Timeline
Oct 2, 2023:
- 7:51 PM Ticket #1478 (10 02 19:48 Transmitter report) created by
- 07:40 LV ON 07:50 HV ON 08:00 TX Power Sample (-70 dB coupling) TX1 5.20 …
- 7:13 PM Ticket #1477 (10 02 19:00 Plots) created by
- 7:12 PM Ticket #1476 (10 02 18:35 Spark gaps adjustment) created by
- 08:20 Spark gaps adjustment 11:06 Spark gaps adjustment 13:29 Spark gaps …
- 9:50 AM Ticket #1475 (10 02 08:20 Experiment started) created by
Sep 27, 2023:
- 2:41 PM Ticket #1474 (09 27 15:00 VSWR antenna) created by
- || ||||||=BEFORE=||||||||=AFTER=|| ||= …
Sep 26, 2023:
- 8:00 AM Ticket #1473 (09 26 08:00 End Experiment) created by
- 8:00 AM Ticket #1472 (09 26 08:00 Operation Resume) created by
- Person in Charge: R. Flores Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
- 7:50 AM Ticket #1471 (09 27 07:50 Transmitter Report) created by
- 09/25/2023 20:00 TX Power Sample (-70 dB coupling) TX1 5.5 Vpp TX3 …
- 7:31 AM Ticket #1470 (09 26 07:30 Plots) created by
- 6:23 AM Ticket #1469 (09 26 06:01 Spark gaps adjustment) created by
- 09 25 20:08 Spark gaps adjustment 22:04 Spark gaps adjustment 09 26 00:06 …
- 6:03 AM Ticket #1468 (09 26 06:00 Imaging Off) created by
Sep 25, 2023:
- 11:59 PM Ticket #1467 (09 25 23:59 Plots) created by
- 7:56 PM Ticket #1466 (09 25 20:00 Operation Resume) created by
- Person in Charge: K.Kuyeng Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
- 7:56 PM Ticket #1465 (09 25 20:00 Spark gaps adjustment) created by
- 08:00 Spark gaps adjustment 10:00 Spark gaps adjustment 11:50 Spark gaps …
- 7:22 PM Ticket #1464 (09 25 19:30 Transmitter report) created by
- 09:00 TX Power Sample (-70 dB coupling) TX1 5.5 Vpp TX3 5.8 Vpp TX4 5.4 …
- 6:14 PM Ticket #1463 (09 25 17:25 Imaging Start) created by
- Start Imaging experiment
- 6:13 PM Ticket #1462 (09 24 20:00 Spark gaps adjustment) created by
- 08:00 Spark gaps adjustment 10:00 Spark gaps adjustment 12:00 Spark gaps …
- 6:10 PM Ticket #1461 (09 24 20:00 Operation Resume) created by
- Person in Charge: A.Belleza Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
- 6:08 PM Ticket #1460 (09 24 17:45 Imaging Start) created by
- Empieza imágenes
- 6:05 PM Ticket #1459 (09 24 17:40 Ch A EWDrift) created by
- Se abre 1 dB en canal A de EWDrift
- 6:05 PM Ticket #1458 (09 24 17:40 Ch A EWDrift) created by
- Se abre 1 dB en canal A de EWDrift
- 6:04 PM Ticket #1457 (09 24 10:15 Ch A EWDrift) created by
- Se atenúa 1 dB en canal A de Exp EWDrift.
