﻿id	summary	owner	type	priority	component	version
818	25 Jan 07:00 Plots of the experiments	I. Manay	Plot	normal	ISR	
834	25 Jan 23:59 Experiment Plots		Plot	normal	ISR	
866	28 Jan 20:00 Operation Resume	I. Manay	Other Instruments	normal	ISR	
875	29 Jan 23:59 Plots of Experiment	AVALDEZ	Plot	normal	ISR	
884	30 Jan 19:59 Figures	P. Condor	Process/Analysis Program	normal	ISR	
760	21 Jan 18:10 Start of the experiment	I. Manay	Start experiment	normal	ISR	
761	21 Jan 18:45 Transmitter were on	I. Manay	Transmitters	normal	ISR	
762	21 Jan 18:22 Spark-gaps summary	I. Manay	Spark Gaps	normal	ISR	
763	21 Jan 20:25 Restart of the experiment	I. Manay	General	normal	ISR	
764	21 Jan 19:59 Operation Resume	I. Manay	General	normal	ISR	
765	21 Ene 20:20 Restart batch in Jars	P.Condor	Acquisition system	normal	ISR	
766	21 Ene 21:08 Noise levels	P.Condor	General	normal	ISR	
767	21 Ene 23:59 Plots	P. Condor	Process/Analysis Program	normal	ISR	
768	22 Ene 00:15 Noise levels	P.Condor	General	normal	ISR	
769	22 Ene 00:22 There is not network in PC-OPERACIONES	P.Condor	Process/Analysis Program	normal	ISR	
770	22 Ene 00:44 Reset Pc operaciones	P.Condor	Acquisition system	normal	ISR	
771	22 Ene 03:15 Problem with Transmitter	P.Condor	Transmitters	normal	ISR	
772	22 Ene 03:23 Transmitter is on	P.Condor	Transmitters	normal	ISR	
773	22 Ene 04:01 Noise levels	P.Condor	General	normal	ISR	
774	22 Ene 06:15 Noise levels	P.Condor	General	normal	ISR	
775	22 Ene 05:02 Spark gaps adjustment	A. Coronado	Spark Gaps	normal	ISR	
776	22 Jan 07:00 Transmitter Power Measurements		Transmitters	normal	ISR	JRO Staff
777	22 Ene 07:50 figures	P. Condor	Process/Analysis Program	normal	ISR	
778	22  Ene 08:00 resume operation	P.Condor	General	normal	ISR	
779	22 Ene 06:22 JASMET system went down		General	normal	JASMET	
780	22 Ene 08:30 220 VAC line was lower than 100 VAC on the JASMET cabin		Start experiment	normal	JASMET	
781	22 Jan 19:30 Transmitter Power Measurements		Transmitters	normal	ISR	
782	22 Ene 09:40 JASMET system went up but without network connection		General	normal	JASMET	
783	22 Ene 10:00 Transmitter was shutdown because of a failure on the power supply		Transmitters	normal	ISR	
784	22 Ene 11:00 Transmitter up with half of the maximum power		Transmitters	normal	ISR	
785	22 Ene 11:20 Transmitter up at full power		Transmitters	normal	ISR	
786	22 Ene 11:24 ATR adjustment		Spark Gaps	normal	ISR	
787	22 Ene 12:19 Plots		Plot	normal	ISR	
788	22 Ene 13:44 Noise levels		Process/Analysis Program	normal	ISR	
789	22 Jan 14:15 ATR adjustment		Spark Gaps	normal	ISR	
790	22 Ene 16:36 Energy up on the JASMET cabin		General	normal	JASMET	
791	22 Ene 17:06 ATR adjustment		Spark Gaps	normal	ISR	
792	22 Ene 17:00 JASMET processing begins		Acquisition system	normal	JASMET	
793	22 Ene 18:47 JASMET processing fixed, the header of the processed data has CodeType=17, this seems to be the problem		Acquisition system	normal	JASMET	
794	22 Ene 18:49 Noise levels		General	normal	ISR	
795	22 Jan 23:00 Transmitter Power Measurements		Transmitters	normal	ISR	JRO Staff
796	22 Jan 23:59 plots of experiments	AValdez	Plot	normal	ISR	
797	23 Jan  05:10 Change data Path	AVALDEZ	Acquisition system	normal	ISR	
