Timeline
Apr 21, 2014:
- 11:37 AM Ticket #1460 (21 Apr 02:22 Antenna VSWR) created by
- WUP 1.02 - 49.93 MHz 1.00 WDW 1.03 NDW 1.09 - 50.005 MHz 1.00 NUP 1.10 …
- 11:31 AM Ticket #1459 (21 Apr 14:19 Log created for 2014_04 ISR+Imaging) created by
- The log has been created for 2014_04 ISR+Imaging.
Apr 9, 2014:
- 10:58 AM Ticket #1458 (09 Apr 13:30 Experiment data to PUMA) created by
- The experiment data were uploaded to the storage system (PUMA) Faraday …
Apr 4, 2014:
- 9:58 AM Ticket #1457 (04 Abr 12:35 End of campaign) created by
- End of campaign. Put pictures of rtis, spectros, noise, power and results.
- 9:39 AM Ticket #1456 (04 Abr 12:30 Transmitter Power mesearuments) created by
- 04/04/2014 08:00 TX Power sample (-70 dB coupling) 1 +6.1 dBm 2 +1.3 dBm/ …
- 5:08 AM Ticket #1455 (04 Apr 07:49 Re-starting acquisition of the Faraday experiment) created by
- The PC of the Faraday experiment re-started itself at 07:49. The …
- 4:20 AM Ticket #1454 (04 Apr 07:05 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Tx1 +6.4 dBm Tx2 +1.5 dBm/ +4.8 …
- 4:08 AM Ticket #1453 (04 Apr 06:55 spark gaps adjustment) created by
Apr 3, 2014:
- 11:58 PM Ticket #1452 (04 Apr 02:40 spark gaps adjustment) created by
- 9:24 PM Ticket #1451 (03 Apr 23:59 plots of experiments) created by
- 9:24 PM Ticket #1450 (03 Apr 23:57 Re-starting acquisition of the Faraday experiment) created by
- The acquisition re-started itself at 23:57.
- 9:21 PM Ticket #1449 (03 Apr 23:30 Re-starting acquisition of the Faraday experiment) created by
- The PC of the Faraday experiment re-started itself at 23:26. The …
- 9:02 PM Ticket #1448 (04 Apr 23:50 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Tx1 +6.6 dBm Tx2 +1.9 dBm/ +5.0 …
- 8:04 PM Ticket #1447 (03 Apr 22:20 spark gaps adjustment) created by
- 4:30 PM Ticket #1446 (03 Apr 20:00 Transmitter Power mesearuments) created by
- 04/03/2014 08:00 TX Power sample (-70 dB coupling) 1 +6.2 dBm 2 +1.4 …
- 3:45 PM Ticket #1445 (03 Apr 18:10 Calibration of ATRs and TRs) created by
- 3:44 PM Ticket #1444 (03 Apr 17:03 IDL program is hanged) created by
- The IDL program had to be finished,then the processing program was …
- 3:36 PM Ticket #1443 (03 Apr 15:09 Calibration of ATRs and TRs) created by
- 3:36 PM Ticket #1442 (03 Apr 11:53 Calibration of ATRs and TRs) created by
- 3:35 PM Ticket #1441 (03 Apr 08:41 Calibration of ATRs and TRs) created by
- 5:19 AM Ticket #1440 (02 Abr 07:50 Lose synchronization in the Faraday aquisition system) created by
- 4:28 AM Ticket #1439 (03 Apr 07:05 Crowbar by voltage drop) created by
- 4:27 AM Ticket #1438 (03 Apr 07:10 Transmitter Power measurements) created by
- 07:07 Crowbar by voltage drop.
