Timeline
Nov 24, 2020:
- 11:59 PM Ticket #1810 (11 24 23:59 Plots) created by
- 11 24 23:59 Plots
- 7:41 PM Ticket #1809 (11 24 19:50 Plots) created by
- Plots of spectra, rti and parameters.
- 7:38 PM Ticket #1808 (11 24 20:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: EW_Drift 1) 10:00 - 20:00 2) …
- 7:35 PM Ticket #1807 (11 24 19:35 Noise levels) created by
- EW Drifts 17:50 A:28.08 B:28.35 C:28.09 D:28.25 19:35 A:27.59 B:27.84 …
- 7:33 PM Ticket #1806 (11 24 19:09 Spark gaps adjustment) created by
- 11:15 Spark gaps adjustment 14:00 Spark gaps adjustment 16:33 Spark gaps …
- 7:31 PM Ticket #1805 (11 24 10:51 Channel B noise is reduced) created by
- Channel B noise is reduced in 1 db.
- 7:30 PM Ticket #1804 (11 24 09:45 Transmitter with all power) created by
- Transmitter with all power
- 7:29 PM Ticket #1803 (11 24 09:36 Transmitter is on) created by
- Transmitter is on
- 7:28 PM Ticket #1802 (11 24 09:19 Transmitter is off) created by
- Transmitter is off to check channel B because the noise raise 1 db
- 7:27 PM Ticket #1801 (11 24 08:42 Channel B noise is reduced 1 db) created by
- Channel B noise is reduced 1 db
- 7:20 PM Ticket #1800 (11 24 08:50 Start Experiment) created by
- Start Experiment. Transmitter is on.
- 6:57 PM Ticket #1799 (11 24 19:00 Transmitter Report) created by
- 08:15 LV ON 08:45 HV ON 09:00 TX Power Sample (-70 dB coupling) TX1 5.68 …