Timeline


and

May 15, 2014:

5:07 PM Ticket #1622 (15 Mayo 19:00 Transmitter Power Measurements) created by ryaya
09:00 TX Power sample (-70 dB coupling) Tx1 +4.0 dBm Tx4 +4.1 dBm Line …
4:58 PM Ticket #1621 (15 May 19:47 Restart Plots) created by avaldez
All plots are restarted due to a delay in the display
4:57 PM Ticket #1620 (15 May 18:40 Spark gap calibration) created by avaldez
ATR & TR calibration
4:56 PM Ticket #1619 (15 May 17:50 Shutdown acquisition system) created by avaldez
Due to a hard disk change the acquisition system has been shut down for 20 …
4:55 PM Ticket #1618 (15 May 16:40 Slight interfence) created by avaldez
Interference in channel A just 10 seconds
4:26 PM Ticket #1617 (15 May 16:05 Restart acquisition system) created by avaldez
Due to copying data to another disk.
4:10 PM Ticket #1616 (15 May 14:35 Spark gap calibration) created by avaldez
ATR & TR calibration
4:10 PM Ticket #1615 (15 May 10:30 Spark gap calibration) created by avaldez
ATR & TR calibration
4:03 AM Ticket #1614 (15 Mayo 07:05 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 +4.2 dBm Tx4 +4.1 dBm Line …
3:36 AM Ticket #1613 (15 May 06:27 AM Calibration of ATRs and TRs) created by avaldez
3:07 AM Ticket #1612 (14 May 23:59 pm Figures of rtis, spectros, etc) created by avaldez
Figures of rtis, spectros, etc.
2:12 AM Ticket #1611 (15 May 02:33 Calibration of ATRs and TRs) created by avaldez
2:11 AM Ticket #1610 (14 May 22:33PM Calibration of ATRs and TRs) created by avaldez

May 14, 2014:

