Timeline


and

Oct 5, 2023:

2:59 PM Ticket #1502 (10 02 19:50 Operation Resume) created by imanay
Person in Charge: I. Manay. Experiment: Valley 9 1) 08:20 - 20:00 2) …
8:01 AM Ticket #1501 (10 05 08:00 Experiment stopped) created by jrojas
8:01 AM Ticket #1500 (10 05 08:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas Experiment: Valley 9 1) 20:00 - 08:00 2) …
7:27 AM Ticket #1499 (10 05 07:20 Plots) created by jrojas
7:10 AM Ticket #1498 (10 05 07:10 Transmitter Report) created by ctipacti
10/04/23 20:00 TX Power Sample (-70 dB coupling) TX1 5.2 Vpp TX4 …
6:32 AM Ticket #1497 (10 05 06:31 Spark gaps adjustment) created by jrojas
10 04 20:30 Spark gaps adjustment 23:00 Spark gaps adjustment 10 05 01:30 …
12:23 AM Ticket #1496 (10 04 23:59 Plots) created by jrojas

Oct 4, 2023:

8:00 PM Ticket #1495 (10 04 20:00 Operation Resume) created by avaldez
Person in Charge: A. Valdez Experiment: Valley 9 1) 08:00 - 20:00 2) …
7:01 PM Ticket #1494 (10 04 19:00 Transmitter Report) created by vquesada
08:00 TX Power Sample (-70 dB coupling) TX1 5.2 Vpp TX4 5.2 Vpp Line …
7:56 AM Ticket #1493 (10 04 08:00 Operation Resume) created by abelleza
Person in Charge: A. Belleza Experiment: Valley 9 1) 20:00 - 08:00 2) …
7:54 AM Ticket #1492 (10 04 05:29 Spark gaps adjustment) created by abelleza
10 03 22:04 Spark gaps adjustment 10 04 00:40 Spark gaps adjustment 03:00 …
7:47 AM Ticket #1491 (10 04 07:48 Plots) created by abelleza
10 04 07:48 Plots
7:19 AM Ticket #1490 (10 04 07:20 Transmitter Report) created by rtadeo
20:00 TX Power Sample (-70 dB coupling) TX1 5.2 Vpp TX4 5.2 Vpp Line …
12:00 AM Ticket #1489 (10 03 23:59 Plots) created by abelleza
10 03 23:59 Plots

Oct 3, 2023:

7:57 PM Ticket #1488 (10 03 20:00 Operation Resume) created by pcondor
Person in Charge: P. Condor Experiment: Valley 9 1) 08:00 - 20:00 2) …
7:57 PM Ticket #1487 (10 03 17:08 Spark gaps adjustment) created by pcondor
09:35 Spark gaps adjustment 12:05 Spark gaps adjustment 14:39 Spark gaps …
7:08 PM Ticket #1486 (10 03 19:50 Plots) created by pcondor
Figures of rti, spectra and coherence
7:01 PM Ticket #1485 (10 03 17:00 Transmitter Report) created by vquesada
08:00 TX Power Sample (-70 dB coupling) TX1 5.2 Vpp TX4 5.2 Vpp Line …
6:43 PM Ticket #1484 (10 03 18:36 Noise levels) created by pcondor
09:16 Medium Pulse 1:19.42 2:16.42 3:17.47 4:16.69 5:16.85 6:15.85 7:18.48 …
7:58 AM Ticket #1483 (10 03 08:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas Experiment: Valley 9 1) 20:00 - 08:00 2) …
7:37 AM Ticket #1482 (10 03 07:30 Plots) created by jrojas
7:15 AM Ticket #1481 (10 03 07:15 Transmitter report) created by rtadeo
20:00 TX Power Sample (-70 dB coupling) TX1 5.20 Vpp TX4 5.20 Vpp Line …
6:59 AM Ticket #1480 (10 03 06:58 Spark gaps adjustment) created by jrojas
10 02 21:05 Spark gaps adjustment 23:30 Spark gaps adjustment 10 03 01:57 …
1:02 AM Ticket #1479 (10 02 23:59 Plots) created by jrojas

Oct 2, 2023:

