec 07:08 Transmitter Power Measurements	new		Transmitters	2017_12 Convection Polar Cap	normal
1802	20 Dec 07:00 plots	new	I. Manay	Plot	2017_12 Convection Polar Cap	normal
1803	20 Dec 07:50 Operation Resume	new	I. Manay	General	2017_12 Convection Polar Cap	normal
1804	19 Dec 12:06 Transmitter off	new		Transmitters	2017_12 Convection Polar Cap	normal
1805	19 Dec 17:32 Transmitter on	new		Transmitters	2017_12 Convection Polar Cap	normal
1806	19 Dec 17:33 Imaging on	new		General	2017_12 Convection Polar Cap	normal
1807	19 Dec 17:39 Faraday restart	new		Acquisition system	2017_12 Convection Polar Cap	normal
1808	19 Dec 18:41 Spark gap adjustments	new		Antennas	2017_12 Convection Polar Cap	normal
1809	19 Dec 10:17 Faraday Processing stopped	new		Acquisition system	2017_12 Convection Polar Cap	normal
1810	19 Dec 19:20 Noise levels	new		Reception	2017_12 Convection Polar Cap	normal
1811	19 Dec 20:00 Operation Resume	new		General	2017_12 Convection Polar Cap	normal
1812	04 Jan Final Faraday Plots	new		Process/Analysis Program	2017_12 Convection Polar Cap	normal
1813	04 Jan FInal Report	new		End experiment	2017_12 Convection Polar Cap	normal
1814	08 Jan 11:00 Upload data to PUMA	new	I. Manay	General	2017_12 Convection Polar Cap	normal
1815	23 Jan 11:59 plot	new	abelleza	Plot		normal