9:21 PM Ticket #1609 (14 May 23:38 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +4.3 dBm Tx4 +4.1 dBm Line …
8:34 PM Ticket #1608 (13 May 23:38 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +4.3 dBm Tx4 +4.1 dBm Line …
4:28 PM Ticket #1607 (13 May 07:00 Transmitter Power mesearuments) created by rtadeo
13/05/2014 08:00 TX Power sample (-70 dB coupling) Tx1 +4.0 dBm Tx4 +4.0 …
3:37 PM Ticket #1606 (14 May 18:30 Experiment start) created by jortiz
New empty hard drive installed.
3:36 PM Ticket #1605 (14 May 18:30 Calibration of ATRs and TRs) created by jortiz
Calibration of ATRs and TRs
2:59 PM Ticket #1604 (14 May 17:45 System shutdown for hard drive change) created by jortiz
System shutdown for hard drive change
2:58 PM Ticket #1603 (14 May 17:42 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars.
2:44 PM Ticket #1602 (14 May 17:27 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars
1:58 PM Ticket #1601 (14 May 16:56 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars
1:05 PM Ticket #1600 (14 May 16:02 JARS loss of data while recovering) created by jortiz
JARS lost data while automatically restarting and recovering.
12:11 PM Ticket #1599 (14 May 15:10 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars
11:49 AM Ticket #1598 (14 May 14:50 Calibration of ATRs and TRs) created by jortiz
Calibration of ATRs and TRs
11:25 AM Ticket #1597 (14 May 14:10 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars. Took about 10 minutes.
10:46 AM Ticket #1596 (14 May 13:43 Transmitters turned off) created by jortiz
Transmitters were turned off during maintenance
9:56 AM Ticket #1595 (14 May 12:56 Digisonde was powered on) created by jortiz
Digisonde was powered on. Expected interference in Channel 1 every 5 …
9:48 AM Ticket #1594 (14 May 12:47 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars
9:28 AM Ticket #1593 (14 May 12:27 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars acquisition system
9:06 AM Ticket #1592 (14 May 12:03 JARS loss of data while recovering) created by jortiz
JARS lost data while automatically restarting and recovering.
8:50 AM Ticket #1591 (14 May 11:45 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars acquisition system
7:45 AM Ticket #1590 (14 May 10:47 Calibration of ATRs and TRs) created by jortiz
Calibration of ATRs and TRs
7:42 AM Ticket #1589 (14 May 10:38 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars
7:24 AM Ticket #1588 (14 May 10:17 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars acquisition system
7:23 AM Ticket #1587 (14 May 10:09 Digisonde was powered off) created by jortiz
Digisonde was detected to cause interference in Channel 1 every 5 minutes …
6:28 AM Ticket #1586 (14 May 09:19 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars
5:44 AM Ticket #1585 (14 May 08:33 Restart MST-ISR-EEJ.bat in Jars) created by jortiz
Restart MST-ISR-EEJ.bat in Jars
4:37 AM Ticket #1584 (14 May 06:48 Calibration of ATRs and TRs) created by pcondor
Calibration of ATRs and TRs
4:37 AM Ticket #1583 (14 May 04:00 Restart mst-isr-eej.py and now there are figures) created by pcondor
Restart mst-isr-eej.py and now there are figures of rti and spectros ISR …
4:34 AM Ticket #1582 (14 May 03:00 Calibration of ATRs and TRs) created by pcondor
Calibration of ATRs and TRs
4:30 AM Ticket #1581 (14 May 01:30 Restart MST-ISR-EEJ.bat in Jars) created by pcondor
Restart MST-ISR-EEJ.bat in Jars
4:28 AM Ticket #1580 (14 May 01:08 Restart MST-ISR-EEJ.bat and mst-isr-EEJ.py) created by pcondor
Restart MST-ISR-EEJ.bat and mst-isr-EEJ.py. Now there are figures of rtis …
4:24 AM Ticket #1579 (14 May 00:00 Figures of spectros) created by pcondor
Figures of spectros and rtis
4:22 AM Ticket #1578 (13 May 23:48 Restart MST-ISR-EEj.bat in Jars) created by pcondor
Restart MST-ISR-EEj.bat in Jars
4:20 AM Ticket #1577 (13 May 23:00 Calibration of TRs and ATRs) created by pcondor
Calibration of TRs and ATRs
4:19 AM Ticket #1576 (13 May 22:56 Restart MST-ISR-ISR.bat in Jars) created by pcondor
Restart MST-ISR-EEJ.bat in Jars
4:16 AM Ticket #1575 (13 May 22:45 Restart Batch in Jars) created by pcondor
Restart Batch in Jars
4:15 AM Ticket #1574 (13 May 22:19 Restart Batch in Jars) created by pcondor
Restart Batch MST-EEJ-ISR in Jars
4:14 AM Ticket #1573 (13 May 21:42 Restart Batch in Jars) created by pcondor
Restart Batch MST-EEJ-ISR in Jars
4:04 AM Ticket #1572 (14 Mayo 07:05 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 +4.4 dBm Tx4 +4.1 dBm Line …

May 13, 2014:

8:03 PM Ticket #1571 (13 Mayo 23:06 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +4.4 dBm Tx4 +4.1 dBm Line …
4:32 PM Ticket #1570 (13 May 19:00 Transmitter Power mesearuments) created by rtadeo
13/05/2007 07:09 LV ON 07:30 TX Power sample (-70 dB coupling) Tx1 +4.1 …
4:30 PM Ticket #1569 (13 May 19:15 Calibration of ATRs and TRs) created by dsuarez
4:29 PM Ticket #1568 (13 May 15:30 Calibration of ATRs and TRs) created by dsuarez
4:28 PM Ticket #1567 (13 May 13:29 Acquisition System) created by dsuarez
after than doing a lot of test to reduce interference signals and other …
4:25 PM Ticket #1566 (13 May 11:45 Interference Signals in EEJ part) created by dsuarez
the interference signal was reduced doing a better location of the BNC …
4:16 PM Ticket #1565 (13 May 07:35 loss of the electric power) created by dsuarez
the electricity came back after than 10 seconds but the transmitter takes …
4:06 PM Ticket #1564 (13 May 11:10 Calibration of ATRs and TRs) created by dsuarez
4:05 PM Ticket #1563 (13 May 10:19 Acquisition System was restarted) created by dsuarez
tanking off a amplification stage in the receivers
4:02 PM Ticket #1562 (13 May 08:36 The Transmitter goes down) created by dsuarez
Problems with Power Amplifier 1, this problem was fixed after than 5 …
3:56 PM Ticket #1561 (13 May 07:35 Calibration of ATRs and TRs) created by dsuarez
3:55 PM Ticket #1560 (13 May 07:35 The beginning of the experiment) created by dsuarez