- 7:51 AM Ticket #1456 (09 25 08:00 Operation Resume) created by
- Person in Charge: J. Rojas. Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
- 7:22 AM Ticket #1455 (09 25 07:20 Plots) created by
- 7:15 AM Ticket #1454 (09 25 07:15 Transmitter Report) created by
- 09/24/2023 20:00 TX Power Sample (-70 dB coupling) TX1 5.5 Vpp TX3 …
- 6:16 AM Ticket #1453 (09 25 06:12 Imaging Off) created by
- 6:15 AM Ticket #1452 (09 25 06:00 Spark gaps adjustment) created by
- 09 24 20:00 Spark gaps adjustment 22:00 Spark gaps adjustment 09 25 00:00 …
- 12:21 AM Ticket #1451 (09 24 23:59 Plots) created by
Sep 24, 2023:
- 7:51 PM Ticket #1450 (09 24 19:52 Plots) created by
- 09 24 19:52 Plots
- 7:58 AM Ticket #1449 (09 24 08:00 Operation Resume) created by
- Person in Charge: R. Flores Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
- 7:58 AM Ticket #1448 (09 24 08:00 Spark gaps adjustment) created by
- 09 23 22:00 Spark gaps adjustment 09 24 00:00 Spark gaps adjustment 02:00 …
- 7:29 AM Ticket #1447 (09 24 07:30 Plots) created by
- 7:14 AM Ticket #1446 (09 24 07:15 Transmitter Report) created by
- 09/23/2023 20:00 TX Power Sample (-70 dB coupling) TX1 5.5 Vpp TX3 …
- 6:35 AM Ticket #1445 (09 24 06:30 Imaging Off) created by
Sep 23, 2023:
- 11:59 PM Ticket #1444 (09 23 23:59 Plots) created by
- 8:05 PM Ticket #1443 (09 23 20:05 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: ISR_Imaging 1) 08:00 - 20:00 2) …
- 8:04 PM Ticket #1442 (09 23 20:01 Spark gaps adjustment) created by
- 08:03 Spark gaps adjustment 09:58 Spark gaps adjustment 12:00 Spark gaps …
- 7:46 PM Ticket #1441 (09 23 19:30 Transmitter Report) created by
- 08:00 TX Power Sample (-70 dB coupling) TX1 5.3 Vpp TX3 5.8 Vpp TX4 5.3 …
- 7:06 PM Ticket #1440 (09 23 19:00 Plots) created by
- 7:05 PM Ticket #1439 (09 23 18:00 Back to first connection for EW_Drifts: Rx line E instead of B) created by
- A channel of EW_Drifts experiment was connected to external B reception …
- 7:00 PM Ticket #1438 (09 23 18:10 Imaging experiment started) created by
- 6:58 PM Ticket #1437 (09 23 08:30 Imaging started for Hydra acquisition) created by
- 7:52 AM Ticket #1436 (09 23 08:00 Operation Resume) created by
- Person in Charge: J. Rojas Experiment: ISR-Imaging 1) 20:00 - 08:00 2) …
- 7:41 AM Ticket #1435 (09 23 06:10 Spark gaps adjustment) created by
- 09 22 20:13 Spark gaps adjustment 22:10 Spark gaps adjustment 09 23 00:02 …
- 7:28 AM Ticket #1434 (09 23 07:30 Plots) created by
- Plots ISR+Imaging
- 7:01 AM Ticket #1433 (09 23 07:00 Transmitter Report) created by
- 09/22/2023 20:00 TX Power Sample (-70 dB coupling) TX1 5.2 Vpp TX3 …
- 6:39 AM Ticket #1432 (09 23 06:14 Imaging Off) created by
- 09 23 06:14 Imaging Off
- 1:26 AM Ticket #1431 (09 22 23:59 Plots) created by
Sep 22, 2023:
- 7:37 PM Ticket #1430 (09 22 20:00 Operation Resume) created by
- Person in Charge: A. VALDEZ Experiment: ISR-Imaging 1) 08:00 - 20:00 pm …
- 7:10 PM Ticket #1429 (09 22 19:10 Transmitter Report) created by
- 08:00 TX Power Sample (-70 dB coupling) TX1 5.3 Vpp TX3 5.9 Vpp TX4 5.5 …
- 7:57 AM Ticket #1428 (09 22 08:00 Operation Resume) created by
- Person in Charge: A. Belleza Experiment: ISR-Imaging 1) 20:00 - 08:00 2) …
