Timeline


and

Sep 26, 2019:

8:19 PM Ticket #1277 (09 26 20:00 Operation Resume) created by kkuyeng
Person in Charge: K.Kuyeng Experiment: EW_Drift-Faraday-Imaging 1) 08:00 - …
8:19 PM Ticket #1276 (09 26 20:00 Spark gaps adjustment) created by kkuyeng
13:40 Spark gaps adjustment 16:09 Spark gaps adjustment 18:32 Spark gaps …
7:44 PM Ticket #1275 (09 26 19:45 Plots) created by kkuyeng
7:43 PM Ticket #1274 (09 26 19:40 Transmitter report) created by ryaya
08:30 Internal arcing detected on TX3. 08:40 Tx configuration changed to …
6:45 PM Ticket #1273 (09 26 13:50 VIPIR restarted) created by kkuyeng
6:45 PM Ticket #1272 (09 26 13:50 VIPIR stopped) created by kkuyeng
VIPIR was stopped to check on an interference, but it was not VIPIR
6:41 PM Ticket #1271 (09 26 17:00 Imaging is on) created by kkuyeng
6:40 PM Ticket #1270 (09 25 12:00 Restart Operation after changes (EWDrift + Imaging)) created by kkuyeng
6:39 PM Ticket #1269 (09 26 11:52 Problem with G channel on Imaging test) created by kkuyeng
Interference on G channel: - Removed TR and antenna is direct - Exchanged …
6:35 PM Ticket #1268 (09 26 08:30 Problem with transmitter - NOW ONLY EWDRIFT +Imaging) created by kkuyeng
Tx3 failed. Changing to just EWDrift +Imaging: - Changing EWDrift to …
7:47 AM Ticket #1267 (09 26 08:00 Operation Resume) created by abelleza
Person in Charge: A. Belleza. Experiment: EW_Drift-Faraday-Imaging 1) …
7:41 AM Ticket #1266 (09 26 07:30 Transmitter power measurements) created by rtadeo
20:00 TX Power sample (-70 dB coupling) TX1 6.00 Vpp TX3 6.00 Vpp TX4 5.04 …
7:37 AM Ticket #1265 (09 26 07:40 Plots) created by abelleza
09 26 07:40 Plots
6:40 AM Ticket #1264 (09 26 06:31 Spark gaps adjustment) created by abelleza
09 25 20:18 Spark gaps adjustment 23:03 Spark gaps adjustment 09 26 01:03 …
6:37 AM Ticket #1263 (09 26 06:04 Stop Imaging) created by abelleza
09 26 06:04 Stop Imaging
6:20 AM Ticket #1262 (09 25 23:59 Plots) created by abelleza
09 25 23:59 Plots

Sep 25, 2019:

8:08 PM Ticket #1261 (09 25 20:00 Operation Resume) created by pcondor
Person in Charge: P. Condor. Experiment: EW_Drift-Faraday-Imaging 1) 08:00 …
7:36 PM Ticket #1260 (09 25 19:45 Plots) created by pcondor
Plots of rtis, spectras and parameters.
7:24 PM Ticket #1259 (09 25 17:20 Spark gaps adjustment) created by pcondor
08:30 Spark gaps adjustment 10:53 Spark gaps adjustment 14:03 Spark gaps …
7:20 PM Ticket #1258 (09 25 18:36 Noise levels) created by pcondor
16:32 EW DRIFTS A:34.36 B:33.24 C:37.89 D:33.80 FARADAY A:35.92 B:36.08 …
7:15 PM Ticket #1257 (09 25 17:27 Imaging is on) created by pcondor
Imaging is on.
7:14 PM Ticket #1256 (09 25 10:05 Problem with transmitter) created by pcondor
Problem with transmitter
7:13 PM Ticket #1255 (09 25 08:20 Problem with transmitter) created by pcondor
Problem with transmitter.
7:10 PM Ticket #1254 (09 25 08:10 Start Campaign) created by pcondor
Start campaign.
7:00 PM Ticket #1253 (09 25 19:00 Transmitter Power Measurements) created by vquesada
07:45 LV ON 07:50 HV ON 08:05 TX Power sample (-70 dB coupling) TX1 5.9 …

Sep 24, 2019:

7:35 PM Ticket #1252 (09 24 19:30 Transmitter power measurements) created by rtadeo
16:50 LV ON 17:00 HV ON 17:10 TX Power sample (-70 dB coupling) TX1 5.76 …

Sep 12, 2019:

8:01 AM Ticket #1251 (09 12 08:00 Operation resume) created by jrojas
Person in Charge: J. Suclupe Experiment: Winds 1) 20:00 - 08:00 2) …
7:47 AM Ticket #1250 (09 12 07:50 Transmitter power measurements) created by rtadeo
20:00 TX Power sample (-70 dB coupling) TX1 6.12 Vpp TX4 6.04 Vpp Line …
7:33 AM Ticket #1249 (09 12 07:30 Plots) created by jrojas
7:25 AM Ticket #1248 (09 12 05:30 Spark gaps adjustments) created by jrojas
11 SEP 20:24 Spark-gaps adjustment 23:31 Spark-gaps adjustment 12 SEP …
7:11 AM Ticket #1247 (09 11 23:59 Plots) created by jrojas

Sep 11, 2019:

7:52 PM Ticket #1246 (09 11 20:00 Spark gaps adjustments) created by jrojas
11 SEP 11:05 Spark-gaps adjustment 14:05 Spark-gaps adjustment 17:00 …
7:51 PM Ticket #1245 (09 11 19:50 Operation resume) created by jrojas
Person in Charge: J. Rojas. Experiment: Winds 1) 08:20 - 20:00 2) …
7:26 PM Ticket #1244 (09 11 19:25 Plots) created by jrojas
7:18 PM Ticket #1243 (09 11 19:20 Transmitter power measurements) created by ctipacti
09:00 TX Power sample (-70 dB coupling) TX1 6.1 Vpp TX4 6.1 Vpp Line …
6:16 PM Ticket #1242 (09 11 17:01 Transmitters off) created by jrojas
Transmitters were off to change disk of acquisition system during 3 …
3:00 PM Ticket #1241 (09 11 14:10 Transmitter off) created by jrojas
The transmitter was off for 18 minutes (14:10 to 14:28) to check D-channel …
2:47 PM Ticket #1240 (09 11 13:56 Transmitter up) created by jrojas
2:46 PM Ticket #1239 (09 11 13:55 Transmitter down) created by jrojas
11:35 AM Ticket #1238 (09 09 14:30 Antenna measurements) created by imanay
49.72 49.92 50.12 wup 1.20 1.06 1.14 Wdw 1.20 1.08 1.11 ndw 1.05 …
7:37 AM Ticket #1237 (09 11 05:09 ATR adjustment) created by jverastegui
7:36 AM Ticket #1236 (09 11 02:25 Transmitter up) created by jverastegui
7:36 AM Ticket #1235 (09 11 02:20 Transmitter down) created by jverastegui
7:35 AM Ticket #1234 (09 11 02:06 ATR adjustment) created by jverastegui
7:34 AM Ticket #1233 (09 11 00:00 Plots) created by jverastegui
http://jro-app.igp.gob.pe/test/graficos/201925300021000001.png
7:26 AM Ticket #1232 (09 11 00:00 Plots) created by jverastegui
7:26 AM Ticket #1231 (09 11 07:30 Transmitter power measurements) created by rtadeo
09 10 19:30 Transmitter power measurements 20:00 TX Power Sample (-70 dB …
7:25 AM Ticket #1230 (09 10 23:14 ATR adjustment) created by jverastegui
7:25 AM Ticket #1229 (09 10 23:10 Real Time web down) created by jverastegui
7:24 AM Ticket #1228 (09 10 20:04 ATR adjustment) created by jverastegui

Sep 10, 2019:

8:03 PM Ticket #1227 (09 10 19:50 Operation resume) created by imanay
Person in Charge: I. Manay. Experiment: Winds 1) 08:20 - 20:00 2) …
7:29 PM Ticket #1226 (09 10 19:30 Transmitter power measurements) created by ryaya
08:00 LV ON 08:15 HV ON 08:30 TX Power Sample (-70 dB coupling) TX1 5.4 …
6:44 PM Ticket #1225 (09 10 17:10 Spark gaps adjustments) created by imanay
10 SEP 08:15 Spark-gaps adjustment 11:16 Spark-gaps adjustment 14:07 …
6:38 PM Ticket #1224 (09 10 08:20 Experiment started) created by imanay

Sep 9, 2019:

1:00 PM Ticket #1223 (12 11 15:30 radar parameter change) created by imanay
Width pulse changed from 4 to 2 uS.
12:48 PM Ticket #1222 (12 14 18:00 Plots) created by imanay
Note: See TracTimeline for information about the timeline view.