May 12, 2014:

12:06 PM Ticket #1559 (12 May 15:06 Antenna VSWR) created by ryanque
Antenna VSWR Wup 1.03 49.94 1.00 Wdn 1.02 49.94 1.01 Ndn 1.05 49.97 …
12:02 PM Ticket #1558 (12 May 15:05 Log created for MST-ISR) created by ryanque
The log has been created.

May 9, 2014:

5:11 AM Ticket #1557 (09 May 08:00 End Experiment) created by pcondor
End Experiment. Put figures of rtis, power, noise, etc
4:32 AM Ticket #1556 (09 May 08:00 Transmitter Power mesearuments) created by rtadeo
08/05/2007 20:00 TX Power sample (-70 dB coupling) Tx1 +6.2 dBm Tx2 +2.2 …
3:19 AM Ticket #1555 (09 May 04:35 Calibration of TRs and ATRs) created by pcondor
Calibration of TRs and ATRs
3:18 AM Ticket #1554 (09 May 01:36 On Transmitter of EW_Drifts) created by pcondor
On Transmitter of EW_Drifts, all is ok.
3:16 AM Ticket #1553 (09 May 01:12 Shut down Transmitter) created by pcondor
Shut down Transmitter to change transmitter of EW_Drifts.
3:14 AM Ticket #1552 (09 May 00:50 Low Power Channels EW_Drifts) created by pcondor
Low Power Channels EW_Drifts. We are repairing.
3:10 AM Ticket #1551 (09 May 00:30 Calibration of ATrs and TRs) created by pcondor
Calibration of ATrs and TRs
3:05 AM Ticket #1550 (08 May 23:59 Figures of rtis, spectros, etc) created by pcondor
Figures of rtis, spectros, etc.
3:04 AM Ticket #1549 (08 May 22:10 Faraday Ch A falls) created by pcondor
Faraday Ch A falls
2:59 AM Ticket #1548 (08 May 20:30 Calibration of ATRs and TRs) created by pcondor
Calibration of ATRs and TRs

May 8, 2014:

5:00 PM Ticket #1547 (08 May 19:00 Transmitter Power Measurements) created by ryaya
08:00 Transmitter OFF, HV failure at PA 4 14:00 Transmitter ON 14:17 alarm …
3:07 PM Ticket #1546 (08 May 17:40 Spark gaps adjustment, transmitters power recovered) created by jverastegui
3:05 PM Ticket #1545 (08 May 17:30 Low transmitters power) created by jverastegui
11:40 AM Ticket #1544 (08 May 14:20 Transmitters at their maximum power) created by jverastegui
11:38 AM Ticket #1543 (08 May 14:10 Transmitters restored) created by jverastegui
7:14 AM Ticket #1542 (08 May 08:00 Transmitter 4 fault detected, transmitters shut down) created by jverastegui
4:10 AM Ticket #1541 (08 May 07:13 Calibration ATR and TR) created by jortiz
4:07 AM Ticket #1540 (08 Mayo 07:12 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 +5.6 dBm Tx2 +2.3 dBm Tx4 +2.2 …
12:31 AM Ticket #1539 (08 May 03:25 Calibration ATR and TR) created by jortiz

May 7, 2014:

