| #760 |
21 Jan 18:10 Start of the experiment
|
I. Manay
|
Start experiment
|
normal
|
ISR
|
|
| #761 |
21 Jan 18:45 Transmitter were on
|
I. Manay
|
Transmitters
|
normal
|
ISR
|
|
| #762 |
21 Jan 18:22 Spark-gaps summary
|
I. Manay
|
Spark Gaps
|
normal
|
ISR
|
|
| #763 |
21 Jan 20:25 Restart of the experiment
|
I. Manay
|
General
|
normal
|
ISR
|
|
| #764 |
21 Jan 19:59 Operation Resume
|
I. Manay
|
General
|
normal
|
ISR
|
|
| #765 |
21 Ene 20:20 Restart batch in Jars
|
P.Condor
|
Acquisition system
|
normal
|
ISR
|
|
| #766 |
21 Ene 21:08 Noise levels
|
P.Condor
|
General
|
normal
|
ISR
|
|
| #767 |
21 Ene 23:59 Plots
|
P. Condor
|
Process/Analysis Program
|
normal
|
ISR
|
|
| #768 |
22 Ene 00:15 Noise levels
|
P.Condor
|
General
|
normal
|
ISR
|
|
| #769 |
22 Ene 00:22 There is not network in PC-OPERACIONES
|
P.Condor
|
Process/Analysis Program
|
normal
|
ISR
|
|
| #770 |
22 Ene 00:44 Reset Pc operaciones
|
P.Condor
|
Acquisition system
|
normal
|
ISR
|
|
| #771 |
22 Ene 03:15 Problem with Transmitter
|
P.Condor
|
Transmitters
|
normal
|
ISR
|
|
| #772 |
22 Ene 03:23 Transmitter is on
|
P.Condor
|
Transmitters
|
normal
|
ISR
|
|
| #773 |
22 Ene 04:01 Noise levels
|
P.Condor
|
General
|
normal
|
ISR
|
|
| #774 |
22 Ene 06:15 Noise levels
|
P.Condor
|
General
|
normal
|
ISR
|
|
| #775 |
22 Ene 05:02 Spark gaps adjustment
|
A. Coronado
|
Spark Gaps
|
normal
|
ISR
|
|
| #776 |
22 Jan 07:00 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
JRO Staff
|
| #777 |
22 Ene 07:50 figures
|
P. Condor
|
Process/Analysis Program
|
normal
|
ISR
|
|
| #778 |
22 Ene 08:00 resume operation
|
P.Condor
|
General
|
normal
|
ISR
|
|
| #779 |
22 Ene 06:22 JASMET system went down
|
|
General
|
normal
|
JASMET
|
|
| #780 |
22 Ene 08:30 220 VAC line was lower than 100 VAC on the JASMET cabin
|
|
Start experiment
|
normal
|
JASMET
|
|
| #781 |
22 Jan 19:30 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
|
| #782 |
22 Ene 09:40 JASMET system went up but without network connection
|
|
General
|
normal
|
JASMET
|
|
| #783 |
22 Ene 10:00 Transmitter was shutdown because of a failure on the power supply
|
|
Transmitters
|
normal
|
ISR
|
|
| #784 |
22 Ene 11:00 Transmitter up with half of the maximum power
|
|
Transmitters
|
normal
|
ISR
|
|
| #785 |
22 Ene 11:20 Transmitter up at full power
|
|
Transmitters
|
normal
|
ISR
|
|
| #786 |
22 Ene 11:24 ATR adjustment
|
|
Spark Gaps
|
normal
|
ISR
|
|
| #787 |
22 Ene 12:19 Plots
|
|
Plot
|
normal
|
ISR
|
|
| #788 |
22 Ene 13:44 Noise levels
|
|
Process/Analysis Program
|
normal
|
ISR
|
|
| #789 |
22 Jan 14:15 ATR adjustment
|
|
Spark Gaps
|
normal
|
ISR
|
|
| #790 |
22 Ene 16:36 Energy up on the JASMET cabin
|
|
General
|
normal
|
JASMET
|
|