7:51 PM Ticket #1478 (10 02 19:48 Transmitter report) created by ryaya
07:40 LV ON 07:50 HV ON 08:00 TX Power Sample (-70 dB coupling) TX1 5.20 …
7:13 PM Ticket #1477 (10 02 19:00 Plots) created by imanay
7:12 PM Ticket #1476 (10 02 18:35 Spark gaps adjustment) created by imanay
08:20 Spark gaps adjustment 11:06 Spark gaps adjustment 13:29 Spark gaps …
9:50 AM Ticket #1475 (10 02 08:20 Experiment started) created by imanay

Sep 27, 2023:

2:41 PM Ticket #1474 (09 27 15:00 VSWR antenna) created by imanay
|| ||||||=BEFORE=||||||||=AFTER=|| ||= …

Sep 26, 2023:

8:00 AM Ticket #1473 (09 26 08:00 End Experiment) created by rflores
8:00 AM Ticket #1472 (09 26 08:00 Operation Resume) created by rflores
Person in Charge: R. Flores Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
7:50 AM Ticket #1471 (09 27 07:50 Transmitter Report) created by vquesada
09/25/2023 20:00 TX Power Sample (-70 dB coupling) TX1 5.5 Vpp TX3 …
7:31 AM Ticket #1470 (09 26 07:30 Plots) created by rflores
6:23 AM Ticket #1469 (09 26 06:01 Spark gaps adjustment) created by rflores
09 25 20:08 Spark gaps adjustment 22:04 Spark gaps adjustment 09 26 00:06 …
6:03 AM Ticket #1468 (09 26 06:00 Imaging Off) created by rflores

Sep 25, 2023:

11:59 PM Ticket #1467 (09 25 23:59 Plots) created by rflores
7:56 PM Ticket #1466 (09 25 20:00 Operation Resume) created by kkuyeng
Person in Charge: K.Kuyeng Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
7:56 PM Ticket #1465 (09 25 20:00 Spark gaps adjustment) created by kkuyeng
08:00 Spark gaps adjustment 10:00 Spark gaps adjustment 11:50 Spark gaps …
7:22 PM Ticket #1464 (09 25 19:30 Transmitter report) created by ryaya
09:00 TX Power Sample (-70 dB coupling) TX1 5.5 Vpp TX3 5.8 Vpp TX4 5.4 …
6:14 PM Ticket #1463 (09 25 17:25 Imaging Start) created by kkuyeng
Start Imaging experiment
6:13 PM Ticket #1462 (09 24 20:00 Spark gaps adjustment) created by kkuyeng
08:00 Spark gaps adjustment 10:00 Spark gaps adjustment 12:00 Spark gaps …
6:10 PM Ticket #1461 (09 24 20:00 Operation Resume) created by abelleza
Person in Charge: A.Belleza Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
6:08 PM Ticket #1460 (09 24 17:45 Imaging Start) created by kkuyeng
Empieza imágenes
6:05 PM Ticket #1459 (09 24 17:40 Ch A EWDrift) created by kkuyeng
Se abre 1 dB en canal A de EWDrift
6:05 PM Ticket #1458 (09 24 17:40 Ch A EWDrift) created by kkuyeng
Se abre 1 dB en canal A de EWDrift
6:04 PM Ticket #1457 (09 24 10:15 Ch A EWDrift) created by kkuyeng
Se atenúa 1 dB en canal A de Exp EWDrift.
7:51 AM Ticket #1456 (09 25 08:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas. Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
7:22 AM Ticket #1455 (09 25 07:20 Plots) created by jrojas
7:15 AM Ticket #1454 (09 25 07:15 Transmitter Report) created by ctipacti
09/24/2023 20:00 TX Power Sample (-70 dB coupling) TX1 5.5 Vpp TX3 …
6:16 AM Ticket #1453 (09 25 06:12 Imaging Off) created by jrojas
6:15 AM Ticket #1452 (09 25 06:00 Spark gaps adjustment) created by jrojas
09 24 20:00 Spark gaps adjustment 22:00 Spark gaps adjustment 09 25 00:00 …
12:21 AM Ticket #1451 (09 24 23:59 Plots) created by jrojas

Sep 24, 2023:

