Timeline
Aug 17, 2018:
- 11:10 PM Ticket #400 (08 17 23:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) TX1 5.32 Vpp Tx4 5.12 Vpp Line …
- 8:13 PM Ticket #399 (08 17 20:00 Operation Resume) created by
- Person in Charge: K.Kuyeng Experiment: valley MST 1) 08:00 - 20:00 2) …
- 8:13 PM Ticket #398 (08 17 20:00 Spark-gaps adjustments) created by
- 17 Aug, 08:42 Spark gaps adjustment 17 Aug, 10:45 Spark gaps adjustment 17 …
- 7:40 PM Ticket #397 (08 17 10:32 Change of disk and restart of the acquisition) created by
- Disk was full. Acquisition was stopped, disk was changed and system …
- 7:32 PM Ticket #396 (08 17 19:20 Transmitter Power Measurements) created by
- 08:00 TX Power sample (-70 dB coupling) Tx1 5.28 Vpp Tx4 5.28 Vpp Voltage …
- 7:36 AM Ticket #395 (08 17 07:30 Plots) created by
- 7:28 AM Ticket #394 (08 17 07:18 Noise Levels) created by
- 16-08-2018 21:44 SHORT PULSE 1:21.47 2:22.72 3:24.09 4:22.69 5:24.10 …
- 7:28 AM Ticket #393 (08 17 07:18 Spark-gaps adjustments) created by
- 16 Aug, 20:45 Spark gaps adjustment 16 Aug, 22:32 Spark gaps adjustment 17 …
- 7:10 AM Ticket #392 (08 17 07:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) TX1 5.36 Vpp Tx4 5.28 Vpp Line …
- 12:53 AM Ticket #391 (08 17 00:10 Plots) created by
Aug 16, 2018:
- 11:09 PM Ticket #390 (08 16 23:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) TX1 5.24 Vpp Tx4 5.18 Vpp Line …
- 7:47 PM Ticket #389 (08 16 19:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: valley MST 1) 06:30 - 20:00 2) …
- 7:45 PM Ticket #388 (08 15 07:49 Antenna measurements) created by
- 7:43 PM Ticket #387 (08 16 18:38 Spark-gaps adjustments) created by
- 16 Aug, 08:38 Spark gaps adjustment 16 Aug, 10:32 Spark gaps adjustment 16 …
- 7:43 PM Ticket #386 (08 16 17:35 Change of disk and restartof the acquisition) created by
- Disk was full. Acquisition was stopped, disk was changed and system …
- 7:43 PM Ticket #385 (08 16 08:35 Problem with C channel) created by
- C channel was down due to a bad connection at operation room.
- 7:43 PM Ticket #384 (08 16 07:49 Digisonde was turned off) created by
- To avoid interferences.
- 7:36 PM Ticket #383 (08 16 06:28 Start of the experiment) created by
- 7:12 PM Ticket #382 (08 16 19:00 Transmitter Power Measurements) created by
- 06:00 Low Volt ON 06:15 High Volt ON 06:20 TX Power sample (-70 dB …
Aug 7, 2018:
- 8:59 AM Ticket #381 (08 06 13:00 Start ISR experiment) created by
- 13:00 se inicia transmisión con media potencia y se deja calentar. 14:00 …
- 8:50 AM Ticket #380 (08 06 20:00 Spark-gaps adjustments) created by
- 06 Agosto 17:08 Spark gaps adjustment 20:10 Spark gaps adjustment
- 7:05 AM Ticket #379 (08 07 07:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) TX1 5.80 Vpp Tx3 5.88 Vpp Tx4 5.64 …
Aug 6, 2018:
- 11:04 PM Ticket #378 (08 06 23:05 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) TX1 5.80 Vpp Tx3 5.80 Vpp Tx4 5.60 …
Jul 23, 2018:
- 2:49 PM Ticket #377 (07 24 07:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: ISR + Imaging 1) 20:00 - 08:00 2) …
- 2:27 PM Ticket #376 (24 Jul 07:20 Transmitter Power Measurements) created by
- 21:00 TX Power sample (-70 dB coupling) Dr1 1.38 Vpp Dr2 1.42 Vpp Dr4 1.40 …
- 2:21 PM Ticket #375 (07 24 07:00 Experiment plots) created by
- 2:16 PM Ticket #374 (07 24 07:05 End of Imaging experiment) created by
- 2:13 PM Ticket #373 (07 24 06:54 Spark-gaps adjustments) created by
- 23 Jul, 23:03 Spark gaps adjustment 24 Jul, 03:01 Spark gaps adjustment 24 …
- 11:54 AM Ticket #372 (07 23 23:59 Experiment plots) created by
- 3:09 AM Ticket #371 (07 23 20:01 Plots) created by
- Plots of rtis, spectras and parameters.