- 4:24 AM Ticket #1437 (03 Apr 07:10 Transmitter Power measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Tx1 +6.1 dBm Tx2 +1.7 dBm/ +4.9 …
- 12:10 AM Ticket #1436 (03 Apr 01:45 Calibration of ATRs and TRs) created by
Apr 2, 2014:
- 10:36 PM Ticket #1435 (03 Apr 00:00 Figures of RTI, noise, spectras, etc) created by
- 10:33 PM Ticket #1434 (02 Apr 21:55 Calibration of ATRs and TRs) created by
- 9:25 PM Ticket #1433 (03 Apr 00:12 Transmitter Power measurements) created by
- 20:00 TX Power sample (-70 dB coupling) 1 +6.3 dBm 2 +2.3 dBm/ +5.1 dBm 4 …
- 4:58 PM Ticket #1432 (02 Apr 19:50 Transmitter Power measurements) created by
- 09:00 TX Power sample (-70 dB coupling) 1 +5.5 dBm 2 +1.4 dBm/ +4.8 dBm 4 …
- 3:49 PM Ticket #1431 (02 Apr 18:35 Calibration of ATRs and TRs) created by
- Calibration of ATRs and TRs
- 12:50 PM Ticket #1430 (02 Apr 15:22 Calibration of ATRs and TRs) created by
- Calibration of ATRs and TRs
- 12:50 PM Ticket #1429 (02 Apr 15:20 Signal Chain Restart) created by
- The signal chain processing program stopped due to an error with an …
- 12:07 PM Ticket #1428 (02 Apr 14:40 Power adjustment in Tx1 due to AC Line variation) created by
- Power adjustment Tx1 due to AC Line variation
- 11:51 AM Ticket #1427 (02 Apr 13:34 Posible Solar Flare Interference) created by
- Noise across all heights was detected at 13:34. Possible suspect is small …
- 9:43 AM Ticket #1426 (02 Apr 12:22 Calibration of ATRs and TRs) created by
- Calibration of ATRs and TRs
- 9:21 AM Ticket #1425 (02 Apr 12:01 Drop in Tx line) created by
- Tx line dropped at 12:01 pm. A previous drop was detected at 11:58am.
- 7:18 AM Ticket #1424 (02 Apr 10:01 Signal Chain restart) created by
- Signal Chain was restarted
- 7:17 AM Ticket #1423 (02 Apr 08:25 Signal Chain stop) created by
- The signal chain processing program stopped due to an error in threading.
- 6:20 AM Ticket #1422 (02 Abr 09:03 Calibration of ATRs and TRs) created by
- Calibration of ATRs and TRs
- 4:50 AM Ticket #1421 (02 Apr 00:00 Figures of RTI, noise, spectras, etc) created by
- Figures of RTI, noise, spectras, etc
- 4:48 AM Ticket #1420 (02 Apr 05:18 Calibration of ATRs and TRs) created by
- Calibration of ATRs and TRs
- 4:48 AM Ticket #1419 (02 Apr 05:00 ChA is recovered after fall of TX1) created by
- ChA is recovered after fall of TX1
- 4:45 AM Ticket #1418 (02 Abr 04:40 Fall Tx1 by variation Line AC) created by
- Fall Tx1 by variation Line AC
- 4:42 AM Ticket #1417 (02 Apr 01:04 Calibration of ATRs and TRs) created by
- Calibration of ATRs and TRs
- 4:41 AM Ticket #1416 (01 Apr 22:22 Change Tr at ChA) created by
- Change Tr at ChA, after put back the same TR at ChA. ChA is attenuated 2 …
- 4:39 AM Ticket #1415 (01 Mar 08:00 Transmitter Power mesearuments) created by
- Date:04/01/2014 20:00 TX Power sample (-70 dB coupling) 1 +6.0 dBm 2 …
- 4:37 AM Ticket #1414 (01 Apr 21:35 ChA is attenuated at 1 db) created by
- ChA is attenuated at 1 db
- 4:37 AM Ticket #1413 (01 Apr 21:25 ChA is attenuated at 1 db) created by
- ChA is attenuated at 1 db
- 4:34 AM Ticket #1412 (01 Apr 21:21 Difference in Noise of Ch A and B is more of 2 db) created by
- Difference in Noise of Ch A and B is more of 2 db
- 4:29 AM Ticket #1411 (01 Apr 20:41 Calibration ATrs and Trs) created by
- Calibration ATrs and Trs
Apr 1, 2014:
- 5:08 PM Ticket #1410 (01 Apr 19:50 Transmitter Power measurements) created by
- 09:00 TX Power sample (-70 dB coupling) 1 +5.3 dBm 2 +1.6 dBm/ +4.8 dBm 4 …
- 4:55 PM Ticket #1409 (01 Apr 19:35 Re-starting the pc of ew_drift experiment) created by
- The PC of the acquisition system was re-started because of problems with …
- 3:30 PM Ticket #1408 (01 Apr 16:20 Spark Gaps adjustment) created by
- 10:48 AM Ticket #1407 (01 Apr 13:25 Spark Gaps adjustment) created by
- 9:17 AM Ticket #1406 (01 Apr 09:25 Spark gap adjusment) created by
- Drop at the reception channels of Faraday due to spark gap problems.