7:51 PM Ticket #1450 (09 24 19:52 Plots) created by abelleza
09 24 19:52 Plots
7:58 AM Ticket #1449 (09 24 08:00 Operation Resume) created by rflores
Person in Charge: R. Flores Experiment: ISR+Imaging 1) 20:00 - 08:00 2) …
7:58 AM Ticket #1448 (09 24 08:00 Spark gaps adjustment) created by rflores
09 23 22:00 Spark gaps adjustment 09 24 00:00 Spark gaps adjustment 02:00 …
7:29 AM Ticket #1447 (09 24 07:30 Plots) created by rflores
7:14 AM Ticket #1446 (09 24 07:15 Transmitter Report) created by ctipacti
09/23/2023 20:00 TX Power Sample (-70 dB coupling) TX1 5.5 Vpp TX3 …
6:35 AM Ticket #1445 (09 24 06:30 Imaging Off) created by rflores

Sep 23, 2023:

11:59 PM Ticket #1444 (09 23 23:59 Plots) created by rflores
8:05 PM Ticket #1443 (09 23 20:05 Operation Resume) created by imanay
Person in Charge: I. Manay. Experiment: ISR_Imaging 1) 08:00 - 20:00 2) …
8:04 PM Ticket #1442 (09 23 20:01 Spark gaps adjustment) created by imanay
08:03 Spark gaps adjustment 09:58 Spark gaps adjustment 12:00 Spark gaps …
7:46 PM Ticket #1441 (09 23 19:30 Transmitter Report) created by rtadeo
08:00 TX Power Sample (-70 dB coupling) TX1 5.3 Vpp TX3 5.8 Vpp TX4 5.3 …
7:06 PM Ticket #1440 (09 23 19:00 Plots) created by imanay
7:05 PM Ticket #1439 (09 23 18:00 Back to first connection for EW_Drifts: Rx line E instead of B) created by imanay
A channel of EW_Drifts experiment was connected to external B reception …
7:00 PM Ticket #1438 (09 23 18:10 Imaging experiment started) created by imanay
6:58 PM Ticket #1437 (09 23 08:30 Imaging started for Hydra acquisition) created by imanay
7:52 AM Ticket #1436 (09 23 08:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas Experiment: ISR-Imaging 1) 20:00 - 08:00 2) …
7:41 AM Ticket #1435 (09 23 06:10 Spark gaps adjustment) created by jrojas
09 22 20:13 Spark gaps adjustment 22:10 Spark gaps adjustment 09 23 00:02 …
7:28 AM Ticket #1434 (09 23 07:30 Plots) created by jrojas
Plots ISR+Imaging
7:01 AM Ticket #1433 (09 23 07:00 Transmitter Report) created by vquesada
09/22/2023 20:00 TX Power Sample (-70 dB coupling) TX1 5.2 Vpp TX3 …
6:39 AM Ticket #1432 (09 23 06:14 Imaging Off) created by jrojas
09 23 06:14 Imaging Off
1:26 AM Ticket #1431 (09 22 23:59 Plots) created by jrojas

Sep 22, 2023:

7:37 PM Ticket #1430 (09 22 20:00 Operation Resume) created by avaldez
Person in Charge: A. VALDEZ Experiment: ISR-Imaging 1) 08:00 - 20:00 pm …
7:10 PM Ticket #1429 (09 22 19:10 Transmitter Report) created by ctipacti
08:00 TX Power Sample (-70 dB coupling) TX1 5.3 Vpp TX3 5.9 Vpp TX4 5.5 …
7:57 AM Ticket #1428 (09 22 08:00 Operation Resume) created by abelleza
Person in Charge: A. Belleza Experiment: ISR-Imaging 1) 20:00 - 08:00 2) …
7:29 AM Ticket #1427 (09 22 07:30 Plots) created by abelleza
09 22 07:30 Plots
7:28 AM Ticket #1426 (09 22 06:15 Imaging Off) created by abelleza
09 22 06:15 Imaging Off
7:01 AM Ticket #1425 (09 22 07:00 Transmitter Report) created by vquesada
09/21/2023 20:00 TX Power Sample (-70 dB coupling) TX1 5.3 Vpp TX3 …
12:27 AM Ticket #1424 (09 21 23:59 Plots) created by abelleza
09 21 23:59 Plots
12:21 AM Ticket #1423 (09 21 23:59 Plots) created by abelleza
09 21 23:59 Plots
12:18 AM Ticket #1422 (09 21 23:59 Plots) created by abelleza
09 21 23:59 Plots

Sep 21, 2023:

8:05 PM Ticket #1421 (09 21 20:00 Operation Resume) created by pcondor
Person in Charge: P. Condor. Experiment: ISR-Imaging 1) 08:00 - 20:00 2) …
7:19 PM Ticket #1420 (09 21 17:50 Plots) created by pcondor
Figures of rti, spectras, parameters and noise
7:12 PM Ticket #1419 (09 21 18.50 Spark gaps adjustment) created by pcondor
10:30 Spark gaps adjustment 13:30 Spark gaps adjustment 15:59 Spark gaps …
7:11 PM Ticket #1418 (09 21 19:11 Transmitter Report) created by ctipacti
07:47 LV ON 08:01 HV ON 08:20 TX Power Sample (-70 dB coupling) TX1 5.3 …
6:44 PM Ticket #1417 (09 21 18:36 Noise levels) created by pcondor
09:13 EW DRIFTS A:32.26 B:31.32 C:32.78 D:31.40 FARADAY A:31.91 B:32.53 …
6:06 PM Ticket #1416 (09 21 17:29 Imaging is ON) created by pcondor
Imaging is ON
6:05 PM Ticket #1415 (09 21 10:31 Imaging is Off) created by pcondor
Imaging is Off after of record pass of Hydra to calibration of Imaging
6:03 PM Ticket #1414 (09 21 08:08 Start experiment) created by pcondor
Start experiment. 08:20 Transmitter to maximum power.
6:01 PM Ticket #1413 (09 21 07:53 Change of channel of EWDrifts) created by pcondor
Change of channel of EWDrifts. Ch A with line 5 but it return to its line.
8:27 AM Ticket #1412 (09 19 17:00 VSWR antenna) created by imanay
|| ||||||=BEFORE=||||||||=AFTER=|| ||= …

Sep 15, 2023:

8:01 AM Ticket #1411 (09 15 08:00 End of Experiment) created by rflores
8:01 AM Ticket #1410 (09 15 08:00 Operation Resume) created by rflores
8:00 AM Ticket #1409 (09 15 08:00 Transmitter Report) created by vquesada
09/14/23 20:00 TX Power Sample (-70 dB coupling) TX1 5.2 Vpp TX3 …
7:31 AM Ticket #1408 (09 15 07:30 Plots) created by rflores
7:14 AM Ticket #1407 (09 15 07:10 Spark gaps adjustment) created by rflores
09 14 21:28 Spark gaps adjustment 09 15 00:02 Spark gaps adjustment 02:29 …
12:00 AM Ticket #1406 (09 14 23:59 Plots) created by rflores

Sep 14, 2023:

8:01 PM Ticket #1405 (09 14 20:00 Operation resume) created by pcondor
Person in Charge: P. Condor. Experiment: HAD 1) 08:00 - 20:00 2) Operation …
7:24 PM Ticket #1404 (09 14 19:50 Plots) created by pcondor
Plots of rti, spectra y Drifts
7:16 PM Ticket #1403 (09 14 19:00 Spark gaps adjustment) created by pcondor
09:10 Spark gaps adjustment 11:30 Spark gaps adjustment 14:00 Spark gaps …
7:16 PM Ticket #1402 (09 14 19:15 Transmitter report) created by ctipacti
08:52 LV ON 09:05 HV ON 09:18 TX Power Sample (-70 dB coupling) TX1 5.1 …
7:15 PM Ticket #1401 (09 14 18:01 Noise levels) created by pcondor
HAD 11:49 A:33.77 B:34.31 14:32 A:34.94 B:35.36 18:01 A:38.59 B:38.15
6:57 PM Ticket #1400 (09 14 09:05 Transmitter is On) created by pcondor
Transmitter is On after to repair the transmission line and 9:19 TX has …
8:23 AM Ticket #1399 (09 14 08:23 Transmitter report) created by ctipacti
09/13/23 20:00 TX Power Sample (-70 dB coupling) TX1 5.0 Vpp TX3 …
8:01 AM Ticket #1398 (09 14 08:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas Experiment: HAD 1) 20:00 - 08:00 2) Operation …
7:57 AM Ticket #1397 (09 14 07:50 Plots) created by jrojas
7:52 AM Ticket #1396 (09 13 20:00 Spark Gaps Adjustment) created by jrojas
09 13 22:32 Spark gaps adjustment 09 14 01:00 Spark gaps adjustment 03:28 …
12:16 AM Ticket #1395 (09 13 23:59 Plots) created by jrojas

