﻿id	summary	reporter	owner	description	type	status	priority	milestone	component	version	resolution	keywords	cc
2359	02 15 07:00 Spark-gap adjustments	avaldez	AVALDEZ	"Person in Charge: A. Valdez
Experiment: 2026_01 ISCOD Polar Vortex (All ISR)

1) Shift: 20:00 (February 14, 2026) – 08:00 (February 15, 2026)

2) Total Shift Duration: 12h 00 min

3) Operation Status: Interrupted before 21:00; continuous operation from 21:00 to 08:00

4) Reasons:

* Failure of Control Module N11.

* The module was temporarily replaced using direct cable connections.

* The experiment was reconfigured to operate in EW Drifts mode only.

* Antenna pointing was reconfigured.

* Transmitters were tested after reconfiguration.

* From 21:00 onward, the experiment ran without interruptions."	Spark gaps	new	normal	2026_01 ISCOD Polar Vortex (All ISR)	ISR				