- 3:07 AM Ticket #370 (07 23 20:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: Medium …
- 2:36 AM Ticket #369 (07 23 19:30 Transmitter Power Measurements) created by
- 07:55 LV ON 08:00 HV ON 08:21 TX Power sample (-70 dB coupling) Dr2 1.45 …
- 2:26 AM Ticket #368 (07 23 19:05 Spark gaps adjustment) created by
- 08:15 Spark gaps adjustment 11:05 Spark gaps adjustment 15:05 Spark gaps …
- 2:12 AM Ticket #367 (07 23 19:03 Noise Levels) created by
- 09:53 EW DRIFTS A:28.08 C:29.21 13:51 EW DRIFTS A:27.83 C:29.35 16:45 EW …
- 2:00 AM Ticket #366 (07 23 08:00 Start campaign) created by
- Start campaign
- 1:57 AM Ticket #365 (07 23 17:23 Imaging on) created by
- Imaging on.
Jul 20, 2018:
- 3:05 PM Ticket #364 (07 21 08:05 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Dr1 1.34 Vpp Dr2 1.42 Vpp Dr4 1.42 …
- 2:57 PM Ticket #363 (07 21 07:51 Digisonde was restarted) created by
- Digisonde was stopped at 19:20 on July 20, due to interference at Imaging …
- 2:57 PM Ticket #362 (07 21 07:50 End of EWDrift experiment) created by
- 2:32 PM Ticket #361 (07 21 07:25 Spark gaps adjustment) created by
- 20 Jul, 23:00 Spark gaps adjustment 21 Jul, 02:50 Spark gaps adjustment 21 …
- 2:32 PM Ticket #360 (07 21 07:25 Noise levels) created by
- 20 Jul 2018 21:30 EW DRIFTS A:31.41 C:32.83 IMAGING 1:20.95 2:20.49 …
- 2:14 PM Ticket #359 (07 21 07:02 End of Imaging experiment) created by
- 12:23 PM Ticket #358 (07 21 03:52 Transmitter Failure) created by
- 03:52 Transmitter Fail, driver 2 03:55 Transmitter on, driver 2
- 12:10 PM Ticket #357 (07 18 07:36 Spark-gaps adjustments) created by
- 17 Jul, 21:17 Spark gaps adjustment 18 Jul, 01:17 Spark gaps adjustment 18 …
- 6:11 AM Ticket #356 (07 20 23:05 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Dr1 1.39 Vpp Dr2 1.44 Vpp Dr4 1.42 …
- 3:15 AM Ticket #355 (07 20 20:00 Operation Resume) created by
- Person in Charge: K.Kuyeng Experiment: ISR + Imaging (Medium Power) 1) …
- 2:38 AM Ticket #354 (07 20 18:20, 19:20 Digisonde) created by
- 18:20 --> Se reinicia la toma de datos de la digisonda porque está …
- 2:35 AM Ticket #353 (07 20 19:30 Transmitter Power Measurements) created by
- 08:00 TX Power sample (-70 dB coupling) Dr2 1.43 Vpp Dr4 1.43 Vpp Line …
- 2:35 AM Ticket #352 (07 20 19:30 Transmitter Power Measurements) created by
- 08:00 TX Power sample (-70 dB coupling) Dr2 1.43 Vpp Dr4 1.43 Vpp Line …
- 2:29 AM Ticket #351 (07 20 17:19 Start of Imaging experiment) created by
- 2:27 AM Ticket #350 (07 20 19:20 Spark gaps adjustment) created by
- 20 Jul, 11:00 Spark gaps adjustment 20 Jul, 15:00 Spark gaps adjustment 20 …
Jul 19, 2018:
- 9:22 PM Ticket #349 (07 19 20:00 Spark gaps adjustment) created by
- 19 Jul, 10:55 Spark gaps adjustment 19 Jul, 15:29 Spark gaps adjustment 19 …
- 9:20 PM Ticket #348 (07 19 17:30 Start of Imaging experiment) created by
- 9:19 PM Ticket #347 (07 19 20:00 Operation Resume) created by
- Person in Charge: K.Kuyeng Experiment: ISR + Imaging (Medium Power) 1) …
- 2:46 PM Ticket #346 (07 20 08:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: Medium Power-EW_Drift-Imaging 1) …
- 2:23 PM Ticket #345 (07 20 07:50 Plots) created by
- Plots of rti, spectra and parameters.