9:12 PM Ticket #1538 (08 May 00:00 Figures of rtis, noise,etc) created by jortiz
Figures of rtis, noise,etc
9:03 PM Ticket #1537 (08 May 00:04 End Imaging) created by jortiz
8:20 PM Ticket #1536 (07 May 23:18 Calibration ATR and TR) created by jortiz
8:12 PM Ticket #1535 (07 Mayo 23:20 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +5.6 dBm Tx2 +2.4 dBm Tx4 +2.4 …
7:51 PM Ticket #1534 (07 May 22:50 Low tension on transmitter crowbar) created by jortiz
Low tension on crowbar in transmitter room. Fixed.
4:24 PM Ticket #1533 (07 May 19:00 Transmitter Power mesearuments) created by rtadeo
07/05/2014 08:00 TX Power sample (-70 dB coupling) Tx1 +5.9 dBm Tx2 +2.1 …
3:17 PM Ticket #1532 (07 May 15:50 Calibration ATR and TR) created by ryanque
3:16 PM Ticket #1531 (07 May 11:45 Interference on channel B of Faraday experiment) created by ryanque
11:00 - Interference in channel B of Faraday experiment 11:50 - …
3:09 PM Ticket #1530 (07 May 08:35 Interchange TR Ew Drift) created by ryanque
Interchange between TR channel A and B of EW Drift experiment.
3:08 PM Ticket #1529 (07 May 08:30 Calibration ATR - TR) created by ryanque
Calibration of ATR and TR
3:59 AM Ticket #1528 (07 Mayo 07:05 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 +5.7 dBm Tx2 +2.3 dBm Tx4 +1.2 …

May 6, 2014:

11:58 PM Ticket #1527 (07 May 02:30 Problems PA4 solved) created by avaldez
02:30am Continues experiment
11:55 PM Ticket #1526 (07 May 01:45 Calibration ATRs-TRs) created by avaldez
11:53 PM Ticket #1525 (07 May 00:09 End Imaging) created by avaldez
11:50 PM Ticket #1524 (07 May 01:48 Problems with Power Amplifier 4) created by avaldez
There was a problem with interlog of PA4, fault relay. At 02:30 am the …
7:59 PM Ticket #1523 (06 Mayo 23:05 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +5.5 dBm Tx2 +2.4 dBm Tx4 +1.9 …
4:47 PM Ticket #1522 (06 May19:00 Transmitter Power measurements) created by ryaya
08:00 TX Power sample (-70 dB coupling) Tx1 +6.0 dBm Tx2 +2.1 dBm/ +5.2 …
4:26 AM Ticket #1521 (06 May 07:00 Transmitter Power mesearuments) created by rtadeo
05/05/2014 20:00 TX Power sample (-70 dB coupling) Tx1 +5.8 dBm Tx2 +2.4 …
3:53 AM Ticket #1520 (06 May 06:58 Calibration ATRs-TRs) created by pcondor
Calibration ATRs-TRs
3:43 AM Ticket #1519 (06 May 00:00 Figures of rtis, noise,etc) created by pcondor
Figures of rtis, noise,etc
3:42 AM Ticket #1518 (06 May 02:40 Calibration ATRs-TRs) created by pcondor
Calibration ATRs-TRs
3:41 AM Ticket #1517 (06 May 00:09 End Imaging) created by pcondor
End Imaging. No Spread F
3:39 AM Ticket #1516 (05 May 22:30 Calibration ATRs-TRs) created by pcondor
Calibration ATRs-TRs

May 5, 2014:

4:48 PM Ticket #1515 (05 May19:00 Transmitter Power measurements) created by ryaya
17:00 TX Power sample (-70 dB coupling) Tx1 +5.7 dBm Tx2 +2.2 dBm/ +5.2 …
4:11 PM Ticket #1514 (05 May 19:16 Restart of Faraday acquisition) created by imanay
3:33 PM Ticket #1513 (05 May 18:00 Start of the Imaging experiment) created by imanay
RF2 output of the EW_Drift DDS was unplugged and Imaging system was …
3:28 PM Ticket #1512 (05 May 17:55 Change of the attenuation) created by imanay
Channel A of Faraday was attenuated 1 dB.
3:26 PM Ticket #1511 (05 May 17:30 Restart of Faraday experiment) created by imanay
There was a connection error between A and B reception cables. Those …
3:23 PM Ticket #1510 (05 May 17:15 Start of the experiment) created by imanay
These are the current attenuations: 1) EW_Drift: A : 0 B : 2 C : 2 D …
8:44 AM Ticket #1509 (05 May 11:47 Antenna VSWR) created by ryanque
Antenna VSWR SUp - 1.03 SDn - 1.01 EDn - 1.02 EUp - 1.03 NUp - 1.04 NDn - …
8:32 AM Ticket #1508 (05 May 11:37 Log for Imaging+ISR experiment created) created by ryanque
The log for the Imaging + ISR campaign has been created.