- 7:29 AM Ticket #1427 (09 22 07:30 Plots) created by
- 09 22 07:30 Plots
- 7:28 AM Ticket #1426 (09 22 06:15 Imaging Off) created by
- 09 22 06:15 Imaging Off
- 7:01 AM Ticket #1425 (09 22 07:00 Transmitter Report) created by
- 09/21/2023 20:00 TX Power Sample (-70 dB coupling) TX1 5.3 Vpp TX3 …
- 12:27 AM Ticket #1424 (09 21 23:59 Plots) created by
- 09 21 23:59 Plots
- 12:21 AM Ticket #1423 (09 21 23:59 Plots) created by
- 09 21 23:59 Plots
- 12:18 AM Ticket #1422 (09 21 23:59 Plots) created by
- 09 21 23:59 Plots
Sep 21, 2023:
- 8:05 PM Ticket #1421 (09 21 20:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: ISR-Imaging 1) 08:00 - 20:00 2) …
- 7:19 PM Ticket #1420 (09 21 17:50 Plots) created by
- Figures of rti, spectras, parameters and noise
- 7:12 PM Ticket #1419 (09 21 18.50 Spark gaps adjustment) created by
- 10:30 Spark gaps adjustment 13:30 Spark gaps adjustment 15:59 Spark gaps …
- 7:11 PM Ticket #1418 (09 21 19:11 Transmitter Report) created by
- 07:47 LV ON 08:01 HV ON 08:20 TX Power Sample (-70 dB coupling) TX1 5.3 …
- 6:44 PM Ticket #1417 (09 21 18:36 Noise levels) created by
- 09:13 EW DRIFTS A:32.26 B:31.32 C:32.78 D:31.40 FARADAY A:31.91 B:32.53 …
- 6:06 PM Ticket #1416 (09 21 17:29 Imaging is ON) created by
- Imaging is ON
- 6:05 PM Ticket #1415 (09 21 10:31 Imaging is Off) created by
- Imaging is Off after of record pass of Hydra to calibration of Imaging
- 6:03 PM Ticket #1414 (09 21 08:08 Start experiment) created by
- Start experiment. 08:20 Transmitter to maximum power.
- 6:01 PM Ticket #1413 (09 21 07:53 Change of channel of EWDrifts) created by
- Change of channel of EWDrifts. Ch A with line 5 but it return to its line.
- 8:27 AM Ticket #1412 (09 19 17:00 VSWR antenna) created by
- || ||||||=BEFORE=||||||||=AFTER=|| ||= …
Sep 15, 2023:
- 8:01 AM Ticket #1411 (09 15 08:00 End of Experiment) created by
- 8:01 AM Ticket #1410 (09 15 08:00 Operation Resume) created by
- 8:00 AM Ticket #1409 (09 15 08:00 Transmitter Report) created by
- 09/14/23 20:00 TX Power Sample (-70 dB coupling) TX1 5.2 Vpp TX3 …
- 7:31 AM Ticket #1408 (09 15 07:30 Plots) created by
- 7:14 AM Ticket #1407 (09 15 07:10 Spark gaps adjustment) created by
- 09 14 21:28 Spark gaps adjustment 09 15 00:02 Spark gaps adjustment 02:29 …
- 12:00 AM Ticket #1406 (09 14 23:59 Plots) created by
Sep 14, 2023:
- 8:01 PM Ticket #1405 (09 14 20:00 Operation resume) created by
- Person in Charge: P. Condor. Experiment: HAD 1) 08:00 - 20:00 2) Operation …
- 7:24 PM Ticket #1404 (09 14 19:50 Plots) created by
- Plots of rti, spectra y Drifts
- 7:16 PM Ticket #1403 (09 14 19:00 Spark gaps adjustment) created by
- 09:10 Spark gaps adjustment 11:30 Spark gaps adjustment 14:00 Spark gaps …
- 7:16 PM Ticket #1402 (09 14 19:15 Transmitter report) created by
- 08:52 LV ON 09:05 HV ON 09:18 TX Power Sample (-70 dB coupling) TX1 5.1 …
- 7:15 PM Ticket #1401 (09 14 18:01 Noise levels) created by
- HAD 11:49 A:33.77 B:34.31 14:32 A:34.94 B:35.36 18:01 A:38.59 B:38.15
- 6:57 PM Ticket #1400 (09 14 09:05 Transmitter is On) created by
- Transmitter is On after to repair the transmission line and 9:19 TX has …
- 8:23 AM Ticket #1399 (09 14 08:23 Transmitter report) created by
