Opened 29 hours ago

#2361 new General

02 15 08:00 Operation Resume

Reported by: avaldez Owned by: AVALDEZ
Priority: normal Milestone: 2026_01 ISCOD Polar Vortex (All ISR)
Component: ISR Version:
Keywords: Cc:

Description

Person in Charge: A. Valdez
Experiment: 2026_01 ISCOD Polar Vortex (All ISR)

1) Shift: 20:00 (February 14, 2026) – 08:00 (February 15, 2026)

2) Total Shift Duration: 12h 00 min

3) Operation Status: Interrupted before 21:00; continuous operation from 21:00 to 08:00

4) Reasons:

  • Failure of Control Module N11.
  • The module was temporarily replaced using direct cable connections.
  • The experiment was reconfigured to operate in EW Drifts mode only.
  • Antenna pointing was reconfigured.
  • Transmitters were tested after reconfiguration.
  • From 21:00 onward, the experiment ran without interruptions.