Apr 25, 2014:

2:06 PM Ticket #1507 (25 Apr 16:50 Interference at the Faraday channels) created by imanay
RTi plots shows interferences every 15 minutes. Vipir, abs were off after …
1:51 PM Ticket #1506 (25 Apr 15:35 Testing a repaired TR) created by imanay
Two TR's were repaired. One of them replaced the TR at the B channel. Two …
1:37 PM Ticket #1505 (25 Apr 15:34 Restart of EW_drift acquisition system) created by imanay
1:33 PM Ticket #1504 (25 Apr 14:15 Change of the attenuation at the B channel) created by imanay
Atenuator was open 1 db at the B channel. These are the current …
1:29 PM Ticket #1503 (25 Apr 14:00 Problems with a TR of the EW_Drift experiment (A channel)) created by imanay
Drop was seen at the A channel. Some tests were done from 13:20 to 14:00 …
12:14 PM Ticket #1502 (25 Apr 13:31 spark gap adjusments) created by imanay
12:13 PM Ticket #1501 (25 Apr 12:25 Restart of EW_drift acquisition system) created by imanay
Acquisition system restarted itself and then manually.
12:13 PM Ticket #1500 (25 Apr 11:47 Restart of EW_drift acquisition system) created by imanay
Acquisition system restarted itself and then manually.
8:10 AM Ticket #1499 (25 Apr 08:27 spark gap adjusments) created by imanay
8:09 AM Ticket #1498 (25 Apr 10:00 2nd restart of the experiment) created by imanay
The experiment was restarted after a second short blackout(5 to 10 …
8:06 AM Ticket #1497 (25 Apr 08:30 Restart of the experiment) created by imanay
The experiment was restarted after the blackout the night before.

Apr 24, 2014:

4:05 PM Ticket #1496 (24 Apr 18:30 Transmitter Power mesearuments) created by rtadeo
24/04/2014 08:00 TX Power sample (-70 dB coupling) Tx1 +5.6 dBm Tx2 …
3:53 PM Ticket #1495 (24 Apr 18:37 Calibration of ATR and TR) created by ryanque
3:48 PM Ticket #1494 (24 Apr 17:18 Interference in EW Drift and Faraday) created by ryanque
17:18 There is an interference in both EW Drift and Faraday experiment. …
3:46 PM Ticket #1493 (24 Apr 16:26 Restart of EW Drift acquisition) created by ryanque
16:26 Due to loss of synchronization the EW Drift acquisition is …
3:43 PM Ticket #1492 (24 Apr 15:21 Calibration of ATR and TR) created by ryanque
3:41 PM Ticket #1491 (24 Apr 11:44 Calibration of ATR and TR) created by ryanque
3:40 PM Ticket #1490 (24 Apr 11:03 Transmitters turned off) created by ryanque
11:03 A problem in TX 4 Driver has been found, concerning the circuit of …
3:37 PM Ticket #1489 (24 Apr 10:20 Noise increments on Faraday channels) created by ryanque
10:20 Channels A and B of Faraday increase in more than 20 dB. 10:40 …
3:32 PM Ticket #1488 (24 Apr 08:11 Calibration of ATR and TR) created by ryanque
ATR amd TR have been calibrated.
5:08 AM Ticket #1487 (24 April 04:30 am Calibration of ATRs and TRs) created by avaldez
5:07 AM Ticket #1486 (24 April 04:24 SYNCHRONISM LOSS IN EW_DRIFT EXPERIMENT) created by avaldez
The PC of the acquisition system was re-started.
5:07 AM Ticket #1485 (24 April 04:24 SYNCHRONISM LOSS IN EW_DRIFT EXPERIMENT) created by avaldez
The PC of the acquisition system was re-started.
4:24 AM Ticket #1484 (24 April 07:10 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 +5.9 dBm Tx2 +2.0 dBm Tx4 +2.3 …