| #791 |
22 Ene 17:06 ATR adjustment
|
|
Spark Gaps
|
normal
|
ISR
|
|
| #792 |
22 Ene 17:00 JASMET processing begins
|
|
Acquisition system
|
normal
|
JASMET
|
|
| #793 |
22 Ene 18:47 JASMET processing fixed, the header of the processed data has CodeType=17, this seems to be the problem
|
|
Acquisition system
|
normal
|
JASMET
|
|
| #794 |
22 Ene 18:49 Noise levels
|
|
General
|
normal
|
ISR
|
|
| #795 |
22 Jan 23:00 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
JRO Staff
|
| #796 |
22 Jan 23:59 plots of experiments
|
AValdez
|
Plot
|
normal
|
ISR
|
|
| #797 |
23 Jan 05:10 Change data Path
|
AVALDEZ
|
Acquisition system
|
normal
|
ISR
|
|
| #798 |
23 Jan 06:50 Spark-gaps summary
|
AVALDEZ
|
Spark Gaps
|
normal
|
ISR
|
|
| #799 |
23 Jan 07:00 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
JRO Staff
|
| #800 |
23 Jan 07:59 Operation Resume
|
AVALDEZ
|
General
|
normal
|
ISR
|
|
| #801 |
23 Jan 19:15 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
|
| #803 |
23 Jan 23:00 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
JRO Staff
|
| #804 |
23 Jan 23:59 Figures
|
P.Condor
|
Process/Analysis Program
|
normal
|
ISR
|
|
| #805 |
24 Jan 07:00 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
JRO Staff
|
| #806 |
24 Jan 06:34 Noise levels
|
P.Condor
|
General
|
normal
|
ISR
|
|
| #807 |
24 Jan 06:08 Spark gaps adjustment
|
W. Rojas
|
Spark Gaps
|
normal
|
ISR
|
|
| #808 |
24 Jan 07:59 Figures
|
P.Condor
|
Process/Analysis Program
|
normal
|
ISR
|
|
| #809 |
24 Jan 08:00 Resume Operation
|
P.Condor
|
General
|
normal
|
ISR
|
|
| #810 |
24 Jan 14:50 20 KV main power supply problem
|
|
Transmitters
|
normal
|
ISR
|
|
| #811 |
24 Jan 19:25 Transmitter power measurements
|
|
Transmitters
|
normal
|
ISR
|
|
| #812 |
24 JAN 12:10 Problems with JARS
|
AValdez
|
Acquisition system
|
normal
|
ISR
|
|
| #813 |
24 JAN 18:03 Spark gaps adjustment
|
AValdez
|
Spark Gaps
|
normal
|
ISR
|
|
| #814 |
24 jAN 19:59 Operation Resume
|
AValdez
|
General
|
normal
|
ISR
|
|
| #815 |
24 Jan 23:59 Plots of the experiments
|
I. Manay
|
Plot
|
normal
|
ISR
|
|
| #816 |
25 Jan 06:45 Spark-gaps summary
|
I. Manay
|
Spark Gaps
|
normal
|
ISR
|
|
| #817 |
25 Jan 07:00 Acq. re-starts
|
I. Manay
|
Acquisition system
|
normal
|
ISR
|
|
| #819 |
25 Jan 07:00 Plots of the experiments
|
I. Manay
|
Plot
|
normal
|
ISR
|
|
| #820 |
25 Jan 07:30 Transmitter power measurements
|
|
Transmitters
|
normal
|
ISR
|
|
| #821 |
25 Jan 07:59 Operation Resume
|
I. Manay
|
General
|
normal
|
ISR
|
|
| #822 |
25 Jan 09:37 Spark Gap Maintenance
|
|
Break Experiment
|
normal
|
ISR
|
|
| #823 |
25 Jan 10:25 Acquisition system stopped
|
|
Acquisition system
|
normal
|
ISR
|
|
| #824 |
25 Jan 12:40 TX Failure
