Timeline
Oct 27, 2024:
- 1:16 PM Ticket #1913 (10 27 13:16 Operation Resume) created by
- Person in Charge: J. Rojas Experiment: Valley 9 1) 10:00 - 14:00 2) …
- 1:16 PM Ticket #1912 (10 27 11:58 Change to RX high resolution) created by
- 1:16 PM Ticket #1911 (10 27 11:02 Change to TX high resolution) created by
- 1:10 PM Ticket #1910 (10 27 13:10 Plots) created by
- 1:09 PM Ticket #1909 (10 27 11:05 Spark gap adjustments) created by
- 11:05 Spark gaps adjustment
- 12:00 PM Ticket #1908 (10 27 12:00 Transmitter Report) created by
- 10:25 LV ON 10:48 HV ON 11:05 TX1 5.00 Vpp TX4 5.30 Vpp Line Voltage …
Oct 26, 2024:
- 12:15 PM Ticket #1907 (10 26 12:11 Transmitter Report) created by
- 09:25 LV ON 10:50 HV ON 11:10 TX Power Sample (-70 dB coupling) TX1 4.64 …
Oct 21, 2024:
- 2:21 PM Ticket #1906 (10 17 10:30 Stop adquisition to change record time to 11 min) created by
- Stop acquisition to change record time to 11 min 10:50 Start acquisition
- 2:13 PM Ticket #1905 (10 17 09:10 Test with new mode) created by
- Test with new mode, Ew Drifts and Faraday, 2 ch, record time of 2.5 min
- 2:06 PM Ticket #1904 (10 16 11:55 Change to Faraday) created by
- Change to Faraday
- 2:01 PM Ticket #1903 (10 16 09:00 Test with EW Drifts , 2ch, 2Tx) created by
- Test with EW Drifts , 2ch, 2Tx 09:10 spark gaps calibration 09:25 Change …
- 1:56 PM Ticket #1902 (10 15 11:50 EW Drifts 2 TX) created by
- EW Drifts 2 TX, maximum power. 12:19 RFb with phase +90, 2 Txs, 2ch.
- 1:49 PM Ticket #1901 (10 15 10:24 Test with EW Drifts) created by
- Test with EW Drifts with maximum power, 1 Tx. 11:20 spark gaps …
- 1:44 PM Ticket #1900 (10 15 09:36 Without hybrid RX) created by
- Without hybrid RX
- 1:40 PM Ticket #1899 (10 15 09:29 Hybrid Rx connected) created by
- Hybrid Rx connected at 09:20 spark gaps calibration
- 12:30 PM Ticket #1898 (10 15 09:00 Start test with Faraday) created by
- Start test with Faraday with 2 chs, without hydrib of Rx
- 12:24 PM Ticket #1897 (10 14 16:05 Faraday 8 ch, 2 Tx) created by
- Faraday 8 ch, 2 Tx. Results lags are not good.It is necessary check phase …
- 9:47 AM Ticket #1896 (10 14 15:20 Test with Faraday) created by
- Test with Faraday 2 ch, 1 Tx, End at 15:50 Problem with transmitter 3. …
- 9:43 AM Ticket #1895 (10 14 14:06 Start test with new mode EW DRifts) created by
- Start test with new mode, EW Drifts 2 ch, 1 Tx. End at 14:26
Note: See TracTimeline
for information about the timeline view.