﻿id	summary	reporter	owner	description	type	status	priority	milestone	component	version	resolution	keywords	cc
1216	06 13 10:13 Check of connections at switchyard (Reception)	imanay	I. Manay	"Connections of cables (B channel)at the switchyard were checked due to fall of signal. Also spark-gaps were checked. Signal restablished after re-connections of the output cables at the reception hybrid (B channel reception line).
This activity was done from 10:10 to 10:13. Signal at B channel was low from 09:59 to 10:13."	General	new	normal	2023_06 Hybrid	ISR				
