Timeline


and

Oct 21, 2021:

11:58 PM Ticket #479 (10 21 23:59 plots) created by jrojas
7:31 PM Ticket #478 (10 21 19:50 Operation resume) created by imanay
Person in Charge: I. Manay Experiment: HAE 1) 08:00 - 20:00 2) Operation …
7:29 PM Ticket #477 (10 21 19:10 plots) created by imanay
7:29 PM Ticket #476 (10 21 19:25 Spark gap adjustments) created by imanay
09:28 Spark gaps adjustment 12:02 Spark gaps adjustment 14:30 Spark gaps …
6:59 PM Ticket #475 (10 21 19:00 Transmitter Report) created by vquesada
08:00 TX Power Sample (-70 dB Coupling) TX1 5.9 Vpp TX3 5.9 Vpp Line …
7:59 AM Ticket #474 (10 21 08:00 Operation resume) created by rflores
Person in Charge: R. Flores Experiment: HAE 1) 20:00 - 08:00 2) Operation …
7:34 AM Ticket #473 (10 21 07:35 plots) created by rflores
7:03 AM Ticket #472 (10 21 07:00 Spark gap adjustments) created by rflores
10 20 20:55 Spark gaps adjustment 23:30 Spark gaps adjustment 10 21 02:00 …
7:03 AM Ticket #471 (10 21 07:05 Transmitter report) created by ctipacti
20/10/2021 20:00 TX Power Sample (-70 dB coupling) TX1 5.8 Vpp TX3 …
3:49 AM Ticket #470 (10 19 19:59 plots) created by avaldez
3:26 AM Ticket #469 (10 19 20:00 Operation resume) created by avaldez
Person in Charge: A. VALDEZ Experiment: HAE 1) 8:00 - 20:00 2) Operation …

Oct 20, 2021:

11:58 PM Ticket #468 (10 20 23:59 plots) created by rflores
7:48 PM Ticket #467 (10 20 20:00 Operation resume) created by kkuyeng
Person in Charge: K.Kuyeng Experiment: HAE 1) 08:00 - 20:00 2) Operation …
7:20 PM Ticket #466 (10 20 19:20 plots) created by kkuyeng
7:19 PM Ticket #465 (10 20 19:20 Spark gap adjustments) created by kkuyeng
08:31 Spark gaps adjustment 11:02 Spark gaps adjustment 13:26 Spark gaps …
7:16 PM Ticket #464 (10 20 17:05 transmitter failure) created by kkuyeng
Failure on power supply of driver 1 Now both drivers are operating with …
6:59 PM Ticket #463 (10 20 19:00 Transmitter report) created by vquesada
08:00 TX Power Sample (-70 dB Coupling) TX1 6.0 Vpp TX3 6.0 Vpp Line …
8:07 AM Ticket #462 (10 20 08:00 Operation resume) created by jsuclupe
Person in Charge: J. Suclupe Experiment: HAE 1) 20:00 - 08:00 2) Operation …
7:43 AM Ticket #461 (10 20 07:30 Transmitter report) created by rtadeo
20:00 TX Power Sample (-70 dB Coupling) TX1 5.8 Vpp TX3 6.0 Vpp Line …
7:05 AM Ticket #460 (10 20 07:15 plots) created by jsuclupe
7:03 AM Ticket #459 (10 20 06:04 Spark gap adjustments) created by jsuclupe
10 19 19:56 Spark gaps adjustment 22:27 Spark gaps adjustment 10 20 01:01 …
6:55 AM Ticket #458 (10 19 23:59 plots) created by jsuclupe

Oct 19, 2021:

7:00 PM Ticket #457 (10 19 19:00 Transmitter report) created by vquesada
08:00 TX Power Sample (-70 dB Coupling) TX1 6.0 Vpp = +5.79 dBm TX3 6.0 …
3:18 PM Ticket #456 (10 19 08:00 Operation resume) created by jrojas
Person in Charge: J. Rojas Experiment: HAE 1) 20:00 - 08:00 2) Operation …
7:29 AM Ticket #455 (10 19 07:30 Spark gap adjustments) created by jrojas
10 18 21:31 Spark gaps adjustment 10 19 00:01 Spark gaps adjustment 02:22 …
7:21 AM Ticket #454 (10 19 07:20 plots) created by jrojas
7:14 AM Ticket #453 (10 19 07:10 Transmitter report) created by ryaya
18/10/2021 21:00 TX Power Sample (-70 dB coupling) TX1 5.8 Vpp TX3 5.9 …
12:11 AM Ticket #452 (10 18 23:59 plots) created by jrojas

