Timeline
Sep 18, 2018:
- 11:24 PM Ticket #470 (09 18 23:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) TX1 5.32 Vpp Tx4 5.10 Vpp Line …
- 8:06 PM Ticket #469 (09 18 19:50 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: High altitude experiment 1) 09:30 …
- 7:58 PM Ticket #468 (09 18 19:30 Acquisition change) created by
- Number of channels of acquisition system was changed from 3 to 4 to see …
- 7:34 PM Ticket #467 (09 18 19:10 Transmitter power measurements) created by
- 07:35 LV ON 07:55 TX Driver 4 Failure 09:10 LV ON 09:17 HV ON 09:30 Phase …
- 7:14 PM Ticket #466 (09 18 18:20 Spark-gaps adjustments) created by
- 17 Sep, 12:27 Spark gaps adjustment 17 Sep, 15:35 Spark gaps adjustment 17 …
- 7:11 PM Ticket #465 (09 18 13:07 Transmitters falls) created by
- Transmitters were down during 3 minutes.
- 7:09 PM Ticket #464 (09 18 10:18 Adjustment at power of transmitters 1 and 4) created by
- A small differences at input power was observed, so they were adjusted.
- 7:04 PM Ticket #463 (09 18 10:00 6" pipeline adjustment) created by
- Experiment was stopped during 4 minutes, from 09:56 to 10:00, to adjust 6" …
- 7:01 PM Ticket #462 (09 18 09:30 Start of the experiment) created by
- After transmitters recovered, experiment started at 9:30.
- 6:54 PM Ticket #461 (09 18 12:00 Antenna measurements) created by
- 49.72 49.92 49.92 Wup = 1.19 1.07 1.21 Wdw = 1.29 …
Sep 6, 2018:
- 8:15 AM Ticket #460 (09 06 08:00 Operation resume) created by
- Person in Charge: P. Condor. Experiment: Hybrid 2 1) 20:00 - 08:00 2) …
- 8:10 AM Ticket #459 (09 06 07:50 Plots) created by
- Plots of rtis and cross spectras.
- 7:18 AM Ticket #458 (09 06 07:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) TX1 5.88 Vpp Tx4 5.80 Vpp Line …
- 7:06 AM Ticket #457 (09 06 05:36 Spark gaps adjustment) created by
- 05-09-2018 20:32 Spark gaps adjustment 23:35 Spark gaps adjustment …
- 7:02 AM Ticket #456 (09 06 06:30 Noise levels) created by
- 05-09-2018 21:05 A:25.36 B:26.43 06-09-2018 00:30 A:22.89 B:23.89 03:10 …
- 1:51 AM Ticket #455 (09 06 00:00 Plots) created by
- Plots of rti and cross spectra
Sep 5, 2018:
- 11:23 PM Ticket #454 (09 05 23:05 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) TX1 5.88 Vpp Tx4 5.80 Vpp Line …
- 8:12 PM Ticket #453 (09 05 19:50 Operation Resume) created by
- Person in Charge: K.Kuyeng Experiment: Hybrid experiment 1) 08:00 - 20:00 …
- 7:48 PM Ticket #452 (09 05 19:30 Transmitter Power Measurements) created by
- 08:00 TX Power sample (-70 dB coupling) TX1 5.80 Vpp Tx3 5.96 Vpp Line …
- 6:16 PM Ticket #451 (09 05 17:55 Spark-gaps adjustments) created by
- 05 Sep, 08:40 Spark gaps adjustment 05 Sep, 11:38 Spark gaps adjustment 05 …
- 7:44 AM Ticket #450 (09 05 06:00 Spark Gaps adjustment) created by
- 04 Sep, 20:31 Spark gaps adjustment 04 Sep, 23:40 Spark gaps adjustment 05 …
- 7:42 AM Ticket #449 (09 05 07:59 Operation Resume) created by
- Person in Charge: A. VALDEZ. Experiment: Hybrid experiment 1) 20:00 PM - …
- 7:30 AM Ticket #448 (09 04 23:59 PLOTS OF EXPERIMENT) created by
- PLOTS
- 7:21 AM Ticket #447 (09 05 07:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) TX1 5.80 Vpp Tx4 5.88 Vpp Line …
Sep 4, 2018:
- 11:23 PM Ticket #446 (09 04 23:05 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) TX1 5.60 Vpp Tx4 5.76 Vpp Line …
- 7:35 PM Ticket #445 (09 04 19:50 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: Hybrid experiment 1) 08:00 - 20:00 …
- 7:32 PM Ticket #444 (09 04 17:35 Spark-gaps adjustments) created by
- 04 Sep, 08:15 Spark gaps adjustment 04 Sep, 11:28 Spark gaps adjustment 04 …
- 7:29 PM Ticket #443 (09 04 11:23 Transmitters fails) created by
- Transmitters were off from 10:48 to 11:23 (35 minutes)
- 7:28 PM Ticket #442 (09 04 10:22 Acquisition system changes) created by
- Acquisition resolution changed from 3.75 to 1.25 Km.
