Timeline


and

Jan 28, 2019:

9:20 AM Ticket #821 (01 28 09:30 Data uploaded to PUMA) created by imanay
Hybrid2, 569 files, 107.6 GB
9:11 AM Ticket #820 (01 28 09:00 Manual of experiment) created by imanay

Jan 24, 2019:

7:51 AM Ticket #819 (01 24 08:01 End) created by pcondor
End of experiment
7:51 AM Ticket #818 (01 24 08:00 Operation Resume) created by pcondor
Person in Charge: P. Condor. Experiment: Hybrid 2 1) 20:00 - 08:00 2) …
7:48 AM Ticket #817 (01 24 07:50 Plots) created by pcondor
Plots of rtis and spectras.
7:01 AM Ticket #816 (01 24 07:00 Transmitter Power Measurements) created by vquesada
23 January 20:00 TX Power sample (-70 dB coupling) Tx1 3.76 Vpp Tx3 …
6:33 AM Ticket #815 (01 24 05:35 Spark gaps adjustment) created by pcondor
01 23 2018 20:35 Spark gaps adjustment 23:30 Spark gaps adjustment 01 24 …
6:31 AM Ticket #814 (01 24 06:07 Noise levels) created by pcondor
01 23 2018 20:52 FARADAY A:15.85 B:14.51 LONG PULSE A:15.29 B:14.45 …
12:26 AM Ticket #813 (01 23 23:59 Plots) created by pcondor
Plots of rtis, spectra and parameters.

Jan 23, 2019:

7:56 PM Ticket #812 (01 23 19:50 Operation resume) created by imanay
Person in Charge: I. Manay. Experiment: Hybrid2 1) 08:00 - 20:00 2) …
7:00 PM Ticket #811 (01 23 19:00 Transmitter Power Measurements) created by rtadeo
08:00 TX Power sample (-70 dB+(-3dB) coupling) Tx1 3.76 Vpp Tx3 3.92 Vpp …
6:40 PM Ticket #810 (01 23 17:36 Spark-gaps adjustments) created by imanay
08:40 Spark-gaps adjustments 11:40 Spark-gaps adjustments 14:47 Spark-gaps …
6:38 PM Ticket #809 (01 23 10:50 Transmission of vipir delayed) created by imanay
It was delayed 3,900 Km to avoid long pulse interference from main radar.
7:01 AM Ticket #808 (01 23 07:50 Operation resume) created by avaldez
Person in Charge: A,Valdez. Experiment: Hybrid2 1) 20:00 - 08:00 2) …
7:00 AM Ticket #807 (01 23 07:00 Transmitter Power Measurements) created by vquesada
22 January 20:00 TX Power sample (-70 dB coupling) Tx1 3.84 Vpp Tx3 …
6:38 AM Ticket #806 (01 22 23:59 PLOTS) created by avaldez
6:35 AM Ticket #805 (01 23 06:30 Spark-gaps adjustments) created by avaldez
20:30 Spark-gaps adjustments 23:35 Spark-gaps adjustments 02:30 Spark-gaps …

Jan 22, 2019:

7:59 PM Ticket #804 (01 22 19:50 Operation resume) created by imanay
Person in Charge: I. Manay. Experiment: Hybrid2 1) 08:30 - 20:00 2) …
7:41 PM Ticket #803 (01 22 19:30 Transmitter report) created by ryaya
08:00 LV ON 08:09 HV ON 08:27 TX Power sample (-70 dB coupling) Tx1 5.48 …
7:08 PM Ticket #802 (01 22 19:00 Several falls of transmitters) created by imanay
Time of falls: 08:40 to 08:42, 2 minutes 08:55 to 08:57, 2 minutes 09:10 …
7:01 PM Ticket #801 (01 22 17:37 Spark-gaps adjustments) created by imanay
08:30 Spark-gaps adjustments 11:32 Spark-gaps adjustments 14:32 Spark-gaps …
9:53 AM Ticket #800 (01 22 08:30 Start of experiment) created by imanay
Digisonde is off, Vipir synchronized with GPS and 6,000 Km ipp.
9:48 AM Ticket #799 (01 21 12:00 VSWR Antenna measurements) created by imanay
||Quarter||49.72||49.92||50.12|| ||Wup||1.19||1.04||1.20|| …

Jan 8, 2019:

9:02 AM Ticket #798 (01 08 08:01 End) created by pcondor
End.
8:58 AM Ticket #797 (01 08 08:00 Operation Resume) created by pcondor
Person in Charge: P. Condor. Experiment: EW_Drift-Faraday-Imaging-Jasmet …
8:54 AM Ticket #796 (01 08 07:55 Plots) created by pcondor
Plots of rtis, spectras and parameters
8:13 AM Ticket #795 (01 08 07:10 Transmitter Power Measurement) created by ctipacti
January 07 21:00 TX Power sample (-70 dB coupling) Tx1 5.7 Vpp D2 1.3 Vpp …
7:31 AM Ticket #794 (01 08 05:32 Spark gaps adjustment) created by pcondor
01 07 2018 20:38 Spark gaps adjustment 23:33 Spark gaps adjustment 01 08 …
7:29 AM Ticket #793 (01 08 06:05 Noise levels) created by pcondor
01 07 2018 21:10 EW DRIFTS A:31.72 B:30.90 C:30.47 D:31.38 IMAGING 1:17.98 …
7:12 AM Ticket #792 (01 08 06:01 Imaging is off) created by pcondor
Imaging is off.
1:34 AM Ticket #791 (01 07 23:59 Plots) created by pcondor
Plots of rtis, spectras and parameters.

Jan 7, 2019:

8:48 PM Ticket #790 (01 07 20:00 Operation Resume) created by kkuyeng
Person in Charge: K.Kuyeng. Experiment: EW_Drift-(Faraday)-Imaging-Jasmet …
8:42 PM Ticket #789 (01 07 19:40 Plots) created by kkuyeng
Se adjuntan los gráficos de EWDrift e imágenes
8:23 PM Ticket #788 (01 07 10:48 Cambio de chispero) created by kkuyeng
10:48 Se apaga transmisores para hacer cambio de chispero 11:05 se …
8:17 PM Ticket #787 (01 07 19:20 Spark-gaps adjustments) created by kkuyeng
01 07 09:00 Spark-gaps adjustments 11:05 Spark-gaps adjustments 14:00 …
8:03 PM Ticket #786 (01 07 19:00 Transmitter Power Measurement) created by vquesada
08:00 TX Power sample (-70 dB coupling) Tx1 5.6 Vpp Voltage Line: 4090 …
8:31 AM Ticket #785 (01 07 07:30 Transmitter power measurements) created by ryaya
21:00 TX Power sample (-70 dB coupling) Tx1 5.7 Vpp D2 1.3 Vpp Voltage …
7:30 AM Ticket #784 (01 07 08:00 Operation Resume) created by jrojas
Person in Charge: A. Valdez. Experiment: EW_Drift-Faraday-Imaging-Jasmet …
7:17 AM Ticket #783 (01 07 07:50 Spark-gaps adjustments) created by jrojas
01 06 DOMINGO 20:10 Spark-gaps adjustments 23:35 Spark-gaps adjustments 01 …
6:50 AM Ticket #782 (01 06 23:59 Plots) created by jrojas

Jan 6, 2019:

9:10 PM Ticket #781 (01 06 20:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas. Experiment: EW_Drift-Faraday-Imaging-Jasmet 1) …
8:40 PM Ticket #780 (01 06 19:40 Plots) created by jrojas
8:04 PM Ticket #779 (01 06 19:00 Transmitter Power Measurement) created by vquesada
08:00 TX Power sample (-70 dB coupling) Tx1 5.7 Vpp Voltage Line: 4090 …
7:09 PM Ticket #778 (01 06 18:00 Spark-gaps adjustments) created by jrojas
01 06 09:00 Spark-gaps adjustments 12:00 Spark-gaps adjustments 15:02 …
6:58 PM Ticket #777 (01 06 17:39 Noise Levels) created by jrojas
01 06 2019 08:22 EW DRIFTS A:33.55 B:32.93 C:32.40 D:33.57 JASMET 1:10.82 …
6:56 PM Ticket #776 (01 06 17:32 Imaging is on) created by jrojas
Imaging is on.
8:46 AM Ticket #775 (01 06 08:00 Operation Resume) created by abelleza
Person in Charge: A. Belleza. Experiment: EW_Drift-Faraday-Imaging-Jasmet …
8:43 AM Ticket #774 (01 06 07:40 Plots) created by abelleza
01 06 07:40 Plots
8:42 AM Ticket #773 (01 06 06:05 Imaging is off) created by abelleza
01 06 06:05 Imaging is off
8:42 AM Ticket #772 (01 06 06:10 Spark-gaps adjustments) created by abelleza
01 05 21:07 Spark-gaps adjustments 01 06 00:00 Spark-gaps adjustments …
8:41 AM Ticket #771 (01 06 07:40 Transmitter power measurement) created by ryaya
21:00 Failure at PLC control system 21:14 TX Power sample (-70 dB …
8:36 AM Ticket #770 (01 05 23:59 Plots) created by abelleza
01 04 23:59 Plots