Sep 13, 2023:

8:00 PM Ticket #1394 (09 13 20:00 Operation Resume) created by kkuyeng
Person in Charge: K.Kuyeng Experiment: HAD 1) 08:00 - 20:00 2) Operation …
8:00 PM Ticket #1393 (09 13 20:00 Spark Gaps Adjustment) created by kkuyeng
09:55 10:15 (noise increased) 12:28 15:00 17:27 20:00 by W.Rojas
7:58 PM Ticket #1392 (09 13 20:00 Plots) created by kkuyeng
7:42 PM Ticket #1391 (09 13 19:42 Transmitter report) created by rtadeo
08:00 TX Power Sample (-70 dB coupling) TX1 5.0 Vpp TX3 5.4 Vpp Line …
7:55 AM Ticket #1390 (09 13 08:00 Operation Resume) created by abelleza
Person in Charge: A. Belleza Experiment: HAD 1) 20:00 - 08:00 2) Operation …
7:51 AM Ticket #1389 (09 13 07:52 Plots) created by abelleza
Plots
7:50 AM Ticket #1388 (09 13 07:30 Spark Gaps Adjustment) created by abelleza
09 12 21:30 09 13 00:00 02:30 05:15 07:30 By Américo Huamaní
7:28 AM Ticket #1387 (09 13 07:28 Transmitter report) created by ctipacti
09/12/23 20:00 TX Power Sample (-70 dB coupling) TX1 4.9 Vpp TX3 …
5:00 AM Ticket #1386 (09 12 23:59 Plots) created by abelleza
Plots

Sep 12, 2023:

7:37 PM Ticket #1385 (09 12 20:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas Experiment: HAD 1) 08:00 - 20:00 2) Operation …
7:29 PM Ticket #1384 (09 12 19:30 Transmitter report) created by ryaya
09:00 TX Power Sample (-70 dB coupling) TX1 5.0 Vpp TX3 5.4 Vpp Line …
7:27 PM Ticket #1383 (09 12 19:20 Plots) created by jrojas
7:15 PM Ticket #1382 (09 12 19:12 Noise levels) created by jrojas
09:18 A:35.12 B:34.76 13:51 A:35.92 B:34.97 19:12 A:38.78 B:40.11
7:13 PM Ticket #1381 (09 12 19:01 Spark gaps adjustment) created by jrojas
09:08 Spark gaps adjustment 11:28 Spark gaps adjustment 14:00 Spark gaps …
8:01 AM Ticket #1380 (09 12 08:00 Operation Resume) created by rflores
Person in Charge: R. Flores Experiment: HAD 1) 20:00 - 08:00 2) Operation …
7:30 AM Ticket #1379 (09 12 07:30 Plots) created by rflores
7:22 AM Ticket #1378 (09 12 07:22 Transmitter report) created by ctipacti
09/11/23 20:00 TX Power Sample (-70 dB coupling) TX1 5.0 Vpp TX3 …
6:40 AM Ticket #1377 (09 12 06:30 Spark gaps adjustment) created by rflores
09 11 20:30 Spark gaps adjustment 23:00 Spark gaps adjustment 09 12 01:30 …
12:00 AM Ticket #1376 (09 11 23:59 Plots) created by rflores

Sep 11, 2023:

7:57 PM Ticket #1375 (09 11 19:50 Operation Resume) created by imanay
Person in Charge: I. Manay. Experiment: HAD 1) 08:10 - 20:00 2) Operation …
7:23 PM Ticket #1374 (09 11 19:20 Plots) created by imanay
7:22 PM Ticket #1373 (09 11 17:59 Spark gaps adjustment) created by imanay
08:10 Spark gaps adjustment 10:26 Spark gaps adjustment 12:59 Spark gaps …
7:12 PM Ticket #1372 (09 11 19:15 Transmitter report) created by rtadeo
08:00 LV ON 08:03 HV ON 08:05 RF ON 08:10 TX Power Sample (-70 dB …
2:11 PM Ticket #1371 (09 11 08:10 Experiment started) created by imanay
Transmitters with all power.
2:10 PM Ticket #1370 (09 07 15:00 Antenna VSWR) created by imanay
|| ||||||=BEFORE=||||||||=AFTER=|| ||= …
Note: See TracTimeline for information about the timeline view.