- 7:26 PM Ticket #441 (09 04 08:57 Transmitters fails) created by
- 7:25 PM Ticket #440 (09 04 19:07 Transmitter Power Measurements) created by
- 07:50 LV ON 07:53 HV ON 08:10 RF ON 08:13 TX Power sample (-70 dB …
- 7:24 PM Ticket #439 (09 04 08:13 Start of the experiment) created by
- Transmitters with all power.
Sep 3, 2018:
- 5:06 PM Ticket #438 (09 03 16:35 End of test) created by
- 4:46 PM Ticket #437 (09 03 14:30 Start of test) created by
- Antenna SWR measurements 49.72 49.92 50.12 MHz Wup 1.26 …
Aug 22, 2018:
- 5:40 PM Ticket #436 (08 22 17:15 End of experiment) created by
- 5:39 PM Ticket #435 (08 22 17:25 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: valley MST. 1) 08:00 - 17:15. 2) …
- 4:43 PM Ticket #434 (08 22 16:16 Spark-gaps adjustments) created by
- 22 Aug, 08:06 Spark gaps adjustment 22 Aug, 10:08 Spark gaps adjustment 22 …
- 8:25 AM Ticket #433 (08 21 19:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: valley MST 1) 08:00 - 20:00 2) …
- 8:23 AM Ticket #432 (08 21 07:47 Transmitters off) created by
- Transmitters were off to change disk of acquisition system.
- 8:20 AM Ticket #431 (08 21 18:37 Spark-gaps adjustments) created by
- 21 Aug, 08:28 Spark gaps adjustment 21 Aug, 10:28 Spark gaps adjustment 21 …
- 7:58 AM Ticket #430 (08 22 07:50 Plots) created by
- Plots of cross spectra and coherence
- 7:42 AM Ticket #429 (08 22 08:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: Valley MST 1) 20:00 - 08:00 2) …
- 7:12 AM Ticket #428 (08 22 07:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) TX1 5.48 Vpp Tx4 5.16 Vpp Line …
- 7:11 AM Ticket #427 (08 22 05:53 Spark gaps adjustment) created by
- 21-08-2018 21:00 Spark gaps adjustment 23:15 Spark gaps adjustment …
- 6:58 AM Ticket #426 (08 22 06:25 Noise levels) created by
- 21-08-2018 22:05 Long 1:20.61 2:19.75 3:20.67 4:22.09 5:20.85 6:21.79 …
- 6:46 AM Ticket #425 (08 22 02:27 Transmitter on) created by
- Transmitter on after of a problem.
- 6:45 AM Ticket #424 (08 22 01:36 Restart Valley) created by
- Restart Valley after of change hard disk of jars
- 6:43 AM Ticket #423 (08 22 01:29 Change of hard disk of JARS) created by
- Change of hard disk of JARS
- 12:24 AM Ticket #422 (08 22 00:00 Plots) created by
- Plots of cross spectra and coherence 21-08-2018.
Aug 21, 2018:
- 11:11 PM Ticket #421 (08 21 23:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) TX1 5.52 Vpp Tx4 5.24 Vpp Line …
- 7:33 PM Ticket #420 (08 21 19:22 Transmitter Power Measurements) created by
- 08:00 TX Power sample (-70 dB coupling) Tx1 5.40 Vpp Tx4 5.14 Vpp Voltage …
- 6:30 PM Ticket #419 (08 21 18:00 Plots) created by
- 7:55 AM Ticket #418 (08 20 23:59 Plots) created by
- 7:32 AM Ticket #417 (08 21 06:25 Spark-gaps adjustments) created by
- 20 Aug, 19:32 Spark gaps adjustment 20 Aug, 21:40 Spark gaps …
- 7:23 AM Ticket #416 (08 21 07:10 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) TX1 5.36 Vpp Tx4 5.28 Vpp Line …
Aug 20, 2018:
- 11:32 PM Ticket #415 (08 20 23:20 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) TX1 5.36 Vpp Tx4 5.28 Vpp Line …
- 8:50 PM Ticket #414 (08 20 20:01 Operation Resume) created by
- Person in Charge: k. Kuyeng. Experiment: Valley MST 1) 15:30 - 20:00 2) …
- 8:31 PM Ticket #413 (08 20 17:53 THe digisonde is turned off.) created by
- 8:28 PM Ticket #412 (08 20 20:00 Spark-gaps adjustments) created by
- 20 Aug, 17:35 Spark gaps adjustment 20 Aug, 19:32 Spark gaps adjustment
- 8:26 PM Ticket #411 (08 20 15:30 EXPERIMENT BEGINS) created by
- Maximum Power Transmitter
- 7:19 PM Ticket #410 (08 20 19:10 Transmitter power measurements) created by
- 14:20 LV ON 15:10 HV ON 15:30 TX Power sample (-70 dB coupling) Tx1 5.36 …
- 11:43 AM Ticket #409 (08 20 11:30 Antenna measurements) created by
- Wup = 1.05 Wdw = 1.07 Ndw = 1.10 Nup = 1.02 Eup = 1.02 Edw = 1.10 Sdw = …
Note: See TracTimeline
for information about the timeline view.