Timeline
Nov 3, 2022:
- 7:41 PM Ticket #903 (11 03 19:50 Operation Resume) created by
- Person in Charge: I. Manay Experiment: HAD 1) 08:00 - 20:00 2) Operation …
- 7:41 PM Ticket #902 (11 03 17:29 Spark gap adjustments) created by
- 10:10 Spark gaps adjustment 12:30 Spark gaps adjustment 14:57 Spark gaps …
- 7:00 PM Ticket #901 (11 03 19:00 Transmitter Report) created by
- 08:00 TX Power Sample (-70 dB coupling) TX1 5.3 Vpp TX3 5.5 Vpp Line …
- 6:57 PM Ticket #900 (11 03 19:00 Plots) created by
- 7:48 AM Ticket #899 (11 03 08:00 Operation Resume) created by
- Person in Charge: J. Rojas. Experiment: HAD 1) 20:00 - 08:00 2) Operation …
- 7:34 AM Ticket #898 (11 03 07:26 Spark gaps adjustment) created by
- 11-02 21:06 Spark gaps adjustment 23:38 Spark gaps adjustment 11-03 01:59 …
- 7:25 AM Ticket #897 (11 03 07:24 Transmitter report) created by
- 19:35 crowbar failure 19:40 crowbar failure 20:00 crowbar failure 20:00 TX …
- 7:14 AM Ticket #896 (11 03 07:10 Plots) created by
- Plots of rti, spectra, noise and drifts
- 6:02 AM Ticket #895 (11 03 06:00 Noise levels) created by
- 11-02 21:39 A:34.30 B:34.34 11-03 01:58 A:33.47 B:33.45 05:59 A:33.65 …
- 1:59 AM Ticket #894 (11 02 23:59 Plots) created by
- Plots of rti, spectra, noise and drifts
Nov 2, 2022:
- 8:01 PM Ticket #893 (11 02 19:50 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: HAD 1) 08:00 - 20:00 2) Operation …
- 8:01 PM Ticket #892 (11 02 19:35 Problem with transmitter) created by
- Problem with transmitter. At 19:40 again is off transmitter to check of a …
- 7:21 PM Ticket #891 (11 02 19:22 Transmitter report) created by
- 07:50 LV ON 08:05 HV ON 08:25 TX Power Sample (-70 dB coupling) TX1 5.40 …
- 7:21 PM Ticket #890 (11 02 19:22 Transmitter report) created by
- 07:50 LV ON 08:05 HV ON 08:25 TX Power Sample (-70 dB coupling) TX1 5.40 …
- 7:18 PM Ticket #889 (11 02 20:00 Plots) created by
- Plots of rti, spectra, noise and drifts
- 7:05 PM Ticket #888 (11 02 11:25 Noise levels) created by
- 11:25 A:34.28 B:34.71 15:21 A:37.82 B:38.75 18:20 A:34.76 B:34.79
- 7:03 PM Ticket #887 (11 02 08:30 Spark gaps adjustment) created by
- 08:30 Spark gaps adjustment 11:00 Spark gaps adjustment 13:30 Spark gaps …
- 6:53 PM Ticket #886 (11 02 15:50 Transmitter is off) created by
- Transmitter is off to check. At 15:52 is On after of found the cause of …
- 6:41 PM Ticket #885 (11 02 10:47 Changing code to Flip) created by
- Changing code to Flip. It will be used to all the campaign
- 6:36 PM Ticket #884 (11 02 10:07 Changing code to another random code) created by
- Changing code to another random code. It produce interference
- 6:34 PM Ticket #883 (11 02 08:47 Changing code to flip) created by
- Changing code to Flip because Random code produce interference
- 6:27 PM Ticket #882 (11 02 08:45 Changing Code) created by
- Changing Code to check if random code produce interference.
- 6:25 PM Ticket #881 (11 02 08:00 Start experiment) created by
- Start Experiment, using Flip Code
Oct 31, 2022:
- 3:08 PM Ticket #880 (10 31 15:00 Antenna VSWR measurements) created by
- || ||||||=MAIN=|| ||= f[M]=||=49.72=||=49.92=||=50.12=|| ||= Wup =|| …
Note: See TracTimeline
for information about the timeline view.