|
|
General
|
normal
|
ISR
|
|
| #825 |
25 Jan 14:05 Acquisition system restarted
|
|
General
|
normal
|
ISR
|
|
| #826 |
25 Jan 16:03 TX Failure
|
|
Transmitters
|
normal
|
ISR
|
|
| #827 |
25 Jan 17:11 Spark Gap Summary
|
|
Spark Gaps
|
normal
|
ISR
|
|
| #828 |
25 Jan 17:41 Acquisition restarted
|
|
Acquisition system
|
normal
|
ISR
|
|
| #829 |
25 Jan 17:47 Noise mesaurement
|
|
General
|
normal
|
ISR
|
|
| #830 |
25 Jan 19:30 Transmitter power measurements
|
|
Transmitters
|
normal
|
ISR
|
|
| #831 |
25 Jan 19:18 Acquisition restarted
|
|
Acquisition system
|
normal
|
ISR
|
|
| #832 |
25 Jan 19:58 Operation Resume
|
|
General
|
normal
|
ISR
|
|
| #833 |
25 Jan 23:20 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
JRO Staff
|
| #835 |
25 Jan 20:50 Acquisition restarted
|
|
Acquisition system
|
normal
|
ISR
|
|
| #836 |
25 Jan 22:14 Acquisition restarted
|
|
Acquisition system
|
normal
|
ISR
|
|
| #837 |
25 Jan 23:51 Plots
|
|
Acquisition system
|
normal
|
ISR
|
|
| #838 |
26 Jan 00:12 Acquisition restarted
|
|
Acquisition system
|
normal
|
ISR
|
|
| #839 |
26 Jan 00:21 Acquisition restarted
|
|
Acquisition system
|
normal
|
ISR
|
|
| #840 |
26 Jan 00:30 Acquisition restarted
|
|
Acquisition system
|
normal
|
ISR
|
|
| #841 |
26 Jan 02:40 TX Failure
|
|
Transmitters
|
normal
|
ISR
|
|
| #842 |
25 Jan 07:05 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
JRO Staff
|
| #843 |
26 Jan 07:30 Spark-gaps summary
|
|
Spark Gaps
|
normal
|
ISR
|
|
| #844 |
26 Jan 07:55 Operation Resume
|
|
General
|
normal
|
ISR
|
|
| #845 |
26 Jan 19:30 Transmitter power measurements
|
|
Transmitters
|
normal
|
ISR
|
|
| #846 |
26 Jan 23:50 Transmitter Power Measurements
|
|
Transmitters
|
normal
|
ISR
|
JRO Staff
|
| #847 |
26 Jan 23:59 Figures
|
P. Condor
|
Process/Analysis Program
|
normal
|
ISR
|
|
| #848 |
27 Jan 07:00 Transmitter Power Measurement
|
|
Transmitters
|
normal
|
ISR
|
JRO Staff
|
| #849 |
27 Jan 06:33 Noise levels
|
P.Condor
|
General
|
normal
|
ISR
|
|
| #850 |
27 Jan 05:40 Spark gaps adjustment
|
A. Huamani
|
Spark Gaps
|
normal
|
ISR
|
|
| #851 |
27 Jan 07:50 Figures
|
P. Condor
|
Process/Analysis Program
|
normal
|
ISR
|
|
| #852 |
27 Jan 08:00 Resume Operation
|
P.Condor
|
General
|
normal
|
ISR
|
|
| #853 |
27 Jan 19:00 Transmitter Power Measurement
|
|
Transmitters
|
normal
|
ISR
|
|
| #854 |
27 Jan 07:29 Spark gaps adjustment
|
dlume
|
Spark Gaps
|
normal
|
ISR
|
|
| #855 |
27 Jan 07:33 Noise levels
|
dlume
|
General
|
normal
|
ISR
|
|
| #856 |
27 Jan 20:00 Resume Operation
|
dlume
|
Start experiment
|
normal
|
ISR
|
|
| #857 |
27 Jan 23:59 Figures
|
|
Process/Analysis Program
|
normal
|
ISR
|
JRO Staff
|
|
(more results for this group on next page)
|