﻿ticket	summary	component	version	milestone	type	owner	status	created	_changetime	_description	_reporter
3	Preventive Mainteinance 24/10/12	component1			defect	somebody	new	2012-10-24T13:04:01-05:00	2012-10-24T13:04:01-05:00	"Tasks:

-Dome cleaning
-Software check(Master software had a problem and was not taking data since 13/10/12. Software was relaunched)
-The tool cabinets were ordered.
-Optics cleaning

Participants:
Luis Navarro
Ricardo Rojas"	lnavarro
4	Preventive Mainteinance 24/10/12	component1			defect	somebody	new	2012-10-24T13:15:10-05:00	2012-10-24T15:13:06-05:00	"Problems with the Camera software sice 13/10/12. The Master software was stocked in the temperature loop. A test was performed using ANDOR software and the camera was not able to reach -78C, it was stocked in -80C.

The system will be shutdown and more test will be performed tonight."	lnavarro
1	Preventive Maintainance 08/29/12	component1			task	somebody	new	2012-08-29T13:35:27-05:00	2012-08-29T15:33:40-05:00	"Preventive Maintainance:
*Lens cleaning
*Filter cleaning->red and green
*Solar calibration: angles found:
Az=5.
Ze=-1.
*Dome cleaning
*Test of SS using testMIR_positions.txt
*Test of the laser shutter with Master and observatory
*Test of the filterslider with Observatory
-------------------------------------------
Extras:
*New security camera installed for te facilty.

--------------------------------------------
People involved:
Luis Navarro
Ricardo Rojas
Oscar Veliz"	lnavarro
2	Preventive Mainteinance 13/09/12	component1			task	somebody	new	2012-09-13T11:17:09-05:00	2012-09-13T13:29:28-05:00	"Tasks:
-Dome, lens, PCs and station cleaning 
-Check of Shutter operation
-Check of FilterSlider operation
-Check of Laser Shutter operation
-Check of Sun calibration(angles remained OK)

Staff involved:
-Luis Navarro
-David Sanchez"	lnavarro
5	Preventive Mainteinance 29/11/12	component1			task	somebody	new	2012-11-29T16:24:57-05:00	2012-11-29T16:24:57-05:00	"Tasks:
Clean of dome and filters
Checking of the CV angles by testMIR.txt
Checking of the laser shutter operation

Others:
Measurements of the:
FPI neck base: 48.5x49x7 inches
Allsky neck base hole: 29x29x12 inches
Roof perimetral wall height: 32 inches

Staff involved: L. Navarro, R. Rojas"	lnavarro