Oct 18, 2021:

7:49 PM Ticket #451 (10 18 20:00 Transmitter Report) created by rtadeo
10:45 HV ON 10:46 RF ON 11:04:00 TX Power Sample (-70 dB coupling) TX1 5.6 …
7:40 PM Ticket #450 (10 18 19:50 Operation resume) created by imanay
Person in Charge: I. Manay Experiment: HAE 1) 11:10 - 20:00 2) Operation …
7:07 PM Ticket #449 (10 18 19:00 plots) created by imanay
7:06 PM Ticket #448 (10 18 19:03 Spark gap adjustments) created by imanay
11:09 Spark gaps adjustment 13:57 Spark gaps adjustment 16:35 Spark gaps …
7:02 PM Ticket #447 (10 18 12:20 Experiment re-started) created by imanay
Experiment were off from 11:38 to 12:20 (42 minutes) due to failure of …
11:59 AM Ticket #446 (10 18 11:10 Experiment started) created by imanay
After transmitters test of the experiment. It was started at 11:10
11:30 AM Ticket #445 (10 15 17:00 VSWR antennas) created by imanay
|| ||||||=MAIN=|| ||= f[M]=||=49.72=||=49.92=||=50.12=|| ||= Wup =|| …

Oct 9, 2021:

8:06 AM Ticket #444 (10 09 08:05 Transmitter Report) created by rtadeo
20:00 TX Power Sample (-70 dB coupling) TX1 5.4 Vpp TX3 5.7 Vpp Line …
7:55 AM Ticket #443 (10 09 08:00 Operation Resume) created by jsuclupe
Person in Charge: J. Suclupe Experiment: High Altitude Drifts 1) 20:00 - …
7:47 AM Ticket #442 (10 09 07:50 plots) created by jsuclupe
7:46 AM Ticket #441 (10 09 06:09 Transmision detention) created by jsuclupe
06:09 Tx off due to 14 burned ABS modules in North down Ed: 1.13 Sd: …
7:38 AM Ticket #440 (10 09 05:00 Spark gaps adjustment) created by jsuclupe
20:57 Spark gaps adjustment 22:59 Spark gaps adjustment 01:00 Spark gaps …
7:31 AM Ticket #439 (10 08 23:59 plots) created by jsuclupe

Oct 8, 2021:

7:43 PM Ticket #438 (10 08 20:00 Operation Resume) created by pcondor
Person in Charge: P. Condor. Experiment: Drifts HA 1) 08:00 - 20:00 2) …
7:32 PM Ticket #437 (10 08 19:50 Plots) created by pcondor
Plots of rtis, spectra and parameters.
7:27 PM Ticket #436 (10 08 19:30 Transmitter Report) created by ctipacti
08:00 TX Power Sample (-70 dB coupling) TX1 5.4 Vpp TX3 5.7 Vpp Line …
7:17 PM Ticket #435 (10 08 18:57 Spark gaps adjustment) created by pcondor
08:56 Spark gaps adjustment 10:58 Spark gaps adjustment 13:01 Spark gaps …
7:12 PM Ticket #434 (10 08 18:07 Noise levels) created by pcondor
08:40 A:32.29 B:32.76 11:37 A:33.00 B:33.08 14:55 A:33.50 B:33.90 18:07 …
7:43 AM Ticket #433 (10 08 08:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas Experiment: High Altitude Drifts 1) 20:00 - …
7:22 AM Ticket #432 (10 08 07:30 plots) created by jrojas
7:21 AM Ticket #431 (10 08 07:30 Transmitter Report) created by rtadeo
20:00 TX Power Sample (-70 dB coupling) TX1 5.4 Vpp TX3 5.7 Vpp Line …
7:08 AM Ticket #430 (10 08 07:00 Spark gaps adjustment) created by jrojas
10 07 21:01 Spark gaps adjustment 22:58 Spark gaps adjustment 10 08 01:00 …

Oct 7, 2021:

11:55 PM Ticket #429 (10 07 23:59 plots) created by jrojas
7:59 PM Ticket #428 (10 07 20:00 Operation Resume) created by kkuyeng
Person in Charge: K.Kuyeng Experiment: High Altitude Drifts 1) 08:00 - …
7:58 PM Ticket #427 (10 07 20:00 Plots) created by kkuyeng
7:10 PM Ticket #426 (10 07 10:33 low signal on Channel A) created by kkuyeng
10:33 - 10:38 --> se ajustan los cables del canal A que van al hibrido de …
7:06 PM Ticket #425 (10 07 19:00 Spark gaps adjustment) created by kkuyeng
09:02 Spark gaps adjustment 11:09 Spark gaps adjustment 13:09 Spark gaps …
6:59 PM Ticket #424 (10 07 19:00 Transmitter Report) created by vquesada
08:00 TX Power Sample (-70 dB coupling) TX1 5.4 Vpp TX3 5.8 Vpp Line …
8:01 AM Ticket #423 (10 07 08:00 Operation Resume) created by rflores
Person in Charge: R. Flores Experiment: HAD 1) 20:00 - 08:00 2) Operation …
7:29 AM Ticket #422 (10 07 07:30 plots) created by rflores
7:14 AM Ticket #421 (10 07 07:15 Transmitter report) created by ryaya
06/10/2021 21:00 TX Power Sample (-70 dB coupling) TX1 5.4 Vpp TX3 5.8 …
7:02 AM Ticket #420 (10 07 07:02 Spark gap adjustments) created by rflores
10/06 21:03 Spark gaps adjustment 23:03 Spark gaps adjustment 10/07 01:04 …

Oct 6, 2021:

11:55 PM Ticket #419 (10 06 23:59 plots) created by rflores
7:53 PM Ticket #418 (10 06 20:00 Operation Resume) created by pcondor
Person in Charge: P. Condor. Experiment: Drifts HA 1) 08:00 - 20:00 2) …
7:30 PM Ticket #417 (10 06 19:50 Plots) created by pcondor
?Plots of rti, spectra and parameter.
7:22 PM Ticket #416 (10 06 19:22 Noise levels) created by pcondor
08:17 A:31.46 B:32.52 10:23 A:32.37 B:32.38 12:56 A:32.90 B:33.34 15:15 …
7:13 PM Ticket #415 (10 06 18:49 Problem with Transmitter) created by pcondor
Problem with Transmitter. Also at 18:50 and 18:51.
7:11 PM Ticket #414 (10 06 19:00 Spark gaps adjustment) created by pcondor
09:01 Spark gaps adjustment 11:01 Spark gaps adjustment 12:55 Spark gaps …
7:03 PM Ticket #413 (10 06 19:00 Transmitter Report) created by vquesada
08:00 TX Power Sample (-70 dB coupling) TX1 5.4 Vpp TX3 5.8 Vpp Line …
6:36 PM Ticket #412 (10 06 17:01 Problem with transmitter) created by pcondor
Problem with transmitter for little minutes.
6:35 PM Ticket #411 (10 06 16:58 Transmitter is on) created by pcondor
Transmitter is ON.
6:33 PM Ticket #410 (10 06 16:30 Change of spark gaps) created by pcondor
Transmitter is off to change spark gaps.
6:32 PM Ticket #409 (10 06 11:47 Problem with transmitter) created by pcondor
Problem with transmitter for little minutes.
6:31 PM Ticket #408 (10 06 09:47 Problem with transmitter) created by pcondor
Problem with transmitter for little minutes
7:38 AM Ticket #407 (10 06 08:00 Operation Resume) created by jsuclupe
Person in Charge: J. Suclupe Experiment: HAD 1) 20:00 - 08:00 2) Operation …
7:23 AM Ticket #406 (10 06 07:25 plots) created by jsuclupe
7:14 AM Ticket #405 (10 06 07:15 Transmitter report) created by ryaya
05/10/2021 21:00 TX Power Sample (-70 dB coupling) TX1 5.5 Vpp TX3 5.8 …
7:05 AM Ticket #404 (10 06 06:58 Spark gap adjustments) created by jsuclupe
10/05 21:12 Spark gaps adjustment 23:05 Spark gaps adjustment 10/06 01:07 …
6:57 AM Ticket #403 (10 05 23:59 plots) created by jsuclupe

Oct 5, 2021:

7:26 PM Ticket #402 (10 05 19:30 Transmitter report) created by rtadeo
10:30 LV ON 10:35 HV ON 10:40 RF ON 10:46 TX Power Sample (-70 dB …
7:24 PM Ticket #401 (10 05 19:50 Operation Resume) created by imanay
Person in Charge: I. Manay Experiment: HAD 1) 10:30 - 20:00 2) Operation …
7:11 PM Ticket #400 (10 05 12:40 Drop of transmitters) created by imanay
Experiment were off during 2 minutes due to failure of transmitters.
7:03 PM Ticket #399 (10 05 19:00 plots) created by imanay
7:02 PM Ticket #398 (10 05 19:01 Spark gap adjustments) created by imanay
13:00 Spark gaps adjustment 15:06 Spark gaps adjustment 16:58 Spark gaps …
6:57 PM Ticket #397 (10 05 10:30 Experiment started) created by imanay
Delayed because transmitters failures.
6:52 PM Ticket #396 (10 04 12:00 VSWR antennas) created by imanay
|| ||||||=BEFORE=||||||||=AFTER=|| ||= …