798	23 Jan 06:50 Spark-gaps summary	AVALDEZ	Spark Gaps	normal	ISR	
799	23 Jan 07:00 Transmitter Power Measurements		Transmitters	normal	ISR	JRO Staff
800	23 Jan 07:59  Operation Resume	AVALDEZ	General	normal	ISR	
801	23 Jan 19:15 Transmitter Power Measurements		Transmitters	normal	ISR	
803	23 Jan 23:00 Transmitter Power Measurements		Transmitters	normal	ISR	JRO Staff
804	23 Jan 23:59 Figures	P.Condor	Process/Analysis Program	normal	ISR	
805	24 Jan 07:00 Transmitter Power Measurements		Transmitters	normal	ISR	JRO Staff
806	24 Jan 06:34 Noise levels	P.Condor	General	normal	ISR	
807	24 Jan 06:08 Spark gaps adjustment	W. Rojas	Spark Gaps	normal	ISR	
808	24 Jan 07:59 Figures	P.Condor	Process/Analysis Program	normal	ISR	
809	24 Jan 08:00 Resume Operation	P.Condor	General	normal	ISR	
810	24 Jan 14:50 20 KV main power supply problem		Transmitters	normal	ISR	
811	24 Jan 19:25 Transmitter power measurements		Transmitters	normal	ISR	
812	24 JAN  12:10 Problems with JARS	AValdez	Acquisition system	normal	ISR	
813	24 JAN  18:03 Spark gaps adjustment	AValdez	Spark Gaps	normal	ISR	
814	24 jAN  19:59  Operation Resume	AValdez	General	normal	ISR	
815	24 Jan 23:59 Plots of the experiments	I. Manay	Plot	normal	ISR	
816	25 Jan 06:45 Spark-gaps summary	I. Manay	Spark Gaps	normal	ISR	
817	25 Jan 07:00 Acq. re-starts	I. Manay	Acquisition system	normal	ISR	
819	25 Jan 07:00 Plots of the experiments	I. Manay	Plot	normal	ISR	
820	25 Jan 07:30 Transmitter power measurements		Transmitters	normal	ISR	
821	25 Jan 07:59 Operation Resume	I. Manay	General	normal	ISR	
822	25 Jan 09:37 Spark Gap Maintenance		Break Experiment	normal	ISR	
823	25 Jan 10:25 Acquisition system stopped		Acquisition system	normal	ISR	
824	25 Jan 12:40 TX Failure		General	normal	ISR	
825	25 Jan 14:05 Acquisition system restarted		General	normal	ISR	
826	25 Jan 16:03 TX Failure		Transmitters	normal	ISR	
827	25 Jan 17:11 Spark Gap Summary		Spark Gaps	normal	ISR	
828	25 Jan 17:41 Acquisition restarted		Acquisition system	normal	ISR	
829	25 Jan 17:47 Noise mesaurement		General	normal	ISR	
830	25 Jan 19:30 Transmitter power measurements		Transmitters	normal	ISR	
831	25 Jan 19:18 Acquisition restarted		Acquisition system	normal	ISR	
832	25 Jan 19:58 Operation Resume		General	normal	ISR	
833	25 Jan 23:20 Transmitter Power Measurements		Transmitters	normal	ISR	JRO Staff
835	25 Jan 20:50 Acquisition restarted		Acquisition system	normal	ISR	
836	25 Jan 22:14 Acquisition restarted		Acquisition system	normal	ISR	
837	25 Jan 23:51 Plots		Acquisition system	normal	ISR	
838	26 Jan 00:12 Acquisition restarted		Acquisition system	normal	ISR	
839	26 Jan 00:21 Acquisition restarted		Acquisition system	normal	ISR	
840	26 Jan 00:30 Acquisition restarted		Acquisition system	normal	ISR	
841	26 Jan 02:40 TX Failure		Transmitters	normal	ISR	
842	25 Jan 07:05 Transmitter Power Measurements		Transmitters	normal	ISR	JRO Staff
843	26 Jan 07:30 Spark-gaps summary		Spark Gaps	normal	ISR	
844	26 Jan 07:55 Operation Resume		General	normal	ISR	
845	26 Jan 19:30 Transmitter power measurements		Transmitters	normal	ISR	
846	26 Jan 23:50 Transmitter Power Measurements		Transmitters	normal	ISR	JRO Staff