- 09/13/23 20:00 TX Power Sample (-70 dB coupling) TX1 5.0 Vpp TX3 …
- 8:01 AM Ticket #1398 (09 14 08:00 Operation Resume) created by
- Person in Charge: J. Rojas Experiment: HAD 1) 20:00 - 08:00 2) Operation …
- 7:57 AM Ticket #1397 (09 14 07:50 Plots) created by
- 7:52 AM Ticket #1396 (09 13 20:00 Spark Gaps Adjustment) created by
- 09 13 22:32 Spark gaps adjustment 09 14 01:00 Spark gaps adjustment 03:28 …
- 12:16 AM Ticket #1395 (09 13 23:59 Plots) created by
Sep 13, 2023:
- 8:00 PM Ticket #1394 (09 13 20:00 Operation Resume) created by
- Person in Charge: K.Kuyeng Experiment: HAD 1) 08:00 - 20:00 2) Operation …
- 8:00 PM Ticket #1393 (09 13 20:00 Spark Gaps Adjustment) created by
- 09:55 10:15 (noise increased) 12:28 15:00 17:27 20:00 by W.Rojas
- 7:58 PM Ticket #1392 (09 13 20:00 Plots) created by
- 7:42 PM Ticket #1391 (09 13 19:42 Transmitter report) created by
- 08:00 TX Power Sample (-70 dB coupling) TX1 5.0 Vpp TX3 5.4 Vpp Line …
- 7:55 AM Ticket #1390 (09 13 08:00 Operation Resume) created by
- Person in Charge: A. Belleza Experiment: HAD 1) 20:00 - 08:00 2) Operation …
- 7:51 AM Ticket #1389 (09 13 07:52 Plots) created by
- Plots
- 7:50 AM Ticket #1388 (09 13 07:30 Spark Gaps Adjustment) created by
- 09 12 21:30 09 13 00:00 02:30 05:15 07:30 By Américo Huamaní
- 7:28 AM Ticket #1387 (09 13 07:28 Transmitter report) created by
- 09/12/23 20:00 TX Power Sample (-70 dB coupling) TX1 4.9 Vpp TX3 …
- 5:00 AM Ticket #1386 (09 12 23:59 Plots) created by
- Plots
Sep 12, 2023:
- 7:37 PM Ticket #1385 (09 12 20:00 Operation Resume) created by
- Person in Charge: J. Rojas Experiment: HAD 1) 08:00 - 20:00 2) Operation …
- 7:29 PM Ticket #1384 (09 12 19:30 Transmitter report) created by
- 09:00 TX Power Sample (-70 dB coupling) TX1 5.0 Vpp TX3 5.4 Vpp Line …
- 7:27 PM Ticket #1383 (09 12 19:20 Plots) created by
- 7:15 PM Ticket #1382 (09 12 19:12 Noise levels) created by
- 09:18 A:35.12 B:34.76 13:51 A:35.92 B:34.97 19:12 A:38.78 B:40.11
- 7:13 PM Ticket #1381 (09 12 19:01 Spark gaps adjustment) created by
- 09:08 Spark gaps adjustment 11:28 Spark gaps adjustment 14:00 Spark gaps …
- 8:01 AM Ticket #1380 (09 12 08:00 Operation Resume) created by
- Person in Charge: R. Flores Experiment: HAD 1) 20:00 - 08:00 2) Operation …
- 7:30 AM Ticket #1379 (09 12 07:30 Plots) created by
- 7:22 AM Ticket #1378 (09 12 07:22 Transmitter report) created by
- 09/11/23 20:00 TX Power Sample (-70 dB coupling) TX1 5.0 Vpp TX3 …
- 6:40 AM Ticket #1377 (09 12 06:30 Spark gaps adjustment) created by
- 09 11 20:30 Spark gaps adjustment 23:00 Spark gaps adjustment 09 12 01:30 …
- 12:00 AM Ticket #1376 (09 11 23:59 Plots) created by
Sep 11, 2023:
- 7:57 PM Ticket #1375 (09 11 19:50 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: HAD 1) 08:10 - 20:00 2) Operation …
- 7:23 PM Ticket #1374 (09 11 19:20 Plots) created by
- 7:22 PM Ticket #1373 (09 11 17:59 Spark gaps adjustment) created by
- 08:10 Spark gaps adjustment 10:26 Spark gaps adjustment 12:59 Spark gaps …
- 7:12 PM Ticket #1372 (09 11 19:15 Transmitter report) created by
- 08:00 LV ON 08:03 HV ON 08:05 RF ON 08:10 TX Power Sample (-70 dB …
- 2:11 PM Ticket #1371 (09 11 08:10 Experiment started) created by
- Transmitters with all power.