Sep 26, 2021:

7:59 AM Ticket #395 (09 26 08:00 End experiment) created by rflores
7:59 AM Ticket #394 (09 26 08:00 Operation Resume) created by rflores
Person in Charge: R. Flores Experiment: ISR_Imaging 1) 20:00 - 08:00 2) …
7:58 AM Ticket #393 (09 26 08:00 Spark gaps adjustment) created by rflores
09 25 21:12 Spark gaps adjustment 23:36 Spark gaps adjustment 09 26 02:06 …
7:34 AM Ticket #392 (09 26 07:35 Plots) created by rflores
7:26 AM Ticket #391 (09 26 07:25 Transmitter report) created by ctipacti
25/09/21 20:00 TX Power Sample (-70 dB coupling) TX1 5.7 Vpp TX3 …

Sep 25, 2021:

11:44 PM Ticket #390 (09 25 23:59 Plots) created by rflores
7:56 PM Ticket #389 (09 25 20:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas Experiment: ISR_Imaging 1) 08:00 - 20:00 2) …
7:18 PM Ticket #388 (09 25 19:20 Plots) created by jrojas
6:57 PM Ticket #387 (09 25 18:30 Spark gaps adjustment) created by jrojas
08:40 Spark gaps adjustment 11:06 Spark gaps adjustment 13:26 Spark gaps …
6:57 PM Ticket #386 (09 25 18:03 Imaging experiment started) created by jrojas
Imaging experiment started at 17:52 with JARSv2 acquisition system. Saving …
7:59 AM Ticket #385 (09 25 08:00 Operation Resume) created by jsuclupe
Person in Charge: J. Suclupe Experiment: ISR_Imaging 1) 20:00 - 08:00 2) …
7:24 AM Ticket #384 (09 25 07:30 Plots) created by jsuclupe
7:12 AM Ticket #383 (09 25 07:30 Transmitter report) created by rtadeo
20:00 TX Power Sample (-70 dB coupling) TX1 5.8 Vpp TX3 6.0 Vpp TX4 5.6 …
7:10 AM Ticket #382 (09 25 06:04 Spark gaps adjustment) created by jsuclupe
09 24 20:02 Spark gaps adjustment 22:31 Spark gaps adjustment 09 25 01:04 …
6:58 AM Ticket #381 (09 24 23:59 Plots) created by jsuclupe

Sep 24, 2021:

7:39 PM Ticket #380 (09 24 19:50 Operation Resume) created by imanay
Person in Charge: I. Manay. Experiment: ISR_Imaging 1) 08:00 - 20:00 2) …
7:15 PM Ticket #379 (09 24 12:45 Transmitters re-started) created by imanay
Transmitters were off during 15 minutes, from 12:30 to 12:45 LT
7:07 PM Ticket #378 (09 24 17:33 Spark gaps adjustment) created by imanay
07:24 Spark gaps adjustment 10:00 Spark gaps adjustment 12:29 Spark gaps …
7:04 PM Ticket #377 (09 24 19:05 Transmitter report) created by vquesada
08:00 TX Power Sample (-70 dB coupling) TX1 5.7 Vpp TX3 5.6 Vpp TX4 5.6 …
6:58 PM Ticket #376 (09 24 19:00 Plots) created by imanay
7:56 AM Ticket #375 (09 24 08:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas Experiment: ISR_Imaging 1) 20:00 - 08:00 2) …
7:31 AM Ticket #374 (09 24 07:30 Spark gaps adjustment) created by jrojas
09 23 21:33 Spark gaps adjustment 09 24 00:03 Spark gaps adjustment 02:33 …
7:19 AM Ticket #373 (09 24 07:20 Transmitter report) created by rtadeo
20:00 TX Power Sample (-70 dB coupling) TX1 5.6 Vpp TX3 5.6 Vpp TX4 5.7 …
7:10 AM Ticket #372 (09 24 07:10 Plots) created by jrojas
12:00 AM Ticket #371 (09 23 23:59 Plots) created by jrojas

Sep 23, 2021:

7:52 PM Ticket #370 (09 23 19:46 Operation Resume) created by jsuclupe
Person in Charge: A. Valdez Experiment: ISR_Imaging 1) 08:00 - 20:00 2) …
7:51 PM Ticket #369 (09 23 19:46 Operation Resume) closed by jsuclupe
fixed
7:46 PM Ticket #369 (09 23 19:46 Operation Resume) created by jsuclupe
Person in Charge: A. Valdez Experiment: ISR_Imaging 1) 20:00 - 08:00 2) …
7:19 PM Ticket #368 (09 23 19:20 Transmitter report) created by ctipacti
08:00 TX Power Sample (-70 dB coupling) TX1 5.6 Vpp TX3 5.6 Vpp TX4 5.6 …
7:59 AM Ticket #367 (09 23 08:00 Operation Resume) created by rflores
Person in Charge: R. Flores Experiment: ISR_Imaging 1) 20:00 - 08:00 2) …
7:35 AM Ticket #366 (09 23 07:35 Plots) created by rflores
7:10 AM Ticket #365 (09 23 07:10 Transmitter report) created by ryaya
22/09/2021 21:00 TX Power Sample (-70 dB coupling) TX1 5.6 Vpp TX3 5.6 …
6:37 AM Ticket #364 (09 23 06:00 Spark gaps adjustment) created by rflores
09 22 20:03 Spark gaps adjustment 22:32 Spark gaps adjustment 09 23 01:00 …
12:00 AM Ticket #363 (09 22 23:59 Plots) created by rflores

Sep 22, 2021:

7:58 PM Ticket #362 (09 22 20:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas Experiment: ISR_Imaging 1) 08:00 - 20:00 2) …
7:34 PM Ticket #361 (09 22 19:34 Spark gaps adjustment) created by jrojas
10:04 Spark gaps adjustment 12:30 Spark gaps adjustment 15:03 Spark gaps …
7:20 PM Ticket #360 (09 22 19:20 Transmitter report) created by ctipacti
08:00 TX Power Sample (-70 dB coupling) TX1 5.6 Vpp TX3 5.6 Vpp TX4 5.7 …
7:07 PM Ticket #359 (09 22 19:10 Plots) created by jrojas
6:34 PM Ticket #358 (09 22 17:52 Imaging experiment started) created by jrojas
Imaging experiment started at 17:52 with JARSv2 acquisition system. Saving …
7:55 AM Ticket #357 (09 22 08:00 Operation Resume) created by jsuclupe
Person in Charge: J. Suclupe Experiment: ISR_Imaging 1) 20:00 - 08:00 2) …
7:48 AM Ticket #356 (09 22 07:30 Transmitter report) created by ryaya
21/09/2021 21:00 TX Power Sample (-70 dB coupling) TX1 5.6 Vpp TX3 5.6 …
7:34 AM Ticket #355 (09 22 07:35 Plots) created by jsuclupe
7:33 AM Ticket #354 (09 22 06:28 Spark gaps adjustment) created by jsuclupe
20:28 Spark gaps adjustment 22:55 Spark gaps adjustment 01:34 Spark gaps …
6:53 AM Ticket #353 (09 21 23:59 Plots) created by jsuclupe

Sep 21, 2021:

7:35 PM Ticket #352 (09 21 19:50 Operation Resume) created by imanay
Person in Charge: I. Manay. Experiment: ISR_Imaging 1) 08:40 - 20:00 2) …
7:21 PM Ticket #351 (09 21 19:30 Transmitter report) created by rtadeo
08:00 LV ON 08:20 HV ON 08:30 RF ON 08:35 TX Power Sample (-70 dB …
7:10 PM Ticket #350 (09 21 19:10 Plots) created by imanay
7:09 PM Ticket #349 (09 21 17:45 Imaging experiment started) created by imanay
Imaging experiment started at 17:45 with JARSv2 acquisition system. Saving …
7:07 PM Ticket #348 (09 21 17:44 Experiment test) created by imanay
From 17:15 to 17:45, transmitters were off to test weird echo detected at …
7:06 PM Ticket #347 (09 21 17:44 Experiment test) created by imanay
From 17:15 to 17:45, transmitters were off to test weird echo detected at …
6:57 PM Ticket #346 (09 21 17:55 Spark gaps adjustment) created by imanay
08:39 Spark gaps adjustment 11:10 Spark gaps adjustment 13:44 Spark gaps …
10:06 AM Ticket #345 (09 21 08:40 ISR_Imaging started) created by imanay
Sub-experiments EW_Drifts and Faraday started at 08:40. Imaging …
9:57 AM Ticket #344 (09 20 15:00 Antenna VSWR measurements) created by imanay
|| ||||||=BEFORE=||||||||=AFTER=|| ||= …
Note: See TracTimeline for information about the timeline view.