Timeline
Apr 1, 2014:
- 5:08 PM Ticket #1410 (01 Apr 19:50 Transmitter Power measurements) created by
- 09:00 TX Power sample (-70 dB coupling) 1 +5.3 dBm 2 +1.6 dBm/ +4.8 dBm 4 …
- 4:55 PM Ticket #1409 (01 Apr 19:35 Re-starting the pc of ew_drift experiment) created by
- The PC of the acquisition system was re-started because of problems with …
- 3:30 PM Ticket #1408 (01 Apr 16:20 Spark Gaps adjustment) created by
- 10:48 AM Ticket #1407 (01 Apr 13:25 Spark Gaps adjustment) created by
- 9:17 AM Ticket #1406 (01 Apr 09:25 Spark gap adjusment) created by
- Drop at the reception channels of Faraday due to spark gap problems.
- 9:01 AM Ticket #1405 (01 Apr 08:45 Spark Gaps adjustment) created by
- 4:51 AM Ticket #1404 (01 Apr 07:13 DP_Faraday Acquisition System stopped) created by
- Faraday Acquisition System was restarted
- 4:14 AM Ticket #1403 (31 Mar 20:00 Transmitter Power mesearuments) created by
- Date:03/31/2014 20:00 TX Power sample (-70 dB coupling) 1 +5.9 dBm 2 …
- 4:06 AM Ticket #1402 (01 Apr 06:20 DP_Faraday Acquisition System stopped) created by
- PC-Faraday stopped acquisition. 6:26 am Acquisition system was restarted.
- 2:40 AM Ticket #1401 (01 Apr 05:19 Spark Gaps adjustment) created by
- 2:38 AM Ticket #1400 (01 Apr 01:11 Spark Gaps adjustment) created by
Mar 31, 2014:
- 9:03 PM Ticket #1399 (31 Mar 23:04 Power Amplifier 2 fall) created by
- There was a problem with source screen. The power amplifier 2 was …
- 8:59 PM Ticket #1398 (31 Mar 22:51 Power Amplifier 2 fall) created by
- There was a problem with source screen. The power amplifier 2 was …
- 8:48 PM Ticket #1397 (31 Mar 21:07 Spark Gaps adjustment) created by
- 8:36 PM Ticket #1396 (31 Mar 19:23 Power Amplifier 1 had problems) created by
- 19:26 Power Amplifier was restarted.
- 8:18 PM Ticket #1395 (31 Mar 17:55 IDL program is hung) created by
- The program had to be finished,then the processing program was restarted.
- 5:13 PM Ticket #1394 (31 Mar 19:50 Transmitter Power measurements) created by
- 17:00 Transmitters on 18:00 TX Power sample (-70 dB coupling) 1 …
- 4:55 PM Ticket #1393 (31 Mar 17:55 Faraday's Plots) created by
- Signal Chain software is sending the Spectras and RTIs plot to real-time …
- 4:52 PM Ticket #1392 (31 Mar 17:50 Attenuation on Faraday's Channels) created by
- On Faraday, the attenuation of Channel A and B are fixed to 10dB and 8dB …
- 4:48 PM Ticket #1391 (31 Mar 17:40 Amplification Stage on Faraday) created by
- Amplification Stage (-15dB) is put out of Channels A and B
- 4:44 PM Ticket #1390 (31 Mar 17:34 UE Channel C) created by
- The experiment is restarted after that problems were solved on UE of …
- 4:34 PM Ticket #1389 (31 Mar 17:15 Start Experiment) created by
- At the beginning there were problems on Channel C of EW-Drifts and Noise …
- 4:08 PM Ticket #1388 (31 Mar 17:00 Antenna Setup) created by
- VSWR Measurements: W_up = 1.03 W_dw = 1.02 N_up = 1.06 (central frequency …
- 8:46 AM Ticket #1387 (31 Mar 11:33 Log created ISCOD HLStormtime 31 Mar - 04 Apr) created by
- Log created
Note: See TracTimeline
for information about the timeline view.