- 2:10 PM Ticket #1370 (09 07 15:00 Antenna VSWR) created by
- || ||||||=BEFORE=||||||||=AFTER=|| ||= …
Sep 7, 2023:
- 8:00 AM Ticket #1369 (09 07 08:00 Operation Resume) created by
- Person in Charge: R. Flores Experiment: ISR_Imaging 1) 20:00 - 08:00 2) …
- 7:34 AM Ticket #1368 (09 07 07:34 Transmitter report) created by
- 09/06/23 20:00 TX Power Sample (-70 dB coupling) TX1 5.7 Vpp TX3 …
- 7:30 AM Ticket #1367 (09 07 07:30 Plots) created by
- 6:01 AM Ticket #1366 (09 07 06:00 Imaging Off) created by
- 6:00 AM Ticket #1365 (09 07 06:00 Spark gaps adjustment) created by
- 09 06 22:31 Spark gaps adjustment 09 07 00:50 Spark gaps adjustment 03:28 …
Sep 6, 2023:
- 11:56 PM Ticket #1364 (09 06 23:59 Plots) created by
- 8:08 PM Ticket #1363 (09 06 20:00 Operation Resume) created by
- Person in Charge: J. Rojas Experiment: ISR_Imaging 1) 08:00 - 20:00 2) …
- 8:07 PM Ticket #1362 (09 06 20:05 Spark gaps adjustment) created by
- 10:00 Spark gaps adjustment 13:00 Spark gaps adjustment 15:10 Spark gaps …
- 7:53 PM Ticket #1361 (09 06 19:50 Falls of transmitters) created by
- Transmitters falls once: 1. From 08:47 to 08:50 (3 minutes)
- 7:51 PM Ticket #1360 (09 06 19:50 Transmitter report) created by
- 08:20 SCREEN PA 3 failure 09:00 TX Power Sample (-70 dB coupling) TX1 5.7 …
- 7:35 PM Ticket #1359 (09 06 19:30 Plots) created by
- 5:52 PM Ticket #1358 (09 06 17:37 Noise levels) created by
- 10:24 EW DRIFTS A:24.29 B:22.82 C:23.50 D:23.59 FARADAY A:18.62 B:18.70 …
- 5:37 PM Ticket #1357 (09 06 17:31 Imaging is ON) created by
- Imaging is ON
- 1:17 PM Ticket #1356 (09 06 13:14 Imaging is off) created by
- Imaging is off
- 10:40 AM Ticket #1355 (09 06 10:34 Imaging is ON) created by
- Imaging is ON to record pass of Hydra
- 8:00 AM Ticket #1354 (09 06 08:00 Operation Resume) created by
- Person in Charge: A. Belleza. Experiment: ISR_Imaging 1) 20:00 - 08:00 2) …
- 7:52 AM Ticket #1353 (09 06 07:52 Plots) created by
- Plots
- 7:38 AM Ticket #1352 (09 06 07:35 Transmitter report) created by
- 20:00 TX Power Sample (-70 dB coupling) TX1 5.7 Vpp TX3 5.5 Vpp TX4 5.9 …
- 7:30 AM Ticket #1351 (09 06 07:23 Imaging Off) created by
- Imaging Off
- 6:55 AM Ticket #1350 (09 05 23:59 Plots) created by
- 09 05 23:59 Plots
Sep 5, 2023:
- 11:02 PM Ticket #1349 (09 05 20:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: ISR-Imaging-AMisr 1) 08:00 - …
- 8:03 PM Ticket #1348 (09 05 19:50 Plots) created by
- Plots rti spectra parameters.
