Timeline


and

Oct 24, 2020:

1:00 PM Ticket #1798 (10 24 13:00 Interference observed with spectrum analyzer) created by imanay
A 49.666 MHz was observed with spectrum analyzer(SA) N9912. Eight channels …

Oct 21, 2020:

5:29 PM Ticket #1797 (10 21 17:30 Reception test with main antena) created by imanay
Reception was tested with main antenna. North and South quarters with ABS …
12:57 PM Ticket #1796 (10 21 13:00 Results with JARS Imaging instead of JARS-IDi) created by imanay
12:25 PM Ticket #1795 (10 21 10:40 Preamplifier gain adjustment (With JARS - Idi)) created by imanay
Using JARS-Idi, the eight pre-amplifier gains were adjusted to: A=2, B=2, …
11:01 AM Ticket #1794 (10 21 10:30 Reception test) created by imanay
The following tests were implemented at reception. 1. Noise generator …

Oct 20, 2020:

11:20 AM Ticket #1793 (10 20 11:30 Data uploaded to PUMA (IMAGING)) created by imanay
378 files / 396G

Oct 19, 2020:

1:35 PM Ticket #1792 (10 19 12:30 Data uploaded to PUMA) created by imanay
2,268 files / 72.9G

Oct 16, 2020:

8:00 AM Ticket #1791 (10 16 08:00 Operation resume) created by abelleza
Person in Charge: A. Belleza Experiment: High altitude drifts 1) 20:00 - …
7:32 AM Ticket #1790 (10 16 07:32 Plots) created by abelleza
10 16 07:32 Plots
7:08 AM Ticket #1789 (10 16 06:32 Spark gaps adjustment) created by abelleza
10 15 20:37 Spark gaps adjustment 23:00 Spark gaps adjustment 10 16 01:43 …
7:06 AM Ticket #1788 (10 16 07:10 Transmitter Report) created by ctipacti
15/10/20 20:00 TX Power Sample (-70 dB coupling) TX1 5.56 Vpp TX3 5.56 …
12:15 AM Ticket #1787 (10 15 23:59 Plots) created by abelleza
10 15 23:59 Plots

Oct 15, 2020:

7:05 PM Ticket #1786 (10 15 19:50 Operation resume) created by imanay
Person in Charge: I. Manay. Experiment: High altitude drifts 1) 08:00 - …
7:02 PM Ticket #1785 (10 15 19:00 Transmitter Report) created by rtadeo
08:00 TX Power Sample (-70 dB coupling) TX1 5.52 Vpp TX3 5.52 Vpp Line …
7:01 PM Ticket #1784 (10 15 19:00 Plots) created by imanay
6:58 PM Ticket #1783 (10 15 18:07 Spark gaps adjustment) created by imanay
10:10 Spark gaps adjustment 12:30 Spark gaps adjustment 15:30 Spark gaps …
6:58 PM Ticket #1782 (10 15 16:55 Adjustment at transmitters) created by imanay
Due to loss of power observed at Unit 3 of transmitters, it was adjusted.
8:06 AM Ticket #1781 (10 15 08:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas Experiment:High Altitude Drifts 1) 20:00 - …
7:33 AM Ticket #1780 (10 15 07:31 Spark gaps adjustment) created by jrojas
10 14 21:37 Spark gaps adjustment 23:57 Spark gaps adjustment 10 15 02:37 …
7:31 AM Ticket #1779 (10 15 07:30 Plots) created by jrojas
Plots of rti, spectra, Average spectra and Drifts.
7:09 AM Ticket #1778 (10 15 07:10 Transmitter Report) created by ctipacti
14/10/20 20:00 TX Power Sample (-70 dB coupling) TX1 5.52 Vpp TX3 5.56 …
6:40 AM Ticket #1777 (10 15 06:31 Noise levels) created by jrojas
10 14 23:33 A:35.83 B:35.76 10 15 01:59 A:34.92 B:35.07 03:29 A:34.91 …
2:02 AM Ticket #1776 (10 14 23:59 Plots) created by jrojas
Plots of rti, spectra, Average spectra and Drifts.