847	26 Jan 23:59 Figures	P. Condor	Process/Analysis Program	normal	ISR	
848	27 Jan 07:00 Transmitter Power Measurement		Transmitters	normal	ISR	JRO Staff
849	27 Jan 06:33 Noise levels	P.Condor	General	normal	ISR	
850	27 Jan 05:40 Spark gaps adjustment	A. Huamani	Spark Gaps	normal	ISR	
851	27 Jan 07:50 Figures	P. Condor	Process/Analysis Program	normal	ISR	
852	27 Jan 08:00 Resume Operation	P.Condor	General	normal	ISR	
853	27 Jan 19:00 Transmitter Power Measurement		Transmitters	normal	ISR	
854	27 Jan 07:29 Spark gaps adjustment	dlume	Spark Gaps	normal	ISR	
855	27 Jan 07:33 Noise levels	dlume	General	normal	ISR	
856	27 Jan 20:00 Resume Operation	dlume	Start experiment	normal	ISR	
857	27 Jan 23:59 Figures		Process/Analysis Program	normal	ISR	JRO Staff
858	28 Jan 08:00 Spark gaps adjustment		Spark Gaps	normal	ISR	JRO Staff
859	28 Jan 07:00 Transmitter power measurements		Transmitters	normal	ISR	
860	28 Jan 08:00 Resume Operation		General	normal	ISR	JRO Staff
861	28 Jan 19:00 Operation Resume		General	normal	ISR	
862	28 Jan 19:59 Transmitter Power Measurements		Transmitters	normal	ISR	
863	28 Jan 20:25 Acquisition system was restarted	I. Manay	Acquisition system	normal	ISR	
864	29 Jan 00:09 Restart of the acquisition	I. Manay	Acquisition system	normal	ISR	
865	29 Jan 00:10 Plots	I. Manay	Plot	normal	ISR	
867	29 Jan 07:15 Spark-gaps summary	J. Lavado	Spark Gaps	normal	ISR	
868	29 Jan 07:30 Transmitter power measurements		Transmitters	normal	ISR	
869	29 Jan 07:59 Operation Resume	I. Manay	General	normal	ISR	
870	29 Jan 10:00 Spark gaps - tungstens replacement		Spark Gaps	normal	ISR	
871	29 Jan 10:35 Acquisition restarted		Acquisition system	normal	ISR	
872	29 Jan 19:00 Transmitter power measurements		Transmitters	normal	ISR	
873	29 Jan 23:00 Transmitter Power Measurement		Transmitters	normal	ISR	JRO Staff
874	30 Jan 07:05 Transmitter Power Measurement		Transmitters	normal	ISR	JRO Staff
876	29 Jan 23:59 Plots of Experiment	AVALDEZ	Plot	normal	ISR	
877	30 Jan  07:20 Spark-gaps summary	AVALDEZ	Spark Gaps	normal	ISR	
878	30 Jan  04:00 Change of disks	AVALDEZ	General	normal	ISR	
879	30 Jan  07:59 RESUME OPERATION	AVALDEZ	General	normal	ISR	
880	30 Jan 18:08 Noise Levels	P.Condor	General	normal	ISR	
881	30 Jan 17:00 Interference in EEJ from 10 to 14 hours.	P.Condor	General	normal	ISR	
882	30 Jan 18:00 Spark gaps adjustment	W. Rojas	Spark Gaps	normal	ISR	
883	30 Jan 19:30 Transmitter Power Measurement		Transmitters	normal	ISR	
885	30 Jan 20:00 Resume Operation	P.Condor	General	normal	ISR	
886	30 Jan 23:00 Transmitter Power Measurement		Transmitters	normal	ISR	JRO Staff
887	30 Jan 23:59 Plots of Experiment		Plot	normal	ISR	
888	31 Jan 07:00 Transmitter Power Measurement		Transmitters	normal	ISR	JRO Staff
889	31 Jan 07:15 Spark gaps summary		Spark Gaps	normal	ISR	
890	31 Jan 08:00 Resume Operation		General	normal	ISR	
891	Turno 31-Enero2016  8am - 8pm		General	normal	ISR	
892	Turno 31-Enero2016  8am - 8pm		End experiment	normal	ISR	
893	31 Jan 20:00 Transmitter Power Measurement		Transmitters	normal	ISR	
965	31 Jan 20:00 Plots		Plot	normal	ISR	
1000	16 Mar 12:00 JASMET30 Manual Configuration		General	normal	ISR	