Timeline


and

Aug 27, 2014:

6:45 AM Ticket #1696 (27 Aug 09:00 End snd Figures) created by pcondor
End of campaign and figures of rti, spectras and noises.
6:33 AM Ticket #1695 (27 Aug 09:20 Data were uploaded to PUMA) created by imanay
1) Faraday Files : 119 Size : 6.2 GB 2) EW_Drift Files : 303 Size : 21.6 …
4:17 AM Ticket #1694 (27 August 07:05 Transmitter Power Measurements) created by vquesada
26 August 2014 20:00 TX Power sample (-70 dB coupling) Tx1 +5.5 dBm …
2:00 AM Ticket #1693 (26 Aug 23:59 Figures of Experiment) created by Avaldez
1:59 AM Ticket #1692 (27 Aug 02:08 Spark gaps adjusment) created by Avaldez
1:57 AM Ticket #1691 (26 Aug 22:47 Spark gaps adjusment) created by Avaldez
1:56 AM Ticket #1690 (26 Aug 20:28 The Transmitter goes down) created by Avaldez
Problems with Power Amplifier, this problem was fixed after 1 minutes
1:54 AM Ticket #1689 (26 Aug 20:05 The Transmitter goes down) created by Avaldez
Problems with Power Amplifier, this problem was fixed after 1 minutes

Aug 26, 2014:

5:10 PM Ticket #1688 (26 Ago 08:00 Transmitter Power mesearuments) created by rtadeo
26/08/2014 hora tx fill Pot.(inc) 16:00 1 16.5 …
4:35 PM Ticket #1687 (26 Aug 19:20 Spark gaps adjusment) created by imanay
3:39 PM Ticket #1686 (26 Aug 18:00 vipir system was turned off) created by imanay
3:30 PM Ticket #1685 (26 Aug 16:20 Ew_drift + Faraday experiment starts) created by imanay
Ew_drift attenuations: --------------------- A : 0 B : 1 C : 0 D : 0 …
9:36 AM Ticket #1684 (26 Aug 12:23 Antena VSWR) created by ryanque
SUP 1.02 SDN 1.04 EDN 1.01 EUP 1.10 NUP 1.08 NDN 1.10 WDN 1.03 WUP 1.04
8:01 AM Ticket #1683 (26 Aug 10:48 Log created) created by ryanque

Aug 11, 2014:

1:41 PM Ticket #1682 (11 Aug 16:30 ISR data was uploaded to PUMA) created by imanay
1) EW_Drift: 25.2GB, 354 files 2) Faraday: 7.26GB, 138 files

Aug 6, 2014:

1:44 PM Ticket #1681 (05 Ago 08:20 Transmitter is turned off) created by pcondor
Transmitter is turned off to check antennas.
1:34 PM Ticket #1680 (05 Aug 12:30 Transmitter Power Measurements) created by ryaya
04 Aug 16:15 Low voltage ON 16:30 HV ON 17:43 TX Power sample (-70 dB) …

Aug 5, 2014:

3:50 PM Ticket #1679 (05 Ago 12:20 Figures rti and spectra) created by pcondor
Figures rti and spectra.
3:20 PM Ticket #1678 (05 Ago 12:25 End) created by pcondor
End experiment.
3:17 PM Ticket #1677 (05 Ago 10:02 Transmitter turn on) created by pcondor
Transmitter turn on.
2:50 PM Ticket #1676 (05 Ago 09:54 Pre Amplifier of ch E is changed) created by pcondor
Pre Amplifier of ch E is changed. Attenuation of chs: Ch A = 0 Ch E …
2:45 PM Ticket #1675 (05 Ago 07:30 Ch E noise is low) created by pcondor
Ch E noise is low. 15.23 db. Tx is turn off for revision of ch D, E and …
2:33 PM Ticket #1674 (04 Ago 20:24 Beacon is connected) created by pcondor
Beacon is connected. All OK.
2:24 PM Ticket #1673 (04 Ago 20:20 TR Ch A is changed) created by pcondor
TR Ch A is changed.
2:21 PM Ticket #1672 (04 Ago 19:36 Tx turn on) created by pcondor
Tx turn on.
2:17 PM Ticket #1671 (04 Ago 19:34 Noise channels after revision channels D,E, and F) created by pcondor
Noise channels after revision channels D,E, and F without transmitter. We …
1:50 PM Ticket #1670 (04 Ago 18:36 Revision of Channels D,E,F) created by pcondor
Revision of Channels D,E,F. Transmitter is turned off.
1:43 PM Ticket #1669 (04 Ago 18:08 We started recording data) created by pcondor
We started recording data. Before we changed pre amplifier of channel F. …
Note: See TracTimeline for information about the timeline view.