Apr 23, 2014:

10:37 PM Ticket #1483 (23 Apr 23:59 plots of experiments) created by avaldez
10:21 PM Ticket #1482 (24 April 00:20 Calibration of ATRs and TRs) created by avaldez
10:18 PM Ticket #1481 (23 April 23:59 IDL program is hung EW_Drift) created by avaldez
The program had to be finished,then the processing program was restarted.
10:15 PM Ticket #1480 (23 April 23:55 SYNCHRONISM LOSS IN EW_DRIFT EXPERIMENT) created by avaldez
The PC of the acquisition system was re-started.
10:09 PM Ticket #1479 (23 April 21:50 Problems in the monitoring program ...) created by avaldez
Because the time reading was very short compared to the time when the …
9:50 PM Ticket #1478 (23 April 21:10 Calibration of ATRs and TRsF) created by avaldez
9:27 PM Ticket #1477 (24 April 00:00 Driever 3 OFF) created by vquesada
00:00 HV driver 3 OFF
8:19 PM Ticket #1476 (23 Abril 23:05 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 +5.8 dBm Tx2 +2.0 dBm Tx4 +2.2 …
5:15 PM Ticket #1475 (23 Apr 19:50 Transmitter Power Measurements) created by ryaya
08:20 HV ON 08:29 TX Power sample (-70 dB coupling) Tx1 +5.8 dBm Tx2 +1.7 …
5:06 PM Ticket #1474 (23 Apr 19:42 Unknown peak in data) created by jortiz
Receivers were saturated for about 2 minutes and then went back to normal. …
2:18 PM Ticket #1473 (23 Apr 17:05 Calibration of ATRs and TRs) created by jortiz
2:09 PM Ticket #1472 (23 Apr 16:51 Imaging Experiment start) created by jortiz
Experiment restart, with Imaging mode
2:08 PM Ticket #1471 (23 Apr 16:32 Experiment stop) created by jortiz
TR adjustment for Imaging
9:25 AM Ticket #1470 (23 Apr 11:50 Re-starting experiment) created by jortiz
Transmitters and experiment re-started at 11:50. The acquisition was not …
9:14 AM Ticket #1469 (23 Apr 11:48 Calibration of ATRs and TRs) created by jortiz
7:29 AM Ticket #1468 (23 Apr 09:22 Transmitter maintenance) created by jortiz
Transmitters were turned off for maintenance to investigate erratic …
6:31 AM Ticket #1467 (23 Apr 09:16 Drop in transmitter power source) created by jortiz
6:20 AM Ticket #1466 (23 Apr 08:51 Drop at the channel A of Faraday experiment) created by jortiz
Due to problems with power source tension to transmitter 4.
5:55 AM Ticket #1465 (23 Apr 08:35 Problems with Faraday acquisition system) created by jortiz
Echos were not located at the right height. Acquisition program was …

Apr 22, 2014:

1:55 PM Ticket #1464 (22 Apr 15:55 Problems with Faraday acquisition system) created by imanay
Echos were not located at the right height. Acquisition program was …
1:46 PM Ticket #1463 (22 Apr 15:00 spark gaps adjusment) created by imanay
1:46 PM Ticket #1462 (22 Apr 14:10 Drop at the channel A of Faraday experiment) created by imanay
Due to problems with RF input of the transmisor.
10:26 AM Ticket #1461 (22 Apr 12:42 Starts campaign) created by ryanque
Problems with the Faraday mode have been solved.

Apr 21, 2014:

11:37 AM Ticket #1460 (21 Apr 02:22 Antenna VSWR) created by ryanque
WUP 1.02 - 49.93 MHz 1.00 WDW 1.03 NDW 1.09 - 50.005 MHz 1.00 NUP 1.10 …
11:31 AM Ticket #1459 (21 Apr 14:19 Log created for 2014_04 ISR+Imaging) created by ryanque
The log has been created for 2014_04 ISR+Imaging.
Note: See TracTimeline for information about the timeline view.