- 2:07 PM Ticket #344 (07 20 06:00 Spark gaps adjustment) created by
- 19-07 23:00 Spark gaps adjustment 20-07 03:00 Spark gaps adjustment 07:03 …
- 2:06 PM Ticket #343 (07 20 07:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Dr1 1.38 Vpp Dr2 1.42 Vpp Dr4 1.42 …
- 1:58 PM Ticket #342 (07 20 06:04 Noise levels) created by
- 19-07-2018 21:15 EW DRIFTS A:30.85 C:32.31 IMAGING 1:20.07 2:19.56 …
- 1:49 PM Ticket #341 (07 20 06:02 Imaging off) created by
- Imaging off
- 7:55 AM Ticket #340 (07 20 00:05 Plots) created by
- Plots of rti, spectra and parameters
- 6:05 AM Ticket #339 (07 19 23:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Dr1 1.38 Vpp Dr2 1.42 Vpp Dr4 1.42 …
- 2:18 AM Ticket #338 (07 19 19:20 Transmitter report) created by
- 09:00 TX Power sample (-70 dB coupling) Dr2 1.5 Vpp Dr4 1.47 Vpp Line …
Jul 18, 2018:
- 2:46 PM Ticket #337 (07 19 07:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: ISR + Imaging 1) 20:00 - 08:00 2) …
- 2:20 PM Ticket #336 (07 19 07:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Dr1 1.39 Vpp Dr2 1.48 Vpp Dr4 1.42 …
- 2:19 PM Ticket #335 (07 19 07:00 End of Imaging experiment) created by
- 1:56 PM Ticket #334 (07 19 06:09 Spark-gaps adjustments) created by
- 18 Jul, 22:04 Spark gaps adjustment 19 Jul, 02:03 Spark gaps adjustment 19 …
- 1:41 PM Ticket #333 (07 18 23:59 Plots) created by
- 2:54 AM Ticket #332 (07 18 19:55 PLots) created by
- Plots of rti, espectras and parameters
- 2:48 AM Ticket #331 (07 18 08:20 Spark gaps adjustment) created by
- 08:20 Spark gaps adjustment
- 2:47 AM Ticket #330 (07 18 20:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: Medium Power-EW_Drift-Imaging 1) …
- 2:44 AM Ticket #329 (07 18 19:40 Transmitter Power Measurements) created by
- 08:00 TX Power sample (-70 dB coupling) Dr2 1.50 Vpp Dr4 1.41Vpp Voltage …
- 2:19 AM Ticket #328 (07 18 :18:59 Noise levels) created by
- EW DRIFTS A:30.0 C: 30.58 IMAGING 1:18.60 2:18.01 3:18:23 4:18:53 5:18.31 …
- 2:16 AM Ticket #327 (07 18 17:22 Imaging is on.) created by
- Imaging is on.
- 2:16 AM Ticket #326 (07 18 17:15 Get out splitters and all Up in one.) created by
- 2:15 AM Ticket #325 (07 18 17:05 Splitter is put) created by
- Splitters is put
- 2:13 AM Ticket #324 (07 18 16:59 All UP in one channel without splitter) created by
- All UP in one channel without splitter
- 2:12 AM Ticket #323 (07 18 16:50 Transmitter on) created by
- Transmitter on after of the revision of Eup antenna and maintenance.
- 2:08 AM Ticket #322 (07 18 09:50 Digisonde each 5 min) created by
- Digisonde each 5 min
- 2:07 AM Ticket #321 (07 18 08:42 Turn of transmitter) created by
- Turn of transmitter to revision of line of channel D and channel E …
Note: See TracTimeline
for information about the timeline view.