Timeline


and

Nov 13, 2018:

8:52 AM Ticket #618 (11 13 09:00 Experiment manual updated) created by imanay

Nov 9, 2018:

7:39 AM Ticket #617 (11 09 07:00 Transmitter Power Measurements) created by vquesada
00:00 TX Power sample (-70 dB coupling) Tx1 6.00 Vpp Tx3 5.68 Vpp Tx4 5.64 …

Nov 8, 2018:

11:38 PM Ticket #616 (11 07 23:00 Transmitter Power Measurements) created by vquesada
20:00 TX Power sample (-70 dB coupling) Tx1 6.00 Vpp Tx3 5.68 Vpp Tx4 5.72 …
8:19 PM Ticket #615 (11 08 19:58 Operation Resume) created by ryanque
Person in Charge: R. Yanque Experiment: EW_Drift-Faraday-Imaging-HF 1) …
8:18 PM Ticket #614 (11 08 19:00 Noise report) created by ryanque
09:02 EW Drift Ch A 24.73 Ch B 25.86 Ch C 26.32 …
8:09 PM Ticket #613 (11 08 18:40 Spark Gap Adjustment) created by ryanque
Person in charge W. Rojas 09:46 Spark Gap adjustment 12:33 Spark Gap …
8:08 PM Ticket #612 (11 08 17:32 Imaging starts) created by ryanque
Imaging starts
8:06 PM Ticket #611 (11 08 16:00 Interference in Faraday) created by ryanque
There is an interfernce in Faraday it appears more in the Channel 1. This …
7:56 PM Ticket #610 (11 08 19:15 Transmitter power measurements) created by ryaya
09:00 TX Power sample (-70 dB coupling) Tx1 5.9 Vpp Tx3 5.6 Vpp Tx4 5.7 …
7:48 PM Ticket #609 (11 08 15:35 Faraday test of Flip during Galaxy pass) created by ryanque
Start test: 14:47 End test 15:35 Flip is working fine with the …
7:45 PM Ticket #608 (11 08 12:15 Moon Pass) created by ryanque
EW Drift Ch D recieves stronger echoes from the moon. 12:40 Echoes from …
8:34 AM Ticket #607 (11 08 08:00 Operation Resume) created by pcondor
Person in Charge: P. Condor. Experiment: EW_Drift-Faraday-Imaging-HF 1) …
8:12 AM Ticket #606 (11 08 07:40 Plots) created by pcondor
Plots of rtis, spectras and parameters.
7:54 AM Ticket #605 (11 08 07:15 Transmitter Power Measurements) created by rtadeo
20:00 TX Power sample (-70 dB coupling) Tx1 5.84 Vpp Tx2 5.56 Vpp Tx4 5.68 …
7:15 AM Ticket #604 (11 08 06:27 Spark gaps adjustment) created by pcondor
07-11-2018 21:41 Spark gaps adjustment 08-11-2018 00:26 Spark gaps …
7:02 AM Ticket #603 (11 08 06:03 Imaging is off) created by pcondor
Imaging is off.
7:01 AM Ticket #602 (11 08 06:06 Noise levels) created by pcondor
07-11-2018 21:03 EW DRIFTS A:25.60 B:24.81 C:26.79 D:25.98 FARADAY …
3:11 AM Ticket #601 (11 08 01:03 Problem with transmitter) created by pcondor
problem with transmitter by 3 minutes.
3:04 AM Ticket #600 (11 07 11:59 Plots) created by pcondor
Plots of rtis, spectras and parameters.

Nov 7, 2018:

8:43 PM Ticket #599 (11 07 19:50 Operation resume) created by imanay
Person in Charge: I. Manay. Experiment: ISR_Imaging + HF 1) 08:00 - 20:00 …
7:47 PM Ticket #598 (11 07 18:33 Spark-gaps adjustments) created by imanay
07 Nov, 09:37 Spark gaps adjustment 07 Nov, 12:30 Spark gaps adjustment 07 …
7:46 PM Ticket #597 (11 07 19:10 Transmitter Power Measurements) created by vquesada
08:05 HV OFF foul radar controller 08:28 TX Power sample (-70 dB coupling) …
5:31 PM Ticket #596 (11 07 14:30 Faraday experiment restarted) created by imanay
14:00 Interference at 11:00 showed up again. Adjustment of connections at …
5:23 PM Ticket #595 (11 07 11:45 Faraday experiment restarted) created by imanay
11:20 An interference at reception of Faraday experiment was found. …
5:13 PM Ticket #594 (11 07 09:15 EW_Drifts re-started) created by imanay
Communications problems with the EW_Drift radar controller. It was …
8:27 AM Ticket #593 (11 07 07:45 OPERATION RESUME) created by jrojas
Person in Charge: J. Rojas. Experiment: EW_Drift-Faraday-Imaging-HF 1) …
8:15 AM Ticket #592 (11 07 07:37 Transmitter Power Measurements) created by rtadeo
20:00 TX Power sample (-70 dB coupling) Tx1 6.04 Vpp Tx3 6.04 Vpp Tx4 6.12 …
7:45 AM Ticket #591 (11 07 07:30 Plots) created by jrojas
7:39 AM Ticket #590 (11 07 07:00 Noise levels) created by jrojas
11 06 21:43 EW DRIFTS A:26.43 B:24.92 C:26.84 D:26.10 FARADAY A:30.25 …
7:23 AM Ticket #589 (11 07 06:30 Imaging off) created by jrojas
7:08 AM Ticket #588 (11 07 06:30 Spark Gap adjustment) created by jrojas
06-11-2018 21:00 Spark gaps adjustment 07-11-2018 00:05 Spark gaps …
6:53 AM Ticket #587 (11 07 05:30 EW_Drift system Failure) created by jrojas
04:27 se cuelga PC de Faraday 05:27 se reinicia PC de Faraday 07:47 se …
2:16 AM Ticket #586 (11 06 23:30 Transmitters falls) created by jrojas
Transmitters were down during 5 minutes.
12:56 AM Ticket #585 (11 06 23:59 Plots) created by jrojas

Nov 6, 2018:

8:40 PM Ticket #584 (11 06 19:30 Spark Gap adjustment) created by avaldez
06-11-2018 12:00 Spark gaps adjustment 17:00 Spark gaps adjustment
8:26 PM Ticket #583 (11 06 19:48 OPERATION RESUME) created by avaldez
Person in Charge: A. VALDEZ. Experiment: EW_Drift-Faraday-Imaging-HF …
8:17 PM Ticket #582 (11 06 14:45 Problems with Faraday Experiment) created by avaldez
14:45 - 17:00 Problems with switchYard. TX Faraday Turn off.
8:14 PM Ticket #581 (11 06 13:15 Problems with Faraday Experiment) created by avaldez
Problems with switchyYard. 13:15-14:00 TX Faraday Turn off.
8:13 PM Ticket #580 (11 06 19:35 Transmitter Power Measurements) created by ctipacti
09:04 LV ON 09:28 HV ON 10:00 TX Power sample (-70 dB coupling) Tx1 6.00 …
11:09 AM Ticket #579 (11 06 10:00 Start experiment) created by avaldez
Note: See TracTimeline for information about the timeline view.