- 9:01 AM Ticket #1405 (01 Apr 08:45 Spark Gaps adjustment) created by
- 4:51 AM Ticket #1404 (01 Apr 07:13 DP_Faraday Acquisition System stopped) created by
- Faraday Acquisition System was restarted
- 4:14 AM Ticket #1403 (31 Mar 20:00 Transmitter Power mesearuments) created by
- Date:03/31/2014 20:00 TX Power sample (-70 dB coupling) 1 +5.9 dBm 2 …
- 4:06 AM Ticket #1402 (01 Apr 06:20 DP_Faraday Acquisition System stopped) created by
- PC-Faraday stopped acquisition. 6:26 am Acquisition system was restarted.
- 2:40 AM Ticket #1401 (01 Apr 05:19 Spark Gaps adjustment) created by
- 2:38 AM Ticket #1400 (01 Apr 01:11 Spark Gaps adjustment) created by
Mar 31, 2014:
- 9:03 PM Ticket #1399 (31 Mar 23:04 Power Amplifier 2 fall) created by
- There was a problem with source screen. The power amplifier 2 was …
- 8:59 PM Ticket #1398 (31 Mar 22:51 Power Amplifier 2 fall) created by
- There was a problem with source screen. The power amplifier 2 was …
- 8:48 PM Ticket #1397 (31 Mar 21:07 Spark Gaps adjustment) created by
- 8:36 PM Ticket #1396 (31 Mar 19:23 Power Amplifier 1 had problems) created by
- 19:26 Power Amplifier was restarted.
- 8:18 PM Ticket #1395 (31 Mar 17:55 IDL program is hung) created by
- The program had to be finished,then the processing program was restarted.
- 5:13 PM Ticket #1394 (31 Mar 19:50 Transmitter Power measurements) created by
- 17:00 Transmitters on 18:00 TX Power sample (-70 dB coupling) 1 …
- 4:55 PM Ticket #1393 (31 Mar 17:55 Faraday's Plots) created by
- Signal Chain software is sending the Spectras and RTIs plot to real-time …
- 4:52 PM Ticket #1392 (31 Mar 17:50 Attenuation on Faraday's Channels) created by
- On Faraday, the attenuation of Channel A and B are fixed to 10dB and 8dB …
- 4:48 PM Ticket #1391 (31 Mar 17:40 Amplification Stage on Faraday) created by
- Amplification Stage (-15dB) is put out of Channels A and B
- 4:44 PM Ticket #1390 (31 Mar 17:34 UE Channel C) created by
- The experiment is restarted after that problems were solved on UE of …
- 4:34 PM Ticket #1389 (31 Mar 17:15 Start Experiment) created by
- At the beginning there were problems on Channel C of EW-Drifts and Noise …
- 4:08 PM Ticket #1388 (31 Mar 17:00 Antenna Setup) created by
- VSWR Measurements: W_up = 1.03 W_dw = 1.02 N_up = 1.06 (central frequency …
- 8:46 AM Ticket #1387 (31 Mar 11:33 Log created ISCOD HLStormtime 31 Mar - 04 Apr) created by
- Log created
Note: See TracTimeline
for information about the timeline view.