Timeline
Jul 19, 2018:
- 9:22 PM Ticket #349 (07 19 20:00 Spark gaps adjustment) created by
- 19 Jul, 10:55 Spark gaps adjustment 19 Jul, 15:29 Spark gaps adjustment 19 …
- 9:20 PM Ticket #348 (07 19 17:30 Start of Imaging experiment) created by
- 9:19 PM Ticket #347 (07 19 20:00 Operation Resume) created by
- Person in Charge: K.Kuyeng Experiment: ISR + Imaging (Medium Power) 1) …
- 2:46 PM Ticket #346 (07 20 08:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: Medium Power-EW_Drift-Imaging 1) …
- 2:23 PM Ticket #345 (07 20 07:50 Plots) created by
- Plots of rti, spectra and parameters.
- 2:07 PM Ticket #344 (07 20 06:00 Spark gaps adjustment) created by
- 19-07 23:00 Spark gaps adjustment 20-07 03:00 Spark gaps adjustment 07:03 …
- 2:06 PM Ticket #343 (07 20 07:00 Transmitter Power Measurements) created by
- 00:00 TX Power sample (-70 dB coupling) Dr1 1.38 Vpp Dr2 1.42 Vpp Dr4 1.42 …
- 1:58 PM Ticket #342 (07 20 06:04 Noise levels) created by
- 19-07-2018 21:15 EW DRIFTS A:30.85 C:32.31 IMAGING 1:20.07 2:19.56 …
- 1:49 PM Ticket #341 (07 20 06:02 Imaging off) created by
- Imaging off
- 7:55 AM Ticket #340 (07 20 00:05 Plots) created by
- Plots of rti, spectra and parameters
- 6:05 AM Ticket #339 (07 19 23:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Dr1 1.38 Vpp Dr2 1.42 Vpp Dr4 1.42 …
- 2:18 AM Ticket #338 (07 19 19:20 Transmitter report) created by
- 09:00 TX Power sample (-70 dB coupling) Dr2 1.5 Vpp Dr4 1.47 Vpp Line …
Jul 18, 2018:
- 2:46 PM Ticket #337 (07 19 07:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: ISR + Imaging 1) 20:00 - 08:00 2) …
- 2:20 PM Ticket #336 (07 19 07:00 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Dr1 1.39 Vpp Dr2 1.48 Vpp Dr4 1.42 …
- 2:19 PM Ticket #335 (07 19 07:00 End of Imaging experiment) created by
- 1:56 PM Ticket #334 (07 19 06:09 Spark-gaps adjustments) created by
- 18 Jul, 22:04 Spark gaps adjustment 19 Jul, 02:03 Spark gaps adjustment 19 …
- 1:41 PM Ticket #333 (07 18 23:59 Plots) created by
- 2:54 AM Ticket #332 (07 18 19:55 PLots) created by
- Plots of rti, espectras and parameters
- 2:48 AM Ticket #331 (07 18 08:20 Spark gaps adjustment) created by
- 08:20 Spark gaps adjustment
- 2:47 AM Ticket #330 (07 18 20:00 Operation Resume) created by
- Person in Charge: P. Condor. Experiment: Medium Power-EW_Drift-Imaging 1) …
- 2:44 AM Ticket #329 (07 18 19:40 Transmitter Power Measurements) created by
- 08:00 TX Power sample (-70 dB coupling) Dr2 1.50 Vpp Dr4 1.41Vpp Voltage …
- 2:19 AM Ticket #328 (07 18 :18:59 Noise levels) created by
- EW DRIFTS A:30.0 C: 30.58 IMAGING 1:18.60 2:18.01 3:18:23 4:18:53 5:18.31 …
- 2:16 AM Ticket #327 (07 18 17:22 Imaging is on.) created by
- Imaging is on.
- 2:16 AM Ticket #326 (07 18 17:15 Get out splitters and all Up in one.) created by
- 2:15 AM Ticket #325 (07 18 17:05 Splitter is put) created by
- Splitters is put
- 2:13 AM Ticket #324 (07 18 16:59 All UP in one channel without splitter) created by
- All UP in one channel without splitter
- 2:12 AM Ticket #323 (07 18 16:50 Transmitter on) created by
- Transmitter on after of the revision of Eup antenna and maintenance.
- 2:08 AM Ticket #322 (07 18 09:50 Digisonde each 5 min) created by
- Digisonde each 5 min
- 2:07 AM Ticket #321 (07 18 08:42 Turn of transmitter) created by
- Turn of transmitter to revision of line of channel D and channel E …
Jul 17, 2018:
- 2:41 PM Ticket #320 (07 18 06:57 Imaging experiment stopped) created by
- 2:41 PM Ticket #319 (07 18 07:36 Noise Levels) created by
- 01:20 EW DRIFTS A:9.39 B:8.54 C:9.50 D:8.45 E:7.65 F:8.83 IMAGING 1:17.52 …
- 2:41 PM Ticket #318 (07 17 07:36 Noise Levels) created by
- 01:20 EW DRIFTS A:13.05 B:11.41 C:12.92 D:11.18 E:9.22 F:12.29 IMAGING …
- 2:13 PM Ticket #317 (07 18 07:08 Transmitter Power Measurements) created by
- 20:00 TX Power sample (-70 dB coupling) Dr1 1.36 Vpp Dr2 1.49 Vpp Dr4 1.45 …
- 3:06 AM Ticket #316 (07 17 19:59 Operation Resume) created by
- Person in Charge: I. Manay. Experiment: ISR + Imaging 1) 11:00 - 20:00 2) …
- 2:12 AM Ticket #315 (07 17 19:08 Transmitter Power Measurements) created by
- 10:00 LV ON 10:30 HV ON 10:55 TX Power sample (-70 dB coupling) Dr1 1.35 …
- 1:59 AM Ticket #314 (07 17 17:15 Spark-gaps adjustments) created by
- 17 Jul, 17:15 Spark gaps adjustment 17 Jul, 11:04 Spark gaps adjustment
- 1:54 AM Ticket #313 (07 17 17:15 Experiment re-started) created by
- It was stopped at 14:30 due to interferences at the up polarization of the …
- 1:48 AM Ticket #312 (07 17 13:50 Change at reception lines) created by
- The four Splitters at the down reception were moved to the up reception.
- 1:46 AM Ticket #311 (07 17 13:52 Digisonde was started) created by
Jul 16, 2018:
- 6:46 PM Ticket #310 (07 17 11:00 Experiment started) created by
- 6:44 PM Ticket #309 (07 16 17:00 Antenna VSWR) created by
Note: See TracTimeline
for information about the timeline view.