- 7:34 PM Ticket #1347 (09 05 19:35 Transmitter report) created by
- 09:00 TX Power Sample (-70 dB coupling) TX1 5.7 Vpp TX3 5.6 Vpp TX4 5.7 …
- 7:05 PM Ticket #1346 (09 05 19:00 Spark gaps adjustment) created by
- 09:00 Spark gaps adjustment 11:30 Spark gaps adjustment 14:00 Spark gaps …
- 7:02 PM Ticket #1345 (09 05 17:37 Noise levels) created by
- 11:09 EW DRIFTS A:23.54 B:22.96 C:23.00 D:24.27 FARADAY A:18.92 B:18.37 …
- 6:55 PM Ticket #1344 (09 05 17:36 Imaging is ON) created by
- Imaging is ON
- 6:54 PM Ticket #1343 (09 05 17:04 Transmitter is off for change hybrid) created by
- Transmitter is off for change hybrid of Drifts. Start experiment at 17:10
- 6:52 PM Ticket #1342 (09 05 13:14 Imaging is off) created by
- Imaging is off
- 6:51 PM Ticket #1341 (09 05 09:22 Imaging is ON) created by
- Imaging is ON to record pass of Hydra
- 7:55 AM Ticket #1340 (09 05 08:00 Operation Resume) created by
- Person in Charge: J. Rojas. Experiment: ISR_Imaging 1) 20:00 - 08:00 2) …
- 7:25 AM Ticket #1339 (09 05 07:30 Transmitter report) created by
- 20:00 TX Power Sample (-70 dB coupling) TX1 5.7 Vpp TX3 5.6 Vpp TX4 5.8 …
- 7:14 AM Ticket #1338 (09 05 07:12 Plots) created by
- 6:38 AM Ticket #1337 (09 05 06:34 Spark gaps adjustment) created by
- 09 04 20:40 Spark gaps adjustment 23:04 Spark gaps adjustment 09 05 01:30 …
- 6:17 AM Ticket #1336 (09 05 06:12 Imaging experiment stopped) created by
- 12:18 AM Ticket #1335 (09 04 23:59 Plots) created by
Sep 4, 2023:
- 7:54 PM Ticket #1334 (09 04 19:50 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: ISR_Imaging 1) 08:30 - 20:00 2) …
- 7:39 PM Ticket #1333 (09 04 19:40 Falls of transmitters) created by
- Transmitters falls three times: 1. From 16:57 to 17:00 (3 minutes) 2. From …
- 7:34 PM Ticket #1332 (09 04 19:30 Transmitter report) created by
- 07:50 LV ON 08:10 HV ON 09:00 TX Power Sample (-70 dB coupling) TX1 5.8 …
- 7:04 PM Ticket #1331 (09 04 19:00 Plots) created by
- 7:03 PM Ticket #1330 (09 04 18:06 Spark gaps adjustment) created by
- 08:25 Spark gaps adjustment 10:30 Spark gaps adjustment 13:00 Spark gaps …
- 6:59 PM Ticket #1329 (09 04 17:30 Imaging experiment started) created by
- 5:37 PM Ticket #1328 (09 04 09:23 vipir re-started) created by
- Blackout solved. Vipir was restarted.
- 5:35 PM Ticket #1327 (09 04 08:30 Experiment re-started) created by
- Blackout was solved. Experiment was restarted.
Note: See TracTimeline
for information about the timeline view.