Jan 5, 2019:

8:47 PM Ticket #769 (01 05 19:59 Operation Resume) created by avaldez
Person in Charge: A. VALDEZ. Experiment: EW_Drift-Faraday-Imaging-Jasmet …
8:42 PM Ticket #768 (01 05 19:40 Plots) created by avaldez
8:27 PM Ticket #767 (01 05 19:27 Spark gaps adjustment) created by avaldez
01 05 2019 08:51 Spark gaps adjustment 12:00 Spark gaps adjustment 15:00 …
8:18 PM Ticket #766 (01 05 19:15 Transmitter Power Measurements) created by ctipacti
08:00 TX Power sample (-70 dB coupling) Tx1 5.6 Vpp Voltage Line: 4050 …
8:57 AM Ticket #765 (01 05 08:00 Operation Resume) created by pcondor
Person in Charge: P. Condor. Experiment: EW_Drift-Faraday-Imaging-Jasmet …
8:52 AM Ticket #764 (01 05 07:50 Plots) created by pcondor
Plots of rtis and parameters.
8:13 AM Ticket #763 (01 05 07:15 Transmitter Power Measurements) created by vquesada
January 04 20:00 TX Power sample (-70 dB coupling) Tx1 5.6 Vpp D2 …
7:40 AM Ticket #762 (01 05 06:00 Imaging is off) created by pcondor
Imaging is off.
7:39 AM Ticket #761 (01 05 06:05 Spark gaps adjustment) created by pcondor
01 04 2019 21:00 Spark gaps adjustment 01 05 2019 00:02 Spark gaps …
7:36 AM Ticket #760 (01 05 06:07 Noise Levels) created by pcondor
01 04 2019 20:55 EW DRIFTS A:31.98 B:31.01 C:30.24 D:31.56 IMAGING 1:17.90 …
1:13 AM Ticket #759 (01 04 23:59 Plots) created by pcondor
Plots of rtis, spectras and parameters.

Jan 4, 2019:

8:40 PM Ticket #758 (01 04 19:50 Operation resume) created by imanay
Person in Charge: I. Manay. Experiment: ISR_Imaging + JASMMET30 1) 08:00 - …
8:14 PM Ticket #757 (01 04 19:15 Transmitter power measurements) created by ctipacti
11:05 LV ON 11:43 HV ON 12:00 TX Power sample (-70 dB coupling) Tx1 5.6 …
7:22 PM Ticket #756 (01 04 18:03 Spark-gaps adjustments) created by imanay
01 04 12:07 Spark-gaps adjustments 15:03 Spark-gaps adjustments 18:03 …
7:17 PM Ticket #755 (01 04 16:00 Imaging experiment restarted) created by imanay
7:12 PM Ticket #754 (01 04 13:50 Experiment changes) created by imanay
Number of channels were change to 6 instead of 4. EW_Drifts processing …
7:04 PM Ticket #753 (01 04 12:00 Experiment restarted) created by imanay
NOTES: -Connections changes due to water leak in one of the …
9:10 AM Ticket #752 (01 04 08:00 Operation Resume) created by jrojas
Person in Charge: J. Rojas. Experiment: EW_Drift-Faraday-Imaging-Jasmet30 …
4:01 AM Ticket #751 (01 04 01:10 Failure at TX3) created by jrojas
Drop in TX3 due to water leakage in the high pressure hose
3:55 AM Ticket #750 (01 04 00:08 Spark-gaps adjustments) created by jrojas
01 03 21:10 Spark-gaps adjustments 01 04 00:08 Spark-gaps adjustments By …
3:53 AM Ticket #749 (01 04 02:18 EW_drift+Faraday Off) created by jrojas
Apagado por falla en TX3
3:51 AM Ticket #748 (01 04 02:15 Imaging Off) created by jrojas
Apagado por falla en TX3
3:51 AM Ticket #747 (01 04 02:45 Transmitter Power Measurements) created by vquesada
January 03 20:00 TX Power sample (-70 dB coupling) Tx1 5.6 Vpp Tx3 5.8 Vpp …
3:50 AM Ticket #746 (01 03 22:47 Noise levels) created by jrojas
01 03 22:47 EW DRIFTS A:32.50 B:31.81 C:30.94 D:32.06 FARADAY A:35.16 …
3:28 AM Ticket #745 (01 04 02:12 Plots) created by jrojas
1:21 AM Ticket #744 (01 03 23:59 Plots) created by jrojas