Oct 14, 2020:

8:25 PM Ticket #1775 (10 14 20:00 Operation Resume) created by kkuyeng
Person in Charge: K.Kuyeng Experiment:High Altitude Drifts 1) 08:00 - …
7:31 PM Ticket #1774 (10 14 19:30 Plots) created by kkuyeng
Plots of rti, Average spectra and Drifts.
7:30 PM Ticket #1773 (10 14 19:30 Spark gaps adjustment) created by kkuyeng
09:08 Spark gaps adjustment 11:31 Spark gaps adjustment 14:06 Spark gaps …
7:28 PM Ticket #1772 (10 14 07:53 Checking RX cables) created by kkuyeng
Check status (connectors and adapters) of RX cables, from antenna input up …
7:09 PM Ticket #1771 (10 14 19:00 Transmitter Report) created by rtadeo
08:00 TX Power Sample (-70 dB coupling) TX1 5.50 Vpp TX3 5.60 Vpp Line …
7:50 AM Ticket #1770 (10 14 08:00 Operation resume) created by abelleza
Person in Charge: A. Belleza Experiment: High altitude drifts 1) 20:00 - …
7:35 AM Ticket #1769 (10 14 07:30 Transmitter Report) created by ryaya
13/10/20 21:00 TX Power Sample (-70 dB coupling) TX1 5.50 Vpp TX3 5.50 …
7:12 AM Ticket #1768 (10 14 06:30 Spark gaps adjustment) created by abelleza
10 13 20:31 Spark gaps adjustment 23:02 Spark gaps adjustment 10 14 01:30 …
12:06 AM Ticket #1767 (10 13 23:59 Plots) created by abelleza
10 13 23:59 Plots

Oct 13, 2020:

7:53 PM Ticket #1766 (10 13 20:00 Operation Resume) created by pcondor
Person in Charge: P. Condor. Experiment:High Altitude Drifts 1) 08:00 - …
7:41 PM Ticket #1765 (10 13 19:45 Plots) created by pcondor
Plots of rti, scpectra and Vertical Drifts.
7:04 PM Ticket #1764 (10 13 19:05 Transmitter Report) created by ctipacti
08:00 TX Power Sample (-70 dB coupling) TX1 5.60 Vpp TX3 5.64 Vpp Line …
6:42 PM Ticket #1763 (10 13 18:06 Spark gaps adjustment) created by pcondor
10:36 Spark gaps adjustment 13:25 Spark gaps adjustment 15:43 Spark gaps …
6:40 PM Ticket #1762 (10 13 18:37 Noise levels) created by pcondor
08:45 A: 34.94 B:35.12 13:07 A:35.94 B:36.44 15:13 A:36.56 B:37.11 18:37 …
7:56 AM Ticket #1761 (10 13 08:00 Operation resume) created by kkuyeng
Person in Charge: K.Kuyeng Experiment: High altitude drifts 1) 20:00 - …
7:55 AM Ticket #1760 (10 13 07:55 Spark gaps adjustment) created by kkuyeng
10 12 22:02 Spark gaps adjustment 10 13 00:32 Spark gaps adjustment 03:01 …
7:35 AM Ticket #1759 (10 13 07:30 Transmitter Report) created by ryaya
12/10/20 21:00 TX Power Sample (-70 dB coupling) TX1 5.52 Vpp TX3 5.36 …
7:34 AM Ticket #1758 (10 13 07:30 Plots) created by kkuyeng
12:15 AM Ticket #1757 (10 13 00:00 Plots) created by kkuyeng

Oct 12, 2020:

7:40 PM Ticket #1756 (10 12 19:50 Operation resume) created by imanay
Person in Charge: I. Manay. Experiment: High altitude drifts 1) 09:30 - …
7:40 PM Ticket #1755 (10 12 19:50 Operation resume) created by imanay
Person in Charge: I. Manay. Experiment: High altitude drifts 1) 09:30 - …
7:34 PM Ticket #1754 (10 12 19:30 Transmitter Report) created by rtadeo
07:55 LV ON 08:30 HV ON 09:40 TX Power Sample (-70 dB coupling) TX1 5.48 …
7:33 PM Ticket #1753 (10 12 19:28 Spark gaps adjustment) created by imanay
09:35 Spark gaps adjustment 11:51 Spark gaps adjustment 14:32 Spark gaps …
6:58 PM Ticket #1752 (10 12 19:00 Plots) created by imanay
1:58 PM Ticket #1751 (10 12 10:00 Adjustment at reception lines) created by imanay
Due to oscillation of the noise level observed at the B channel, another …
1:40 PM Ticket #1750 (10 12 09:33 Start experiment) created by imanay
Start of the experiment was delayed due to transmitter failures. One of …

Oct 7, 2020:

11:34 AM Ticket #1749 (10 07 11:24 SWR Antenna) created by pcondor
SWR mean Antenna 49.72 49.92 50.12 Ed 1.15 1.03 …
11:18 AM Ticket #1748 (10 07 11:17 Plots of test) created by pcondor
Plots of test
11:16 AM Ticket #1747 (10 07 09:30 Test HA Drifts) created by pcondor
Start Test HA Drifts with maximum power 10:13 Noise A: 32.90 B: 32.91 …

Sep 28, 2020:

9:40 AM Ticket #1746 (09 28 09:50 Data uploaded to PUMA (ISR)) created by imanay
504 files, 170G

Sep 24, 2020:

5:25 PM Ticket #1745 (09 24 17:10 Operation resume) created by imanay
Person in Charge: I. Manay. Experiment: ISR_Imaging 1) 08:00 - 17:10 2) …
5:23 PM Ticket #1744 (09 24 17:10 plots) created by imanay
5:17 PM Ticket #1743 (09 24 17:00 Transmitter Report) created by rtadeo
08:00 TX Power Sample (-70 dB coupling) TX1 5.84 Vpp TX3 6.00 Vpp TX4 5.84 …
5:15 PM Ticket #1742 (09 24 13:40 Spark gaps adjustment) created by imanay
10:18 Spark gaps adjustment 13:40 Spark gaps adjustment
9:56 AM Ticket #1741 (09 24 09:30 Experiment restarted due to fall of transmitters) created by imanay
Transmitters fell from 09:14 to 09:28.
9:52 AM Ticket #1740 (09 24 07:47 Acquisition system restarted) created by imanay
Acquisition system (JARS2) restarted due to fail at the acquisition …
9:43 AM Ticket #1739 (09 24 08:00 Operation Resume) created by jrojas
Person in Charge: J.Rojas Experiment: EW_Drift-Faraday-Imaging 1) 20:00 - …
7:18 AM Ticket #1738 (09 24 07:17 Plots) created by jrojas
7:15 AM Ticket #1737 (09 24 07:12 Noise Levels) created by jrojas
09 23 23:01 EW DRIFTS A:32.16 B:31.42 C:31.68 D:31.73 FARADAY A:36.07 …
7:14 AM Ticket #1736 (09 24 07:15 Transmitter Report) created by ctipacti
September 23 20:00 TX Power Sample (-70 dB coupling) TX1 5.92 Vpp …
7:12 AM Ticket #1735 (09 24 07:00 Faraday processing restart) created by jrojas
09 23 21:50 Faraday processing restart (the processing had stopped 19:50) …
7:11 AM Ticket #1734 (09 24 07:00 Spark gaps adjustment) created by jrojas
09 23 22:04 Spark gaps adjustment 09 24 01:02 Spark gaps adjustment 04:05 …
7:10 AM Ticket #1733 (09 24 07:09 Imaging OFF) created by jrojas
09 24 07:09 Imaging OFF
12:24 AM Ticket #1732 (09 23 23:59 Plots) created by jrojas
Note: See TracTimeline for information about the timeline view.