Jan 3, 2019:

8:56 PM Ticket #743 (01 03 20:00 Operation Resume) created by kkuyeng
Person in Charge: K.Kuyeng Experiment: EW_Drift-Faraday-Imaging-Jasmet30 …
8:53 PM Ticket #742 (01 03 19:45 Plots) created by kkuyeng
01 03 19:45 Plots
8:26 PM Ticket #741 (01 03 19:20 Transmitter power measurements) created by ryaya
08:00 TX Power sample (-70 dB coupling) Tx1 5.6 Vpp Tx3 5.8 Vpp Tx4 5.8 …
8:16 PM Ticket #740 (01 03 17:40 Imaging Start) created by kkuyeng
01 03 17:40 Imaging Start
8:14 PM Ticket #739 (01 03 19:12 Spark-gaps adjustments) created by kkuyeng
01 03 09:21 Spark-gaps adjustments 12:17 Spark-gaps adjustments 15:15 …
8:54 AM Ticket #738 (01 03 08:00 Operation Resume) created by abelleza
Person in Charge: A. BELLEZA Experiment: EW_Drift-Faraday-Imaging-Jasmet30 …
8:44 AM Ticket #737 (01 03 07:45 Plots) created by abelleza
01 03 07:45 Plots
8:43 AM Ticket #736 (01 02 19:50 Operation resume) created by imanay
Person in Charge: I. Manay. Experiment: ISR_Imaging + JASMMET30 1) 08:00 - …
8:16 AM Ticket #735 (01 03 07:15 Transmitter power measurements) created by ctipacti
January 02 21:00 TX Power sample (-70 dB coupling) Tx1 5.5 Vpp Tx3 5.8 Vpp …
8:14 AM Ticket #734 (01 03 06:18 Spark-gaps adjustments) created by abelleza
01 02 21:16 Spark-gaps adjustments 01 03 00:21 Spark-gaps adjustments …
8:12 AM Ticket #733 (01 03 06:00 Imaging Off) created by abelleza
01 03 06:00 Imaging Off
8:08 AM Ticket #732 (01 02 23:59 Plots) created by abelleza
01 02 23:59 Plots

Jan 2, 2019:

8:23 PM Ticket #731 (01 02 19:20 Transmitter power measurements) created by ryaya
08:30 LV ON 09:00 HV ON 09:10 TX Power sample (-70 dB coupling) Tx1 5.6 …
7:37 PM Ticket #730 (01 02 18:16 Spark-gaps adjustments) created by imanay
01 02 12:23 Spark-gaps adjustments 15:11 Spark-gaps adjustments 18:16 …
7:35 PM Ticket #729 (01 02 17:30 Imaging started) created by imanay
7:34 PM Ticket #728 (01 02 09:00 ISR + Imaging & JASMET30 re-stablished) created by imanay
Re-new of spark-gaps took one hour.
4:40 PM Ticket #727 (01 02 14:32 JASMET ON) created by jrojas
After the change of the Radar Controller, the experiment was re-started
4:39 PM Ticket #726 (01 02 13:48 JASMET TX OFF) created by jrojas
JASMET TX is power off to verify antenna. Changes in the configuration of …

Dec 31, 2018:

8:58 AM Ticket #725 (12 31 07:58 Operation Resume) created by avaldez
Person in Charge: A. VALDEZ Experiment: EW_Drift-Faraday-Imaging-HF 1) …
8:57 AM Ticket #724 (12 31 07:55 Spark-gaps adjustments) created by avaldez
12 30 22:14 Spark-gaps adjustments 12 31 01:16 Spark-gaps adjustments …
8:51 AM Ticket #723 (12 30 23:59 Plots) created by avaldez
8:40 AM Ticket #722 (12 31 07:40 Transmitter power measurements) created by ryaya
December 30 21:00 TX Power sample (-70 dB coupling) Tx1 5.7 Vpp Tx3 5.9 …
Note: See TracTimeline for information about the timeline view.